1686626dwg08of14_PLUMBING.pdf
PDF 43 MB Posted
- Solicitation number
- N4008525R2500
About this file
This file contains plumbing and medical gas system drawings and details for a dental clinic replacement project at Marine Corps Recruit Depot Parris Island, SC. The drawings show comprehensive plumbing plans for both floors including waste piping, pressure piping, and medical gas systems. Specific systems detailed include dental air compressors, oral evacuation, dental surgical vacuum, oxygen, nitrous oxide, and treated water systems.
The drawings include detailed floor plans showing pipe routing, equipment locations, valve placements, and connection details. Key equipment specifications are provided for dental air compressors (DAC-1), oral evacuation systems (OE-1 and OE-2), medical gas manifolds, and dental utility connections. Detailed control diagrams and sequences of operation are included for the oral evacuation and dental air systems. The plans require specialized plumbing infrastructure to support dental operatories including amalgam separators, sterilization equipment, and medical gas zone valve boxes. All systems must be installed according to NFPA 99 requirements for medical gas and vacuum systems.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: LEGEND IS UNABRIDGED.
SOME SYMBOLOGY & PIPING
LINETYPES INDICATED MAY NOT
BE INCLUDED IN PROJECT.
ACID WASTE
DEIONIZED WATER
DENTAL ORAL EVACUATION
TREATED WATER (REVERSE OSMOSIS)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER, 140º
DOMESTIC HOT WATER, 160º
DOMESTIC HOT WATER RETURN
TEPID WATER
GREASE WASTE
INSTRUMENT COMPRESSED AIR
LAB COMPRESSED AIR - DENTAL (30-35 PSIG)
LAB COMPRESSED AIR - MEDICAL (50-55 PSIG)
LAB DUST EVACUATION
MEDICAL CARBON DIOXIDE
MEDICAL COMPRESSED AIR
MEDICAL HELIUM
MEDICAL HYDROGEN
MEDICAL NITROGEN
MEDICAL NITROUS OXIDE
MEDICAL OXYGEN
MEDICAL SURGICAL VACUUM
MEDICAL WAGD
NATURAL GAS, 2 PSIG
PROCESS COMPRESSED AIR
SANITARY WASTE
UNDERGROUND PIPE
STORM DRAIN
OVERFLOW DRAIN
ACID
NG
SS
PLUMBING LEGEND (UNABRIDGED)
OD
SD
LA
LA
IA
PA
MA
MV
OE
LDE
WAGD
O
CO2
NO
N
HE
H
DI
TR
140º
160º
TW
GR
FLOOR CLEANOUTFCO
CLEANOUT TO GRADECOTG
WATER METER
(PULSE ACCUMULATOR
OUTPUT TO BAS)
CONNECT TO EXISTING
AT INDICATED POINT
HUB DRAINHD
FLOOR SINKFS-1
FLOOR DRAINFD-1
ROOF DRAINRD
OVERFLOW DRAINOD
RD
OD
ROOF DRAIN ASSEMBLY
(SEE ARCH.)
BUTTERFLY VALVE
GATE VALVE
NON-SLAM CHECK VALVE
PLUG VALVE
CALIBRATED BALANCING VALVE
GAS COCK
WATER HAMMER ARRESTOR
HOSE BIBB
HB
WALL HYDRANT (FREEZE PROOF)
WH
ELBOW, TURNED DOWN
ELBOW, TURNED UP
BRANCH BOTTOM CONNECTION
BRANCH TOP CONNECTION
CAP OR PLUG
PUMP
RISE OR DROP
NON-POTABLE WATERNPW
CLEANOUT CO
A
UNION
CEILING ACCESS PANEL
DENTAL COMPRESSED AIRDA
DENTAL SURGICAL VACUUMDSV
BALL VALVE
UNIT MARK
SEE ABBREVIATIONS
XXX-#
VENT
THERMOMETER
PRESSURE GAUGE
BACKFLOW PREVENTER
(SEE DETAILS FOR TYPE)
ELECTRONIC TRAP PRIMER
FLOOR SINK, FLOOR DRAIN,
HUB DRAIN CONNECTION
IDENTIFIER
DRAIN CONNECTION
IDENTIFIER TO ETP
PIPE SIZE TRANSITION
M
LOW VOLTAGE WIRE
PRESSURE RELIEF VALVE
3 WAY MOTORIZED
CONTROL VALVE
M
DUPLEX AIR FILTER
FLEXIBLE CONNECTOR
PRESSURE REDUCING VALVE
SOFTENED COLD WATER
SOFTENED HOT WATER
SOFTENED HOT WATER RETURN
SOFTENED HOT WATER, 140°S140º
SHWR
SHW
SCW
V
ETP-2-Z
ELECTRONIC TRAP PRIMER
CONNECTION IDENTIFIER
DOMESTIC WATER PLAN EXAMPLE.
ALSO SEE SANITARY PLANS FOR
DRAIN FIXTURE LOCATION.
FD-1
ETP MARK IDENTIFIER
(ETP-1)
ETP-1-#
ETP-2-#
ETP MARK IDENTIFIER
(ETP-2)
REDUCED PRESSURE BACKFLOW
PREVENTER (RPBP)
AIR EXHAUSTAE
AIR INTAKEAI
REDUCED PRESSURE BACKFLOW
PREVENTER (RPBP) WITH STRAINER
ZVB-#
ZVB MARK IDENTIFIER
MEDICAL GAS PIPE FROM ZVB
TO SERVED UNITS (TYP)
MEDICAL GAS PIPE FROM
MEDICAL GAS SOURCE TO
ZVB (TYP)
8" SLAB STEP (DEPRESSED
AREA)
OVERFLOW DRAIN
DOWNSPOUT
OD DS
MONITOR (OUTPUT TO BAS)M
MATCHLINE
NOTE: MATCHLINES APPLY TO
PLUMBING SHEETS ONLY.
Z
MOTOR
STARTER
COMBINATION MOTOR STARTER
WITH INTEGRAL DISCONNECT
DISCONNECT
FUSED DISCONNECT
MOTOR RATED TOGGLE SWITCHM
M
CONTROL CONTACTS
POWER LINE (BY DIV 26)
LOW VOLTAGE WIRE
NOTE: NO PIPING ALLOWED TO BE
EMBEDDED HORIZONTALLY WITHIN THE
THICKNESS OF CONCRETE SLABS AND
CONCRETE FILL ON METAL DECK.
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:0
:5
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
12" = 1'-0"
P-001
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
P L
U M
B
IN
G A
B B
R E
V
IA
T
IO
N S
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909144
WET WET CLE
GCM
NPT NATIONAL PIPE THREAD
NPW NON-POTABLE WATER
NTS NOT TO SCALE
O OXYGEN
OD OVERFLOW DRAIN
OE ORAL EVACUATION
OEE ORAL EVACUATION EXHAUST
PA PROCESS AIR
PB PRESSURE BOOSTER
PD PRESSURE DROP
PDI PLUMBING DRAINAGE INSTITUTE
PH PHASE
PLBG PLUMBING
PRESS. PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PT PLASTER TRAP
PV PLUG VALVE
PWB PLUMBING WALL BOX
RCT RECEIVER TANK
RD ROOF DRAIN
REF REFERENCE
REG REGULATING
RENO RENOVATE / RENOVATION
REQD REQUIRED
RM ROOM
RO REVERSE OSMOSIS
RP RECIRCULATION PUMP
RPBP REDUCED PRESSURE BACKFLOW PREVENTER
RPM ROTATIONS PER MINUTE
RW RAINWATER
S SINK
SAN SANITARY
SCW SOFT COLD WATER
SD STORM DRAIN
SDR STANDARD DIMENSION RATIO
SDU SUPPLY AND DRAIN UNIT
SE SEWAGE EJECTOR
SEP SEPARATOR TANK
SFU SUPPLY FIXTURE UNITS
SH SHOWER
SHT SHEET
SHW SOFT HOT WATER
SHWR SOFT HOT WATER RETURN
SIM SIMILAR
SP SUMP PUMP
SPEC SPECIFICATION
SQ SQUARE
SRW SECONDARY RAINWATER
SS SANITARY SEWER; STAINLESS STEEL
ST SEPARATOR TANK
STRUC STRUCTURAL
SYS SYSTEM
T&P TEMPERATURE AND PRESSURE
TEMP TEMPERATURE; TEMPORARY
TMV THERMOSTATIC MIXING VALVE
TLT TOILET
TP TRAP PRIMER
TR TREATED WATER
TS TEMPERATURE SENSOR
TW TEPID WATER
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VENT, VOLTS
VP VACUUM PUMP
VTR VENT THRU ROOF
W WASTE
W/ WITH
WAGD WASTE ANESTHETIZING GAS DISPOSAL
WAGE WASTE ANESTHETIZING GAS EXHAUST
WC WATER CLOSET; WATER COLUMN
WCO WALL CLEANOUT
WH WALL HYDRANT
WHA WATER HAMMER ARRESTOR
WM WATER METER
WS WATER SOFTENER, WASTE STACK
WST WATER SOFTENER TANK
ZVB MEDICAL GAS ZONE VALVE BOX
ELEV ELEVATOR
EMV EMERGENCY MIXING VALVE
EQMT EQUIPMENT
ESEW EMERGENCY SHOWER / EYEWASH
ES-TMV EMERGENCY SHOWER THERMOSTATIC MIXING VALVE
(PROVIDED WITH FIXTURE)
ET EXPANSION TANK
ETP ELECTRONIC TRAP PRIMER
EW EYEWASH
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EX EXISTING
FA FROM ABOVE
FB FROM BELOW
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FFE FINISHED FLOOR ELEVATION
FIN FLR FINISHED FLOOR
FLR FLOOR
FM FORCE MAIN
FS FLOOR SINK
FT FEET
FW FILTERED WATER
G GAS
GAL GALLON
GPG GRAINS PER GALLON
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GREASE WASTE
GTV GATE VALVE
GV GLOBE VALVE
GWH GAS WATER HEATER
HB HOSE BIBB
HBT HYDROPNEUMATIC BUFFER TANK
HC HANDICAP
HD HUB DRAIN
HDPE HIGH DENSITY POLYETHYLENE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HST HOT WATER STORAGE TANK
HVAC HEATING / VENTILATING / AIR CONDITIONING
HWCP HOT WATER CIRCULATING PUMP
Hz HERTZ
IAW IN ACCORDANCE WITH
IE INVERT ELEVATION
IN INCHES
IN. WC INCHES OF WATER, GAUGE
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
JS JANITORS SINK
JSN JOINT SCHEDULE NUMBER
KTR CONTRACTOR
L LAVATORY
LA LAB AIR - DENTAL / MEDICAL
LAI LAB AIR INTAKE
LAP LOCAL ALARM PANEL
LAV LAVATORY
LDPE LOW DENSITY POLYETHYLENE
LF LINEAR FEET
LP LIQUIFIED PETROLEUM GAS
LVL LEVEL
MA MEDICAL COMPRESSED AIR
MAC MEDICAL AIR COMPRESSOR
MAI MEDICAL AIR INTAKE
MAP MEDICAL GAS MASTER ALARM PANEL
MAX MAXIMUM
MECH MECHANICAL
MED MEDICAL
MFR MANUFACTURER
MG MEDICAL GAS
MIN MINIMUM
MS MOP SINK
MTD MOUNTED
MV MEDICAL SURGICAL VACUUM
MVE MEDICAL VACUUM EXHAUST
MX MIXING VALVE
N NITROGEN
NC NORMALLY CLOSED
NCC NITROGEN CONTROL CABINET
NG NATURAL GAS
NO NITROUS OXIDE
AAP MEDICAL GAS AREA ALARM PANEL
ABBRV ABBREVIATION
ABV ABOVE
AC ABOVE CEILING; AIR COMPRESSOR
AD AREA DRAIN
ADD'L ADDITIONAL
AE AIR EXHAUST
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
AI AIR INTAKE; ANALOG INPUT
ALT ALTERNATE
AO ANALOG OUTPUT
APR AIR PRESSURE REDUCING STATION
ARCH ARCHITECTURAL
AS AMALGAM SEPARATOR
ASSY ASSEMBLY
AUTO AUTOMATIC
BAS BASE AUTOMATION SYSTEM
BCW BOOSTED COLD WATER
BF BELOW FLOOR
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTER
BHW BOOSTED HOT WATER
BI BINARY INPUT
BLDG BUILDING
BLK BLOCK
BLV BALANCING VALVE
BO BINARY OUTPUT
BSMT BASEMENT
BT BRINE TANK
BTUH BRITISH THERMAL UNITS PER HOUR
BV BALL VALVE
BWV BACKWATER VALVE
CA COMPRESSED AIR
CAI COMPRESSED AIR INTAKE
CAP CAPACITY
CD CONDENSATE WASTE
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEANOUT; CARBON MONOXIDE
CO2 CARBON DIOXIDE
COMM COMMUNICATIONS
COMP. COMPOSITE
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONT CONTINUATION; CONTINUOUS
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
CU CUBIC; COPPER
CV CHECK VALVE
CVTR CONCENTRIC VENT KIT THRU ROOF
DA DENTAL COMPRESSED AIR
DAC DENTAL AIR COMPRESSOR
DAI DENTAL AIR INTAKE
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEMO DEMOLISH / DEMOLITION
DFU DRAIN FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DI DEIONIZED WATER
DIA DIAMETER
DN DOWN
DOR DESIGNER OF RECORD
DS DOWNSPOUT
DSV DENTAL SURGICAL VACUUM
DSVE DENTAL SURGICAL VACUUM EXHAUST
DWBP DOMESTIC WATER BOOSTER PUMP
DWG DRAWING
DWH DOMESTIC WATER HEATER
EA EACH
EE-TMV EMERGENCY EYEWASH THERMOSTATIC MIXING
VALVE (PROVIDED WITH FIXTURE)
EL ELEVATION
ELEC ELECTRICAL
PLUMBING ABBREVIATIONS (UNABRIDGED)
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L L
I AM
A
B B.9 C C.9 D D.6 E E.4 E.6 F G H H.4 H.6 J J.4 K K.1 L M N
6.2
5.6
4.8
2.2
FCO FCO
FCO FCO
FCO
FCO
FCO FCO
FCO
491 DFU
MATCHLINE: 1G
MATCHLINE: 1A
M A
T C
H
LI
N E
: 1 A
M A
T C
H
LI
N E
: 1 M
MATCHLINE: 1B
MATCHLINE: 1M
MATCHLINE: 1C
MATCHLINE: 1M
MATCHLINE: 1D
MATCHLINE: 1M
M A
T C
H
LI
N E
: 1 M
M A
T C
H
LI
N E
: 1 F
M A
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
M A
T C
H
LI
N E
: 1 H
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 L
MATCHLINE: 1K
MATCHLINE: 1F
MATCHLINE: 1A
MATCHLINE: MECH YARD
DFU
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
6' 12' 24'
SCALE: 3/32"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
3/32" = 1'-0"
SCALE: 3/32" = 1'-0"
PW011
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
C
O M
P O
S
IT
E
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909145
WET WET CLE
BELOW SLAB WASTE PLAN -
COMPOSITE
GCM
SHEET NOTES:
1. ALL SANITARY AND VENT PIPING SHOWN ON PW011-PW022 IS LOCATED BELOW SLAB.
2. SEE PW111-PW122 FOR PIPING LOCATION ABOVE FINISHED FLOOR AND UP TO THE UNDERSIDE OF THE SECOND FLOOR SLAB.
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
A B C D
DTR-GEN
1H14
MECH
1A01
MAIN ELEC
1A01B
MAIN ELEC
1A01A
WC-2
WC-2
WC-1
FS-4
FS-4
FCO
TMV-1
436 DFU
FS-4
COORDINATE 6" SS PIPE
WITH UNDERGROUND
ELECTRICAL SERVICES
6" SS
FD-3
WCO FCO
MATCHLINE: 1G
MATCHLINE: 1A
M A
T C
H
LI
N E
: 1 A
M A
T C
H
LI
N E
: 1 M
MATCHLINE: 1B
MATCHLINE: 1M
MATCHLINE: 1A
MATCHLINE: MECH YARD
SEE CU102 FOR
CONTINUATION
6" SS 6" SS
4" SS 4" SS
6" S
D0680
4" SS
2" SS
4" SS
FCO
4"
4"
S
4" SS
FS-4
4"
FS-4
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
4"
WCO
COTG
4"
4"
5' IE
SS PASSES UNDER FOOTER AT
THIS LOCATION. SEE CIVIL FOR
ROUTING DETAILS AND SOIL
PREP. CU502
M A
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
A A
A
A
A
A
FS-4
B
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:1
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW012
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909146
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0A
GCM
SHEET NOTES:
4" SS FROM FIRST FLOOR
4" SS FROM FIRST FLOOR
2" V UP TO FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
D E F
RECRUIT
WAITING
1B02a
LOBBY
1B02
VESTIBULE
1B01
RECRUIT PUB
TLT, F
1B03
RECRUIT PUB
TLT, M
1B04
RECRUIT PUB
TLT, M
1B05
RECRUIT PUB
TLT, F
1B07
L-4 L-4
WC-2
WC-2
WC-1
L-4 L-4
JC-1
EW-1
FS-4
4"
FCO
WC-2
WC-2
WC-1
BF-2 BF-2BF-2 BF-2
U-1 U-2 U-2
6" SS
FD-3 FD-3
FD-3FD-3
4" SS
WCO
FCO
WCO FCO
WCO
M A
T C
H
LI
N E
: 1 A
M A
T C
H
LI
N E
: 1 M
MATCHLINE: 1C
MATCHLINE: 1M
MATCHLINE: 1B
MATCHLINE: 1M
3"
3" SS
D0680
D0680
4" SS
2" SS
2" SS
4" SS
1 1
WC-2
WC-2
WC-2
U-2
WC-2
WC-2
U-2
L-3 L-3
L-3 L-3
4"
1 1
1 13
FS-4
6" SS
D0680 D0680 D0680
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
WCO
WC-2
MATCHLINE: 1G
MATCHLINE: 1A
MATCHLINE: 1H
MATCHLINE: 1B
A
A
B B
C C
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:1
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW013
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
B
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909147
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0B
GCM
SHEET NOTES:
2" V UP TO FIRST FLOOR
3" V UP TO FIRST FLOOR
3" SS FROM FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
F G H
2.2
CBCT
1J13
PANO-CEPH
1C05
PANO-CEPH
1C04
PANO-CEPH
1C06
CLASSROOM
1C01
RECORDS
1C03B
CONSULT OFC
1C03D
RECEP
1C03A
COPY
1C03h
L-2
JC-1
EW-1
CORRIDOR
1CC2
6" SS
EWC-1
L-2 L-2
6" SS
SEP-1
FD-3
MATCHLINE: 1C
MATCHLINE: 1M
MATCHLINE: 1D
MATCHLINE: 1M
RECRUIT
IP/CLIN SPT
1C01A
ELEV MACH
1C02
2"
L-2MATCHLINE: 1J
MATCHLINE: 1C
MATCHLINE: 1K
MATCHLINE: 1D
3"
2" SS
2"
6" SS
2"
SP-1
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
BELOW SLAB FORCE MAIN FROM SP-1
2" FM
F M
CONNECT 2" FM INTO TOP OF 6" SS
MAIN WITH WYE FITTING
AS-1A
3" SS
MATCHLINE: 1H
MATCHLINE: 1B
MATCHLINE: 1B
MATCHLINE: 1M
C
CORRIDOR
1JC3
LOBBY
1C07
SP-1 CONTROL PANEL
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:2
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW014
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
C
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909148
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0C
GCM
SHEET NOTES:
2" V UP TO FIRST FLOOR
3" SS FROM FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
H J K
RAD OFC
1D13
GAS STOR
1D18
EQ STOR
1D16
SOIL UTIL
1D15
MED WASTE
1D17
DEPT HEAD
GEN
DENTISTRY
1D11
AD WAITING
1D03c
LOBBY
SEATING
1D03a
EQ STOR
1D06
VESTIBULE
1D01
AD TLT
1D05
COMM RM
1D08
JAN CL
1D07
L-2
SS-1
S-4
WC-1
L-1
JC-1
EW-1
FCO
FS-4
FCO
RECORD
ASSEMBLY /
WORK
1D02
CREDENTIALING
DENTISTS
1D14
4" SS UP
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
4"
4" SS 6" SS
3"
4" SS 4" SS
MATCHLINE: 1D
MATCHLINE: 1M
M A
T C
H
LI
N E
: 1 M
M A
T C
H
LI
N E
: 1 F
DEPT HEAD
GEN/ASSIST
1D10
4" SS
2"
MECH
1F04
MATCHLINE: 1K
MATCHLINE: 1D
2" SS
4" SS 4" SS 4" SS 4" SS
6" SS
FCO
4" SS
4"
M
T C
H
LI
N E
: 1 C
MATCHLINE: 1J
MATCHLINE: 1C
MATCHLINE: 1L
MATCHLINE: 1F
D
EW-1
EMV-2
EMV-2
EW-1
1 1
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:2
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW015
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909149
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0D
GCM
SHEET NOTES:
2" V UP TO FIRST FLOOR
3" V UP TO FIRST FLOOR
4" SS FROM FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
K L M N
GAS STOR
1D18
CHEM STOR
1F03a
ELEV MACH
1F02
SUPPLY STOR
1F03
ELEC
1F01
ES-1
FS-4
FS-4
FCO
CORRIDOR
1FC2
STAIR
1FS2
EWC-1
4"
A
T C
H
LI
N E
: 1 M
M A
T C
H
LI
N E
: 1 F
MATCHLINE: 1L
MATCHLINE: 1F
MECH
1F04
4" SS
2"
FCO
2" SS
4" SS 4" SS 4" SS
4"
SP-2
CONNECT 2" FM INTO TOP OF
4" SS MAIN WITH WYE FITTING.
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
BELOW SLAB FORCE MAIN FROM SP-2
FM
MATCHLINE: 1K
MATCHLINE: 1D
D
D
SP-2 CONTROL PANEL
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:3
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW016
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
F
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909150
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0F
GCM
SHEET NOTES:
2" V UP TO FIRST FLOOR
4" SS FROM FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
ST TLT
1G11
FCO
DIR DENTAL
SVCS
1G03
OPS OFFICER
1G02
CORRIDOR
1GC2
SEL OFC
1G04
TEAM COLLAB
1G05
CLINIC MGR
1G01
CORRIDOR
1GC1
STAIR
1GS1
LPCO CLINIC
1G07
MANAGED
CARE
1G06
CORRIDOR
1GC3
LACT RM
1G10
CORRIDOR
1GC4
WC-1
L-1
S-1
D0680
D0680
FD-3
MATCHLINE: 1G
MATCHLINE: 1A
M A
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
4" SS 4" SS
2"
SEE CU102 FOR
CONTINUATION
6"
4" SS
2"
3" SS
2" SS
4" SS
4"
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
134" S
S
WCO
4'- 6" IE
COTG
110 DFU
A
A
B
4" SS
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:3
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW017
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
G
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909151
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0G
GCM
SHEET NOTES:
2" SS FROM FIRST FLOOR
3" SS FROM FIRST FLOOR
2" V UP TO FIRST FLOOR
4" V UP TO FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
4.8
DTR-GEN
1H01
DTR-GEN
1H03
DTR-GEN
1H08
DTR-GEN
1H10
DTR-GEN
1H09
DTR-GEN
1H15
DTR-GEN
1H19
DTR-GEN
1H21
DTR-GEN
1H14
DTR-GEN
1H06
DTR-GEN
1H02
DTR-GEN
1H16
DTR-GEN
1H18
DTR-GEN
1H20
DTR-GEN
1H22
PT TLT
1H25
PT TLT
1H12
RECRUIT PUB
TLT, F
1B03
RECRUIT PUB
TLT, M
1B04
COMM RM
1H13
JAN CL
1H24
ELEC
1H23
CAD/CAM
MILLING
1J01
CORRIDOR
1HC2
L-4 L-4
WC-2
WC-2
L-4 L-4
WC-1
L-1
WC-1
WC-1
JC-1
EW-1
EW-1
D0680
D0680 D0680
D0680
D0680 D0680 D0680
D0680 D0680
ST TLT
1H11
CORRIDOR
1HC1
U-1 U-2 U-2
4" SS
L-1
2" SS
FD-3FD-3
4" SS
FCO
M A
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
DTR-GEN
1H04
DTR-GEN
1H05
DTR - GEN
1H07
D0680 D0680
L-1
D0680
D0680
4" SS
3"
D0680
D0680
4" SS
MATCHLINE: 1J
MATCHLINE: 1C
4" SS
4" SS 4" SS 4" SS 4" SS
2"
2" SS 2" SS 2" SS 2" SS 3" SS
2" SS
2" SS
2" SS
2" SS
2" SS 2" SS
2" SS
4"
2" SS 2" SS
2" SS
2" SS
3 3 3
3 3 3
3 3
4" SS
D0680 D0680 D0680
WCO
DO NOT ROUTE PLUMBING
PIPING THROUGH ELEVATOR
SHAFTS, STAIRWELLS, DATA,
AND ELECTRICAL ROOMS. (TYP.)
FCO
FCO
MATCHLINE: 1G
MATCHLINE: 1A
MATCHLINE: 1H
MATCHLINE: 1B
B
SS PASSES
THROUGH SLEEVE
EMBEDDED IN
FOUNDATION. SEE
D1/S-505SS PASSES THROUGH
SLEEVE EMBEDDED IN
FOUNDATION. SEE C1/S-505
SS PASSES THROUGH
SLEEVE EMBEDDED IN
FOUNDATION. SEE D1/S-505
SS PASSES THROUGH
SLEEVE EMBEDDED IN
FOUNDATION. SEE C1/S-505
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:4
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW018
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
H
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909152
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0H
GCM
SHEET NOTES:
4" SS FROM FIRST FLOOR
2" SS FROM FIRST FLOOR
2" V UP TO FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
DTR-GEN
1J12
DTR-GEN
1J10
DTR-GEN
1J07
DTR-GEN
1J03
CBCT
1J13
PANO-CEPH
1C04
PANO-CEPH
1C06
DTR-GEN
1J08
DTR-GEN
1J04
PT TLT
1H12
MAIN COMM RM
1J02
DTR-GEN
1J06
CAD/CAM
MILLING
1J01
CAD/CAM
MILLING
1J11
L-2
WC-1
L-1
WC-1
WC-1
JC-1
S-5
EW-1
S-3 S-3
S-5
EW-1
JC-1
WC-1
L-1
EMV-2
EMV-2
EW-1
FCO
FCO
L-2 L-2
4" SS
L-1
2" SS 2" SS
2"
OE-2
OE-1 DSV-1
DAC-1
SEP-3
SEP-4
SEP-2
SEP-1
2"
T C
H
LI
N E
: 1 H
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 K
DTR-GEN
1J09
DTR-GEN
1J05
DNTG1
D0680D0680 D0680D0680
EMV-2
D0680
4" SS
2"
L-2MATCHLINE: 1J
MATCHLINE: 1K
MATCHLINE: 1D
4" SS
4" SS
4"
4" SS 4" SS 4" SS
2" SS
2" SS
2 3
FS-4
FS-4
FS-4
FS-4
AS-1A
A S
-2 A
DO NOT ROUTE
PLUMBING PIPING
THROUGH ELEVATOR
SHAFTS, STAIRWELLS,
DATA, AND ELECTRICAL
ROOMS. (TYP.)
FCO
FCO
3" SS
4" SS 4"
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND ELECTRICAL
ROOMS. (TYP.)
MATCHLINE: 1H
MATCHLINE: 1B
MATCHLINE: 1J
MATCHLINE: 1C
E E
E
E
SS PASSES
THROUGH SLEEVE
EMBEDDED IN
FOUNDATION. SEE
D1/S-505
CORRIDOR
1JC3
4"
3"
2"
D0680
D0680
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:5
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW019
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
J
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909153
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0J
GCM
SHEET NOTES:
2" SS FROM SECOND FLOOR
3" SS FROM SECOND FLOOR
2" V UP TO FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
DTR-GEN
1K18
DTR-GEN
1K19
DTR-GEN
1K09
DTR-GEN
1K11
DTR-GEN
1K05
DTR-GEN
1K16
PT TLT
1K01
PT TLT
1K20
DTR-GEN
1K04
RAD OFC
1D13
GAS STOR
1D18
EQ STOR
1D16
SOIL UTIL
1D15
MED WASTE
1D17
DTR-GEN
1K10
DTR-GEN
1K12
DTR-GEN
1K06
DTR-GEN
1K08DTR-GEN
1J08
DTR-GEN
1K03
JAN CL
1K02
ELEC
1K15
CAD/CAM
MILLING
1J11
SS-1
S-5
EW-1
JC-1
WC-1
L-1
WC-1
D0680
EMV-2
D0680
FCO
4" SS
FCO
L-2
2" SS
2"
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 L
DTR-GEN
1J09
DTR-GEN
1K07
DTR-GEN
1K17
EMV-2
4" SS
4"
L-2
3" S
S
2" SS
2" SS 2" SS
2" SS 4" SS
2" SS
2" SS
2" SS 2" SS
2" SS
2" SS
4" SS 4" SS 4" SS 4" SS
3 3 3
2 3
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND ELECTRICAL
ROOMS. (TYP.)
MATCHLINE: 1J
MATCHLINE: 1C
MATCHLINE: 1L
MATCHLINE: 1F
MATCHLINE: 1K
MATCHLINE: 1D
EW-1
EMV-2
EMV-2
EW-1
4"
D0680 D0680
D0680 D0680 D0680 D0680
4" SS
2" SS
D0680 D0680 D0680 D0680
2" SS
1 1
PM120
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW020
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
K
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909154
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0K
GCM
SHEET NOTES:
2" SS FROM SECOND FLOOR
4" SS FROM SECOND FLOOR
2" V UP TO FIRST FLOOR
3" V UP TO FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
PT TLT
1K20
2ND DET
DENTISTS
1L05b
2ND DET
DENTISTS
1L05c
ENTERPRISE
1L05a
SMALL TEAMS
1L05
LCPO 2ND DET
1L03
LPO AND
SUPER GEN
DEN
1L02
ST TLT
1L04
DTR-GEN
1K12
WC-1
L-1
WC-1
D0680
D0680
4" SS
FCO STAIR
1FS2
4"
A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 L
MATCHLINE: 1L
MATCHLINE: 1F
OIC 2ND DET
1L01
4"
2" SS
4" SS 4" SS
WCO
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND ELECTRICAL
ROOMS. (TYP.)
MATCHLINE: 1K
MATCHLINE: 1D
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW021
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
L
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909155
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK 0L
GCM
SHEET NOTES:
2" SS FROM SECOND FLOOR
4" SS FROM SECOND FLOOR
2" V UP TO FIRST FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
D.6 E E.4 E.6 F G
2.2
STAGING AREA
1M01a
WCO
MATCHLINE: 1C
MATCHLINE: 1M
MATCHLINE: 1B
MATCHLINE: 1M
G H H.4 H.6 J J.4
2.2
STAGING AREA
1M01a
MATCHLINE: 1D
MATCHLINE: 1M
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:1
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
PW022
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
M
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909156
WET WET CLE
GCM
SCALE: 1/4" = 1'-0"
PARTIAL BELOW SLAB WASTE PLAN - BLOCK 0M-A
C1
SCALE: 1/4" = 1'-0"
PARTIAL BELOW SLAB WASTE PLAN - BLOCK 0M-B
A2
A B
SHEET NOTES:
1. NO SANITARY WORK ON THIS SHEET. ONLY SHOWN FOR CLARITY.
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
B C D
M A
T C
H
LI
N E
: M E
C H
Y A
R D
M A
T C
H
LI
N E
: 1 M
MATCHLINE: 1A
MATCHLINE: MECH YARD
6" SS
FD-6
2" V UP
AREA DRAIN FOR CHILLERS.
PROVIDE WITH REMOVABLE
COVER TO ONLY DRAIN
WHEN NEEDED.
SEE CU103 FOR
CONTINUATION
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
4' 8' 16'
SCALE: 1/8"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:1
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/8" = 1'-0"
PW023
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
B E
L O
W S
L A
B W
A S
T E
P L
A N
B
L O
C K
M E
C H
Y A
R D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909157
WET WET CLE
BELOW SLAB WASTE PLAN - BLOCK
MECH YARD
GCM
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
6.2
5.6
4.8
2.2
DTR-GEN
1J12
DTR-GEN
1K18
DTR-GEN
1K19
DTR-GEN
1J10
DTR-GEN
1K09
DTR-GEN
1H01
DTR-GEN
1H03
DTR-GEN
1K11
DTR-GEN
1H08
DTR-GEN
1H10
DTR-GEN
1H09
DTR-GEN
1H15
DTR-GEN
1H19
DTR-GEN
1H21
DTR-GEN
1H14
DTR-GEN
1K05
DTR-GEN
1J07
DTR-GEN
1H06
DTR - GEN
1H07
DTR-GEN
1J03
DTR-GEN
1K16
PT TLT
1K01
PT TLT
1K20
DTR-GEN
1K04
CBCT
1J13
PANO-CEPH
1C05
PANO-CEPH
1C04
PANO-CEPH
1C06
RAD OFC
1D13
CUB SPLY
1F03b
CC ALC
1JC1a
GAS STOR
1D18
CHEM STOR
1F03a
EQ STOR
1D16
BOTTLE FILL
1JC1c
SOIL UTIL
1D15 MED WASTE
1D17
2ND DET
DENTISTS
1L05b
2ND DET
DENTISTS
1L05c
ENTERPRISE
1L05a
SMALL TEAMS
1L05
LCPO 2ND DET
1L03
DEPT HEAD
GEN
DENTISTRY
1D11
LPO AND
SUPER GEN
DEN
1L02
ST TLT
1L04
CLASSROOM
1C01
RECORDS
1C03B
CONSULT OFC
1C03D
RECEP
1C03A
COPY
1C03h
AD WAITING
1D03c
RECRUIT
WAITING
1B02a
DTR-GEN
1K10 DTR-GEN
1K12
DTR-GEN
1K06
DTR-GEN
1K08
DTR-GEN
1J08DTR-GEN
1J04
DTR-GEN
1H02
DTR-GEN
1H16
DTR-GEN
1H18 DTR-GEN
1H20
DTR-GEN
1H22
PT TLT
1H25
PT TLT
1H12
DTR-GEN
1K03
LOBBY
1B02
LOBBY
SEATING
1D03a
EQ STOR
1D06
VESTIBULE
1B01
VESTIBULE
1D01
ST TLT
1G11
AD TLT
1D05
RECRUIT PUB
TLT, F
1B03 RECRUIT PUB
TLT, M
1B04
COMM RM
1D08
COMM RM
1H13
MAIN COMM RM
1J02
JAN CL
1H24
JAN CL
1K02
JAN CL
1D07
MECH
1A01
ELEC
1H23
ELEC
1K15
MAIN ELEC
1A01B
DTR-GEN
1J06
CAD/CAM ALC
1JC1d
ELEV MACH
1F02
REC DIST/SIGN
1C03f
REC DIST/SIGN
1C03g
AD KIOSK
1D03b
STAGING AREA
1M01a
SUPPLY STOR
1F03
RECYCLE
1F05
CAD/CAM
MILLING
1J01
CAD/CAM
MILLING
1J11
ELEC
1F01
MAIN ELEC
1A01A
RECRUIT
WAITING
1B02b
MATCHLINE: 1G
MATCHLINE: 1A
M A
T C
H
LI
N E
: 1 A
M A
T C
H
LI
N E
: 1 M
MATCHLINE: 1B
MATCHLINE: 1M
MATCHLINE: 1C
MATCHLINE: 1M
MATCHLINE: 1D
MATCHLINE: 1M
M A
T C
H
LI
N E
: 1 M
M A
T C
H
LI
N E
: 1 F
M A
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
M A
T C
H
LI
N E
: 1 H
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 L
MATCHLINE: 1K
MATCHLINE: 1F
MATCHLINE: 1A
MATCHLINE: MECH YARD
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
6' 12' 24'
SCALE: 3/32"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:3
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
3/32" = 1'-0"
SCALE: 3/32" = 1'-0"
PW111
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
C
O M
P O
S
IT
E
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909158
WET WET CLE
FIRST FLOOR WASTE PLAN -
COMPOSITE
GCM
SHEET NOTES:
1. ALL SANITARY AND VENT PIPING SHOWN ON PW111-122 IS LOCATED ABOVE THE FINISHED FLOOR AND UP TO THE UNDERSIDE OF THE SECOND FLOOR SLAB.
2. SEE PW011-022 FOR PIPING AT FIRST FLOOR LEVEL AND BELOW.
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
MECH
1A01
MAIN ELEC
1A01B
MAIN ELEC
1A01A
STAIR
1GS1 WC-2
WC-2
WC-1
FS-4
FS-4
DTR-GEN
1H14
FCO
FS-4
2" SS
MATCHLINE: 1G
MATCHLINE: 1A
M A
T C
H
LI
N E
: 1 A
M A
T C
H
LI
N E
: 1 M
MATCHLINE: 1B
MATCHLINE: 1M
WCO
2" V
MATCHLINE: 1A
MATCHLINE: MECH YARD
2 2
23 3 3 3 3
4" SS 4" SS 4" SS
3"
4" SS 4" SS
FS-41 4" SS
4" SS
FS-4
2"
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
2" V UP
2" V UP
2" V
FD-3
V
3" SS
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
M A
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
A A
A
A A
A
B
FCO
FS-4
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:3
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW112
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
B
L O
C K
A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909159
WET WET CLE
FIRST FLOOR WASTE PLAN - BLOCK 1A
GCM
SHEET NOTES:
4" SS DOWN TO BELOW SLAB
2" SS FROM SECOND FLOOR
3" SS FROM SECOND FLOOR
4" SS FROM SECOND FLOOR
3" SS DOWN TO BELOW SLAB
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
RECRUIT PUB
TLT, F
1B03
RECRUIT PUB
TLT, M
1B04
CORRIDOR
1BC1
LOBBY
1B02
VESTIBULE
1B01
RECRUIT PUB
TLT, M
1B05
RECRUIT PUB
TLT, F
1B07
L-4 L-4
WC-2
WC-2
WC-1
L-4 L-4
JC-1
FCO
U-1 U-2 U-2
WC-2 WC-2
WC-1
FCO
M A
T C
H
LI
N E
: 1 A
M A
T C
H
LI
N E
: 1 M
MATCHLINE: 1B
MATCHLINE: 1M
MATCHLINE: 1C
MATCHLINE: 1M
WCO
WCO
2" V 2" V
3"
2" V
3" SS
M A
T C
H
LI
N E
: 1 B
M A
T C
H
LI
N E
: 1 C
4" SS
3"
WC-2
WC-2
U-2
U-2
L-3
L-3 L-3
L-3
WC-2
WC-2
WC-2
WC-2
FD-3
FD-3
FD-3 2
4" SS
2" V
2" V
2" S
S
3" SS
2" V UP
FCO
FD-3
WCO
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
M A
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
A
B B
C C
BF-2 BF-2 BF-2 BF-2
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:4
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW113
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
B
L O
C K
B
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909160
WET WET CLE
FIRST FLOOR WASTE PLAN - BLOCK 1B
GCM
SHEET NOTES:
3" V UP TO VTR
2" SS FROM SECOND FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
CORRIDOR
1CC1
PANO-CEPH
1C04
PANO-CEPH
1C05
PANO-CEPH
1C06
RECEP
1C03A
CONSULT OFC
1C03D
CORRIDOR
1CC2
LOBBY
1C07
CLASSROOM
1C01
L-2
JC-1
L-2
JAN CL
1H24
EWC-1
L-2 L-2
SEP-1
2" SS
2" V
MATCHLINE: 1M
MATCHLINE: 1D
MATCHLINE: 1M
RECRUIT
IP/CLIN SPT
1C01A
ELEV MACH
1C02ELEVATOR 2
1CE2
MATCHLINE: 1J
MATCHLINE: 1C
MATCHLINE: 1K
MATCHLINE: 1D
M A
T C
H
LI
N E
: 1 B
M A
T C
H
LI
N E
: 1 C
M A
T C
H
LI
N E
: 1 B
M A
T C
H
LI
N E
: 1 C
3" SS
3"
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
M A
T C
H
LI
N E
: 1 H
C
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:4
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW114
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
B
L O
C K
C
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909161
WET WET CLE
FIRST FLOOR WASTE PLAN - BLOCK
1C
GCM
SHEET NOTES:
2" SS FROM SECOND FLOOR
3" SS FROM SECOND FLOOR
2" V UP TO SECOND FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
RAD OFC
1D13
DEPT HEAD
GEN
DENTISTRY
1D11
DEPT HEAD
GEN/ASSIST
1D10
CREDENTIALING
DENTISTS
1D14
SOIL UTIL
1D15
EQ STOR
1D16
MED WASTE
1D17
GAS STOR
1D18
COMM RM
1D08
JAN CL
1D07
CORRIDOR
1DC1
EQ STOR
1D06
AD TLT
1D05
LOBBY
1D03
VESTIBULE
1D01RECORD
ASSEMBLY /
WORK
1D02
L-2
EW-1 EW-1
SS-1
WC-1
L-1
JC-1
EW-1
S-4
FS-4
CORRIDOR
1KC2
FCO
FCO
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
MATCHLINE: 1D
MATCHLINE: 1M M
A
T C
H
LI
N E
: 1 M
M A
T C
H
LI
N E
: 1 F
2" S
S
4"
MATCHLINE: 1K
MATCHLINE: 1D
MATCHLINE: 1L
MATCHLINE: 1F
4" SS
4"
4"
2 2
4"
2"
MATCHLINE: 1J
MATCHLINE: 1C
D
4"
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:5
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW115
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
B
L O
C K
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909162
WET WET CLE
FIRST FLOOR WASTE PLAN - BLOCK
1D
GCM
SHEET NOTES:
2" SS FROM SECOND FLOOR
4" SS FROM SECOND FLOOR
2" V UP TO SECOND FLOOR
3" V UP TO SECOND FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
COMM RM
1D08
CORRIDOR
1FC1
ELEC
1F01
MECH
1F04
CORRIDOR
1FC2
ELEV MACH
1F02
STAIR
1FS2
SUPPLY STOR
1F03
ES-1
FS-4
FS-4
3" SS
3"
EWC-1
2"
T C
H
LI
N E
: 1 M
M A
T C
H
LI
N E
: 1 F
MATCHLINE: 1L
MATCHLINE: 1F
2"
2"
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
RECYCLE
1F05
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 L
M A
T C
H
LI
N E
: 1 D
D
D
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW116
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P A
L N
B
L O
C K
F
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909163
WET WET CLE
FIRST FLOOR WASTE PALN - BLOCK 1F
GCM
SHEET NOTES:
2" V FROM BELOW SLAB
2" SS FROM SECOND FLOOR
4" SS FROM SECOND FLOOR
4" SS DOWN TO BELOW SLAB
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
STAIR
1GS1 WC-2
WC-2
WC-1
L-1
S-1
D0680
CLINIC MGR
1G01
CORRIDOR
1GC4
OPS OFFICER
1G02
DIR DENTAL
SVCS
1G03 SEL OFC
1G04
TEAM COLLAB
1G05
CORRIDOR
1GC2
CORRIDOR
1GC1
CORRIDOR
1GC3
LPCO CLINIC
1G07
MANAGED
CARE
1G06
LACT RM
1G10
ST TLT
1G11
DTR-GEN
1H01
DTR-GEN
1H02
COMM RM
1H13
DTR-GEN
1H14
FCO
MATCHLINE: 1G
MATCHLINE: 1A
M A
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
D0680
2" V
2"
2"
2" V UP
WCO
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
A
FCO
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:0
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW117
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
B
L O
C K
G
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909164
WET WET CLE
FIRST FLOOR WASTE PLAN - BLOCK
1G
GCM
SHEET NOTES:
2" SS DOWN TO BELOW SLAB
3" SS DOWN TO BELOW SLAB
2" SS FROM SECOND FLOOR
3" SS FROM SECOND FLOOR
2" V FROM BELOW SLAB
2" V UP TO SECOND FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
L-4 L-4
WC-2
WC-2
L-4 L-4
WC-1
WC-1
L-1
WC-1
JC-1
EW-1
S-5
EW-1
D0680 D0680
D0680 D0680
D0680
D0680
D0680 D0680
D0680 D0680
D
DTR-GEN
1H01
DTR-GEN
1H03
DTR - GEN
1H07
DTR-GEN
1H09
ST TLT
1H11
CORRIDOR
1HC1
DTR-GEN
1H02
DTR-GEN
1H06
DTR-GEN
1H08
DTR-GEN
1H10
PT TLT
1H12
PT TLT
1H25
ELEC
1H23
DTR-GEN
1H21
DTR-GEN
1H19
DTR-GEN
1H15
COMM RM
1H13
CORRIDOR
1HC2
DTR-GEN
1H14
DTR-GEN
1H16
DTR-GEN
1H18
DTR-GEN
1H20
DTR-GEN
1H22 JAN CL
1H24
FCO
FCO
U-1 U-2 U-2
D0680
L-1
L-1
2" V 2" V 2" V
2" V 2" V
T C
H
LI
N E
: 1 G
M A
T C
H
LI
N E
: 1 H
M A
T C
H
LI
N E
: 1 H
M A
T C
H
LI
N E
: 1 J
D0680
DTR-GEN
1H05
2" V
DTR-GEN
1H04
D0680 D0680 D0680D0680D0680
3"
MATCHLINE: 1J
MATCHLINE: 1C
M A
T C
H
LI
N E
: 1 B
M A
T C
H
LI
N E
: 1 C
2" V
3" SS 3" SS
2" SS 2" SS
WCO
WCO
2" V
3" SS
2" V
M A
T C
H
LI
N E
: 1 B
M A
T C
H
LI
N E
: 1 C
2" V
2" V
2" S
S
3" SS
FCO2"
2" V
2"
WCO
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
2" V
B
M A
T C
H
LI
N E
: 1 A
1 1
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:1
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW118
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
B
L O
C K
H
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909165
WET WET CLE
FIRST FLOOR WASTE PLAN - BLOCK
1H
GCM
SHEET NOTES:
2" SS FROM SECOND FLOOR
3" SS FROM SECOND FLOOR
2" V UP TO SECOND FLOOR
4" V UP TO SECOND FLOOR
3" SS DOWN TO BELOW SLAB
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
PANO-CEPH
1C04
PANO-CEPH
1C05
RAD OFC
1D13
L-2
WC-1
WC-1
L-1
WC-1
JC-1
EW-1
L-2
L-1
JC-1
S-5
EW-1
S-3 S-3
S-5
WC-1
EW-1
CAD/CAM
MILLING
1J01
DTR-GEN
1J03
DTR-GEN
1J07
CAD/CAM
MILLING
1J11
CORRIDOR
1JC1
MECH
1J15
CORRIDOR
1JC4
CORRIDOR
1JC2
DTR-GEN
1J12
MAIN COMM RM
1J02
DTR-GEN
1J04
DTR-GEN
1J06
DTR-GEN
1J08
DTR-GEN
1J10
CBCT
1J13
CORRIDOR
1JC3
PT TLT
1K01
JAN CL
1K02
FCO
D0680 D0680
L-2 L-2
L-1
DAC-1
DSV-1OE-1
SEP-2
SEP-1
OE-2
SEP-3
SEP-4
2" V
M A
T C
H
LI
N E
: 1 H
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 K
D0680D0680
MATCHLINE: 1J
MATCHLINE: 1C
MATCHLINE: 1K
MATCHLINE: 1D
DTR-GEN
1J09
2" V
44 4
2" SS
FS-4
FS-4
FS-4
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
DO NOT ROUTE PLUMBING
PIPING THROUGH ELEVATOR
SHAFTS, STAIRWELLS, DATA,
AND ELECTRICAL ROOMS.
(TYP.)
E
E
E
E
DTR-GEN
1J05
DNTG1
2"
1 2" V
2" V D0680
D0680
D0680
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:2
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW119
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
B
L O
C K
J
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909166
WET WET CLE
FIRST FLOOR WASTE PLAN - BLOCK 1J
GCM
SHEET NOTES:
2" SS DOWN TO BELOW SLAB
3" SS DOWN TO BELOW SLAB
2" V UP FROM BELOW SLAB
2" SS FROM SECOND FLOOR
3" SS FROM SECOND FLOOR
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
RAD OFC
1D13
SOIL UTIL
1D15
EQ STOR
1D16
MED WASTE
1D17
GAS STOR
1D18
EW-1 EW-1
SS-1
L-1
JC-1
WC-1
S-5
WC-1
EW-1
D0680
D0680
CAD/CAM
MILLING
1J11
ELEC
1K15
PT TLT
1K01
DTR-GEN
1K03
DTR-GEN
1K05
DTR-GEN
1K09
DTR-GEN
1K11
CORRIDOR
1KC1
JAN CL
1K02
DTR-GEN
1K04
DTR-GEN
1K06
DTR-GEN
1K08
DTR-GEN
1K10
DTR-GEN
1K12
DTR-GEN
1K16
DTR-GEN
1K18
DTR-GEN
1K19
PT TLT
1K20
CORRIDOR
1KC2
FCO
FCO
L-2
L-1
2" V 2" V 2" V
M A
T C
H
LI
N E
: 1 J
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 L
2"
MATCHLINE: 1K
MATCHLINE: 1D
MATCHLINE: 1L
MATCHLINE: 1F
DTR-GEN
1J09
2" V 2" V
2" SS 2" SS
2" V 2" V
DTR-GEN
1K17
4"
DO NOT ROUTE PLUMBING
PIPING THROUGH ELEVATOR
SHAFTS, STAIRWELLS, DATA,
AND ELECTRICAL ROOMS.
(TYP.)
MATCHLINE: 1J
MATCHLINE: 1C
DTR-GEN
1K07
D0680 D0680 D0680 D0680
D0680 D0680 D0680 D0680
D0680 D0680 D0680 D0680
PM120 2" V
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/2024
2' 4' 8'
SCALE: 1/4"=1'-0"
P A
R R
IS
I S
L A
N D
S
C M
C R
D
P A
R R
IS
I S
L A
N D
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
M
ID
L A
N T
D C
C O
R E
MT / SVR
EJA
DSN
Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024
/2
/2
:1
:2
A
M
C
U s e rs \e lli o t.
te a g u e
\D o c u m e n ts \2
P e lli o t.
te a g u e D
Z A
G .r v t
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
PW120
P-7889
D E
N T
A L
C L
IN
IC
R E
P L
A C
E M
E N
T
F
IR
S T
F L
O O
R W
A S
T E
P L
A N
B
L O
C K
K
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A T
L A
N T
IC
12909167
WET WET CLE
FIRST FLOOR WASTE PLAN - BLOCK 1K
GCM
SHEET NOTES:
2" SS FROM SECOND FLOOR
3" SS FROM SECOND FLOOR
4" V UP TO SECOND FLOOR
2" SS DOWN TO BELOW SLAB
PROFESSIONAL
NO. 40396
A
A L
AB
A
M
N G
E
E
ENI
R
I G
E R
RE
D E
TS
E. T E A G
U E
W
I L
GAS STOR
1D18
ELEC
1F01
WC-1
L-1
WC-1
D0680
D0680
ST TLT
1L04
CORRIDOR
1LC1
LPO AND
SUPER GEN
DEN
1L02
OIC 2ND DET
1L01
SMALL TEAMS
1L05
2" SS
WCO
L-1
M A
T C
H
LI
N E
: 1 K
M A
T C
H
LI
N E
: 1 L
MATCHLINE: 1L
MATCHLINE: 1F
1 1
3"
3" SS
2"
2"
WCO
DO NOT ROUTE PLUMBING PIPING
THROUGH ELEVATOR SHAFTS,
STAIRWELLS, DATA, AND
ELECTRICAL ROOMS. (TYP.)
RECYCLE
1F05
M A
T C
H
LI
N E
: 1 D
PM120
FIRST FLOOR KEY PLAN
PLAN
NORTH
1A 1C 1F
1G 1J
1L 1H
1B
1K
1D
1M
112 113 114 115
120119118
A
B
C
D
1 2 3 4
1 2 3 4
A
B
C
D
SCALE:
PROJECT NO:
CONSTR CONTR NO:
NAVFAC DRAWING NO:
SHEET: OF
FIRE PROTECTION
CHIEF ENG/ARCH
BRANCH MGR
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
08/19/202…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .