This document is an Amendment of Solicitation (Amendment 0008) for the P-7889 Dental Clinic Replacement project at the Marine Corps Recruit Depot in Parris Island, South Carolina. The amendment provides detailed responses to multiple pre-proposal inquiries and clarifications across various technical and design aspects, including equipment specifications, construction materials, utility systems, elevator capacities, roofing systems, and photovoltaic system details. Key clarifications include guidance on dental equipment procurement, confirmation of metal stud gauge sizes, specifications for solar module and inverter systems, and responses to technical questions about construction materials and building systems.
The solicitation maintains the original response date of 01 May 2025 at 2:00 PM EDT, with the amendment providing contractors additional technical guidance to help them prepare accurate and compliant proposals. The amendment addresses questions about equipment specifications, construction techniques, utility installations, and technical requirements across multiple disciplines, including electrical, mechanical, architectural, and structural elements. The document emphasizes that contractors should base their submissions on meeting the specified requirements and that there are no prior approval clauses for most technical systems, requiring contractors to provide solutions that meet the contract document specifications.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No.: N4008525R2500 - P7889 Dental Clinic Replacement, MCRD, Parris Island, SC
Solicitation Response Date: 01 May 2025 NLT 2:00PM EDT.
See Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Apr-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008525R2500
X 9B. DATED (SEE ITEM 11)
24-Feb-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Apr-2025
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008525R2500
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0008
The purpose of thie amendment is to:
1. Provide responses to pre-proposal inquiries
2. Provide supporting documentation
a. See “USMC ESS_Standard Equip List-v6.1”.
Reference Question Response
Page Section Para Technical
Amendment 4 and 01 14 00 and 01 32
17.00 20
Please confirm if the restrictions applied in Technical Amendment 4 (3/11/25) are of the same type of requirements set forth in COST-LOADED
NETWORK ANALYSIS SCHEDULES (NAS)
Anticipated Restricted Delays (01 32 17.00 20, 1.10.1.8) or if this is in addition to. For instance
1.10.1.9 calls for one lost workday for every two months of project duration (so 6 days a year) plus up to 88 additional days a year.
See revised Work Restrictions issued with Amendment 005.
02 41 00 Please confirm that all equipment will be left behind for the demolition to dispose of in Building 674, including x-ray machines, operating chairs, etc.
Equipment will be evaluated by the Government for use in the new facility or sent to DRMO.
As-Built Dwgs
To better evaluate the scope of demolition, can the government provide copies of the As Built drawings for BLDG 602 and 674.
Foundation drawings provided in Amendment 004.
01 57 19.01 20 -1.3.1.3
Section 01 57 19, page 3 under 1.3.1.3 Surplus and Impacted Media Management says, "The Contractor should understand that the soils produced during excavation and construction, and ground water produced from dewatering of excavations and trenches, may be contaminated with chemical constituents. Appropriate planning and considerations for likely profiling and offsite disposal of impacted media should be made prior to construction." It is unknown what quantity of excavated soil will be contaminated. Please provide a unit price line item on the bid form with a quantity of contaminated soils in cubic yards and a line item for contaminated ground water in gallons.
See CLIN 1D. Specification section 01 57 19.01 20 Paragraph 1.3.1.3.1 Purpose and Overview states "Contractor shall provide the Contracting Officer with written notification of the quantity, lab testing documentation, and anticipated volume of surplus or impacted soil or groundwater that is anticipated to be generated and disposed during construction.
T-002 Please provide the "USMC ESS STANDARD
EQUIPMENT AND MATERIALS LIST"
mentioned in Note #1 of NIWC IDS/DURESS EQUIPMENT chart on T-002.
Provided with AMD 0008.
11 78 13 2.2.13 The floor-mounted dental utility centers typically come provided with the dental chairs, and only work with that specific make/model of dental chair. For bidding purposes, please clarify which model of dental chair the Govt intends to procure;
otherwise, please advise how to bid this particular item.
Bidder should base bids off an intended manufacturer that meets specification requirements.
General Please provide an equipment utility schedule for all Category C equipment.
Contract documents were designed in coordination to ensure utilities are available for all categories of equipment.
A-730 Based on hoistway dimensions and cab size indicated on A-730 for elevators CE1 and CE2, the designed 4,500 lb capacaity is not feasible.
Please confirm 4,000 lb capacity is acceptable for CE1 and CE2.
Similar item addressed in AMD 0005.
Passenger elevators 1CE1 and 1CE2 will be 4000lb elevators. Will correct Section 14 24 23 Paragraph 2.1.1.1.
Supporting documentation to be provided in forthcoming amendment.
Section 14 24 23 Paragraph 2.1.1.1 Type changed to Twinpost above ground 1-stage and rated load to 4000lbs with 4'-0" depth (1CE1 and 1CE2). Paragraph 2.1.1.2 type changes to Twinpost above ground 1-stage but 1FE3 remains same rated load as 4500lb with 4'-0" pit depth.
Supporting documentation to be provided in forthcoming amendment.
117100- 7.2.4.6
Please provide a basis of design manufacturer and model number for the pass-thru windows S1099A and S1900E.
Answered in AMD 0005. Basis of design is not provided unless there is approval for sole source and a J&A.
Base bid off of intended make and model that meets specs.
B3/A-431 The A-661 Finish Schedule does not have any casework or countertop finishes noted. Elevation B3/A-431 notes CRS metal casework and SS4 solid surface countertops. Please confirm casework and countertop materials are to be per elevations.
Similar item addressed in AMD 0005. Casework is CRS metal and countertop is SS4 per the elevation B3 on A-431. See technical amendment 8.
A-680 Please confirm whether F3010 Bulletin Board is to be CFCI or GFGI. It is listed in both schedules on A-680
Answered in AMD 0005. F3010 is GFGI; it is not CFCI. See technical amendment 8
117213- 2.2.7
117213-2.2.7 details the D0904 workstation to have steel construction cabinets; however, addendum 4 calls for all "D" tags to be plastic laminate construction. Please confirm the cabinets and support components for all D0904 should be plastic laminate not metal.
Answered in AMD 0005 . There is no laminate clad metal casework in the project. The specification paragraph 2.1.2 in 12.35.70 will be deleted. CRS cabinets (corrosion resistant steel) are to be all metal construction. PL1/PL2 plastic laminate cabinets are to be AWI premium grade. All dental modular casework with a "D" JSN is laminate over particle board, (see medical equipment cut sheets and specifications).
117213- 2.2.7
117213- 2.2.7 details the D0904 to have a worksurface made from heat, abrasion, and chemical resistant material. Please provide provide the finish and material for the countertops at all D0904.
Answered in AMD 0005. Specs do not specify required materiel; please ensure proposed make and model provides a countertop made of a heat, abrasion and chemical resistant materiel.
117213- 2.2.7
117213-2.2.7 details the D0904 to have overhead lighting, electrical lines, and several built in plumbing items. This seems to be a prefabricated workstation that would be provided as a complete system, rather than casework and countertops with Mechanical/Electrical/Plumbing components being added in the field. Please provide a Basis of Design Manufacturer and Model number for D0904.
Answered in AMD 0005. Specs states this JSN to be a workstation; a pre-fabricated workstation would be a viable solution so long as it meets the stated details.
117213- 2.2.9
117213-2.2.9 details D0930, dental lab casting station. This seems to be prefabricated/assembled unit. Please provide a basis of design manufacturer and model number for D0930 and D0760 casting machine guard.
Answered in AMD 0005. Basis of design is not provided unless there is approval for sole source and a J&A.
A pre-fabricated workstation that meets the stated details would be a viable solution.
117213- 2.2.10
117213-2.2.10 details D0942, dental microblasting station. Please provide a basis of design manufacturer and model number
Answered in AMD 0005. Basis of design will not be provided. A pre-fabricated workstation that meets the stated details would be a viable solution.
117213- 2.2.11
117213-2.2.11 and 2.12 details D6150 and D6155 operating lights. Please provide a basis of design manufacturer and model number for the light.
Basis of design is not provided unless there is approval for sole source and a J&A. Base your submmission on requirements provided.
117100- 2.4.4
117100- 2.4.4 and 2.4.5 detail S0960E and S0965 washers. Please provided a basis of design model number for both units.
Basis of design is not provided unless there is approval for sole source and a J&A. Base your submmission on requirements provided.
117213- 2.2.4
117213-2.2.4 details D0755 tank assembly, please provided a basis of design model number and manufacturer.
Basis of design is not provided unless there is approval for sole source and a J&A. Base your submmission on requirements provided.
A-314, 07 52 00
The roof detail drawings such as A-314 state that the flat roof portion of the portico is to be constructed of an EPDM membrane roofing system. No specification Section for EPDM roofing has been provided. Please provide the EPDM specification section or clarify if this area of flat roofing is to be three-ply modified bitumen roof system per 07 52 00 (provided) in lieu of
EPDM.
Similar to line 163. Drawing notes will be changed to reflect "Membrane Roofing." See Technical Amendment 0008.
A-116, A-
The overhead coiling counter door #1F03B on Drawing A-116 shows the door in a type 1A wall.
Drawing A-550 calls for wall type 1A to be STC 42 rated. Please confirm that the coiling counter door #1F03B does not need to be STC rated.
Coiling Counter Door do not need to be STC rated.
A-114, A-
The overhead coiling counter doors for rooms #1C03A2 & #1C03C on Drawing A-114 shows the doors in a type 11 wall. Wall type 11 on drawing A-551 calls for the wall to be STC 50 rated. Please confirm that the coiling counter doors #1C03A2 & #1C03C do not need to be STC rated.
Coiling Counter Doors do not need to be STC rated.
CU102 Note 14 on CU102 calls out a jack and bore for the waterline crossing Blvd De France. Can this crossing be installed as an open cut utility installation with pavement patching. There is a significant cost savings for this installation to be open cut.
Our understanding is that the Base did not want an open utility cut across Blvd De France. Install as designed as open utility cut is not an option.
Spec 05 04 00
Please specify metal stud gauge sizes for exterior wall, brick soffits/columns shown on Dwg A501, A502, A505, A506, A507, S512, S513, S516, S521, S523
Per specification 05 40 00 and Paragraph H on drawing S-001, it is the contractor's responsibility to design cold-formed metal framing.
Note that minimum stud size and thickness requirements are given in Paragraph H.3 on S-001.
Spec 27 10 00
2.4.2 states equipment racks are to be 4 post free standing racks while T-401 shows 2 post racks and note 2 on T-401 specifies the NMCI rack to be a lockable cabinet. Can you please clarify what is required for equipment racks?
Provide standard and NMCI racks as described on sheets T-001 & T-401.
Dwg
EP501
Please confirm the correct DC and AC size for the photovoltaic system.
The minimum sizes are provided on the drawings. We show 80 panels at 350 watts, with an inverter size of 27.6kW.
Dwg
EP501
Could you please confirm the preferred manufacturers for solar modules, inverters, and racking systems? We propose using Longi 540W modules and SolarEdge/SMA inverters rated for 277/480V 3-phase 4-wire (datasheets attached).
Please confirm if these are acceptable.
There is no prior approval clause for this system. The Contractor must provide a system which meets the requirements of the Contract Documents.
Dwg
EP501
We plan to use Solaredge/SMA inverters, which are built-in wye configurations (3-phase, 4-wire) inverters. We won't need an isolation transformer that converts the output of these delta inverters into wye. Please confirm if this additional isolation transformer can be removed from the scope.
The electrical isolation provided by the transformer is required.
Dwg
EP501
Our understanding is that the PV contractor's scope is limited to providing and installing the solar panels, optimizers, inverters, racking, and AC disconnect, while the electrical contractor will be responsible for the final point of interconnection, including conduits and conductors from the AC disconnect to the main distribution panel. Please confirm if that is correct
We cannot answer questions which concern division of labor between sub-contractors. The General Contractor is responsible for the entire work, and division of labor must be coordinated with that entity as well as the other sub-contractors to ensure that a complete project is delivered.
Dwg E801
Please confirm if the rooftop lightning protection system falls under the PV scope of work or the electrical contractor's scope of work.
This is under the general contractor's scope to determine division of labor.
However, the two systems must be coordinated.