N4008525R2500 AMD 0004.pdf
PDF 265 KB Posted
- Solicitation number
- N4008525R2500
About this file
This document is an Amendment (Number 0004) to a federal solicitation for a dental clinic replacement project at the Marine Corps Recruit Depot in Parris Island, South Carolina. The amendment extends the solicitation response date from 14 April 2025 to 28 April 2025, both at 2:00 PM EDT, and also extends the pre-proposal inquiry submission deadline to 14 April 2025. The amendment includes multiple technical clarifications and responses to contractor inquiries, covering areas such as ground improvement specifications, electrical and mechanical system details, wall and partition configurations, fireproofing requirements, and various technical specifications for the construction project. The amendment provides additional context and guidance for potential bidders, addressing specific technical questions about construction materials, system installations, shielding requirements, and other project-specific details that were raised during the solicitation process.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No.: N4008525R2500 - P7889 Dental Clinic Replacement, MCRD, Parris Island, SC
The Solicitation Response Date extended from 14 April 2025 NLT 2:00PM EDT to 28 April 2025 NLT 2:00PM EDT.
The pre-preposal inquiry submission deadline extended to 14 April 2025 NLT 2:00PM EDT.
See Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Apr-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008525R2500
X 9B. DATED (SEE ITEM 11)
24-Feb-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Apr-2025
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008525R2500
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is to:
1. Extend the proposal due date from 14 April 2025 NLT 2:00PM EDT to 28 April 2025 NLT 2:00PM EDT
2. Extend the pre-proposal inquiry submission deadline to 14 April 2025 NLT 2:00PM EDT
3. Revise solicitation provisions per updated FAR guidelines
4. Provide relevant attachments in support of pre-proposal inquiry responses as follows
a. 602001
b. 602002
c. 602003
d. 674001
e. 674002
f. 674003
g. 3 of 23 Foundation Plan Building P-88-A (602)
h. 4 of 23 Foundation Details Building P-88-A (602)
i. Geo Tech portion P-7889 MCRD PARRIS ISLAND CORRECTED FINAL BASIS OF DESIGN
- 26 AUGUST 2024
5. Provide responses to pre-proposal inquiries
Reference Question Response
Page Section Para Amd 1 -
Technical Amendment
Amendment 1 including a revised 01 14 00 Work Restriction to notify offerors that Graduations occur approximately 44 weeks per year and not noise generating activities are not allowed all day Thursday until noon on Friday, however, normal working hours are only Monday through Friday 7am to 3:30pm. This is basically 30% of the working days in a year.
1 - Please confirm offerors confirm offerors can not work on these days 44 weeks of the year.
2 - Please confirm offerors can work Saturdays and outside the 7am to 3:30PM hours to make up for this restriction.
1. Confirmed
2. Yes, with proper requests approved by the Government prior to the work occurring, work can be performed on Saturdays and at times outside the normal workday schedule.
RFP The proposal due date is currently 4/14/25, a Monday.
Please consider revising the bid date to a Tuesday through Thursday as they usually result in better market interest.
Bid due date extended per AMD
00 21 00 Specification 00 21 00 Instructions to Bidders references the Small Business Subcontracting Plan - Attachment H which includes a space for Total Prime Performed Value.
Please provide FAR 52.236-1 which states Prime Contractor Self Performance percentage on this solicitation.
Added per AMD 0004
RFP Factor 1 Factor 1, Corporate Experience (i) Solicitation Submittal Requirements - Will NAVFAC please lower the construction cost requirement from “$35M or greater” to “$20M or greater” under the “Size” requirement under Factor 1?
Bid remains as is. Please bid per
RFP.
RFP Please confirm if this project is tax exempt. If not exempt what are the required taxes to be carried?
In accordance with South Carolina state statute 117-314.11, the contract with the prime contractor is tax exempt in accordance with the referenced statute. The tax exempt form, ST-10G, can be found at www.sctax.gov.
RFP We recommend moving the bid date to a day that is on Tuesday - Thursday in order to achieve better subcontractor participation.
Bid due date extended per AMD
Pricing Sheet
For CLIN line item 0001B, 2 "Provide unit price for Asbestos Removal and Disposal" at 20 CF. Is this CLIN intended to pick-up all anticipated Asbestos up to 20 CF or is this used as a differing site condition contingency beyond what should be anticipated on the plans and specs?
This is for a differing site condition contingency beyond what should be anticipated on the plans and specs.
Pricing Sheet
For CLIN line item 0001B, 3 "Provide unit price for Hazardous materials (other than Asbestos) Removal and disposal" at 40 CF. Is this CLIN intended to pick-up all anticipated Hazardous Materials up to 40 CF or is this used as a differing site condition contingency beyond what should be anticipated on the plans and specs?
This is for a differing site condition contingency beyond what should be anticipated on the plans and specs.
01 32
17.00 20
1.10.1.10.1 Spec Section 01 32 17.00 20 COST-LOADED
NETWORK ANALYSIS SCHEDULES (NAS), section
1.10.1.10.1 Cost Loading Activities states that "The value
of commissioning, testing and closeout WBS section may not be less than 10 percent of the total costs for procurement and construction activities." This is an excessive percentage of costs that could reasonably be assumed to be retainage if applied incorrectly, which is not allowed. For instance, true costs of Cx and TAB is closer to 1-3% of most contract values but is this section is misapplied to just those activities routinely. Will this item be enforced and if so what activities are allowed to be added into the schedule to account for the 10%? For instance if sums can be allocated to certain submittals, periodic inspections, 3rd party testing and inspections, etc. These costs could be spread throughout the duration of the project via dedicated activities at the end.
However, if 10% is pushed to the Cx phase of the project or the last 10-15% in the schedule, this is a major issue for cash flow on a project and certain administrators view
Delete “submittals, periodic inspections”, ADD ‘’FINAL” 3rd party testing and inspections, etc."… The intent of this spec language is to provide for adequate documentation that completed work in place is in compliance with the contract. Cx occurs throughout the Design and Construction and Post-Construction, so activities listed shall not include submittals because they do not represent work in place.
Government pays for accepted work in place. Commissioning and testing can occur at any time after the contractor submits all Certificates of Readiness for a system category and are approved by the government. 10 percent spread across commissioning, testing, and closeout WBS may encompass a large number this item as such. Essentially this is gray area and can lead to improper interpretation and usage.
of activities and period of performance.
01 91 00 15 20
Multiple Who is the Commissioning Authority (CxA) for this project and please
Cx contract will be (FDE) Facility Dynamics Engineering through the Clark-Nexsen-MB IDIQ
01 91 00 15 20
Multiple Is there a software management component to the commissioning process that will be required outside of eCMS?
The Cx firm will likely propose their own proprietary Cx software;
however, all Cx Submittals must go through eCMS.
01 91 00 15 20
Multiple The specs are written to use the term CxA and CxC synonymously. We would like to confirm that the GC does not need to contract with a 3rd party Commissioning firm as an assist to the Governments Commissioning Agent.
GC is required to have a QC Commissioning representative designated to coordinate all Cx activities with the Government's commissioning firm. The Specification UFGS 01 91 00.15 22 will be provided in an addendum to replace UFGS 01 91 00.15 20.
CU50
2-
CU50
Are there BJWSA permit fees or other meeting or review fees that the GC is to carry with their bid?
No
3.5 13 49 10 Under 3.5, Testing and Certification of Shielding. Please clarify who is picking up this scope; the GC or the Government as this is not listed in the required Special Inspections? If by the GC what standard are we to be testing to?
GC to perform this inspection or post install testing report to verify compliance with NCRP 145.
M902 M902: The VAV's and HW Reheat VLV's use 25 VA, so each circuit in the power panel displayed can only support 3 VAV termincals at 80% load. The use of this type of power set up will increase power homeruns exponentially. Please consider 120V Power to VAV's and individual transformers in teh VAV's.
The BOD system from JCI can power 5 VAV boxes per 96VA tranformer. This means 25 VAV boxes can be powered per 500 VA transformer (as shown on M-902 notes 1-6). The electrical design has provided (12) dedicated 120V - 20A circuits for the DDC system. These are indicated as DDP-1 thru DDP-12.
They are shown on the EP sheets and the circuits are fed from the following panel boards: EQ21A, EQCOM1D, EQCOM2D and 2HVAC1. This is more than enough to power the BOD BAS system and devices. Follow the drawings and specs as shown. However, if the bidding contractor wishes to provide a no cost change to meet the design intent of the system as they desire and submit a variance request then that is also acceptable. See 01 33 00 for variation request forms and format.
EP112 The Power Connections in EP 112 QTY 2 Circuits, EP 116 QTY 1 Circuit, EP 132 QTY 2 Circuits and EP 136 QTY 1 Circuit. This will cover normal DDC panels for the Mech Rooms. The VAVs Power Transformers will also need 3 Dedicated Circuits to accommodate for VAV power. Please confirm if 3 added circuits will be added to each Nech Room for VAV Power
The electrical design has provided
(12) dedicated 120V - 20A circuits for the DDC system. These are indicated as DDP-1 thru DDP-12.
They are shown on the EP sheets and the circuits are fed from the following panel boards: EQ21A, EQCOM1D, EQCOM2D and 2HVAC1. This is more than enough to power the BOD BAS system and devices. Follow the drawings as shown.
A161 Please advise if any permanent fall protection is required at roof level.
Yes, there will be fall protection anchors. The design and location were delegated design to the contractor to provide stainless steel fall protection anchors on the standing seam metal roof. See paragraph 1.10.1 of 075200 in the specifications. This paragraph applies to all roofing systems.
C3/A-252 Detail notes artwork as JSN #A6046A but item is not addressed on A-680. Please confirm artwork is to be government furnished, government installed.
Yes, Artwork is to be government furnished and installed. The artwork is part of the CID, FF&E Package and includes the following JSNs (A6045, A6046, A6046A).
21 13 13 21 13 13 - 2.2.1: Welded Stainless Steel Fire water service piping from point outside building perimter to a flanged fitting at least 1' above FF. Please verify this material can be ductile iron.
The specification states a continuous section of welded stainless steel fire water service piping "is acceptable."
This pipe section is not required to be stainless. Comply with NFPA 24, FP400 Detail C3 and all other project requirements.
21 13 13 &
CU505
21 13 13 - 3.4.11 notes the Fire Water BFP must be in a heated enclosure. CU505, detail W-01 does not show the BFP in a heated enclosure. The backflow preventer is 5' from the building exterior, above grade. It is assumed a heated enclosure is not required per CU505, please verify.
Heated enclosure is required for fire and domestic BFPs. See detail
A4/CU501
FP001 FP001-it is noted that for pipe sizes 2" and smaller schedule 40 threaded pipe must be used. In lieu of threaded, can groove fittings and couplings be used instead as this has been used on past projects on base.
Use threaded connections for pipe sizes 2" and smaller (Schedule 40).
A-400, A-
Note on A-400 states "PROVIDE STAINLESS STEEL
PLATE AT ALL LOCATIONS OF A5075 SHOWN ON
THE EQUIPMENT DRAWINGS, 18 GA BRUSHED
FINISH, FOR MOUNTING DISPENSER TO WALL.
1/4" RADIUS CORNERS, EDGES GROUND
SMOOTH, COUNTERSUNK HOLE AT EACH
CORNER WITH FLATHEAD TOGGLE BOLTS TO BE
MOUNTED FLUSH." A5075 is noted as GFGI on A-
680. Please advise if the stainless steel plate and toggle bolts are intregal to A5075 and are to be contractor furnished & contractor installed.
The plate is not integral to the A5075 and is Contractor Furnished and Installed as indicated on A-400.
01 57 19 Can the GOV provide information o the status of the DHEC SWPPP permit for this project. At the site visit it sounded like the GOV may have already started this process with their DOR's
Stormwater permit application was received by SCDE on 11/27/2024 and is in review
02 82 00 Can the GOV please provide a copy of the HAZMAT report for buildings 602 and 674
HAZMAT Reports Provided via
AMD 0003
Dwg
CS503
Please confirm that concrete sidewalk doesn’t need aggregate base.
Sidewalk does not require aggregate base. Prepare sidewalk subgrade in accordance with the Specification 31 23 00.00 20.
Dwg
CS506
Trash enclosure details on Dwg CS506 show concrete wall but A-180 show 8" CMU wall (detail A4/A-173).
Please calrify.
Enclosure shall be per the Architectural plans.
Dwg
CG501
Please provide 8" PVC and 12" PVC roof drain layout and drainage details
There is one roof drain in the design.
It connects to SDMH-03. This pipe shall be 8-inch diameter as noted on detail B4/CG501.
Dwg
CU102
Please indicate if fire hydrants needed. New fire hydrants are not required in the design. Existing hydrants provide required hose lay distances.
14-15 Factor 2 N/A The solicitation under Factor 2, Management Approach and Schedule, states: "Provide schedule, documenting in 11" x 17" pages and in an Adobe PDF file. There is no page limit for the schedule." Under the Factor 2, Critical Path Schedule, states: "Provide a summary schedule on no more than one (1) 11" x 17" page." Please clarify how many pages our proposal schedule can be.
No page requirement, please bid per
RFP
t N/A N/A Specification 02 83 00 paragraph 1.3 references a Hazardous Materials Survey date March 2022 as an attached document to the specifications. The Hazardous Materials Survey is not included with the contract specifications. Please provide the referenced Hazardous Materials Survey
HAZMAT Report was provided via
AMD 0003
N/A N/A N/A Specification 02 82 00 paragraph 1.3.1.1 states the wall board and joint compound in the existing facilities to be demolished were tested for asbestos and the results are attached to the contract specifications. Test results for the wall board and joint compound were not attached in the contract specifications. Please provide the test results for the wall board and joint compound.
Will provide.
12357
2.2.1.1 N/A 123570-2.2.1.1. and 2.1.3 specifies medical casework and dental prosthetics casework to be all metal (cold rolled steel, CRS) construction, but do not identify any difference in construction of the two types of casework.
Several locations have casework designated as CRS (cold rolled steel). Please confirm CRS designated casework and the metal (medial can dental prosthetics) casework are to be provided by a single manufacturer via 123570.
CRS stands for "Corrosion Resistant Steel". There is no laminate clad metal casework in the project. The specification paragraph 2.1.2 in
12.35.70 will be deleted. CRS designated casework is to be all metal construction.
12357
2.2.1.2 N/A 123570-2.2.1.2 specifies dental casework to have metal cabinet bodies with plastic laminate exteriors; however, the drawings do not detail metal cabinets with laminate
There is no laminate clad metal casework in the project. The specification paragraph 2.1.2 in exteriors, the drawings either call for CRS (metal cabinets) or PL1/PL2 plastic laminate cabinets. Please confirm CRS cabinets are to be all metal construction and provided via 123570 and cabinets designated with PL-** are to be AWI premium grade plastic laminate cabinets via 064116.
12.35.70 will be deleted. CRS cabinets (corrosion resistant steel) are to be all metal construction.
PL1/PL2 plastic laminate cabinets are to be AWI premium grade. All dental modular casework with a "D" JSN is laminate over particle board, (see specifications).
12357
2.2.1.2 N/A 12370-2.2.1.2 please confirm there is not a requirement for the cabinets on this project to be metal cabinets covered with decorative laminate plastic exteriors. Please confirm cabinets are either to be all metal construction or AWI premium grade plastic laminate. If any cabinets are required to have metal bodies and plastic laminate applied sheets for the exterior, please provide the locations for where these cabinets are required, construction detail for the applied laminate panel exteriors, and a Basis of Design manufacturer.
There is no laminate clad metal casework in the project. The specification paragraph 2.1.2 in
12.35.70 will be deleted. CRS cabinets (corrosion resistant steel) are to be all metal construction.
PL1/PL2 plastic laminate cabinets are to be AWI premium grade. All dental modular casework with a "D" JSN designation is laminate over particle board, (see specifications).
64116 N/A N/A The following elevations are calling out PL-2 Casework with SS-4 Countertops: B2,B3/A-432 and A2,A4, B2,B4/A-433. Finish Schedule on A-665 details PL2’s laminate finish and note 14 under “miscellaneous interior finishes” calls for Dental Casework to have a PL2 finish.
Per the previous RFI’s please confirm AWI premium grade plastic laminate casework, as specified in 064116, is acceptable in these areas.
Dental modular casework is represented on A432 B2,B3 and A433 B2,B4. All dental modular casework with a "D" JSN designation is laminate over particle board (see specifications).
12360
5.2.1.1 N/A Section 123600-5.2.1.1 details epoxy resin countertops to be provided in the manufacturer’s standard finishes, and A655, Finish Schedule, does not have the finish for Epoxy Resin Countertops specified. There is a price difference between black epoxy resin and colored epoxy (grey, slate, and putty). Please confirm if we are to price the epoxy resin countertops as standard black or if we are to include colored epoxy resin in our pricing.
Epoxy Resin countertops to be
STANDARD BLACK.
Hazar dous
Materi als
Survey
Page 5 3 Paragraph reads, "Prior to demolition/renovation activities,, LBP material that is likely to be disturbed or damaged to the extent that significant amounts of lead would be released, must be removed and/or managed and disposed of using approved practices under USEPAs NESHAP, 40 CFR Part 745." 40 CFR Part 745 is the subpart that mandates Lead Based Paint Poisoning in Certain Residential Structures. This regulation does not or appear to apply to this project. Lead-basedpaint associated with this project is mostly associated with red paint on structural steel components throughout Building 674 and 602. Standard demolition practices consiting of demolishing stuctural or building components with lead-based paint, in place with heavy equipment, as long as 29 CFR 1926.62 is followed. We do not believe the intent is to scrape and remove the 37,9992 SF of red lead-based paint associated with these components. During demolition, the steel components, painted with lead-based paint will be segregated from the building construction debris and sent to recycling yard as lead, is a
No, the red lead-based paint does not need to be abated. During demolition, the steel components, painted with lead-based paint should be segregated from the building construction debris for disposal or recycling in accordance with state and federal regulations.
metal and can be recycled. The question is, "Does the red lead-based paint need to be scraped and removed from the structural steel compoents prior to demolition of the builidng?"
B3/P-506 Detail B3/P-506: Please verify the RO Water Supply LDPE Piping, Autoclave , Dental Water Faucet, Brine Drain Line, Permeate Pump, Reserve Water Storage Tank is all GFGI w/ the L2000 water filtration System. Detail B3 is unclear for these items listed in question.
L2000 is a Log Cat C item and is GFGI. The BOD unit provides all the items mentioned. The only thing provided by the Div 22 KTR is as noted on the detail.
P-510 A3/P-510: are Type "H" Cylinders GFGI? Yes, medical gas cylinders are government provided, and government installed
P-801 A-680 and P-801 show the typical consoles and cabinets on the project and plumbing coordination notes. If we take D0680 for instance which is a Console, accessory, Dental Operatory w/ sink. Note 2 is referenced in the notes area for that piece of equipment which notes "plumbing trade shall make final connection to waster and water, and connect to fixture provided by others".
The water and Dental Air risers don't show any connections or piping inside the console that is needed.
Can you please provide connection details on what is required by Div 22 Plumbing?
P-801 schedule shows each piece of equipment and the connections for each service required. The floor plans (PM sheets) show the DA drops to the D0680 consoles and is noted with the following :DA
PIPING DN FROM 1ST FLOOR
CEILING IN WALL TO BELOW
SLAB. DA CONNECTION TO
D0680 IS IN WALL BEHIND
CONSOLE BEFORE PIPE GOES
UNDERGROUND. TYP ALL
D0680 ON FIRST FLOOR. These drops are also shown on the risers.
Please review all sheets and all notes for a complete understanding of the design requirements.
P-801 P-801: Natural Gas Connections are not shown on the Plumbing Fixture Schedule. Please provide. For instance, D0904 doesn't have NG listed.
P-801 provides a specific "Natural Gas Equipment Schedule". This schedule specifically addresses the question asked.
A-553 Wall Types 20, 20A, 21, and 21A show CMU extending to bottom of structure above. Wall Types 22 and 22A cut the CMU off just above the scheduled ceilings. Please confirm that all interior CMU partitions (Wall Types 20, 20A, 21, 21A, 22, 22A) are to extend to underside of structure above.
Yes all interior CMU partitions to extend to underside of structure above except where noted and detailed otherwise. See structural for top of wall termination of interior CMU walls. Also shown on A-300 Series for top of wall construction.
Addendum needed for revised noting on wall type sheets on sheet A-553.
00 21 00 Please provide the adjectival ratings for Technical Factors 1, 2, 3, 4, and 5.
Adjectival ratings will not be provided.
CG201 Earthquake drains are called out around the perimeter of the building footprint. Could the requirement to utilize earthquake drains be waived if all of the performance criteria could be met using only aggregate piers?
The intent is to indicate that earthquake drains may be utilized in leiu of aggregate piers outside of the building footprint. The contractor can opt to utilize aggregate piers only throughout the ground improvement area to meet the performance specification. See callouts and notes 3 & 4 on sheet CG201. See notes and callouts on sheet CG202.
S-001 Design Loads. Can the structural engineer provide the actual gravity loads (Dead Loads and Live loads) for the individual column and wall foundations?
Design for a bearing pressure of 3500 psf as indicated in note J2 on S- 002 and paragraph 1.4.1.c(1) of Specification 31 62 50.
S-001 Design Loads. What assumed bearing pressure for the foundations should be utilized for ground improvement design?
Design for a bearing pressure of 3500 psf as indicated in note J2 on S- 002 and paragraph 1.4.1.c(1) of Specification 31 62 50.
01 57 19 - 1.2.15.6
Specification 01 57 19, Page 6 under 1.2.15.6 Surplus Soil says that Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with paragraph HAZARDOUS MATERIAL MANAGEMENT. Please confirm that the contractor is not responsible for the disposal and/or treatment of contaminated or hazardous soils.
Hazardous waste disposal requirements for the contractor are provided in Specification section 01 57 19 paragraph 3.7.3.3 Hazardous Waste Disposal.
01 57 19 - 3.16
Section 01 57 19, page 31 under 3.16 says, "If petroleum-contaminated soil, or suspected hazardous waste is found during construction that was not identified in the Contract documents, immediately notify the Contracting Officer.
Do not disturb this material until authorized by the Contracting Officer." Please confirm that the contractor is not responsible for any treatment or disposal if contaminated or hazardous soil materials.
Hazardous waste disposal requirements for the contractor are provided in Specification section 01 57 19 paragraph 3.7.3.3 Hazardous Waste Disposal. CLIN 0001B AMD 0001 provides a line item for removal and disposal of hazardous material.
B1/S-501 A-310
Detail B1/S-501 notes that CMU block may be used below grade in lieu of brick veneer. This detail also shows grout fill between the CMU block and foundation wall. The wall sections on A-310 seem to show rigid insulation extended down below grade between the CMU and foundation wall. If CMU is used in lieu of brick veneer, please clarify whether grout is to be used, or if rigid insulation is to extend below grade down to the footing.
No perimeter insulation required per ASHRAE 90.1, Table 5.5-3 (Zone 3A) for unheated slab on grade floors. Amendment needed for revision to Architectural Drawings sections to match structural drawings showing grout filled cavity.
TA Drawing Set
AMD 03 provided a PPI response noting “There is no A/V in the base bid”. RFP documents contain TA Audio Visual drawing set. Please confirm the only AV scope we are to provide in the base bid is the infrastructure, raceways, backboxes, and conduit with pull strings (no wiring or equipment) in accordance with the TA AV drawings.
Contractor is responsible for all Audio/Visual infrastructure in the Base Bid. Refer to AMD 0001 "Document 00 22 13.00 20
SUPPLEMENTARY
INSTRUCTIONS TO OFFERORS"
(Clin 8 - Bid Option 7) for additional information regarding Bid Options.
PPI Reference to AMD 03 does not appear to be applicable to AV.
31 62 50 Specification 31 62 50 paragraph 1.4.1.c.5 and 1.4.1.c.6. -
3. What is the performance criteria for the Ground Improvement Area outside of the structure? Is this area required to be improved to a site class D? Is it required to have post-event liquefaction settlement of 0.5 inches or less?
All ground improvement performance criteria in specification 31 62 50 is applicable to the areas included in the "Approximate Extents of Ground Improvement" indicated on Drawing CG201.
S-511 S-008 S-002
Sheet S-008 has multiple callouts for "vertical reinforcement in grouted cells @ typical spacing." Detail B1/S-511 states "8" CMU, fully grouted." Keynote 8 on S-002 says "All block cells must be filled solid with grout." Please confirm that all CMU cells should be fully grouted, regardless if the cells do or do not have reinforcing.
All CMU cells must be fully grouted.
S-001 05 30 00 - 2.1.2
Keynote G.1 on Sheet S-001 calls for all metal deck at floors and roofs to be G90 coated. Paragraph 2.1.2 of specification 05 30 00 STEEL DECKS calls for composite decks to be G60 coated. Please clarify the desired coating of the composite decks
G90 is correct for composite decks.
AMD 3
HazMat Report, AMD 1
Price Schedule
The HazMat report in Amendment 3 provides quantities for asbestos that are to be abated prior to demolition of buildings 603 and building 674. The bid form provides a unit price line item 1C for Asbestos Removal and Disposal for 20 cubic feet. Please confirm that the quantities of asbestos abatement in the HazMat report are to be included in the base bid and that the unit price line item 1C is for additional asbestos removal.
The quantities in the hazardous material report are to be included in the base bid. The unit price referred to is for additional asbestos removal.
Reference to 1C is incorrect. See AMD 001 "Document 00 22 13.00
20 SUPPLEMENTARY
INSTRUCTIONS TO OFFERORS"
Price Schedule
Line Item 1D on the Price Schedule is for Removal and Disposal of Hazardous Materials (other than Asbestos).
Please confirm that this line item is for hazardous materials related to the building demolition and not hazardous soils. If this item is for the items quantified in the Amendment 1 HazMat report, please confirm that this quantity is in addition to the items called out in the Hazardous Materials report.
This line item is for hazardous materials related to building demolition and not soils. This quantity is in addition to the hazardous material report. Reference to 1D is incorrect. See See AMD 001 "Document 00 22 13.00 20
SUPPLEMENTARY
INSTRUCTIONS TO OFFERORS"
Small Business Subcontracti ng Plan
Attachment H - Small Business Subcontracting Plan Template has a last page for Base Period and Option Year Subcontracting Goals. Please confirm that this page is not required as there are not option years to this solicitation.
This is a standalone construction solicitation; please fill out the base period on the last page of subject attachment
A-551 Partition Type 11B is called out on A-551. This partition type does not appear to show up on any other page.
Please confirm location if required for partition type 11B.
Wall Type 11B is located at Col. Grid G/4.9, in Block 1C.
A-552 Partition Type 14A is called out on A-552. This partition type does not appear to show up on any other page.
Please confirm location if required for partition type 14A.
Parition 14A is located first on the first level in Block 1J surrounding the column at column line G/6 and in Block 2F. The second location is at the horizotnal furring wall directly above door 2F05, where the note reads "offset studs, align finished face." Ammendment needed to add wall tag to wall shown in Block 2F.
A-553 Partition types 21 & 21A cut section notes "omit gyp board this side only at wall type 21B". However, there does not appear to be a wall type 21B. Please confirm this for wall type 21A.
Wall type 21B located at elevator shafts in blocks 1C, 2C, 1F, and 2F.
Ammendment required for wall tags to be changed to 21A at elevator shaft locations.
A-553, A1/A-314
Partition types 21 & 21A show 2 1/2" metal studs on A-
553. However, A1/A-314 shows partition type 21A in room 1B07 to receive 1 5/8" metal stud and 3 5/8" metal
The wall located between 1B07 and 1C01 will be a wall type 21A as denoted by the plan with a 2 1/2" stud in room 1C01 ONLY. Once the framing with batt insulation at the top of the wall. Please confirm what is required at this location.
wall continues north of door 1C01B the wall composition will be that of a wall type 20A at the CMU with a new wall type 7F ( to be added to wall type sheet A-551) consisting of a 1 5/8" stud with a single layer of gysum board attached to wall type 20A. The 3 5/8" metal stud and batt insulation at the top of the wall between rooms 1B07 and 1C01 is to seal off the unconditioned 1B07 from the conditioned 1C01 and for sound abatement. Ammendment needed for revision to floor plans in both noting and graphics for wall between and north of 1B07 and 1C01 as well as updates to wall type 7 on sheet A- 551.
A-117 Stair 1GS1 appears to show drywall partitions in on the west wall. Please confirm if this is wall type 7 as shown on level 2.
Wall type 7 is on plan east wall on both stair levels of 1GS1 and 1BS2.
A-117 Stair 1GS1 appears to show a layer of drywall directly applied to CMU at east, north, and south walls. Please confirm the intent is for all CMU in the stair wells to be exposed and painted PT1 per finish schedule other than partition type 7 is called out.
In Stair 1GS1 and 2BS2, single layer of gypsum board is applied to the North, East, and South walls. Single layer of gypsum board also applied on west wall at door in 1GS1.
Confirmed that all of these to be painted PT1 as stated in finish schedule.
A-117 Stair 1FS2 appears to show drywall partitions in on the east wall. Please confirm if this is wall type 7 as shown on level 2.
Wall type 7 is on plan east wall on both stair levels of 1FS1 and 1FS2.
A-117 Stair 1FS2 appears to show a layer of drywall directly applied to CMU at west, north, and south walls. Please confirm the intent is for all CMU in the stair wells to be exposed and painted PT1 per finish schedule other than partition type 7 is called out.
In Stair 1FS1 and 1FS2, single layer of gypsum board is applied to the North and west walls. The wall to the south where the elevator is located is wall type 21B. Single layer of gypsum board also applied on east wall at door in 1FS1. Confirmed that all of these to be painted PT1 as stated in finish schedule.
23 09 13 Specs Section 230913 2.6.3.4.1 calls for RTD type room sensors. Would Thermistor Sensor with same operating range and accuracy be acceptable
Provide what is specified. It is noted that the second paragraph of the referenced section states "Thermistors are acceptable in lieu of platinum or nickel RTD, provided thermistor carries a five-year guarantee that device will maintain its accuracy within tolerance of ±
0.36 F between 32 F and 150 F, and
0.5 F between -20 F and 212 F."
MH115 &
M-402
MH115 notes a 48"x48" OA louver. M-402 notes 60x48". Please verify louver is to be 48"x48".
The correct size is 60x48 as shown A-206 and A-202. However, the detail on A-630 for L1 and L2 is shown incorrectly. Will issue Amendment
M-410 & A1/A-202
There is a arching louver shown on A1/A-202 (7'4"x10').
This louver appears on M-410 but it is not noted to be insulated blank off panels on the back of this large louver.
Please verify this should be blanked-off as well
All unducted portions of metal wall louvers are to be blanked off and insulated.
CD104 Note 9 on CD104 says, "IF ASBESTOS INSULATION
IS SUSPECTED ON ANY OF THE STEAM PIPING TO
BE DEMOLISHED, THE CONTRACTOR SHALL
STOP STEAM LINE DEMOLITION AND CONTACT
THE CONTRACTING OFFICER FOR DIRECTION."
Please confirm that there is no asbestos steam piping removal to be included in the base bid.
Hazardous waste disposal requirements for the contractor are provided in Specification section 01 57 19 paragraph 3.7.3.3 Hazardous Waste Disposal. CLIN 0001B (AMD 0001) provides a line item for removal and disposal of hazardous material.
C-002 Site & Utility Demo note 12 on C-002 says, "WATER
AND SANITARY UTILITIES ARE OWNED BY
BEAUFORT-JASPER WATER AND SEWER
AUTHORITY (BJWSA)." Please identify a point of demarcation where BJWSA is furnishing and installing the water and sanitary utilities to on the plans.
Contractor is required to provide all water main and sanitary sewer work and materials indicated on the drawings. Per note 12 on sheet C- 002, the contractor must coordinate water and sanitary utility work with Mr. Joseph Gentile, MCRD Parris Island Contract Officer Representative Utilities Privitazation Contract.
10 44 16 & 10 99 00
The Fire extinguisher section and miscellaneous building specialties sections both contain different fire extinguisher requirements. Section 10 44 16 lists all extinguishers at 10lbs and semi recessed cabinets, while section 10 99 00 list 10lb and 20lb extinguishers with semi and full recessed cabinets. Can you specify which section Is correct and give a Basis of design for the fire extinguishers and cabinets.
Provide 10 pound for extinguishers inside cabinets and 20 pound for extinguisher on wall brackets
10 21 13 Under products in the toilet compartments section 10 21 13 2.3.2, the specifications list ceiling hung Urinal screens. All the urinal screens in the drawings are listed as wall Hung. Is there ceiling hung Urinal screens not shown in the drawings or is this section not needed?
wall hung urinal screen only
A-114 through A-
In the floor plans of the Architectural plans there is a clear callout and listing of Corridor Rail (listed as CR in legend & called out as CR1). There is no listing in the specifications or finish legend. Can you Please provide a Basis of Design for the Corridor Rail (CR & CR1)
CR1 Basis of Design- Inpro Corp-
3100 SERIES, 3130VV, 5 3/4"
HANDRAIL WITH INTEGRATED
VINYL WALL GUARD, COLOR-
CASTLE 0256. Product will be added to specifications.
AG601 Sign types callout to images that look like large artwork pieces but there are is no mention of it in the specs or locations. can you provide a basis of design for these images.
Basis of Design image is for signs only, not large artwork. Image is called out in key notes 32 and 33 on sheet AG601 (shutterstock image 118549450 with opacity of 50%) -sign types designate if image is required.
280000 Please confirm that the contractor is only responsible for pathways, rough-in, and power of all electronic security systems.
Contractor is responsible for all Electronic Security System infrastructure in the Base Bid. Refer to AMD 0001 "Document 00 22
13.00 20 SUPPLEMENTARY
INSTRUCTIONS TO OFFERORS"
(Clin 5 - Bid Option 4) for additional information regarding Bid Options.
A-171,A- 172, A-174
Detail A2 on A-174 calls out a "MECHANICAL YARD
CAP, PROVIDE GALV. 9 GA. 2" MESH CHAIN LINK
FABRIC W/ ALL APPROPRIATE FITTINGS AND
CONNECTIONS." This detail refers to the Mini-Split Enclosure plan C1/A172 on the Clinic Main Exterior Brick Veneer, but it calls it out as a Mechanical Yard Cap.
Please confirm that the Mechanical Yard shown in detail A1/A171 does not require a chain link roof cap.
Main mechanical yard shown on A1/A171 WILL NOT have chain link roof cap. Chain link roof cap will only be at mini-split yards at grid lines B and M.
A-132, A- 136, A-202
Drawing A-202 detail A4 shows an elevation with what appears to be a type L4 louver (from A-6) but has no callout number on A-202. This area is located on the second floor at areas 2A and 2F. On drawings A-132 and A-136 this same area shows the louver to be a type L3 louver. Please confirm if these louvers are to be a L3 or L4 louver.
Drawing A-132 and A-136 should be louver type 4. Elevation A4/A-202 does show louver type 4.
G-110, A- 710, A-740, A-741, 07 81 00
Drawing G-110 (Life Safety Notes) and specification section 07 81 00 (Spray Applied Fireproofing), conflict on the fire rating of the building and if spray applied fireproofing is or is not required. Drawing G-110 lists the primary structural frame, bearing walls, nonbearing walls, floor construction and roof construction to be 0 Hour rated and that additional will not be required for the exit stairs and elevator shafts. While specification section 07 81 00 lists the columns, floor decks and floor supports to be 1 HR rated. Through searching the drawings, the only request for fireproofing is on drawings A-710, A-740, & A-741where a note is requesting spray fireproofing on the underside of the deck in rooms 1GS1, 1CE1, 1CE2, & 1FE3. The beams and any columns do not appear to have applied fireproofing in these locations and Drawings A-710, A-740, & A-741 contradicts with the notes on G-110. Please confirm if spray applied fireproofing is or is not required. If spray applied fireproofing is required please confirm that it is for rooms 1GS1, 1CE1, 1CE2, & 1FE3 only and only at the underside of the decking above said rooms.
The spray applied fireproofing is required to create a 1-hour fire resistance rated lid for the stairway and elevator shafts only.
G-110 indicates structural element rating requirements for the building as Type IIB construction. G-110 also states additional fireproofing will not be required to meet NFPA 101 Section 8.2.3.3 which is in regard to the structure supporting the shaft fire barriers.
The fireproofing specified is required to create a lid for the stair and elevator shafts since the shaft fire barriers are not continuous from the bottom of the building to the roof.
NFPA 101 Section 8.6.4.1 permits the shaft to terminate where the highest level of the shaft has constructed with construction meeting the hourly rating of the shaft (1-hour in this case.
As stated in Spec Section 07 81 00 Para. 1.2.1, the spray-applied fireproofing spec is intended to apply to spraying all of the elements of a steel floor portion within rooms where indicated on the drawings
(creating a rated lid for the stairway and elevator shafts).
A-203, A-
Drawing A-203 detail A3 calls for a metal wall panel system above the sliding door entry systems. This is at both entry locations in areas 1B and 1D. The wall section for this area can be seen on drawing A-311 detail A3.
No specification section was provided for metal wall panel assemblies. Please provide a division 7 specification section for the required metal wall panels.
Will provide section 074213 with Amendment.
A-600, A- 601, A-602, and A-603
The door schedules on drawings A-600 through A-603 do not mention if any of the doors are to be STC rated.
Several of the wall types listed in drawings A-550 Through A-553 list STC ratings up to STC 55. A Solid core wood door assembly normally provides approximately a STC 25 rating and with the seal packages called for in the door schedule would be STC 32 rated. Please confirm that no STC ratings are required for all of the doors per the door schedules (drawings A-600, A-601, A-602, and A-603).
Provide solid wood doors and gasketing as prescibed.
A550, MH161,
MH162
Several of the second floor drawings have a keynote detail with (listed rooms) requiring envelope sealing and pressure testing as outlined in MH161 & MH162. These rooms appear to be surrounded by variants of the wall type #2. Drawings MH161 & MH162 detail how to seal penetrations and cracks, but have no mention if the walls for these rooms will need an air/vapor barrier to be installed or if paint is sufficient for the testing requirements. Please confirm that the paint on the gypsum per wall type #2 on drawing A-550 will be sufficient for the seal and pressure testing of rooms 2C01, 2C02, 2C05, 2C06, 2C08, 2D01, 2D02, 2D03, 2H10, 2H16, 2H17, 2J05, 2J06, 2J10, 2J11, & 2K04.
Paint is acceptable for all interior wall types for testing purposes.
However, all portions of rooms (Eg.
2L01) with exterior walls must be provided with air barriers per plans and specifications.
A-002 Drawing A-002 shows the continuous air barrier around the whole perimeter of the building but has the word “Tested” in each area (1A-1L and 2A-2L). Please confirm that only the full building air barrier envelope is to receive pressure testing and that it is not required to test each individual area.
The whole building will be pressure tested as stated on A-002. Air barrier testing is for the whole building as defined on A-002. In addition there are testing requirements for individual rooms/suites based on sheets MH161 & MH162.
A-610, A- 611, A-612, A-613, A-
The Door frame details in drawings A-610 through A-614 do not show the frames in CMU walls to receive either grout or foam insulation. Please confirm that door frames in CMU walls do not require grouting or foam insulation.
Exterior doors in CMU block only fill with foam insulation.
Amendment Required for notation on door schedule.
A-602 Drawing A-602 lists door 2H08 to have a lead frame only for the door. Please confirm that this is correct and a lead lined door leaf is not required for this room.
No lead lined door required.
13 49 10 - 1.3.3
Specification section 13 49 10 paragraph 1.3.3 for X-Ray Shielding calls for materials to be purchased from a single manufacturer. Please consider removing this requirement as multiple different trades will be supplying
The intent is to not provide lead-lined doors from multiple sources or wallboard and wall patches from multiple sources. A single source does not need to manufacture doors, and installing these products such as drywall, leaded windows, lead lined doors and frames.
glass, frames and wallboard products.
CG102 Key Note 8 & 9 call out the downspout boot locations.
There is no roof drain piping shown except one location where the RD connects to SDMH-03. Detail B4/CG501 shows an 8" PVC pipe connecting to a 12" PVC pipe.
Please provide roof drain piping locations on the plan as well as pipe sizing.
The only roof drain in the design is the one referenced in this PPI that connects to SDMH-03. The roof drain pipe connecting to SDMH-03 is 8" PVC. Key note 9 only calls out the location of downspouts. Concrete splash blocks shall be provided in these locations. Specifications will be revised to clarify requirement.
Dental Equipment
Please advise if locks are required at dental casework doors and drawers.
IAW Spec Section 117213 locks on dental casework is not a requirement.
Hazar dous
Materi als
Survey Report
Page 5 3 Paragraph reads, "Prior to demolition/renovation activities,, LBP material that is likely to be disturbed or damaged to the extent that significant amounts of lead would be released, must be removed and/or managed and disposed of using approved practices under USEPAs NESHAP, 40 CFR Part 745." 40 CFR Part 745 is the subpart that mandates Lead Based Paint Poisoning in Certain Residential Structures. This regulation does not or appear to apply to this project. Lead-based paint associated with this project is mostly associated with red paint on structural steel components throughout Building 674 and 602. Standard demolition practices consiting of demolishing stuctural or building components with lead-based paint, in place with heavy equipment, as long as 29 CFR 1926.62 is followed. We do not believe the intent is to scrape and remove the 37,9992 SF of red lead-based paint associated with these components. During demolition, the steel components, painted with lead-based paint will be segregated from the building construction debris and sent to recycling yard as lead, is a metal and can be recycled. The question is, "Does the red lead-based paint need to be scraped and removed from the structural steel compoents prior to demolition of the builidng?"
No, the red lead-based paint does not need to be abated. During demolition, the steel components, painted with lead-based paint should be segregated from the building construction debris for disposal or recycling in accordance with state and federal regulations.
Dwg
CS103
What should be the assumed installation elevation for the ground improvement elements for bidding purposes?
See CG202 for Schematic Ground Improvement Section. Installation elevations are dependent on the contractor's ground improvement consultant's design of the drainage layer, aggregate pier elements, and the optional earthquake drains. See section 1.4.1 of specificaton 31 62 50 for mimimmum thicknesses and tip elevations.
Dwg S001
What assumed bearing pressure for the foundations should be utilized for ground improvement design? (If actual gravity loading of the column/wall footings cannot be provided.)
Duplicate of item 91. Design for a bearing pressure of 3500 psf as indicated in note J2 on S-002 and paragraph 1.4.1.c(1) of Specification 31 62 50.
Dwg S101
Can the structural engineer provide the actual gravity loads (Dead Loads and Live loads) for the individual column and wall foundations? This helps to optimize the design of ground improvement and often leads to less expensive estimates for support
Duplicate of item 90. Design for a bearing pressure of 3500 psf as indicated in note J2 on S-002 and paragraph 1.4.1.c(1) of Specification 31 62 50.
Dwg S101
Area there any foundations/slabs that do not require ground improvement?
Provide ground improvement in the areas included in the "Approximate Extents of Ground Improvement" indicated on Drawing CG201.
Spec 31 62
1.4.1.c.5 1.4.1.c.6
What is the performance criteria for the Ground Improvement Area outside of the structure? Is this area required to be improved to a site class D? Is it required to have post-event liquefaction settlement of 0.5 inches or less?
Duplicate of item 100. All ground improvement performance criteria in specification 31 62 50 is applicable to the areas included in the "Approximate Extents of Ground Improvement" indicated on Drawing
CG201.
Spec 31 62
1.4.1.e Is placement of a drainage layer and drainage geotextile excluded from the scope of the ground improvement contractor?
No.