This is a no-conflict letter from the Collier County Water-Sewer District (CCWSD) to Kisinger Campo & Associates regarding the 16th Street NE Bridge Construction and Roadway Improvements project. Dated August 18, 2022, the letter confirms that CCWSD does not own utilities within the scope of the project, thereby clearing any potential utility conflicts. The letter is addressed to Mr. Phillip Ciancimino, EI, and is signed by Matthew McLean, P.E., Director of Planning and Project Management Division for CCWSD. This clearance letter serves as supporting documentation for Bid No. 24-8265, demonstrating that the project design team has verified no conflicting utility ownership by the water and sewer district.

The letter is a standard administrative document required during the pre-construction planning phase to ensure project feasibility and mitigate risks associated with unexpected utility conflicts. Such no-conflict letters from relevant utility providers are typically required documentation submitted with bid packages or during the design phase to verify that infrastructure improvements can proceed without interference from existing utility systems. This particular letter relates to a comprehensive infrastructure project involving bridge construction and roadway widening funded through federal highway administration grants under the Local Agency Program.

View the file

Other files

File Type Posted
24-8265_–_Gopher_Tortoise_Burrow_Map.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
24-8265_Exhibit_J-3_-_Specifications_SS_4.16.25.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-14_-_City_of_Naples_No_Conflict.pdf PDF
24-8265_Exhibit_L-1_-_BHR_Signed.pdf PDF
24-8265_Exhibit_L-2_-_Geotechnical_Report_Mast_Arm_Signed.pdf PDF
24-8265_Exhibit_L-7_-_Scope_of_Work.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
24-8265_Exhibit_K-1_-_ERP_No._11-108960_Permit.pdf PDF
24-8265_Exhibit_K-2_-_ROW_16774-R_Permit.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-11_-_SummitBB_No_Conflict.pdf PDF
24-8265_Exhibit_L-12_-_Comcast_No_Conflict.pdf PDF
24-8265_Exhibit_L-14_-_City_of_Naples_No_Conflict.pdf PDF
24-8265_Exhibit_L-18_-_Structure_Geotech_Report_3.19.25.pdf PDF
24-8265_Exhibit_L-19_-_Roadway_Geotechnical_Report_Signed.pdf PDF
24-8265_Exhibit_L-1_-_BHR_Signed.pdf PDF
24-8265_Exhibit_L-20_-_Railroad_Clear_16th_st_ne_bridge_dm.pdf PDF
24-8265_Exhibit_L-4_-Pavement_Design_Memorandum_S&S.pdf PDF
24-8265_Exhibit_L-6_-_Structures_Load_Rating_Signed.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Federal_Provisions_Package.pdf PDF
24-8265_Federal_Provisions_Package.pdf PDF
24-8265_Authorization_to_Advertise.pdf PDF
24-8265_Exhibit_L-11_-_SummitBB_No_Conflict.pdf PDF
24-8265_Exhibit_L-16_-_Utilities_Clear_16th_St_Ne_Bridge_dm.pdf PDF
24-8265_Exhibit_L-18_-_Structure_Geotech_Report_3.19.25.pdf PDF
24-8265_Exhibit_L-19_-_Roadway_Geotechnical_Report_Signed.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
24-8265_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
24-8265_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
24-8265_Exhibit_J-1_-_Collier_County_Signalization_Technical_Special_Provisions.pdf PDF
24-8265_Exhibit_K-2_-_ROW_16774-R_Permit.pdf PDF
24-8265_Exhibit_K-4_-_SFWMD_230510-38578_Permit.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-3_-_LDAR_Signed.pdf PDF
24-8265_Exhibit_L-6_-_Structures_Load_Rating_Signed.pdf PDF
Construction_Services_LAP_Agreement_2024_version_1-FLAT_w-Exhibits.pdf PDF
24-8265_Exhibit_J-3_-_Specifications_SS_4.16.25.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-2_-_Geotechnical_Report_Mast_Arm_Signed.pdf PDF
24-8265_Exhibit_L-3_-_LDAR_Signed.pdf PDF
24-8265_Exhibit_L-8_-_Drainage_Design_Documentation_S&S.pdf PDF
24-8265_Exhibit_L-9_-_UWS_FPL_Distribution_Signed.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 18, 2022

Kisinger Campo & Associates 13461 Parker Commons Blvd, Suite 104 Fort Myers, FL. 33912 Attn: Mr. Phillip Ciancimino, EI

Re: 16th Street NE Bridge Construction and Roadway Improvements

Dear Mr. Ciancimino:

The Collier County Water-Sewer District (CCWSD) does not own utilities with the scope of the project, this serves as a “no conflict” letter.

Sincerely, Matthew McLean, P.E.

Director, Planning and Project Management Division Matthew.McLean@colliercountyfl.gov 3339 Tamiami Trail East, Suite 303 Naples, FL 34112 239-252-6213 mailto:Matthew.McLean@colliercountyfl.gov

2022-08-18T13:07:55-0400
McLeanMatthew

File details come from the government source that posted it. Updated .