About this file
This is a Florida Department of Transportation (FDOT) Utility Work Schedule for TECO Peoples Gas, involving a utility facility with an 8" coated steel gas main located in Collier County. The document is dated December 14, 2016, with FDOT plans dated April 2023, and relates to Financial Project ID 45123-1-58-01. The utility work schedule indicates that the existing 8" gas main running from Station 504+41 to 524+58 with a 50' right offset will remain in place, with no additional construction or relocation activities planned prior to or during the FDOT project construction.
The document is signed by Alex McFarlane, Project Manager for TECO Peoples Gas, on May 15, 2023, and attested by Jesse E. Gill, Roadway EOR/Utility Coordinator, on February 14, 2024. The utility work schedule follows Rule 14-46.001 F.A.C. and is pursuant to Section 337.403 F.S., establishing an agreement between the Utility Agency/Owner (UAO) and FDOT regarding utility relocation or adjustment. The document requires the UAO to obtain a utility permit and comply with the 2017 Utility Accommodation Manual, with provisions for notification and coordination between the utility company and FDOT.
View the file
Other files
Show 40 more
Latest 50 of 157 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rule 14-46.001 F.A.C
FLORIDA DEPARTMENT OF TRANSPORTATION
UTILITY WORK SCHEDULE
December 14, 2016
Pursuant to Section 337.403 F.S., the UAO and FDOT agree to the UAO’s need for relocation or adjustment to its utilities and FDOT’s need for a schedule for the UAO to effect the relocation or adjustment. This utility work schedule is based on FDOT plans dated in the project information box below. Any deviation by FDOT or its contractor from these plans, may void this utility work schedule. Upon notification by FDOT of a change to these plans, the UAO may negotiate a new utility work schedule. The UAO agrees to notify FDOT and the contractor in writing prior to starting, stopping, resuming, and completing work in accordance with this utility work schedule. The UAO shall obtain a utility permit and comply with requirements of the 2017 Utility Accommodation Manual (UAM) for all work done under this utility work schedule. The UAO is not responsible for events beyond the control of the UAO that could not be reasonably anticipated by the UAO and which could not be avoided by the UAO with exercise of due diligence at the time of the occurrence.
FDOT PROJECT INFORMATION
Financial Project ID: 45123-1-58-01 Federal Project ID:
State Road Number: County: Collier FDOT Plans Dated: April 2023 District Document No.:
UTILITY AGENCY/OWNER (UAO)
Utility Company: TECO Peoples Gas UAO Project Rep: Alex Mcfarlane Phone: 813-557-6134 E-mail: amcfarlane@tecoenergy.com UAO Field Rep: Nicholas Foster Phone: 239-898-9230 E-mail: NfFoster@tecoenergy.com
UTILITY SIGNATURE
I have reviewed the FDOT plans referenced above and submit this utility work schedule in compliance with UAM Section 5 and agree to be bound by the terms of this utility work schedule.
UAO Rep. Date 5 / 15 / 2023 Name Alex Mcfarlane Title Propject Manager
ENGINEER OF RECORD SIGNATURE
I attest this utility work schedule is compatible with the FDOT plans referenced above.
EOR. Date / / Name Title
APPROVAL BY DISTRICT UTILITIES
This utility work schedule is complete and acceptable to FDOT.
FDOT Rep. Date / / Name Title
SECTION A: SUMMARY OF UTILITY WORK
The below days are the total numbers of days shown for all activities in Section C of this utility work schedule. The breakdown of how these days are to be incorporated into the FDOT project and the dependence of these days upon the completion of other activities by the UAO or others is shown in Section C.
Days prior to FDOT project construction: 0 Days during FDOT project construction: 0 jgill Text Box Jesse E. Gill, P.E.
jgill Text Box Roadway EOR / Utility Coordinator jgill Text Box 02 14 2024
FLORIDA DEPARTMENT OF TRANSPORTATION
UTILITY WORK SCHEDULE
December 14, 2016
Financial Project ID: 45123-1-58-01 Utility Company: TECO Peoples Gas FDOT Plans Dated: April 2023
SECTION B: UAO SPECIAL CONDITIONS/CONSTRAINTS
FLORIDA DEPARTMENT OF TRANSPORTATION
UTILITY WORK SCHEDULE
December 14, 2016
Financial Project ID: 45123-1-58-01 Utility Company: TECO Peoples Gas FDOT Plans Dated: April 2023
SECTION C: UAO’s WORK ACTIVITIES
Act.
No.
Utility Facility (type, size, material, status)
From Station/ Offset
To Station/ Offset
Utility Work Activity Description
Dependent Activity TCP Phase
Consecutive Calendar Days
Prior to During Const. Const.
1 8” Coated Steel Gas Main
504+41 / 50’ Rt
524+58 / 50’ Rt To Remain N/A N/A 0 0