The file's text, extracted by GovTribe without its formatting.
07-01-14 Renovate Pharmacy for USP 800 VAMC New Orleans, LA 01-01-18
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
| DIVISION 00 SPECIAL SECTIONS |
| DATE |
| 00 01 15 |
| List of Drawing Sheets |
| 07-15 |
DIVISION 01 GENERAL REQUIREMENTS
| 01 00 00 |
| General Requirements |
| 10-17 |
| 01 32 16.15 |
| Project Schedules (Small Projects – Design/Bid/Build |
| 04-13 |
| 01 33 23 |
| Shop Drawings, Product Data, and Samples |
| 05-17 |
| 01 35 26 |
| Safety Requirements |
| 02-17 |
| 01 42 19 |
| Reference Standards |
| 05-16 |
| 01 74 19 |
| Construction Waste Management |
| 09-13 |
| 01 91 00 |
| General Commissioning Requirements |
| 10-15 |
DIVISION 02 – EXISTING CONDITIONS
| 02 41 00 |
| Demolition |
| 08-17 |
| 03 30 53 |
| (Short-Form) Cast-in-Place Concrete |
| 02-16 |
DIVISION 05 – METALS
| 05 12 00 |
| Structural Steel |
| 05 40 00 |
| Cold-Formed Metal Framing |
| 05-16 |
| 05 50 00 |
| Metal Fabrications |
| 07-14 |
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
| 06 10 00 |
| Rough Carpentry |
| 10-17 |
DIVISION 07 THERMAL AND MOISTURE PROTECTION
| 07 21 13 |
| Thermal Insulation |
| 10-17 |
| 07 54 23 |
| Thermoplastic Polyolefin (TPO) Roofing |
| 08-16 |
| 07 84 00 |
| Firestopping |
| 02-16 |
| 07 92 00 |
| Joint Sealants |
| 10-17 |
DIVISION 08 OPENINGS
| 08 11 13 |
| Hollow Metal Doors and Frames |
| 08-16 |
| 08 31 13 |
| Access Doors and Frames |
| 02-16 |
| 08 71 00 |
| Door Hardware |
| 01-16 |
| 08 71 13 |
| Automatic Door Operators |
| 02-16 |
DIVISION 09 – FINISHES
| 09 05 16 |
| Subsurface Preparation |
| 02-15 |
| 09 22 16 |
| Non-Structural Metal Framing |
| 05-16 |
| 09 29 00 |
| Gypsum Board |
| 11-14 |
| 09 67 23.30 |
| Resinous Decorative Mortar Flooring |
| 02-16 |
DIVISION 10 - SPECIALITIES
| 10 26 00 |
| Wall and Door Protection |
| 10-15 |
DIVISION 21- FIRE SUPPRESSION
| 21 13 13 |
| Wet-Pipe Sprinkler Systems |
| 06-15 |
DIVISION 22 – PLUMBING
| 22 05 11 |
| Common Work Results for Plumbing |
| 07-16 |
| 22 05 23 |
| General-Duty Valves for Plumbing Piping |
| 09-15 |
| 22 07 11 |
| Plumbing Insulation |
| 09-15 |
| 22 11 00 |
| Facility Water Distribution |
| 09-15 |
| 22 13 00 |
| Facility Sanitary and Vent Piping |
| 09-15 |
| 22 14 00 |
| Facility Storm Drainage |
| 09-15 |
| 22 40 00 |
| Plumbing Fixtures |
| 09-15 |
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
| 23 05 11 |
| Common Work Results for HVAC |
| 08-17 |
| 23 05 12 |
| General Motor Requirements for HVAC and Steam Generation Equipment |
| 08-17 |
| 23 05 41 |
| Noise and Vibration Control for HVAC Piping and Equipment |
| 02-15 |
| 23 05 93 |
| Testing, Adjusting, and Balancing for HVAC |
| 02-15 |
| 23 07 11 |
| HVAC and Boiler Plant Insulation |
| 02-15 |
| 23 08 00 |
| Commissioning of HVAC Systems |
| 11-16 |
| 23 09 23 |
| Direct-Digital Control System for HVAC |
| 09-11 |
| 23 21 13 |
| Hydronic Piping |
| 08-17 |
| 23 22 13 |
| Steam and Condensate Heating Piping |
| 08-17 |
| 23 25 00 |
| HVAC Water Treatment |
| 02-15 |
| 23 31 00 |
| HVAC Ducts and Casings |
| 03-13 |
| 23 37 00 |
| Air Outlets and Inlets |
| 02-15 |
| 23 40 00 |
| HVAC Air Cleaning Devices |
| 02-12 |
| 23 73 00 |
| Indoor Central-Station Air-Handling Units |
| 04-11 |
DIVISION 26 – ELECTRICAL
| 26 05 11 |
| Requirements for Electrical Installations |
| 01-16 |
| 26 05 19 |
| Low-Voltage Electrical Power Conductors and Cables |
| 01-17 |
| 26 05 26 |
| Grounding and Bonding for Electrical Systems |
| 01-17 |
| 26 05 33 |
| Raceway and Boxes for Electrical Systems |
| 01-18 |
| 26 27 26 |
| Wiring Devices |
| 01-18 |
| 26 29 11 |
| Motor Controllers |
| 01-18 |
| 26 29 21 |
| Enclosed Switches and Circuit Breakers |
| 01-17 |
| 26 51 00 |
| Interior Lighting |
| 01-18 |
00 01 10-1