000115 List of Drawings.docx
DOCX document 20 KB Posted
- Solicitation number
- 36C25621R0013
About this file
This document provides details for a federal contract opportunity to remodel a pharmacy compounding area and build out a new segregated compounding area at a Veterans Health Administration medical center in New Orleans, Louisiana, to meet USP 800 requirements. The contractor shall provide all supervision, labor, materials, tools, and equipment for the remodeling and build out project, estimated to cost between $1 million and $5 million. This opportunity is a 100% set-aside for service-disabled veteran-owned small businesses. Offerors must be verified through the Vendor Information Pages database and registered in the System for Award Management to be considered. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovate Pharmacy for USP 800 VAMC New Orleans, LA 07-01-15
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
| GENERAL | |
| G001 | COVER SHEET |
| G002 | LEGENDS, ABBREVIATIONS, DETAILS AND NOTES |
| ARCHITECTURAL | |
| AD101 | PARTIAL FOURTH FLOOR DEMO PLAN |
| AD111 | PARTIAL FOURTH FLOOR DEMO RCP |
| A101 | PARTIAL FOURTH FLOOR PLAN |
| A111 | PARTIAL FOURTH FLOOR RCP |
| A501 | PARTITION TYPES, SCHEDULES AND DETAILS |
| STRUCTURAL | |
| S501 | STEEL DETAILS |
| MECHANICAL | |
| M001 | LEGEND AND GENERAL NOTES-MECHANICAL |
| MD101 | PARTIAL FOURTH FLOOR AND INTERSTITIAL FOURTH FLOOR DUCTWORK DEMOLITION-MECHANICAL |
| MD102 | PARTIAL FOURTH FLOOR INTERSTITIAL MECHANICAL ROOM PIPING DEMOLITION-MECHANICAL |
| MD103 | PARTIAL SIXTH FLOOR INTERSTITIAL SUPPLY DUCTWORK NEW WORK-MECHANICAL |
| M101 | PARTIAL FOURTH FLOOR AND MECHANICAL ROOM SUPPLY DUCTWORK NEW WORK-MECHANICAL |
| M102 | PARTIAL FOURTH FLOOR INTERSTITIAL SUPPLY DUCTWORK NEW WORK-MECHANICAL |
| M103 | PARTIAL FOURTH FLOOR AND MECHANICAL ROOM RETURN AND EXHAUST DUCTWORK NEW WORK-MECHANICAL |
| M104 | PARTIAL FOURTH FLOOR INTERSTITIAL FOURTH RETURN AND EXHAUST DUCTWORK NEW WORK-MECHANICAL |
| M105 | PARTIAL FOURTH FLOOR INTERSTITIAL PIPING NEW WORK-MECHANICAL |
| M106 | PARTIAL SIXTH FLOOR MECHANICAL ROOM DUCTWORK NEW WORK PLAN-MECHANICAL |
| M401 | PARTIAL FOURTH FLOOR AIR FLOW REQUIREMENTS AND SENSOR/DISPLAY PANEL LOCATION PLANS-MECHANICAL |
| M501 | MECHANICAL DETAILS |
| M502 | MECHANICAL DETAILS |
| M503 | MECHANICAL DETAILS |
| M601 | MECHANICAL SCHEDULES |
| M801 | CONTROL SCHEMATIC, CONTROL SCHEDULES AND LEGEND-MECHANICAL |
| M802 | CONTROL SCHEMATIC, CONTROL SCHEDULES AND LEGEND-MECHANICAL |
| PLUMBING | |
| P-001 | LEGEND, ABBREVIATIONS, SCHEDULES, AND GENERAL NOTES |
| PD101 | PARTIAL THIRD INTERSTITIAL DEMOLITION PIPING WORK |
| PD102 | PARTIAL FOURTH FLOOR DEMOLITION PIPING PLAN |
| PL101 | PARTIAL THIRD INTERSTITIAL PIPING PLAN |
| PL102 | PARTIAL FOURTH FLOOR PLAN-NEW WORK |
| PL201 | ISOMETRIC RISER DIAGRAMS |
| FIRE PROTECTION | |
| F001 | LEGEND, GENERAL NOTES AND DETAILS |
| FD101 | PARTIAL FOURTH FLOOR-DEMOLITION PLAN |
| FP101 | PARTIAL FOURTH FLOOR-NEW WORK PLAN |
| ELECTRICAL | |
| E001 | LEGEND AND NOTES |
| ED101 | DEMOLITION FLOOR PLAN |
| E101 | NEW WORK PLAN-LIGHTING |
| E102 | FOURTH FLOOR NEW WORK PLAN-POWER |
| E103 | PENTHOUSE NEW WORK PLAN-POWER |
| E104 | NEW WORK PLAN-SYSTEMS |
| E501 | E501-DETAILS |
END
00 01 15 - 1