This solicitation is for a remodel of a pharmacy compounding area to meet USP 800 requirements at the Southeast Louisiana Veterans Health Care System in New Orleans, Louisiana. The contractor shall provide all supervision, labor, material, tools and equipment to remodel the current pharmacy compounding area and build out a new segregated compounding area as a backup. This is a 100% set-aside for service-disabled veteran-owned small businesses. Offerors must be verified as an SDVOSB in VetBiz. The magnitude of construction is between $1 million and $5 million. The NAICS code is 236220 with a small business size standard of $39.5 million. Work will be performed in New Orleans, Louisiana. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.

View the file

Other files

File Type Posted
36C25621R0013 0002.docx DOCX document
Sign in Sheet - Pharmacy Remodel Project.pdf PDF
36C25621R0013 0001.pdf PDF
054000 Cold-Formed Metal Framing.docx DOCX document
013323 Shop Drawings.docx DOCX document
262921 01-17 ENCLOSED SWITCHES AND CIRCUIT BREAKERS.docx DOCX document
230593 02-15 TESTING ADJUSTING AND BALANCING FOR HVAC.docx DOCX document
000110 TOC.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
General Decision LA 20190041 05-31-2019 Orleans Parish LA Building.pdf PDF
224000 09-15 PLUMBING FIXTURES.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY (1).docx DOCX document
260526 01-17 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.docx DOCX document
017419 Construction Waste Management.doc DOC document
102600 Wall and Door Protection.docx DOCX document
220711 09-19 PLUMBING INSULATION.docx DOCX document
234000 2-12 HVAC AIR CLEANING DEVICES.doc DOC document
230541 02-15 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.docx DOCX document
230711 02-15 HVAC AND BOILER PLANT INSULATION.docx DOCX document
072113 Thermal Insulation.docx DOCX document
233100 3-13 HVAC DUCTS AND CASINGS .docx DOCX document
Architectural Final.pdf PDF
087113 ADO.docx DOCX document
088000 Glazing.docx DOCX document
230800 11-16 COMMISSIONING OF HVAC SYSTEMS.docx DOCX document
260519 01-17 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.docx DOCX document
092900 Gypsum Board.docx DOCX document
221300 09-15 FACILITY SANITARY AND VENT PIPING.docx DOCX document
230511 8-17 COMMON WORK RESULTS FOR HVAC.docx DOCX document
000115 List of Drawings.docx DOCX document
092216 Non-Structural Metal Framing.docx DOCX document
Fire Protection Final.pdf PDF
099100 Painting.docx DOCX document
232500 02-15 HVAC WATER TREATMENT.docx DOCX document
Exhibit B Past and Present Performance Questionnaire.docx DOCX document
233700 02-15 AIR OUTLETS AND INLETS.docx DOCX document
087100 Door Hardware.docx DOCX document
081113 HM Doors and Frames.docx DOCX document
051200 Structural Steel.docx DOCX document
079200 Joint Sealants.docx DOCX document
262726 01-18 WIRING DEVICES.docx DOCX document
36C25621R0013_2.docx DOCX document
010000 General Requirements.docx DOCX document
075423 Thermoplastic Polyolefin Roofing.docx DOCX document
220523 09-15 GENERAL-DUTY VALVES FOR PLUMBING PIPING.docx DOCX document
260511 01-16 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS .docx DOCX document
096723-30 Resinous Decorative Mortar Flooring.docx DOCX document
078400 Firestopping.docx DOCX document
230923 9-11 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.doc DOC document
230512 08-17 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT.docx DOCX document
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate Pharmacy for USP 800 11-01-19 VAMC New Orleans, LA

SECTION 22 11 00

FACILITY WATER DISTRIBUTION

PART 1 - GENERAL

1.1 DESCRIPTION

A.Domestic water systems, including piping and all necessary accessories as designated in this section.
B.A complete listing of all acronyms and abbreviations are included in Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.

1.2 RELATED WORK

A.Section 01 00 00, GENERAL REQUIREMENTS.
B.Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C.Section 07 84 00, FIRESTOPPING.
D.Section 07 92 00, JOINT SEALANTS.
E.Section 09 91 00, PAINTING.
F.Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.
G.Section 22 07 11, PLUMBING INSULATION.

1.3 APPLICABLE PUBLICATIONS

A.The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B.American Society of Mechanical Engineers (ASME):

ASME Boiler and Pressure Vessel Code -

BPVC Section IX-2019Welding, Brazing, and Fusing Qualifications
A13.1-2015Scheme for Identification of Piping Systems
B16.32016Malleable Iron Threaded Fittings: Classes 150 and 300
B16.11-2016Forged Fittings, Socket-Welding and Threaded
B16.12-2009Cast Iron Threaded Drainage Fittings
B16.15-2018Cast Copper Alloy Threaded Fittings: Classes 125 and 250
B16.18-2018Cast Copper Alloy Solder Joint Pressure Fittings
B16.22-2018Wrought Copper and Copper Alloy Solder-Joint Pressure Fittings
B16.51-2018Copper and Copper Alloy Press-Connect Pressure Fittings
C.American Society of Sanitary Engineers (ASSE):
1010-2004Performance Requirements for Water Hammer Arresters
D.American Society for Testing and Materials (ASTM):
A53/A53M-2018Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
B32-2008(R2014)Standard Specification for Solder Metal
B43-2015Standard Specification for Seamless Red Brass Pipe, Standard Sizes
B61-2015Standard Specification for Steam or Valve Bronze Castings
B62-2017Standard Specification for Composition Bronze or Ounce Metal Castings
B75/B75M-2019Standard Specification for Seamless Copper Tube
B88-2016Standard Specification for Seamless Copper Water Tube
B687-1999(R2016)Standard Specification for Brass, Copper, and Chromium-Plated Pipe Nipples
C919-2019Standard Practice for Use of Sealants in Acoustical Applications
D2000-2018Standard Classification System for Rubber Products in Automotive Applications
E1120-2016Standard Specification for Liquid Chlorine
E1229-2016Standard Specification for Calcium Hypochlorite
E.American Water Works Association (AWWA):
C651-2014Disinfecting Water Mains
F.American Welding Society (AWS):
A5.8/A5.8M-2019Specification for Filler Metals for Brazing and Braze Welding
G.International Code Council, (ICC):
IPC-2018International Plumbing Code
H.Manufacturers Standardization Society (MSS):
SP-58-2018Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation
SP-72-2010aBall Valves With Flanged or Butt-Welding Ends For General Service
SP-110-2010Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends
I.NSF International (NSF):
61-2019Drinking Water System Components – Health Effects
372-2016Drinking Water System Components – Lead Content
J.Plumbing and Drainage Institute (PDI):
PDI-WH 201-2017Water Hammer Arresters
K.Department of Veterans Affairs:
H-18-8-2016Seismic Design Requirements

1.4 SUBMITTALS

A.Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B.Information and material submitted under this section shall be marked “SUBMITTED UNDER SECTION 22 11 00, FACILITY WATER DISTRIBUTIONS”, with applicable paragraph identification.
C.Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity.

1. All items listed in Part 2 - Products.

D.Complete operating and maintenance manuals including wiring diagrams, technical data sheets and information for ordering replacement parts:
1.Include complete list indicating all components of the systems.
2.Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.

1.5 QUALITY ASSURANCE

A.A certificate shall be submitted prior to welding of steel piping showing the Welder’s certification. The certificate shall be current and no more than one year old. Welder’s qualifications shall be in accordance with ASME BPVC Section IX.
B.All pipe, couplings, fittings, and specialties shall bear the identification of the manufacturer and any markings required by the applicable referenced standards.
C.Bio-Based Materials: For products designated by the USDA’s Bio-Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-Preferred Program, visit http://www.biopreferred.gov.

1.6 SPARE PARTS

A. For mechanical press-connect fittings, provide tools required for each pipe size used at the facility.

1.7 AS-BUILT DOCUMENTATION

A.Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.
B.Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions shall be in electronic version on compact disc or DVD inserted into a three ring binder. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations. Notes on all special systems or devices shall be included. A list of recommended spare parts (manufacturer, model number, and quantity) shall be furnished. Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the As-Built documentation.
C.The installing contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them in Auto-CAD version 2016 provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.
D.Certification documentation shall be provided to COR 10 working days prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certificate if applicable that all results of tests were within limits specified. If a certificate is not available, all documentation shall be on the Certifier’s letterhead.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Material or equipment containing a weighted average of greater than 0.25 percent lead are prohibited in any potable water system intended for human consumption, and shall be certified in accordance with NSF 61 or NSF 372. Endpoint devices used to dispense water for drinking shall meet the requirements of NSF 61, Section 9.

2.2 ABOVE GROUND (INTERIOR) WATER PIPING

A.Pipe: Copper tube, ASTM B88, Type L, drawn.
B.Fittings for Copper Tube:
1.Wrought copper or bronze castings conforming to ASME B16.18 and ASME B16.22. Unions shall be bronze, MSS SP-72, MSS SP-110, solder or braze joints. Use 95/5 tin and antimony for all soldered joints.
2.Mechanical press-connect fittings for copper pipe and tube shall conform to the material and sizing requirements of ASME B16.51, NSF 61 approved, 50 mm (2 inch) size and smaller mechanical press-connect fittings, double pressed type, with EPDM (ethylene propylene diene monomer) non-toxic synthetic rubber sealing elements and un-pressed fitting identification feature.
C.Adapters: Provide adapters for joining pipe or tubing with dissimilar end connections.
D.Solder: ASTM B32 alloy type Sb5, HA or HB. Provide non-corrosive flux.
E.Brazing alloy: AWS A5.8M/A5.8, brazing filler metals shall be BCuP series for copper to copper joints and BAg series for copper to steel joints.

2.3 EXPOSED WATER PIPING

A.Finished Room: Use full iron pipe size chrome plated brass piping for exposed water piping connecting fixtures, casework, and cabinets when not concealed by apron including those furnished by the Government or specified in other sections.
1.Pipe: ASTM B43, standard weight.
2.Fittings: ASME B16.15 cast bronze threaded fittings with chrome finish.
3.Nipples: ASTM B687, Chromium-plated.
4.Unions: MSS SP-72, MSS SP-110, brass or bronze with chrome finish. Unions 65 mm (2-1/2 inches) and larger shall be flange type with approved gaskets.
B.Unfinished Rooms and Mechanical Rooms: Chromeplated brass piping is not required. Paint piping systems as specified in Section 09 91 00, PAINTING.

2.4 TRAP PRIMER WATER PIPING

A.Pipe: Copper tube, ASTM B88, type K, hard drawn.
B.Fittings: Bronze castings conforming to ASME B16.18 Solder joints.
C.Solder: ASTM B32 alloy type Sb5. Provide non-corrosive flux.

2.5 DIELECTRIC FITTINGS

A. Provide dielectric couplings or unions between pipe of dissimilar metals.

2.6 STERILIZATION CHEMICALS

A.Hypochlorite: ASTM E1229.
B.Liquid Chlorine: ASTM E1120.

2.7 WATER HAMMER ARRESTER

A.Closed copper tube chamber with permanently sealed 413 kPa (60 psig) air charge above a Double O-ring piston. Two high heat Buna-N 0-rings pressure packed and lubricated with FDA approved silicone compound. All units shall be designed in accordance with ASSE 1010. Access shall be provided where devices are concealed within partitions or above ceilings. Size and install in accordance with PDI-WH 201 requirements. Provide water hammer arrestors at:
1.All solenoid valves.
2.All groups of two or more flush valves.
3.All quick opening or closing valves.

PART 3 - EXECUTION

3.1 INSTALLATION

A.General: Comply with the International Plumbing Code and the following:
1.Install branch piping for water from the piping system and connect to all fixtures, valves, cocks, outlets, casework, cabinets and equipment, including those furnished by the Government or specified in other sections.
2.Pipe shall be round and straight. Cutting shall be done with proper tools. Pipe, except for plastic and glass, shall be reamed to remove burrs and a clean smooth finish restored to full pipe inside diameter.
3.All pipe runs shall be laid out to avoid interference with other work/trades.
4.Install union and shut-off valve on pressure piping at connections to fixture groups.
5.Pipe Hangers, Supports and Accessories:
a.All piping shall be supported per the IPC, VA H-18-8 Seismic Design Requirements, MSS SP-58, and SMACNA as required.
b.Shop Painting and Plating: Hangers, supports, rods, inserts and accessories used for pipe supports shall be shop coated with zinc chromate primer paint. Electroplated copper hanger rods, hangers and accessories may be used with copper tubing.
c.Floor, Wall and Ceiling Plates, Supports, Hangers:
1)Solid or split un-plated cast iron.
2)All plates shall be provided with set screws.
3)Pipe Hangers: Height adjustable clevis type.
4)Adjustable Floor Rests and Base Flanges: Steel.
5)Concrete Inserts: "Universal" or continuous slotted type.
6)Hanger Rods: Mild, low carbon steel, fully threaded or Threaded at each end with two removable nuts at each end for positioning rod and hanger and locking each in place.
7)Pipe Hangers and Riser Clamps: Malleable iron or carbon steel. Pipe Hangers and riser clamps shall have a copper finish when supporting bare copper pipe or tubing.
8)Rollers: Cast iron.
9)Self-drilling type expansion shields shall be "Phillips" type, with case hardened steel expander plugs.
10)Hangers and supports utilized with insulated pipe and tubing shall have 180 degree (minimum) metal protection shield centered on and welded to the hanger and support. The shield thickness and length shall be engineered and sized for distribution of loads to preclude crushing of insulation without breaking the vapor barrier. The shield shall be sized for the insulation and have flared edges to protect vaporretardant jacket facing. To prevent the shield from sliding out of the clevis hanger during pipe movement, center-ribbed shields shall be used.
11)Miscellaneous Materials: As specified, required, directed or as noted on the drawings for proper installation of hangers, supports and accessories. If the vertical distance exceeds 6.1 m (20 feet) for cast iron pipe additional support shall be provided in the center of that span. Provide all necessary auxiliary steel to provide that support.
12)With the installation of each flexible expansion joint, provide piping restraints for the upstream and downstream section of the piping at the flexible expansion joint. Provide calculations supporting the restraint length design and type of selected restraints. Restraint calculations shall be based on the criteria from the manufacturer regarding their restraint design.
6.Install chrome plated cast brass escutcheon with set screw at each wall, floor and ceiling penetration in exposed finished locations and within cabinets and millwork.
7.Penetrations:
a.Firestopping: Where pipes pass through fire partitions, fire walls, smoke partitions, or floors, install a fire stop that provides an effective barrier against the spread of fire, smoke, and gases as specified in Section 07 84 00, FIRESTOPPING. Completely fill and seal clearances between raceways and openings with the firestopping materials.
b.Waterproofing: At floor penetrations, completely seal clearances around the pipe and make watertight with sealant as specified in Section 07 92 00, JOINT SEALANTS. Bio-based materials shall be utilized when possible.
c.Acoustical sealant: Where pipes pass through sound rated walls, seal around the pipe penetration with an acoustical sealant that is compliant with ASTM C919.
8.Mechanical press-connect fitting connections shall be made in accordance with the manufacturer’s installation instructions. The tubing shall be fully inserted into the fitting and the tubing marked at the shoulder of the fitting. The fitting alignment shall be checked against the mark on the tubing to assure the tubing is fully engaged (inserted) in the fitting. Ensure the tube is completely inserted to the fitting stop (appropriate depth) and squared with the fitting prior to applying the pressing jaws onto the fitting. The joints shall be pressed using the tool(s) approved by the manufacturer. Minimum distance between fittings shall be in accordance with the manufacturer’s requirements. When the pressing cycle is complete, visually inspect the joint to ensure the tube has remained fully inserted, as evidenced by the visible insertion mark.
B.Domestic Water piping shall conform to the following:
1.Grade all lines to facilitate drainage. Provide drain valves at bottom of risers and all low points in system. Design domestic hot water circulating lines with no traps.
2.Connect branch lines at bottom of main serving fixtures below and pitch down so that main may be drained through fixture. Connect branch lines to top of main serving only fixtures located on floor above.

3.2 TESTS

A.General: Test system either in its entirety or in sections. Submit testing plan to COR 10 working days prior to test date.
B.Potable Water System: Test after installation of piping and domestic water heaters, but before piping is concealed, before covering is applied, and before plumbing fixtures are connected. Fill systems with water and maintain hydrostatic pressure of 1035 kPa (150 psig) gage for two hours. No decrease in pressure is allowed. Provide a pressure gage with a shutoff and bleeder valve at the highest point of the piping being tested. Pressure gauge shall have 1 psig increments.
C.The test pressure shall hold for the minimum time duration required by the applicable plumbing code or authority having jurisdiction.

3.3 STERILIZATION

A.After tests have been successfully completed, thoroughly flush and sterilize the interior domestic water distribution system in accordance with AWWA C651.
B.Use liquid chlorine or hypochlorite for sterilization.

3.4 DEMONSTRATION AND TRAINING

A. Provide services of manufacturer’s technical representative for four hours to instruct VA Personnel in operation and maintenance of the system.

E N D - 22 11 00 - 4