This document is a Price Schedule Attachment for a Dental Clinic Replacement project at Marine Corps Recruit Depot Parris Island, South Carolina. The price proposal form includes a base price for the entire project and six optional line items covering additional scope such as Building Integrated Photovoltaic (BIPV) system, landscaping enhancements, mechanical screen walls, Electronic Security System (ESS), telecom infrastructure, and an Internal Cellular Antenna System (IRES). The pricing structure allows the government to evaluate and potentially exercise these optional items within 365 calendar days after contract award, with the total contract completion timeline set at 1,074 calendar days.
The pricing document requires contractors to provide unit prices for specific line items, including base construction work, sitework, asbestos removal, hazardous materials disposal, and unsatisfactory material replacement. The government will evaluate the total bid by adding the base price and optional item prices, with the award to be made on the aggregate sum of these line items. Key requirements include providing a firm fixed price for optional items, potential performance bond adjustments if options are exercised, and adherence to specific pricing and evaluation criteria outlined in the document.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
| Line Item |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Sub-Total |
| Total Price |
| 1 |
| BASE PRICE: Total Price for the entire work for Project P7889 Dental Clinic Replacement in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item. |
| 1 |
| EA |
| 1A |
| Subtotal of Base Price for the entire work for P7889 Dental Clinic Replacement complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 1 |
| EA |
| 1B |
| Subtotal of Base Price for the entire project sitework, outside the facility 5-foot line, for P7889 Dental Clinic Replacement, complete in accordance with the drawings and specifications, but excluding work described in another line Item. |
| 1 |
| EA |
| 1C |
| Unit Price for providing Asbestos Removal and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 20 |
| CF |
| $_____ |
| $_____ |
| 1D |
| Unit Price for providing Hazardous Materials (other than Asbestos) Removal and Disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 40 |
| CF |
| $_____ |
| $_____ |
| 1E |
| Unit Price for providing Unsatisfactory Material removal and replace with Satisfactory Materials complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 100 |
| CY |
| $_____ |
| $_____ |
| 2 |
| Option Item No. 1: Price for providing all work in connection with the Building Integrated Photovoltaic (BIPV) system complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. |
| 1 |
| EA |
| 3 |
| Option Item No. 2: Price for providing increasing all Southern Live Oak caliper from 3" to 6" and adding perimeter shrubs, bed edge and mulch at the northwest parking lot. |
| 1 |
| EA |
| 4 |
| Option Item No. 3: Price for providing mechanical screen walls for condensing units to be added at both east and west facades. Screen walls to be comprised of staggered standard brick coursing and CMU masonry posts with brick veneer with steel gates. Price for all screen work, foundations, and related appurtenances complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. |
| 1 |
| EA |
| 5 |
| Option Item 4: Price for providing Electronic Security System (ESS) equipment, testing, and associated training, but excluding work provided in another Priced line item. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Video Systems complete in accordance with the drawings and specifications. Equipment includes items such as Premise Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video recorders, workstations, and the communication cabling connecting these devices together. |
Include the price for supporting, permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door hardware, mounting hardware, and power connections. Exterior supporting infrastructure includes items such as exterior duct banks, manholes, utility poles, utility connections, and power connections.
| 1 |
| EA |
| 6 |
| Option Item 5: Price for providing all work in connection with Telecom and Server Room racks and cable management as required to terminate and test cabling in accordance with the drawings and specifications. |
| 1 |
| EA |
| 7 |
| Option Item 6: Price for providing a complete and functional Internal Cellular Antenna System (IRES) as acquired per applicable codes and criteria. Provide and install equipment, including but not limited to antennas and all other required components and the communication cabling connecting these devices together. |
Include the price for supporting permanent infrastructure under the Base Price. Interior supporting infrastructure includes but it is not limited to items such as conduit and junction boxes. Exterior supporting infrastructure includes but it is not limited to items such as exterior duct banks, manholes, utility poles, utility connections, power connections and the communication cabling connecting these devices together.
| 1 |
| EA |
1.1 GENERAL BID NOTES
1. Award will be made on the total sum of Contract Line Items 0001A, 0001B, 0001C, 0001D, 0001E, and the sum of the extensions under Contract Line Items 0002, 0003, 0004, 0005, 0006, and 0007. For CLINs 0001C, 0001D, and 0001E enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
1. The Government reserves the unilateral right to award CLINs 0002 through 0007 to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for CLINs 0002 through 0007. No provision is made for economic price adjustment. If any of these Options are exercised, the contract completion date remains 1,074 calendar days after award of the contract.
1. If CLINs 0002, 0003, 0004, 0005, 0006, and 0007 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
1. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
1. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
-- End of Document --
File details come from the government source that posted it. Updated .