1686626dwg09of14_MECHANICAL.pdf
PDF 21 MB Posted
- Solicitation number
- N4008525R2500
About this file
This file contains mechanical drawings and specifications for the HVAC/mechanical systems of a new dental clinic replacement project at Marine Corps Recruit Depot Parris Island, SC. The drawings include detailed ductwork plans for first and second floors, attic, and roof, along with mechanical equipment layouts, controls diagrams, and air balance maps.
The drawings show a comprehensive HVAC system with multiple air handling units (AHU-1A, AHU-1B, AHU-2A, AHU-2B), variable air volume (VAV) boxes, exhaust fans, and specialized ventilation systems for dental operatories and laboratories. Key components include fume hoods, snorkel exhausts, pressure-controlled environments for sterile processing areas, and dedicated exhaust systems for the dental laboratory. The control systems include DDC (Direct Digital Control) integration, emergency shutdown capabilities, and pressure monitoring for critical spaces. The mechanical rooms are located on both floors with chillers, boilers, and associated pumping systems. The drawings are dated August 2024 and have been approved by both NAVFAC and the Defense Health Agency.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CEILING RETURN GRILLE/REGISTER (SEE SCHEDULE FOR TYPE)
CEILING EXHAUST GRILLE/REGISTER (SEE SCHEDULE FOR TYPE)
EXISTING DUCTWORK TO BE DEMOLISHED
EXISTING DUCTWORK
NEW DUCTWORK SEE SPECS FOR INSULATION REQUIREMENTS
DUCT ELBOW WITH TURNING VANES
RADIUS DUCT ELBOW
RECTANGULAR DUCT TAKEOFF (SEE DETAILS SHEETS)
DUCT UP
DUCT DOWN
CEILING DIFFUSER (SEE SCHEDULE FOR TYPE)
SINGLE LINE PIPE UP
SINGLE LINE PIPE DOWN
DOUBLE LINE PIPE UP
DOUBLE LINE PIPE DOWN
BALL VALVE
NON-SLAM CHECK VALVE
PLUG VALVE
PRESSURE REDUCING VALVE (FILL VALVE)
PRESSURE RELIEF VALVE
MECHANICAL LEGEND (UNABRIDGED)
INLINE STRAINER
INLINE STRAINER WITH BLOWNDOWN VALVE AND HOSE BIBB
PRESSURE GAUGE AND COCK
BACKFLOW PREVENTER
FLEXIBLE PIPE CONNECTION
2 WAY MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL VALVE
UNION
CONCENTRIC REDUCER
ECCENTRIC REDUCER
THERMOMETER
SENSOR WELL
THERMOSTAT, x = ZONE NUMBERT x
PRESSURE AND TEMPERATURE TEST PORT
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE
MANUAL BALANCE DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE/SMOKE DAMPER
CALIBRATED BALANCING VALVE
VENTURI FLOW METER
-240CFM ROOM AIRFLOW CFM OFFSET (POSITIVE/NEGATIVE)
XX-XX
XXX
DIFFUSER TAG - 1ST ROW : MARK - NECK SIZE (IN)
2ND ROW: CFM
HARD CEILING ACCESS PANEL
M M
M
S
F
FS
AUTOMATIC AIR VENT W/ SHUTOFF VALVE
MANUAL AIR VENT W/ SHUTOFF VALVE
METER (WATER OR GAS)
PIPE BREAK
UNDERGROUND PIPE
FLEXIBLE DUCT (SEE DETAIL
ON M-701) PIPE CAP
COMBINATION THERMOSTAT/HUMIDISTAT, x = ZONE NUMBERT xH
CONTROL SYMBOL LEGEND (UNABRIDGED)
GENERIC CONTROL DEVICE
(SEE ABBREVIATIONS)
HARDWIRED INTERLOCK
GENERIC LOW VOLTAGE CONTROL
INPUT/OUTPUT (SEE
ABBREVIATIONS)
SMOKE DETECTOR
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
TYPICAL PUMP/FAN
POINT SENSOR
AVERAGING SENSOR
COIL
FILTER (DPS OR DP)
UV LIGHT ARRAY
BAS INTEGRATION
RJ-45, RS-485, ETC
MOTOR
AIRFLOW MEASURING STATION
POWER LINE (BY DIV 26)
EQUIPMENT
LOW VOLTAGE WIRE
CONTROL DEVICE
STARTER
COMBINATION MOTOR STARTER
WITH INTEGRAL DISCONNECT
DISCONNECT
FUSED DISCONNECT
MOTOR RATED TOGGLE SWITCH
A M
S
T S
COMM
XXX
M
M
M
M
D
PAI AO BI BO
I
M D
E S
M D
E S
T S
SDTO FACP
CONTROL CONTACTS
2 WAY MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL VALVE
480V-3Ф ELECTRICAL SERVICE
SB SECURITY BARS
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:0
:5
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
12" = 1'-0"
M-001
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
L E
G E
N D
A N
D N
O T
E S
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909353
TEP TEP CLE
GCM
NO NORMALLY OPEN; NUMBER
NTS NOT TO SCALE
OA OUTDOOR AIR
OAL OUTDOOR AIR LOUVER
OC ON CENTER
OCC OCCUPANCY SENSOR
OD OUTSIDE DIAMETER
P-GAUGE PRESSURE GAUGE
P/T PORTA PRESSURE/TEMPERATURE PORT
P PUMP
PCF POUNDS PER CUBIC FEET
PCR PUMPED CONDENSATE RETURN (STEAM)
PCW PROCESS COOLING WATER
PCWP PROCESS COOLING WATER PUMP
PCWR PROCESS COOLING WATER RETURN
PCWS PROCESS COOLING WATER SUPPLY
PH PHASE
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
R RADIUS; RELAY
RA RETURN AIR
RD ROUND DIFFUSER
RG RETURN AIR GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID
RP REDUCED PRESSURE
RPM REVOLUTIONS PER MINUTE
RR RETURN AIR REGISTER
RS REFRIGERANT SUCTION
RV ROOF VENT
SA SUPPLY AIR
SAV SOLENOID AIR VALVE
SD SMOKE DAMPER; SMOKE DETECTOR
SF SQUARE FEET; SUPPLY FAN
SG SOFFIT GRILLE
SIM SIMILAR
SP STATIC PRESSURE SENSOR
SPS STATIC PRESSURE SWITCH
SPEC SPECIFICATION
SR SIDEWALL REGISTER (SUPPLY AIR) REGISTER
SS STAINLESS STEEL
STD STANDARD
STM STEAM
SV SUPPLY VALVE
T THERMOSTAT
TC TIME CLOCK
TDR TIME DELAY RELAY
TEMP TEMPERATURE
TG TRANSFER GRILLE
TS TEMPERATURE SENSOR
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UC UNDERCUT DOOR - 3/4"
UG UNDERGROUND
UH UNIT HEATER
V VOLTS
VA VENTILATION AIR: CONDITIONED, DEDICATED
OUTSIDE AIR
VC VOLUME CONTROLLER
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VFM VENTURI FLOW METER
VVU VARIABLE VOLUME UNIT
W WIDTH
WB WET BULB
WP WEATHER PROOF
WPD WATER PRESSURE DROP
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
°F DEGREES FAHRENHEIT
F FLOW SWITCH
FC FAIL CLOSED
FCU FAN COIL UNIT
FD FIRE DAMPER; FLOOR DRAIN
FEV FUME EXHAUST VALVE
FG FILTER GRILLE
FH FUME HOOD
FMI FLOW METER (INSERTION ELECTROMAGNETIC)
FMM FLOW METER (INLINE ELECTROMAGNETIC)
FMT FLOW METER (INSERTION TURBINE)
FMS FLOW MEASURING STATION
FO FLAT OVAL; FAIL OPEN
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE OR HIGHT TEMPERATURE STAT
FRP FIBERGLASS REINFORCED PLASTIC
FS FLOAT SWITCH
FT FEET
FT WG FEET OF WATER, GAUGE
FTU FAN TERMINAL UNIT
FZ FREEZESTAT
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GEV GENERAL EXHAUST VALVE
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HUMIDISTAT
HI HIGH STATIC PRESSURE SWITCH
HG HOT GAS
HHW HEATING HOT WATER
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HP HEAT PUMP; HORSEPOWER
HPS HIGH PRESSURE STEAM
HR HOUR
HS HUMIDITY SENSOR
HX HEAT EXCHANGER
ID INSIDE DIAMETER
IN. INCHES
IN. WG INCHES OF WATER, GAUGE
KW KILOWATTS
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LB POUND
LD LINEAR DIFFUSER
LL LOW STATIC PRESSURE SWITCH
LLS LIQUID LINE SOLENOID VALVE
LPS LOW PRESSURE STEAM
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
M WATER METER
MAX MAXIMUM
MBH THOUSANDS OF BTUH
MCF THOUSANDS OF CUBIC FEET
MD MOTORIZED DAMPER
MERV MINIMUM EFFICIENCY RATING VALUE
MIN MINUTE; MINIMUM
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
ATFP ANTI-TERRORISM FORCE PROTECTION
A AMPS; AREA
AAV AUTOMATIC AIR VENT
ABV ABOVE
ABV CLG ABOVE FINISHED CEILING
AC AIR CONDITIONING UNIT
ACH AIR CHANGE PER HOUR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AMS AIRFLOW MEASURING STATION
AO ANALOG OUTPUT
AP ACCESS PANEL
B BOILER
BD BALANCING DAMPER
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BI BINARY INPUT
BMCP BOILER MANAGEMENT CONTROL PANEL
BO BINARY OUTPUT
BTU BRITISH THERMAL UNITS
BTUH BTU PER HOUR
C COMMON
CAC CONTROL AIR COMPRESSOR
CD CEILING DIFFUSER
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEANOUT
COND CONDENSATE
CR CONDENSATE RETURN (STEAM)
CSR CURRENT SENSING RELAY
CT COOLING TOWER
CU CONDENSING UNIT; COPPER
CV COEFFICIENT OF VALVE
CW COLD WATER
DB DRY BULB
DC DUST COLLECTOR
DDC DIRECT DIGITAL CONTROLS
DEFL DEFLECTION
DG DOOR GRILLE
DIA DIAMETER
DN DOWN
DP DIFFERENTIAL PRESSURE SWITCH
DPS DIFFERENTIAL PRESSURE SENSOR
DS DUCT SILENCER
DTW DUAL TEMPER WATER
DTWR DUAL TEMPER WATER RETURN
DTWS DUAL TEMPER WATER SUPPLY
EA EACH
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EFF EFFICIENCY
EG EXHAUST GRILLE
EH EXHAUST HOOD
ENT ENTERING
EP ELECTRIC-PNEUMATIC SWITCH
EPT ELECTRIC-PNEUMATIC TRANSDUCER
ER EXHAUST REGISTER
ES END SWITCH
ESP EXTERNAL STATIC PRESSURE
EV EXHAUST VALVE
MECHANICAL ABBREVIATIONS (UNABRIDGED)
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D U
ASREE.
V F
D
V F
D V
F D
V F
D
2.2
B.9 D E F G H
J K L
MB C.9
MATCHLINE: BLOCK 1G
MATCHLINE: BLOCK 1A
M A
T C
H
LI
N E
: B
LO
C K
A
M A
T C
H
LI
N E
: B
LO
C K
M
M A
T C
H
LI
N E
: B
LO
C K
M
M A
T C
H
LI
N E
: B
LO
C K
F
MATCHLINE: BLOCK 1L
MATCHLINE: BLOCK 1F
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
L
M A
T C
H
LI
N E
: B
LO
C K
B
M A
T C
H
LI
N E
: B
LO
C K
C
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
6' 12' 24'
SCALE: 3/32"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:5
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
3/32" = 1'-0"
SCALE: 3/32" = 1'-0"
MH110
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
C O
M P
O S
IT
E
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909354
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
COMPOSITE
GCM
SHEET NOTE:
PROVIDE HINGED ACCESS DOORS IN DUCTWORK AS INDICATED IN SPEC 23 30 00 SECTION 2.9.3.
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
D
V F
D V
F D
V F
D
2.2
B.9 D
B C.9
MATCHLINE: BLOCK 1G
MATCHLINE: BLOCK 1A
M A
T C
H
LI
N E
: B
LO
C K
A
M A
T C
H
LI
N E
: B
LO
C K
M
M A
T C
H
LI
N E
: B
LO
C K
A
M A
T C
H
LI
N E
: B
LO
C K
B x2 x4 ø
V A
V 1A
-0
RF-PLC
CC-1A
ET-HHW
AS-HHW
S F
-P
LC
V A
V 1A
-0
ET-CHW
BT-1
CHWP-2
CHWP-1
AHU-1A
E1-10Ø
S1-10Ø
MECH
1A01
MAIN ELEC
1A01B
MAIN ELEC
1A01A
CHEMICAL TREATMENT
CHEMICAL TREATMENT
48x48 OA INTAKE
LOUVER. SEE
SHEET M-701 FOR
OUTDOOR AIR
PLENUM DETAIL.
E
LE
C T
R
IC
A L
Z O
N E
AC-1A01A
A C
-1 A
B
C1
M-304
30x92
CHW SHOT FEEDER.
HHW SHOT FEEDER
PLUMBING ZONE
24x92
6ø
14ø ø
C U
-4 C
U -3
C U
-2 C
U -1
FCU-1A01
AS-CHW
DDC
ø ø x1
HHWP-1
HHWP-2
B A
S
W O
R K
S T
A T
IO
N
S3-12X12
OUTDOOR AIR WEATHER
STATION
C4
M-306 x4
12ø
48x15
48x15
DS-AHU1A-1
12ø
12ø 12ø
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:5
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH111
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909355
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1A
GCM
NOTE:
1. SEE ENLARGED MECHANICAL ROOM PLANS FOR
MORE DETAIL LOCATIONS OF DUCT DEVICES, ETC.
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
D V
F D
2.2
D E F
C.9
M A
T C
H
LI
N E
: B
LO
C K
A
M A
T C
H
LI
N E
: B
LO
C K
M
M A
T C
H
LI
N E
: B
LO
C K
A
M A
T C
H
LI
N E
: B
LO
C K
B
MATCHLINE: BLOCK 1B
MATCHLINE: BLOCK 1M
MATCHLINE: BLOCK 1C
MATCHLINE: BLOCK 1M
x4
2 V A
V 1A
-0
V A
V 1A
-0
BT-1
CHWP-2
CHWP-1
AHU-1A
E1-10Ø
E1-10Ø
S1-8Ø
12x10
VAV1A-04
S1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
E1-6Ø ø
R1-6Ø
S1-8Ø
E1-16Ø
LOBBY
1B02
VESTIBULE
1B01
RECRUIT PUB
TLT, M
1B04
RECRUIT PUB
TLT, F
1B07
S1-10Ø
VAV1A-05
30x92
24x92
6ø
20ø 20x18
14ø
14ø
E1-8Ø 220E1-10Ø
VAV1B-06
x1
STAIR
1BS3
ø
RECRUIT PUB
TLT, F
1B03
10ø
DDC
ø ø x1 ø ø
6ø
OUTDOOR AIR WEATHER
STATION
C4
M-306
10x14
14x14 x1
14x14 ø x4
R3-96X15
12ø
48x15
48x15
DS-AHU1A-1
12ø
12ø 12ø
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:5
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH112
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
B
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909356
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1B
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
F G H
M A
T C
H
LI
N E
: B
LO
C K
B
M A
T C
H
LI
N E
: B
LO
C K
C
M A
T C
H
LI
N E
: B
LO
C K
C
M A
T C
H
LI
N E
: B
LO
C K
D
MATCHLINE: BLOCK 1C
MATCHLINE: BLOCK 1M
E1-6Ø ø
S1-8Ø
S1-8Ø
R1-10Ø
S1-10Ø
R1-6Ø
R1-6Ø
R1-6Ø
R1-6Ø
S1-8Ø
S1-8Ø
MATCHLINE: BLOCK 1J
MATCHLINE: BLOCK 1C
ø
R1-10Ø
VAV1B-13
ø ø
PANO-CEPH
1C05
PANO-CEPH
1C04
PANO-CEPH
1C06
CONSULT OFC
1C03D
RECEP
1C03A
CORRIDOR
1CC1
CORRIDOR
1JC3
LOBBY
1C07
S1-6Ø
CORRIDOR
1JC4
R1-10Ø
R1-6Ø
16ø ø
22ø 26ø ø
12ø
20ø
22ø x1
6ø
RECORDS
1C03B x1
12x10 ø
16ø
S1-6Ø
V A
V 1B
-1 ø
CORRIDOR
1JC2
C O
R R
ID
O
R 1C
C
R1-6Ø ø
S1-6Ø ø
24ø
S P
S
FCU-1J15
A2
M-304
S /D
FIRST FLOOR
EMERGENCY AIR
DISTRIBUTION
SHUTDOWN SWITCH.
A C
-1 C
VAV1B-18
ø ø
R3-96X15
R3-96X15 ø
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH113
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
C
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909357
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1C
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
H J K
M A
T C
H
LI
N E
: B
LO
C K
M
M A
T C
H
LI
N E
: B
LO
C K
F
M A
T C
H
LI
N E
: B
LO
C K
D
M A
T C
H
LI
N E
: B
LO
C K
F
MATCHLINE: BLOCK 1D
MATCHLINE: BLOCK 1M
M A
T C
H
LI
N E
: B
LO
C K
C
M A
T C
H
LI
N E
: B
LO
C K
D
R1-6Ø
R1-6Ø
S1-6Ø
S1-6Ø
R1-12Ø
S1-8Ø ø
E1-8Ø
S1-8Ø 175S1-6Ø
S1-8Ø
S1-10Ø
S1-10Ø ø
E1-6Ø
R1-6Ø
S1-6Ø
R1-6Ø
E1-6Ø
E1-6Ø
H-1B
28ø ø x2
R1-6Ø ø ø
VAV1B-15
12x10 ø
S1-8Ø
V A
V 1B
-1
S3-12X12
R2-12X12 ø
R A
D O
F C
1D
G A
S S
T O
R 1D
EQ STOR
1D16
SOIL UTIL
1D15
M E
D W
A S
T E
1D
DEPT HEAD
GEN
DENTISTRY
1D11
EQ STOR
1D06
VESTIBULE
1D01
AD TLT
1D05
COMM RM
1D08
JAN CL
1D07
CREDENTIALING
DENTISTS
1D14
RECORD
ASSEMBLY /
WORK
1D02
DEPT HEAD
GEN/ASSIST
1D10
CORRIDOR
1KC2
LOBBY
1D03
CORRIDOR
1DC1
VAV1B-10
AC-1K15
22ø x1
S1-6Ø
14ø
24ø ø
R1-14Ø
20ø ø
26ø ø
14ø
14ø
12x10
28ø ø x1
E3-12X12
R1-6Ø
16x15
AC-1D08
C3
M-306
V A
V 1B
-1 ø
S1-6Ø
26ø
24X20 EXH UP
THROUGH 2ND
FLOOR CHASE.
SEE SHEET
MH134 FOR
CONTINUATION.
12x10
16ø ø
VAV1B-12
8ø
10ø
10ø 10 ø ø ø
A2
M-304
ELECTRICAL ZONE
24ø ø ø
6ø
R3-96X15 x1
12ø12ø
12ø
12ø48x15
48x15
TG2-12X12
TG3-12X12
ø
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH114
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909358
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1D
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
K L
M
M A
T C
H
LI
N E
: B
LO
C K
M
M A
T C
H
LI
N E
: B
LO
C K
F
MATCHLINE: BLOCK 1L
MATCHLINE: BLOCK 1F
MATCHLINE: BLOCK 1D
MATCHLINE: BLOCK 1M
S1-8Ø ø
H-1B
DDP-8
DDC
DDC
DDC
DDP-7
x4
36ø
28ø ø
A H
U -1
B x2
R F
-P
LC
CC-1B
S F
-P
LC
E1-14Ø
S1-8Ø
S1-8Ø
S1-8Ø ø
R2-12X12
VAV1B-14
VAV1B-01
S3-12X12
VAV1B-02
G A
S S
T O
R 1D
ELEV MACH
1F02
SUPPLY STOR
1F03
ELEC
1F01
STAIR
1FS2
CORRIDOR
1FC1
C O
R R
ID
O
R 1F
C
ELEVATOR 3
1FE3
48x48 OA LOUVER. SEE SHEET
M-701 FOR OUTDOOR AIR PLENUM
DETAIL.
A C
-1 F
AC-1F01
14ø
E1-6Ø
C U
-8
12ø
E3-12X12
E1-6Ø
RECYCLE
1F05 x6
26x72
26x72
38ø
14ø ø
AC-1D08
14ø
C U
-5 C
U -7
C U
-6
26ø ø
C3
M-304
S1-6Ø
C3
M-306
26ø
FCU-1F04
8ø
28ø
14ø
16x16 EXH UP THROUGH 2ND
FLOOR MECHANICAL ROOM
2F05. SEE SHEET MH135 FOR
CONTINUATION.
ST TLT
1L04CORRIDOR
1KC2
MECH
1F04
ELECTRICAL ZONE
8ø ø x1
12ø12ø
12ø
12ø48x15
48x15
DS-AHU1B-1
TG3-12X12
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH115
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
F
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909359
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1F
GCM
NOTE:
1. SEE ENLARGED MECHANICAL ROOM PLANS FOR
MORE DETAIL LOCATIONS OF DUCT DEVICES, ETC.
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
B.9 D
B C.9
MATCHLINE: BLOCK 1G
MATCHLINE: BLOCK 1A
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H ø
S F
-P
LC
AHU-1A
S1-10Ø
36ø ø
38ø ø
VAV1A-08
V A
V 1A
-0 x1
S1-10Ø
S 1-
8Ø
R1-8Ø
R1-10Ø
S1-8Ø
R1-6Ø
S1-8Ø
R1-8Ø
R1-6Ø
R1-6Ø
S1-6Ø
S1-6Ø
S1-8Ø
R1-8Ø
R1-6Ø
R1-6Ø
E1-6Ø
S1-6Ø
VAV1A-07
16ø
VAV1A-06
D D
P -1
D D
P -2
D D
P -3
D D
P -4
D D
P -5
H -1
A
S1-10Ø
S1-10Ø
S1-6Ø
DTR-GEN
1H01
DTR-GEN
1H02
ST TLT
1G11
COMM RM
1H13
LPCO CLINIC
1G07
DIR DENTAL
SVCS
1G03
SEL OFC
1G04
OPS OFFICER
1G02
CLINIC MGR
1G01
TEAM COLLAB
1G05
LACT RM
1G10
MANAGED
CARE
1G06
STAIR
1GS1
CORRIDOR
1GC3
CORRIDOR
1GC4
CORRIDOR
1GC2
CORRIDOR
1GC1
E
LE
C T
R
IC
A L
Z O
N E
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
AC-1H13
24x92
6ø
14ø
20ø
12ø14ø ø
16ø 38 ø
S3-12X12
DTR-GEN
1H14
RECRUIT PUB
TLT, F
1B03
MECH
1A01
S1-8Ø
12x10 ø
C U
-4
FCU-1A01
DDC
DDC
ø ø
D D
C
D D
C
D D
P -6
34ø x1
HHWP-1
A1
M-304 ø ø
DS-AHU1A-2
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH116
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
G
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909360
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1G
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
D E F
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
MATCHLINE: BLOCK 1J
MATCHLINE: BLOCK 1C
V A
V 1A
-0
S1-8Ø
S1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
E1-6Ø
R1-6Ø
MATCHLINE: BLOCK 1J
MATCHLINE: BLOCK 1C
16ø
VAV1A-06
S1-10Ø
S1-10Ø
14x13
VAV1A-14VAV1A-13
14x13
S1-10Ø
R1-10Ø
R1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
E1-6Ø
E1-16Ø
S1-16Ø
34ø 26ø ø
14x1314x13
V A
V 1A
-1 ø
S 1-
Ø
S1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
VAV1A-11
E1-6Ø
20ø
R1-10Ø 315 14 ø
S1-10Ø
16ø
R1-10Ø
R1-10Ø
R1-10Ø
R1-10Ø
E1-6Ø
S1-10Ø
R1-10Ø
R1-10Ø
R1-10Ø
R2-12X12
22ø
R1-10Ø
R1-10Ø
R1-10Ø
R1-10Ø
R1-10Ø
DTR-GEN
1H01
DTR-GEN
1H03
DTR-GEN
1H08
DTR-GEN
1H10
DTR-GEN
1H09
DTR-GEN
1H15
DTR-GEN
1H19
DTR-GEN
1H21
DTR-GEN
1H14
DTR-GEN
1H06
DTR - GEN
1H07
DTR-GEN
1H02
DTR-GEN
1H16
DTR-GEN
1H18
DTR-GEN
1H20
DTR-GEN
1H22
P T
T
LT
1H
PT TLT
1H12
RECRUIT PUB
TLT, M
1B04
COMM RM
1H13
JAN CL
1H24
ELEC
1H23
ST TLT
1H11
CORRIDOR
1GC3
CORRIDOR
1HC1
CORRIDOR
1HC2
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
AC-1H13
AC-1H23
S1-8Ø
VAV1A-03
VAV1A-05
6ø
20ø 20x18
14ø
14ø ø
STAIR
1BS3
ø
S3-12X12 ø
RECRUIT PUB
TLT, F
1B03
R1-10Ø
DTR-GEN
1H05
S1-6Ø
R1-10Ø
R1-10Ø
18ø
S1-8Ø
16ø ø
36ø ø
S1-6Ø
26ø
DTR-GEN
1H04
A C
-1 J0
R1-10Ø
20x18
DDC
DDC
ø ø ø
E1-10Ø
CORRIDOR
1HC2
34ø ø
SPS
ø
20X40 EXH UP THOUGH 2ND
FLOOR CHASE. SEE SHEET
MH138 FOR CONTINUATION.
A1
M-304
10x14
14x14 x1
14x14
18ø
DS-AHU1A-2
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:1
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH117
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
H
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909361
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1H
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
K
MATCHLINE: BLOCK 1J
MATCHLINE: BLOCK 1C
R1-10Ø
R1-6Ø
R1-6Ø
MATCHLINE: BLOCK 1J
MATCHLINE: BLOCK 1C
E1-6Ø
E1-16Ø
S1-16Ø ø
E1-6Ø
VAV1A-15
R1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
E1-16Ø
E1-6Ø ø
R1-6Ø
R1-6Ø
S1-10Ø
R1-10Ø
R1-10Ø 300S1-10Ø
VAV1A-17
E1-6Ø
S1-10Ø
VAV1A-18
S1-10Ø
S1-10Ø
VAV1A-12
16x15
VAV1A-16
R1-10Ø
R2-12X12
R1-10Ø
20ø
R1-10Ø
34ø ø
DTR-GEN
1J10
DTR-GEN
1J07
DTR-GEN
1J03
CBCT
1J13
DTR-GEN
1J08
DTR-GEN
1J04
P T
T
LT
1H
PT TLT
1H12
MAIN COMM RM
1J02
JAN CL
1H24
DTR-GEN
1J06
CAD/CAM
MILLING
1J01
CAD/CAM
MILLING
1J11
CORRIDOR
1JC2
CORRIDOR
1JC1
MECH
1J15
AC-1K15
AC-1J02
R1-10Ø ø ø
CORRIDOR
1JC4
ø
22ø 26ø
22ø
16ø
S1-6Ø
S1-6Ø
16ø ø
24ø
R1-10Ø
R1-10Ø
DTR-GEN
1J09
20x18
S3-12X12
VAV1A-19
26ø
E1-6Ø
S1-6Ø
16ø
S1-8Ø
DTR-GEN
1J05
R1-10Ø ø
24ø ø ø
S1-16Ø
18ø ø
20x18
12x14
20x18 ø
12x10
FCU-1J15
A2
M-304
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:1
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH118
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
J
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909362
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1J
GCM
40X20 EXH UP THOUGH 2ND
FLOOR CHASE. SEE SHEET
MH138 FOR CONTINUATION.
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
L
S1-6Ø
R1-12Ø
S1-8Ø
28ø
E1-16Ø
E1-6Ø
R1-6Ø
E1-6Ø
24ø
20ø
S1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
E1-6Ø
S1-6Ø
R1-10Ø
S1-10Ø
S1-10Ø
R1-10Ø
R1-10Ø
S1-10Ø
S1-10Ø
R1-10Ø
S1-10Ø
S1-10Ø
R1-10Ø
R1-10Ø
S1-10Ø
R1-10Ø
S1-10Ø
R1-10Ø
S1-8Ø
VAV1B-08B
R1-10Ø
V A
V 1B
-0
R1-10Ø
R1-10Ø
10ø
DTR-GEN
1K18
DTR-GEN
1K19
DTR-GEN
1K09
DTR-GEN
1K11
DTR-GEN
1K05
PT TLT
1K01
PT TLT
1K20
DTR-GEN
1K04
DTR-GEN
1K10
DTR-GEN
1K12
DTR-GEN
1K06
DTR-GEN
1K08
DTR-GEN
1K03
JAN CL
1K02
ELEC
1K15
CORRIDOR
1LC1
CORRIDOR
1KC1
VAV1B-10
AC-1K15
VAV1B-07A
S1-10Ø
VAV1B-07B
V A
V 1B
-0 ø
22ø
24ø
14ø 12x10
28ø ø
E3-12X12
16x15
S1-6Ø
DTR-GEN
1K07
14ø
DTR-GEN
1K17
DTR-GEN
1K16 ø
R1-10Ø
12x1016x15
16x15 ø
14ø
R1-10Ø
24X20 EXH UP
THROUGH 2ND
FLOOR CHASE.
SEE SHEET
MH134 FOR
CONTINUATION.
12x10
16ø
VAV1B-12
8ø
10ø
10ø
S1-16Ø
S1-10Ø ø
8ø
S1-6Ø ø ø
26ø x8
SPS
VAV1B-08A
24ø
6ø ø
20ø
R1-10Ø ø
20ø 26ø
12x10
16x15
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:1
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH119
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
K
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909363
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1K
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
M
MATCHLINE: BLOCK 1L
MATCHLINE: BLOCK 1F
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
L
S1-8Ø
E1-6Ø
S1-6Ø
S1-10Ø
R1-6Ø
S1-6Ø
S1-12Ø
R1-16Ø
S1-12Ø
R1-16Ø
S1-12Ø
R1-6Ø
S1-6Ø
R1-6Ø ø
S1-6Ø
DTR-GEN
1K11
SMALL TEAMS
1L05
LPO AND
SUPER GEN
DEN
1L02
OIC 2ND DET
1L01
CORRIDOR
1LC1
14ø
E1-6Ø
VAV1B-03
x1
12ø
V A
V 1B
-0
V A
V 1B
-0 ø ø
20ø
DTR-GEN
1K12
2ND DET
DENTISTS
1L05c
2ND DET
DENTISTS
1L05b ø
LCPO 2ND DET
1L03 ø ø
8ø
ST TLT
1L04CORRIDOR
1KC2
ø
26ø x8
S1-8Ø x8
28ø
18ø
8ø
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:2
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH120
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
L
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909364
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1L
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
2.2
MATCHLINE: BLOCK 1C
MATCHLINE: BLOCK 1M
øS1-8Ø
S1-14Ø
S1-14Ø
S1-14Ø
S1-14Ø
E1-16Ø
E1-16Ø
E1-16Ø ø
VAV1B-15
12x10
CLASSROOM
1C01
LOBBY
1C07
ELEVATOR 1
1CE1
ELEVATOR 2
1CE2
16ø
VAV1B-06
x1
12ø
R1-6Ø
6ø ø
22ø
10ø
VAV1B-16B
VAV1B-16A
16ø
ELEV MACH
1C02
20x18
20x18
RECRUIT
IP/CLIN SPT
1C01A
S1-6Ø ø ø ø
A2
M-304
A C
-1 C ø ø
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:2
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH121
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
F
IR
S T
F L
O O
R
B L
O C
K
M
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909365
TEP TEP CLE
DUCTWORK PLAN FIRST FLOOR -
BLOCK 1M
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
VFD
B.9 D E F G H
J K L
MB C.9
MATCHLINE: BLOCK 2G
MATCHLINE: BLOCK 2A
MATCHLINE: BLOCK 2L
MATCHLINE: BLOCK 2F
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
L
M A
T C
H
LI
N E
: B
LO
C K
B
M A
T C
H
LI
N E
: B
LO
C K
C
M A
T C
H
LI
N E
: B
LO
C K
C
M A
T C
H
LI
N E
: B
LO
C K
D
C4
M-306
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
6' 12' 24'
SCALE: 3/32"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:3
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
3/32" = 1'-0"
SCALE: 3/32" = 1'-0"
MH130
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
C O
M P
O S
IT
E
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909366
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
COMPOSITE
GCM
SHEET NOTE:
PROVIDE HINGED ACCESS DOORS IN DUCTWORK AS INDICATED IN SPEC 23 30
00 SECTION 2.9.3.
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
B C.9
MATCHLINE: BLOCK 2G
MATCHLINE: BLOCK 2A
M A
T C
H
LI
N E
: B
LO
C K
A
M A
T C
H
LI
N E
: B
LO
C K
B
E1-6Ø
VAV2A-03
E1-8Ø
E1-8Ø
RF-PLC
CC-2A
SF-PLC
S3-12X12
VAV2A-05
H-2A
DDP-9
DDP-10
DDC
DDC
36ø
S1-8Ø
S1-8Ø
F LOCKERS
2A05
F SHOWER
2A05B
F TLT
2A05A
M TLT
2A08
JAN CL
2A03
ELEC
2A02
MECH
2A04
SCRUB ALC
2A05C
ELECTRICAL ZONE
120x24 OA INTAKE
LOUVER. SEE SHEET
M-701 FOR OUTDOOR
AIR PLENUM DETAIL.
A C
-2 A
AHU-2A 80x50
24x24
36x3826x80
26x80 ø
14ø10ø
R1-10Ø
S1-12Ø ø ø
18ø 18ø
E1-6Ø
S1-8Ø ø ø
R1-12Ø
B1
M-304
FCU-2A04
8ø
8'X6' REMOVABLE
LOUVER
10ø
10ø
12x12
ATTIC ACCESS LADDER
C4
M-306
6ø
14ø
6ø S
S
PROVIDE DIFFUSER OF
SS MATERIAL TYPE
CONSTRUCTION.
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:3
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH131
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909367
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2A
GCM
NOTE:
1. SEE ENLARGED MECHANICAL ROOM PLANS FOR
MORE DETAIL LOCATIONS OF DUCT DEVICES, ETC.
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
C.9
M A
T C
H
LI
N E
: B
LO
C K
A
M A
T C
H
LI
N E
: B
LO
C K
B
M A
T C
H
LI
N E
: B
LO
C K
B
M A
T C
H
LI
N E
: B
LO
C K
C
E1-8Ø
H-2A
DDP-9
DDP-10
DDC
DDC
VAV2A-06
S1-8Ø
S1-14Ø
E1-6Ø
10ø
VAV2A-13
S1-6Ø
S1-8Ø
S1-8Ø
S1-8Ø
S1-8Ø
R1-16Ø
VAV2A-15
DTR-OH
2B03
DTR-OH
2B04
DTR-OH
2B05
DTR-OH
2B02
M LOCKERS
2B01
F SHOWER
2A05B
M SHOWER
2B01A
M TLT
2A08
JAN CL
2B06
SCRUB ALC
2A05C
TEAM COLLAB
2B07
SCRUB ALC
2A06
RECRUIT
WAITING
2C10b
CORRIDOR
2HC2
V A
V 2A
-1
12ø
R1-8Ø
R1-8Ø 260 R1-8Ø
R1-8Ø
R1-6Ø
R1-10Ø
80x50
26x80 ø
14ø
22ø 22ø 18ø
18ø 18ø
E1-6Ø ø ø
E1-6Ø ø
12x10 ø
26X22 EXH UP TO
EF2A-1 IN ATTIC.
R1-12Ø
8ø
M LOCKERS
2B01
8'X6' REMOVABLE
LOUVER
10ø
6ø ø
S1-6Ø
12x12
8ø
8ø
6ø
14x16 x1 x1 ø ø øTG3-10Ø
150 TG3-10Ø
22ø ø x1
C4
M-306
16x15
18ø
6ø S
S
PROVIDE DIFFUSER OF
SS MATERIAL TYPE
CONSTRUCTION.
6ø SS
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:3
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH132
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
B
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909368
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2B
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
M A
T C
H
LI
N E
: B
LO
C K
B
M A
T C
H
LI
N E
: B
LO
C K
C
M A
T C
H
LI
N E
: B
LO
C K
C
M A
T C
H
LI
N E
: B
LO
C K
D
S1-6Ø
R1-16Ø
S1-10Ø
S2-10Ø
S2-10Ø
V A
V 2B
-0 3S2-10Ø
S2-10Ø
V A
V 2B
-0 x1
V A
V 2B
-0
S1-10Ø
S1-8Ø
V A
V 2B
-0
S1-8Ø
VAV2B-06
R1-8Ø
E1-6Ø
S2-10Ø
R1-16Ø
RECRUIT
WAITING
2C10b
RECRUIT
WAITING
2C10b
WORKROOM
PREP
2C04
PT TLT
2C15
RECOVERY
2C09
DTR-OS
2C06
DTR-OS
2C08
DTR-OS
2C02
DTR-OS
2C01
DTR-OS
2C05
CORRIDOR
2CC1
CORRIDOR
2CC2
CORRIDOR
2CC3
LOBBY
2C10
ELEVATOR 1
2CE1
ELEVATOR 2
2CE2
S1-8Ø
S1-10Ø
R1-16Ø
24ø
E3-12X12
E3-12X12 170
E3-12X12
E3-12X12
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
J
R1-14Ø
8ø
8ø
8ø x1
R1-6Ø ø
16ø øS1-8Ø
S1-8Ø
12x10 x1
8ø
8ø
VAV2B-10
6ø ø
6ø ø
20x18
16ø ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
20X14 EXH UP TO
EF2B-2 IN ATTIC.
14ø
28ø
12x10 x1
22ø ø
TG3-8Ø
TG3-8Ø
TG3-10Ø
ø
R1-14Ø
8ø
16ø
E3-12X12
24ø
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:3
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH133
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
C
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909369
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2C
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
M A
T C
H
LI
N E
: B
LO
C K
M
M A
T C
H
LI
N E
: B
LO
C K
F
M A
T C
H
LI
N E
: B
LO
C K
C
M A
T C
H
LI
N E
: B
LO
C K
D
V A
V 2B
-0
S1-8Ø
S1-12Ø
S1-12Ø
C A
H -2
C A
H -3
C A
H -1
C A
H -6
C A
H -5
V A
V 2B
-1
C A
H -7
C A
H -8
C A
H -9
C A
H -1
C
A H
-1
C A
H -1
S 1-
Ø
S1-14Ø
S1-12Ø
28ø
S1-6Ø
S1-6Ø
VAV2B-13
12x10
R1-6Ø
S1-6Ø
R1-6Ø
S3-12X12
D D
P -1
D D
C
D D
P -1
H -2
B
SL LINEN
2F01
COMM RM
2D07
CMS CUB
2D05
DENTAL MECH
2D06
RECRUIT
WAITING
2C10b
CORRIDOR
2KC2
CORRIDOR
2DC1
CORRIDOR
2CC3
x3
R1-6Ø
R1-6Ø
R1-6Ø
R1-8Ø ø
12x10
24ø 30ø
AC-2K15
DECON
2D03
STERILIZATION
2D02
STER STOR
2D01
E1-6Ø
22ø22ø
S1-14Ø
C A
H -4
S1-12Ø x1 ø20 x1 ø
S S
16ø 22ø 12ø
R1-6Ø
S3-12X12 ø ø ø ø
R1-14Ø
24X20 EXH FROM FIRST FLOOR
UP TO EF1B-1 IN ATTIC.
18X26 EXH UP
TO EF2B-2 IN
ATTIC.
S1-6Ø x1
VAV2B-10
V A
V 2B
-1
28ø
C4
M-305
A4
M-305
C3
M-306
TG3-10Ø
TG3-10Ø
F
PROVIDE FIRE DAMPER AT
FLOOR PENETRATION.SEE
FLOOR FIRE DAMPER
DETAIL ON SHEET M-702.
TG3-10Ø
TG3-10Ø
TG3-10Ø
TG3-10Ø
VAV2B-17
12x10
AC-2D07
E
LE
C T
R
IC
A L
Z O
N E ø 10 ø ø ø ø
S S ø
S S
S1-10Ø
CORRIDOR
2FC1
8'X6' REMOVABLE
LOUVER
12ø
R1-14Ø
SPS
SPS
16ø ø
ATTIC ACCESS
LADDER
22ø
8ø SS 8ø SS
10ø SS 8ø SS
8ø SS ø
S S
10ø SS ø
S S ø
S S
8ø S
S
10ø SS
10ø SS
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:4
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH134
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909370
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2D
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
VFD
M
M A
T C
H
LI
N E
: B
LO
C K
M
M A
T C
H
LI
N E
: B
LO
C K
F
MATCHLINE: BLOCK 2L
MATCHLINE: BLOCK 2F
M A
T C
H
LI
N E
: B
LO
C K
D
M A
T C
H
LI
N E
: B
LO
C K
F
S1-6Ø
S1-6Ø
VAV2B-13
12x10
S1-6Ø
S3-12X12
D D
P -1
D D
C
D D
C
D D
P -1
H -2
B
SL LINEN
2F01
S O
IL
U
T
IL
2F
MECH
2F05
ELEC
2F03
BIOMED
2F08
SPECIALTY
SUPP STOR
2F06
RECYCLE
2F04
ST TLT
2F07
CORRIDOR
2FC2
STAIR
2FS2
ELEVATOR 3
2FE3
x5 x4 x3
R1-12Ø
S3-12X12 x1
V A
V 2B
-1
S1-14Ø
16x15
VAV2B-15
E1-6Ø
S1-8Ø ø
16ø
38ø ø
38ø
S1-6Ø
S1-8Ø
R1-8Ø
R1-6Ø
CC-2B
HC-2B
12x10
30ø
AC-2F03
CAH-14
E1-6Ø
E1-6Ø
8ø 14ø
22ø
8ø
8ø
E1-6Ø
16X16 EXH DUCT FROM 1ST
FLOOR TO EF1B-1 IN ATTIC.
26x97
26x80
12ø
28ø
B3
M-304
C3
M-306
VAV2B-17
12x10
E
LE
C T
R
IC
A L
Z O
N E
S1-10Ø
CORRIDOR
2FC1
FCU-2F05
SF-PLC
RF-PLC
TG1-10Ø
AHU-2B
VAV2B-14
ø
F
PROVIDE FIRE DAMPER AT
FLOOR PENETRATION.SEE
FLOOR FIRE DAMPER
DETAIL ON SHEET M-702.
8'X6' REMOVABLE
LOUVER
12ø
12ø
12ø
6ø
EXH UP TO EF2B-1. SEE C2 ON
SHEET M-305 FOR HEAT HOOD
INSTALLATION DETAILS.
S/D
SECOND FLOOR
EMERGENCY AIR
DISTRIBUTION
SHUTDOWN SWITCH
(KEYED).
ATTIC ACCESS
LADDER
22ø ø
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:4
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH135
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
F
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909371
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2F
GCM
60x72 OA INTAKE LOUVER. SEE
SHEET M-701 FOR OUTDOOR AIR
PLENUM DETAIL.
NOTE:
1. SEE ENLARGED MECHANICAL ROOM PLANS FOR
MORE DETAIL LOCATIONS OF DUCT DEVICES, ETC.
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
B C.9
MATCHLINE: BLOCK 2G
MATCHLINE: BLOCK 2A
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
S1-8Ø
ST TLT
2G01
F LOCKERS
2A05
F SHOWER
2A05B
COMM RM
2H15
SCRUB ALC
2A05C
SCRUB ALC
2A06
LOUNGE
2G02
STAIR
2AS1
CORRIDOR
2GC1
CORRIDOR
2GC2
CORRIDOR
2AC1
x1
V A
V 2A
-0
S1-10Ø
E1-6Ø
30ø
R1-14Ø
R1-14Ø
S1-10Ø
S1-10Ø
S1-10Ø
32ø
S1-8Ø
S1-8Ø
S1-8Ø
S1-8Ø x1
VAV2A-02
ø
S1-10Ø
S1-8Ø
S3-12X12
V A
V 2A
-1
VAV2A-04
S1-12Ø
S1-8Ø
R1-10Ø
R1-10Ø ø
24ø 22ø 22ø
AC-2H15
ø
18ø 18ø ø ø ø
S1-8Ø
R1-12Ø
10ø x1 ø ø
22ø ø
12ø ø
SOMERSET
2G03a
30ø
16x15
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:5
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH136
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
G
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909372
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2G
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
C.9
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
G
M A
T C
H
LI
N E
: B
LO
C K
H
E1-6Ø
10ø
VAV2A-13
S1-6Ø
S1-8Ø
S1-8Ø
S1-8Ø
S1-8Ø
S1-6Ø
R1-16Ø
VAV2A-15
DTR-COMP
2H10
DTR-ENDO
2H01
DTR-ENDO
2H03
DTR-ENDO
2H05
DTR-ENDO
2H02
DTR-ENDO
2H04
DTR-ENDO
2H06
DTR-OH
2B03
DTR-OH
2B04
DTR-PERIO
2H17
DTR-PERIO
2H16
PT TLT
2H12CBCT
2H08
LPO
ENDO/PERIO/INPROC
2H07
ENDO
PROVIDERS
2H11
PERIO OFC
2H18
DTR-OH
2B05
DTR-OH
2B02
M LOCKERS
2B01
COMM RM
2H15
JAN CL
2B06
ELEC
2H19
TEAM COLLAB
2B07
SCRUB ALC
2A06
STORAGE
2H20
CORRIDOR
2GC2
CORRIDOR
2HC1
CORRIDOR
2JC3
CORRIDOR
2HC2
32ø ø
S1-10Ø
S1-8Ø
S3-12X12
V A
V 2A
-1
S1-8Ø
S1-8Ø
22ø
V A
V 2A
-0
S1-10Ø
S1-10Ø
V A
V 2A
-0
S1-8Ø
S1-8Ø 260 V
A V
2A -1
S1-6Ø
S1-10Ø
E1-6Ø
V A
V 2A
-1 1S1-14Ø
S1-6Ø
R1-6Ø
R2-12X12
12ø
R1-8Ø
R1-8Ø 260 R1-8Ø
R1-8Ø
R1-6Ø
R1-10Ø
VAV2A-09
E3-12X12
R1-8Ø
S1-10Ø
AC-2H19
ø
A C
-2 J0
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
J
22ø 18ø
AC-2H15
E3-12X12
S1-14Ø
R1-6Ø
14ø
E2-14X8 210
E2-14X8
E2-14X8
14ø
E2-14X8
E2-14X8
E2-14X8
32ø ø ø
14ø
E2-14X8
R1-8Ø
30ø
18ø ø
E1-6Ø ø
8ø
R1-6Ø ø
12x10
R1-14Ø ø
R1-8Ø
20X40 EXH FROM FIRST
FLOOR TO EF1A-1 IN ATTIC.
VAV2A-14
R1-12Ø
6ø
S1-6Ø
12x12
8ø
8ø
6ø x1 x1 ø
TG3-10Ø
150 TG3-10Ø
ø ø
S1-6Ø
12ø
20ø
TG3-10Ø
x1
14x13
TG3-10Ø
x1
F
PROVIDE FIRE DAMPER AT
FLOOR PENETRATION.SEE
FLOOR FIRE DAMPER DETAIL
ON SHEET M-702.
TG3-8Ø
15020 ø
S1-14Ø ø
TG3-8Ø
A1
M-304 x1
10ø
30ø
16x15
12ø
18ø
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:5
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH137
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
H
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909373
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2H
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
K
S1-6Ø
S1-6Ø
V A
V 2B
-0 3S2-10Ø
V A
V 2B
-0
VAV2B-06
S1-12Ø
PT TLT
2K02
PT TLT
2H12
CLASSROOM,
TABLE/CHAIR
2J01
CONF RM
2J01A
ENDO
PROVIDERS
2H11
AD TLT
2K01
WORKROOM
PREP
2C04
DTR-OS
2C02
DTR-OS
2J05
MED PREP
2J14
DTR-OS
2C05
DTR-OS
2J06
DTR-OS
2J11
COMM RM
2J03
STORAGE
2H20
CORRIDOR
2CC1
CORRIDOR
2JC3
CORRIDOR
2JC4
CORRIDOR
2JC2
CORRIDOR
2JC1
E1-6Ø
22ø
24ø
R1-14Ø
R1-14Ø
20ø
R1-8Ø
12x12
20ø
S1-6Ø
S1-6Ø
S1-10Ø
S1-10Ø
S1-10Ø
S1-10Ø
16x14
VAV2A-16
R1-16Ø
S1-6Ø
S3-12X12
V A
V 2B
-1
VAV2B-08
S2-10Ø
S1-8Ø ø
VAV2B-05
12x10
S1-10Ø
S2-10Ø
S2-10Ø
R1-16Ø
E3-12X12
E3-12X12 ø
20ø
E3-12X12
E3-12X12
E3-12X12
E3-12X12
R2-12X12
A C
-2 J0
M A
T C
H
LI
N E
: B
LO
C K
H
M A
T C
H
LI
N E
: B
LO
C K
J
10ø
24ø
E1-6Ø
8ø x1
10ø
8ø
8ø
S2-10Ø
E1-6Ø ø
R1-6Ø
8ø
8ø
R1-8Ø
VAV2B-07
ø ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
14ø
28ø ø
TG3-10Ø
TG3-10Ø
DTR-OS
2J10
ELEC
2K15
12ø
10ø x1
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
TG3-8Ø
10ø ø
R1-14Ø
8ø
SPS
16ø
12ø
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:5
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH138
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
J
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909374
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2J
GCM
F
20X40 EXH FROM FIRST
FLOOR TO EF1A-1 IN ATTIC.
PROVIDE FIRE DAMPER AT
FLOOR PENETRATION.SEE
FLOOR FIRE DAMPER DETAIL
ON SHEET M-702.
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
H
J K
M A
T C
H
LI
N E
: B
LO
C K
D
M A
T C
H
LI
N E
: B
LO
C K
F
M A
T C
H
LI
N E
: B
LO
C K
J
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
L
28ø
S1-6Ø
S1-6Ø
DTR- PROST
2K11
DTR- PROST
2K07DTR- PROST
2K05
DTR- PROST
2K03
PT TLT
2K02
ORAL
SURGEONS
2K16
PROSTH/PERIO
PROVIDERS
2K19DEPT HEAD
SPEC
DENTISTRY
2K17
LPO
PROSTH/OS
2K20
DTR-COMP
2K04
CAD/CAM ALC
2K09
AD TLT
2K01
DTR-GEN
2K06 DTR-GEN
2K08
DTR-GEN
2K10
ELEC
2K15
CORRIDOR
2KC2
CORRIDOR
2JC2
CORRIDOR
2KC1
CORRIDOR
2LC1
R1-6Ø
V A
V 2B
-1
R1-14Ø
R1-14Ø
24ø 18ø
R1-6Ø x1
VAV2A-21
20ø
14x14
VAV2A-18
S1-14Ø
S1-14Ø
S1-14Ø 490 S1-14Ø
R1-14Ø ø
12x8
VAV2A-20
S1-6Ø
S1-8Ø
VAV2A-17
S1-10Ø
16x14
VAV2A-19
S1-8Ø
S1-8Ø
S1-6Ø
R1-8Ø
R1-6Ø
14ø
R1-8Ø
R1-8Ø
S1-6Ø
S1-8Ø
S1-6Ø
S1-6Ø
S1-6Ø
R1-6Ø
R1-6Ø
R1-8Ø ø
12x10
AC-2K15
E1-6Ø
R1-14Ø
125 CFM 4" EXH UP TO
EF2B-1 IN ATTIC. SEE
EXHAUST SNORKEL
(UL225) DETAIL ON
SHEET M-702.
E1-6Ø
16ø 22ø 12ø
E1-6Ø
E2-14X8 ø
12x10
24X20 EXH FROM FIRST FLOOR
UP TO EF1B-1 IN ATTIC.
VAV2B-09
18X26 EXH UP
TO EF2B-2 IN
ATTIC.
S1-6Ø
28ø28ø
TG3-10Ø
TG3-10Ø
F
PROVIDE FIRE DAMPER AT
FLOOR PENETRATION.SEE
FLOOR FIRE DAMPER
DETAIL ON SHEET M-702.
TG3-10Ø
TG3-10Ø
TG3-10Ø
TG3-10Ø
S1-10Ø
CORRIDOR
2FC1
12ø x1
TG3-8Ø
TG3-8Ø
10ø
12x10 14ø
R1-14Ø
S1-10Ø
E1-6Ø
TEAM COLLAB
2K12
SPS
16ø
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH139
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
K
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909375
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2K
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
M
MATCHLINE: BLOCK 2L
MATCHLINE: BLOCK 2F
M A
T C
H
LI
N E
: B
LO
C K
K
M A
T C
H
LI
N E
: B
LO
C K
L
CERAMICS LAB
2L04
5 AXIS MILLING
2L02
DENTAL
LABORATORY
2L01
LAB EQ STOR
2L03
LPO
PROSTH/OS
2K20
JAN CL
2L05
STAIR
2FS2
CORRIDOR
2LC1
38ø
S1-10Ø ø
R1-6Ø
R1-14Ø ø
S1-6Ø
S1-6Ø
E1-16Ø
S1-14Ø
S1-14Ø
S1-16Ø
S1-16Ø
S1-16Ø
S1-16Ø
S1-6Ø
12x10
S1-16Ø
S1-16Ø
125 CFM 4" EXH UP TO
EF2B-1 IN ATTIC. SEE
EXHAUST SNORKEL
(UL225) DETAIL ON
SHEET M-702.
ø
CAH-13
8ø SS
E1-14Ø
E1-14Ø ø
E1-6Ø
CAH-14
VAV2B-09
14ø
28ø
C1
M-305
C2
M-305
CORRIDOR
2FC1
TG1-10Ø
VAV2B-14
12ø
S1-10Ø
S1-14Ø
E1-6Ø
20x18
20x18
20x18
TEAM COLLAB
2K12
TG1-10Ø
EXH UP TO
EF2B-1 IN ATTIC.
18" EXH UP TO EF2B-1. SEE C1 ON
M-305 FOR HEAT HOOD
INSTALLATION DETAILS.
475 CFM EXH. SEE FUME HOOD
(D0925A) CONNECTION DETAIL ON
SHEET M-703.
EXH UP TO
EF2B-1 IN ATTIC.
EXH UP TO EF2B-1. SEE C2 ON
SHEET M-305 FOR HEAT HOOD
INSTALLATION DETAILS.
x1
2PS
24ø
RC-01
SV-01
SV-03
SV-02A
RC-02A
RC-02B
SV-02B
RC-03
24ø
14ø
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
IS
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A M
C
U s e rs \t ro y .p e rs a u d
\D o c u m e n ts
\2
.0
M tr o y .p e rs a u d .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
MH140
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
D U
C T
W O
R K
P L
A N
S E
C O
N D
F L
O O
R
B L
O C
K
L
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909376
TEP TEP CLE
DUCTWORK PLAN SECOND FLOOR -
BLOCK 2L
GCM
PROFESSIONAL
NO. 39614
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D
E
TS
P
T R O Y
D
J K L
M
EF2B-2EF1A-1
EF2A-1
EF1B-1
EF2B-1
E V
-0
EV-06
ø ø
24ø ø ø
18ø ø ø
22ø ø
24ø
22X16 EXH UP TO ROOF. SEE
SHEET M-703 FOR UPBLAST
FUME EXHAUST FAN DETAIL.
18X14 EXH UP TO
GR1B-1 ON ROOF.
20X14 EXH UP TO
GR2B-1 ON ROOF.
16X10 EXH UP TO
GRA1A-1 ON ROOF.
12X16 EXH UP TO
GR2A-1 ON ROOF.
24X20 EXH UP FROM
2ND FLOOR. SEE SHEET
MH139 FOR
CONTINUATION.
16X16 EXH UP FROM 2ND FLOOR
MECHANICAL ROOM 2F05. SEE
SHEET MH135 FOR CONTINUATION.
26X18 EXH UP FROM
2ND FLOOR. SHEET
MH139 FOR
CONTINUATION.
14X20 EXH UP FROM
2ND FLOOR. SEE SHEET
MH133 FOR
CONTINUATION.
40X20 EXH UP FROM
2ND FLOOR. SEE SHEET
MH137 FOR
CONTINUATION.
ø
E V
-0
E V
-0
E V
-0
E V
-0
16ø ø ø
8ø SS
8ø
EXH UP FROM 2ND FLOOR.
SEE SHEET MH140 FOR
CONTINUATION.
S P
S-
24ø 24ø SS
24ø
14ø
28ø ø
S S ø
S S
DS-EF2B-1
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134 135 136
140139138
SECOND FLOOR KEY PLAN
PLAN
NORTH
2A
2C 2F
2G 2J
2L 2H
2B
2K
2D 132 133 134…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .