24-8265_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf

PDF 130 KB Posted

Attached to
16th Street NE Bridge Project (LAP) GRANT FUNDED
Solicitation number
24-8265
Issued by
Collier County, Florida

About this file

This is an Environmental, Health and Safety (EHS) Contractor Requirements document issued by Collier County for the 16th Street NE Bridge Project (Bid No. 24-8265), a $26.36 million infrastructure improvement project funded through federal highway administration grants under the Local Agency Program (LAP). The project involves constructing a new 147-foot bridge over the Golden Gate Main Canal, widening approximately 3.3 miles of roadway, installing traffic signals, and implementing transportation infrastructure enhancements. Sealed bids are due November 20, 2025, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for October 21, 2025, at 10:00 a.m. in Naples, Florida. Contractors must substantially complete all work within 520 consecutive calendar days, with final completion required within 30 calendar days after punch list delivery. Liquidated damages are assessed at $7,442 per calendar day for failure to achieve substantial completion.

All contractors must comply with comprehensive EHS requirements including adherence to applicable federal, state, and local regulations (OSHA, DOT, EPA, DHS, ANSI, FDEP, NFPA), Collier County Standard Operating Procedures, and Job Safety Analysis requirements. Contractors must develop site-specific plans addressing safety, security, hurricane preparedness, pandemic safety, respirable crystalline silica, confined space entry, asbestos management, mold remediation, and environmental protection as applicable to the work scope. When working within rights-of-way, all FDOT and MUTCD requirements must be followed, including ANSI/ISEA 107-2010 compliant Class 2 or 3 high-visibility safety garments and appropriate work zone signage and traffic control measures. Prospective bidders must be pre-qualified by the Florida Department of Transportation in specified work classes, submit a 5% bid bond, and meet the project's 10.54% disadvantaged business enterprise goal. The project is subject to Davis-Bacon wage requirements, Buy America provisions, and equal employment opportunity standards, with environmental compliance including wetland mitigation and protection for endangered species.

View the file

Other files

File Type Posted
24-8265_-_Exhibit_I_-_Enviornmental_Supplemental.pdf PDF
24-8265_Solicitation_R2.pdf PDF
24-8265_Pre-Bid_Meeting_Sign-In_sheets.pdf PDF
24-8265_Pre-Bid_Meeting_Sign-In_sheets.pdf PDF
24-8265_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
24-8265_-_Bid_Schedule.xlsx XLSX spreadsheet
24-8265_Exhibit_L-11_-_SummitBB_No_Conflict.pdf PDF
24-8265_Exhibit_L-15_-_CCWSD_No_Conflict.pdf PDF
24-8265_Exhibit_L-19_-_Roadway_Geotechnical_Report_Signed.pdf PDF
24-8265_Exhibit_L-9_-_UWS_FPL_Distribution_Signed.pdf PDF
24-8265_Federal_Provisions_Package.pdf PDF
24-8265_Exhibit_J-1_-_Collier_County_Signalization_Technical_Special_Provisions.pdf PDF
24-8265_Exhibit_K-4_-_SFWMD_230510-38578_Permit.pdf PDF
24-8265_Exhibit_L-8_-_Drainage_Design_Documentation_S&S.pdf PDF
24-8265_Exhibit_L-9_-_UWS_FPL_Distribution_Signed.pdf PDF
24-8265_Exhibit_M-2_-_Roadway_Plans_S&S.pdf PDF
24-8265_Exhibit_J-1_-_Collier_County_Signalization_Technical_Special_Provisions.pdf PDF
24-8265_Exhibit_K-2_-_ROW_16774-R_Permit.pdf PDF
24-8265_Exhibit_K-3_-_SAJ-2024-03917_Permit.pdf PDF
24-8265_Exhibit_L-12_-_Comcast_No_Conflict.pdf PDF
24-8265_Exhibit_L-19_-_Roadway_Geotechnical_Report_Signed.pdf PDF
24-8265_Exhibit_L-2_-_Geotechnical_Report_Mast_Arm_Signed.pdf PDF
24-8265_Exhibit_L-3_-_LDAR_Signed.pdf PDF
24-8265_Exhibit_L-4_-Pavement_Design_Memorandum_S&S.pdf PDF
24-8265_Exhibit_L-5_-_Structures_Calcs_S&S.pdf PDF
24-8265_Exhibit_L-9_-_UWS_FPL_Distribution_Signed.pdf PDF
24-8265_Exhibit_M-1_-_LightingPlans_S&S.pdf PDF
24-8265_Exhibit_M-4_-_Signing_&_Pavement_Marking_Plans_S&S.pdf PDF
24-8265_Authorization_to_Advertise.pdf PDF
24-8265_Authorization_to_Advertise.pdf PDF
24-8265_Exhibit_L-12_-_Comcast_No_Conflict.pdf PDF
24-8265_Exhibit_L-17_-_TECO_UWS_Signed.pdf PDF
24-8265_Exhibit_M-4_-_Signing_&_Pavement_Marking_Plans_S&S.pdf PDF
24-8265_Exhibit_L-11_-_SummitBB_No_Conflict.pdf PDF
24-8265_Exhibit_L-12_-_Comcast_No_Conflict.pdf PDF
24-8265_Exhibit_L-13_-_CCBFO_No_Conflict.pdf PDF
24-8265_Exhibit_L-15_-_CCWSD_No_Conflict.pdf PDF
24-8265_Exhibit_L-13_-_CCBFO_No_Conflict.pdf PDF
24-8265_Exhibit_K-3_-_SAJ-2024-03917_Permit.pdf PDF
24-8265_Exhibit_L-4_-Pavement_Design_Memorandum_S&S.pdf PDF
24-8265_Exhibit_L-5_-_Structures_Calcs_S&S.pdf PDF
24-8265_Exhibit_L-7_-_Scope_of_Work.pdf PDF
24-8265_Exhibit_L-8_-_Drainage_Design_Documentation_S&S.pdf PDF
24-8265_Exhibit_J-2_-_Roadway_Lighting_Design_Standards.pdf PDF
Construction_Bid_Instructions_-_LAP_rev.2025.pdf PDF
Construction_Services_LAP_Agreement_2024_version_1-FLAT_w-Exhibits.pdf PDF
24-8265_Exhibit_J-2_-_Roadway_Lighting_Design_Standards.pdf PDF
24-8265_Exhibit_J-3_-_Specifications_SS_4.16.25.pdf PDF
24-8265_Exhibit_K-1_-_ERP_No._11-108960_Permit.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental, Health and Safety

Contractor Requirements for all BCC Construction Projects

1. Contractors will be required to understand and comply with all applicable laws and regulations of any governmental entity (OSHA, DOT, EPA, DHS, ANSI, FDEP. NFPA, etc.) and

Collier County CMA’s, EHS Standard Operating Procedures (SOP’s) or Job Safety Analysis

(JSA’s) that that pertain to environmental, health and safety standards and/or work practices applicable to the activities they perform for Collier County. These include but are not limited to:

• Must wear a BCC provided Vendor Badge at all times while on BCC property.

• Powered Industrial Vehicle Certifications (Heavy Equipment, Cranes, etc.)

• Storage, handling, and use of flammable liquids and hazardous materials, including fuels and compressed gas cylinders.

• Daily reporting of any incidents/accidents or any OSHA safety inspections of equipment and worksites.

• Weekly reporting of at least one internal safety inspection of equipment and worksite.

• Use of Personal Fall Protection Devices while working at heights above 6 feet.

• Following Electrical Safety Practices, Arc Flash and Lockout/Tagout procedures.

• Proper use of Personal Protective Equipment. (PPE)

• Proper maintenance and use of ladders and other equipment.

• Guarding of wall and floor openings, open trenches, and excavations.

• Environmental Requirements (Permitting, Tanks, etc.)

2. Required Site EHS Plans for:

• Site Specific Safety Plan

• Site Specific Security Plan

• Site Specific Hurricane Plan

• Site Specific Pandemic Safety Plan (COVID-19) (If Applicable)

• Site Specific Respirable Crystalline Silica Plan (If Applicable)

• Site Specific Confined Space Entry Plan (If Applicable)

• Site Specific Asbestos Management Plan (If Applicable)

• Site Specific Mold Testing and Remediation Management Plan (If Applicable)

• Site Specific Environmental Protection Plan (Spill Cleanup, SPCC, etc.) (If

Applicable)

3. When working within a right-of-way (i.e. roads, sidewalks, bike paths, etc) – All applicable

FDOT and/or MUTCD requirements are to be followed at all times. Specifics include but are not limited to:

• ANSI/ISEA 107-2010 Compliant Class 2 or 3 Hi-Visibility Safety Garments.

• Applicable work zone signage, cones, barricades or barrels, arrow panels, flagging personnel and Stop/Slow Paddles, where necessary, required by law or the BCC.

• An applicable work zone (Maintenance of traffic) plan based on FDOT and/or

MUTCD designs on site.

4. Risk Management is included in all Pre-Activity/Construction, Activity/Construction and

Post Activity/Construction Meetings.

5. Safeguarding construction sites – Protecting the jobsite and preventing or inhibiting public access after activities are finished for the day is equally important. Therefore, all hazardous locations within construction sites and rights-of-ways are to be adequately protected.

Specifics include but are not limited to:

• Damaged, blocked, or missing sections of sidewalks, bike paths or other pedestrian access zones shall be protected with orange barricade fencing, barricades with yellow or red tape (depending on the hazard) or an equivalent means of protection. Sidewalks must also be posted as being closed on both sides with a white sign with black letters.

• Excavations must be protected in a similar manner as listed above if they must be left open overnight, during weekend hours, etc.

• All other hazards shall be evaluated by the contractor to ensure there are no dangerous conditions remaining that could be inadvertently encountered by collier county employees and/or the public while the construction site is not active (i.e., when no construction work is taking place).

6. Contractor must agree that all work must meet or exceed the standards set forth in the

Collier County Vertical Construction Standards and Collier County IT Construction Standards

(if applicable) unless specifically exempted in writing by Facilities Management Division

Director and Risk Management Director.