AMD 0005 - Technical Amendment 0007.pdf
PDF 1 MB Posted
- Solicitation number
- N4008525R2500
About this file
This document is a Technical Amendment 0007 for the P7889 Dental Clinic Replacement project at the Marine Corps Recruit Depot in Parris Island, South Carolina. The amendment makes several modifications to the original solicitation, including adding Section 07 42 13 Metal Wall Panels to the Project Table of Contents, updating work restrictions to allow a 10-hour work period between 6 a.m. and 6 p.m., and making minor adjustments to various technical specifications such as steel deck coating, metal wall louvers, and fire extinguisher requirements. The amendment also provides updated submittal requirements for the metal wall panels, including shop drawings, product data, samples, design data, test reports, and certificates that must be submitted for government approval.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC ATLANTIC
TECHNICAL AMENDMENT 0007
Solicitation: N62470-19-D-5015 Title: PROJECT P7889 DENTAL CLINIC REPLACEMENT
MARINE CORPS RECRUIT DEPOT
PARRIS ISLAND – BEAUFORT, SC
Date: 09 April 2025
PROJECT TABLE OF CONTENTS
Add Section 07 42 13 METAL WALL PANELS to the Project Table of Contents
FROM:
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11 LIST OF DRAWINGS
00 22 13.00 20 02/14, CHG 3: 11/18 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS
01 20 00 11/20, CHG 2: 08/21 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 11/15, CHG 5: 08/21 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 58 00 08/19, CHG 4: 05/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 3: 08/21 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 91 00.15 20 02/21, CHG 1: 05/21 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 05/20 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 – CONCRETE
03 30 00 02/19, CHG 3: 11/21 CAST-IN-PLACE CONCRETE
03 45 33 05/16, CHG 1: 11/21 PLANT PRECAST STRUCTURAL CONCRETE
DIVISION 04 – MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 – METALS
05 05 23.13 10 08/18 ULTRASONIC INSPECTION OF WELDMENTS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17, CHG 1: 05/17 METAL STAIRS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 42 29 AUTOMATIC ENTRANCES
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 39 08/20 FOLDING PANEL PARTITIONS
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 99 00 MISCELLANEOUS BUILDING SPECIALTIES
DIVISION 11 - EQUIPMENT
11 70 00 11 71 00
05/20 05/20
GENERAL REQUIREMENTS FOR MEDICAL AND
DENTAL EQUIPMENT
STERILIZERS AND ASSOCIATED EQUIPMENT
11 72 13 05/20 MEDICAL AND DENTAL EQUIPMENT
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 35 70 08/16, CHG 2: 11/18 HEALTHCARE CASEWORK
12 36 00 08/18, CHG 2: 08/18 COUNTERTOPS
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
13 49 10 11/20 X-RAY SHIELDING
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 – PLUMBING
22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES
22 60 70 05/20 GAS AND VACUUM SYSTEMS FOR HEALTHCARE
FACILITIES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 02/14 COMMON PIPING & HYDRONIC SPECIALTIES
FOR HVAC
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 22 26.00 20 02/10, CHG 1: 05/15 STEAM SYSTEM
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 HEATING HOT WATER AND CHILLED WATER
PIPING SYSTEMS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR HVAC DDC
25 05 11.02 05/21 CYBERSECURITY FOR ELECTRONIC SECURITY
SYSTEM
25 05 11.03 05/21 CYBERSECURITY FOR FIRE DETECTION AND
ALARM SYSTEM
25 05 11.04 05/21 CYBERSECURITY FOR LIGHTING CONTROL
SYSTEM
25 05 11.05 05/21 CYBERSECURITY FOR NURSE CALL SYSTEM
25 05 11.06 05/21 CYBERSECURITY FOR UTILITY MONITORING
CONTROL SYSTEM
25 05 11.07 05-21 CYBERSECURITY FOR PUBLIC ADDRESS
CONTROL SYSTEM
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR MCRD
PARRIS ISLAND - DENTIAL CLINIC
REPLACEMENT FACILITY-RELATED CONTROL
SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 11/21 APPARATUS INSPECTION AND TESTING
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)
SYSTEMS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS
27 51 23 11/21 INTERCOMMUNICATION SYSTEM
27 52 24 11/20 NURSE CALL SYSTEM
27 53 19.13 05/20 FIRST RESPONDER DISTRIBUTED ANTENNAE
SYSTEMS (DAS)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 28 10 05
05/16 05/16
ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
31 62 50 11/20, CHG 1: 05/22 DENSIFIED AGGREGATE PIERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING AND RIGID PAVEMENT
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
SITE FACILITIES
32 14 13.13 11/19 INTERLOCKING PRECAST PERVIOUS CONCRETE
UNIT PAVING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 84 24 08/11 TEMPORARY IRRIGATION SPRINKLER SYSTEMS
32 92 23 04/06 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 40 00 11/21 STORMWATER UTILITIES
33 61 13.13 02/16 PREFABRICATED UNDERGROUND HYDRONIC
ENERGY DISTRIBUTION
33 63 23 04/06 EXTERIOR ABOVEGROUND STEAM DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 40 - PROCESS INTERCONNECTIONS
40 17 30.00 40 05/16 WELDING GENERAL PIPING
-- End of Project Table of Contents –
TO:
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11 LIST OF DRAWINGS
00 22 13.00 20 02/14, CHG 3: 11/18 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS
01 20 00 11/20, CHG 2: 08/21 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 11/15, CHG 5: 08/21 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 58 00 08/19, CHG 4: 05/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 3: 08/21 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 91 00.15 20 02/21, CHG 1: 05/21 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 05/20 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 – CONCRETE
03 30 00 02/19, CHG 3: 11/21 CAST-IN-PLACE CONCRETE
03 45 33 05/16, CHG 1: 11/21 PLANT PRECAST STRUCTURAL CONCRETE
DIVISION 04 – MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 – METALS
05 23.13 10 08/18 ULTRASONIC INSPECTION OF WELDMENTS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17, CHG 1: 05/17 METAL STAIRS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 42 29 AUTOMATIC ENTRANCES
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 39 08/20 FOLDING PANEL PARTITIONS
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 99 00 MISCELLANEOUS BUILDING SPECIALTIES
DIVISION 11 - EQUIPMENT
11 70 00 11 71 00
05/20 05/20
GENERAL REQUIREMENTS FOR MEDICAL AND
DENTAL EQUIPMENT
STERILIZERS AND ASSOCIATED EQUIPMENT
11 72 13 05/20 MEDICAL AND DENTAL EQUIPMENT
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 35 70 08/16, CHG 2: 11/18 HEALTHCARE CASEWORK
12 36 00 08/18, CHG 2: 08/18 COUNTERTOPS
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
13 49 10 11/20 X-RAY SHIELDING
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 – PLUMBING
22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES
22 60 70 05/20 GAS AND VACUUM SYSTEMS FOR HEALTHCARE
FACILITIES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 02/14 COMMON PIPING & HYDRONIC SPECIALTIES
FOR HVAC
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 22 26.00 20 02/10, CHG 1: 05/15 STEAM SYSTEM
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 HEATING HOT WATER AND CHILLED WATER
PIPING SYSTEMS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR HVAC DDC
25 05 11.02 05/21 CYBERSECURITY FOR ELECTRONIC SECURITY
SYSTEM
25 05 11.03 05/21 CYBERSECURITY FOR FIRE DETECTION AND
ALARM SYSTEM
25 05 11.04 05/21 CYBERSECURITY FOR LIGHTING CONTROL
SYSTEM
25 05 11.05 05/21 CYBERSECURITY FOR NURSE CALL SYSTEM
25 05 11.06 05/21 CYBERSECURITY FOR UTILITY MONITORING
CONTROL SYSTEM
25 05 11.07 05-21 CYBERSECURITY FOR PUBLIC ADDRESS
CONTROL SYSTEM
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR MCRD
PARRIS ISLAND - DENTIAL CLINIC
REPLACEMENT FACILITY-RELATED CONTROL
SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 11/21 APPARATUS INSPECTION AND TESTING
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)
SYSTEMS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS
27 51 23 11/21 INTERCOMMUNICATION SYSTEM
27 52 24 11/20 NURSE CALL SYSTEM
27 53 19.13 05/20 FIRST RESPONDER DISTRIBUTED ANTENNAE
SYSTEMS (DAS)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 28 10 05
05/16 05/16
ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
31 62 50 11/20, CHG 1: 05/22 DENSIFIED AGGREGATE PIERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING AND RIGID PAVEMENT
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
SITE FACILITIES
32 14 13.13 11/19 INTERLOCKING PRECAST PERVIOUS CONCRETE
UNIT PAVING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 84 24 08/11 TEMPORARY IRRIGATION SPRINKLER SYSTEMS
32 92 23 04/06 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 40 00 11/21 STORMWATER UTILITIES
33 61 13.13 02/16 PREFABRICATED UNDERGROUND HYDRONIC
ENERGY DISTRIBUTION
33 63 23 04/06 EXTERIOR ABOVEGROUND STEAM DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 40 - PROCESS INTERCONNECTIONS
40 17 30.00 40 05/16 WELDING GENERAL PIPING
-- End of Project Table of Contents --
SECTION 01 14 00 – WORK RESTRICTIONS
Paragraph 1.3.2 Working Hours
Regular working hours will consist of an 8 1/2 hour period established by the Contracting Officer, between 7 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.
Working hours are further restricted for noise generating activities such as demolition, pile driving, jack hammering, jack and boring, large construction vehicles leaving and entering the site, large air compressors or generators running, etc., are not permitted on recruit graduation weeks. These restrictions will be in effect all day Thursday until noon on Friday on graduation weeks. Graduations occur approximately 44 weeks per year.
TO:
Regular working hours will consist of an 8 ½ up to a 10 hour period established by the Contracting Officer, between 6 a.m. and 6 p.m., Monday through Friday, excluding Government holidays.
Working hours are further restricted for noise generating activities such as demolition, pile driving, jack hammering, jack and boring, large construction vehicles leaving and entering the site, large air compressors or generators running, etc., are not permitted on recruit graduation weeks. These restrictions will be in effect all day Thursday until noon on Friday Thursday and Friday from 7:00 am to 11:00 am on graduation weeks. Graduations occur approximately 44 weeks per year.
Paragraph 1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
TO:
Work outside regular working hours requires Contracting Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
Saturday work requests will be restricted for noise generating activities such as demolition, pile driving, jack hammering, jack and boring, large construction vehicles leaving and entering the site, large air compressors or generators running, etc., from 7:30 am to 8:30 am on weeks of a Crucible due to the Eagle Globe and Anchor presentation ceremony. There are approximately 40 Eagle Globe and Anchor presentation ceremonies per year.
SUBMITTAL REGISTER
Revise Submittal Register (Attached) to include submittals from 07 42 13
SECTION 05 30 00 – STEEL DECKS
Paragraph 2.1.2 Composite Deck
FROM:
Conform to ASTM A653/A653M or ASTM A1008/A1008M for composite deck assembly.
Fabricate deck used as the tension reinforcing in composite deck of the steel design thickness required by the design drawings. Zinc-coat in conformance with ASTM A653/A653M, G60 coating class.
TO:
Conform to ASTM A653/A653M or ASTM A1008/A1008M for composite deck assembly.
Fabricate deck used as the tension reinforcing in composite deck of the steel design thickness required by the design drawings. Zinc-coat in conformance with ASTM A653/A653M, G60 G90 coating class.
SECTION 07 42 13 METAL WALL PANELS
Add new Section 07 42 13 in its entirety (Attached)
SECTION 07 60 00 FLASHING AND SHEET METAL
Paragraph 3.1.16.1 Terminations
Neatly fit into the drainage connection the downspouts terminating in drainage lines and fill the joints with a portland cement mortar cap sloped away from the downspout. Provide downspouts terminating in splash blocks with elbow-type fittings. Provide splash pans as specified.
TO:
Neatly fit into the drainage connection the downspouts terminating in drainage lines and fill the joints with a portland cement mortar cap sloped away from the downspout. Provide downspouts terminating in splash blocks with elbow-type fittings. Provide concrete splash blocks at all locations not indicated to terminate in drainage lines. Provide splash pans as specified.
SECTION 08 91 00 METAL WALL LOUVERS
Paragraph 2.2 METAL WALL LOUVERS
FROM:
Wind driven rain resistant type, with bird screens, filter frames, and made to withstand the wind load indicated on structural drawings. Wall louvers must bear the AMCA certified ratings program seal for air performance and water penetration in accordance with AMCA 500-L, AMCA 511, AMCA 540 for basic protection, and AMCA 550 for high velocity wind driven rain resistance. The louver must have a water penetration of 0.10 or less ounce per square foot of free area at a free velocity of feet per minute. Provide minimum 47 percent free area.
TO:
Wind driven rain resistant type, with bird screens, filter frames, and made to withstand the wind load indicated on structural drawings. Wall louvers must bear the AMCA certified ratings program seal for air performance and water penetration in accordance with AMCA 500-L, AMCA 511, AMCA 540 for basic protection, and AMCA 550 for high velocity wind driven rain resistance. The louver must have a maximum water penetration of 0.06 kilograms or less per square meter 0.10 or less ounce per square foot of free area at a free velocity of 873 feet per minute when tested for 15 minutes. Provide minimum 479 percent free area. Provide with AMCA 550 High Velocity Wind Driven Rain Resistant Damper. Maximum allowed pressure drop at 873 feet per minute must be 0.1 inches of water or less.
SECTION 10 44 16 FIRE EXTINGUISHERS
Paragraph 2.1.2 Size
FROM:
10 pounds extinguishers.
TO:
10 pounds extinguishers at fire extinguisher cabinet locations. 20 pounds extinguishers at wall mounted cabinets.
SECTION 10 99 00 MISCELLANEOUS BUILDING SPECIALTIES
Paragraph 2.4 WALL GUARDS
FROM:
Wall Guards (Identified as BR1, Bumper Rails and CHR1, Chair Rails, on the drawings). Provide with prefabricated end closure caps, inside and outside corners, concealed splices, cushions, mounting hardware and other accessories standard with the manufacturer. Extruded aluminum retainers shall conform to ASTM B221, alloy 6063, temper T5 or T6. End caps and corners shall be field adjustable to assure close alignment with wall guards.
TO:
Wall Guards (Identified as BR1, Bumper Rails, CR1 Corridor Rails, and CHR1, Chair Rails, on the drawings). Provide with prefabricated end closure caps, inside and outside corners, concealed splices, cushions, mounting hardware and other accessories standard with the manufacturer.
Extruded aluminum retainers shall conform to ASTM B221, alloy 6063, temper T5 or T6. End caps and corners shall be field adjustable to assure close alignment with wall guards.
SECTION 12 35 70 HEALTHCARE CASEWORK
Delete Paragraph 2.1.2 Dental Casework in its entirety
FROM:
2.1.2 Dental Casework
Provide dental operator casework of carbon steel covered with laminated plastic sheets.
Pattern, color and finish of decorative laminated plastic for exteriors of casework selected by the Contracting Officer from the manufacturer's standard color and woodgrain samples.
TO:
2.1.2 Dental Casework
Provide dental operator casework of carbon steel covered with laminated plastic sheets.
Pattern, color and finish of decorative laminated plastic for exteriors of casework selected by the Contracting Officer from the manufacturer's standard color and woodgrain samples.
-- End of Technical Amendment 0007 --
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
N62470-19-D-5015
DENTAL CLINIC REPLACEMENT - MARINE CORPS RECRUIT DEPOT
07 42 13 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installation
Contractor
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.1Recycled Content;
2.1 GWall Panels
2.2.1 GWall Panels
2.2.2Factory Color Finish
1.5.5Closure Materials
2.5.4.4Pressure Sensitive Tape
2.5.4.1Sealants and Caulking
1.5.5Accessories
2.5Accessories
SD-04 Samples
2.1 GWall Panels
2.2.1 GWall Panels
1.5.3.1 GFasteners
2.5.3 GMetal Closure Strips
GColor chart
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
P7889 Dental Clinic Replacement Marine Corps Recruit Depot Parris Island - Beaufort, South Carolina
SECTION 01 14 00
WORK RESTRICTIONS
11/ 11, CHG 14: 02/ 22
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.2.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.2.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.2.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
SECTION 01 14 00 Page 1
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.2.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.2.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.2.1.2.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.2.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under
SECTION 01 14 00 Page 2 renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.2.2 Working Hours
Regular working hours will consist of up to a 10 hour period established by the Contracting Officer, between 7 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.
Working hours are further restricted for noise generating activities such as demolition, pile driving, jack hammering, jack and boring, large construction vehicles leaving and entering the site, large air compressors or generators running, etc., are not permitted on recruit graduation weeks. These restrictions will be in effect Thursday and Friday from 7:00 am to 11:00 am on graduation weeks. Graduations occur approximately 44 weeks per year.
1.2.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
Saturday work requests will be restricted for noise generating activities such as demolition, pile driving, jack hammering, jack and boring, large construction vehicles leaving and entering the site, large air compressors or generators running, etc., from 7:30 am to 8:30 am on weeks of a Crucible due to the Eagle Globe and Anchor presentation ceremony. There are approximately 40 Eagle Globe and Anchor presentation ceremonies per year.
1.2.4 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
SECTION 01 14 00 Page 3
e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection.
1.3 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 14 00 Page 4
SECTION 05 30 00
STEEL DECKS
05/ 15, CHG 2: 08/ 18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI D100 (2017) Cold-Formed Steel Design Manual
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel
AWS D1.3/D1.3M (2018) Structural Welding Code - Sheet Steel
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A792/A792M (2021a) Standard Specification for Steel Sheet, 55% Aluminum-Zinc Alloy-Coated by the Hot-Dip Process
ASTM A1008/A1008M (2021a) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
STEEL DECK INSTITUTE (SDI)
ANSI/SDI C (2017) Standard for Composite Steel Floor Deck - Slabs
SECTION 05 30 00 Page 1
ANSI/SDI QA/QC (2017) Standard for Quality Control and Quality Assurance for Installation of Steel Deck
ANSI/SDI RD (2017) Standard for Steel Roof Deck
SDI DDM04 (2015; 7th Printing, July 2019) Diaphragm Design Manual; 4th Edition
SDI DDP (1987; R 2000) Deck Damage and Penetrations
SDI MOC3 (2016) Manual of Construction with Steel Deck (3rd Edition)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for Construction
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Fabrication and Placement Drawings ; G
SD-03 Product Data
Accessories
Deck Units
Galvanizing Repair Paint
Mechanical Fasteners (Screws)
Touch-Up Paint
Welding Rods and Accessories
SD-04 Samples
Metal Floor and Roof Deck Units
SD-05 Design Data
Deck Units ; G
SD-07 Certificates
Welder Qualifications
Welding Procedures
Manufacturer's Certificate
SECTION 05 30 00 Page 2
Stud Manufacture's Certification
Stud Manufacture's Test Reports
1.3 QUALITY ASSURANCE
1.3.1 Deck Units
Furnish deck units and accessory products from a manufacturer regularly engaged in manufacture of steel decking. Provide manufacturer's certificate s attesting that the decking material meets the specified requirements.
1.3.2 Qualifications for Welding Work
Follow Welding Procedures of AWS D1.3/D1.3M for sheet steel and AWS D1.1/D1.1M for stud welding.
Submit qualified Welder Qualifications in accordance with AWS D1.3/D1.3M for sheet steel and AWS D1.1/D1.1M for stud welding, or under an equivalent approved qualification test.
Submit manufacturer's catalog data for Welding Rods and Accessories .
1.3.3 Fabrication and Placement Drawings
Show type and location of units, location and sequence of connections, bearing on supports, methods of anchoring, attachment of accessories, adjusting plate details, cant strips, ridge and valley plates, metal closure strips, size and location of holes to be cut and reinforcement to be provided, the manufacturer's erection instructions and other pertinent details.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver deck units to the site in a dry and undamaged condition. Store and handle steel deck in a manner to protect it from corrosion, deformation, and other types of damage. Do not use decking for storage or as working platform until units have been fastened into position.
Exercise care not to damage material or overload decking during construction. The maximum uniform distributed storage load must not exceed the design live load. Stack decking on platforms or pallets and cover with weathertight ventilated covering. Elevate one end during storage to provide drainage. Maintain deck finish at all times to prevent formation of rust. Repair deck finish using touch-up paint. Replace damaged material.
1.5 DESIGN REQUIREMENTS FOR ROOF DECKS
1.5.1 Properties of Sections
Properties of metal roof deck sections must comply with engineering design width as limited by the provisions of AISI D100 .
1.5.2 Allowable Loads
Indicate total uniform dead and live load for detailing purposes.
SECTION 05 30 00 Page 3
PART 2 PRODUCTS
2.1 DECK UNITS
Submit manufacturer's design calculations, or applicable published literature for the structural properties of the proposed deck units.
Provide products with an average recycled content of steel products so postconsumer recycled content plus one half of preconsumer recycled content not less than 25 percent.
2.1.1 Roof Deck
Conform to ASTM A653/A653M or ASTM A1008/A1008M for deck used in conjunction with insulation and built-up roofing. Fabricate roof deck units of the steel design thickness required by the design drawings, and zinc-coated in conformance with ASTM A653/A653M , Z275 G90 coating class or aluminum-zinc coated in accordance with ASTM A792/A792M Coating Designation AZM165 AZ55. Furnish sample of Metal Floor and Roof Deck Units used to illustrate actual cross section dimensions and configurations.
2.1.2 Composite Deck
Conform to ASTM A653/A653M or ASTM A1008/A1008M for composite deck assembly. Fabricate deck used as the tension reinforcing in composite deck of the steel design thickness required by the design drawings.
Zinc-coat in conformance with ASTM A653/A653M , G90 coating class.
2.1.3 Length of Deck Units
Provide deck units of sufficient length to span three or more spacings where possible.
2.1.4 Touch-Up Paint
Provide a high zinc-dust content paint for regalvanizing welds in galvanized steel conforming to ASTM A780/A780M .
Provide touch-up paint for zinc-coated units of an approved galvanizing repair paint with a high-zinc dust content. Repair damaged finishes of the undersides of deck units and accessories with touch-up paint to prevent the formation of rust.
2.2 ACCESSORIES
Provide accessories of same material as deck, unless specified otherwise.
Provide manufacturer's standard type accessories, as specified.
2.2.1 Adjusting Plates
Provide adjusting plates, or segments of deck units, of same thickness and configuration as deck units in locations too narrow to accommodate full size units. Provide factory cut plates of predetermined size where possible.
2.2.2 End Closures
Fabricated of sheet metal by the deck manufacturer. Provide end closures minimum 0.0295 inch thick to close open ends at exposed edges of floors, SECTION 05 30 00 Page 4 parapets, eaves, and openings through deck.
2.2.3 Closure Plates for Composite Deck
Support and retain concrete at each floor level. Provide edge closures at all edges of the slab of sufficient strength and stiffness to support the wet concrete. Provide metal closures for all openings in composite steel deck 1/4 inch and over.
2.2.4 Sheet Metal Collar
Where deck is cut for passage of pipes, ducts, columns, etc., and deck is to remain exposed, provide a neatly cut sheet metal collar to cover edges of deck. Do not cut deck until after installation of supplemental supports.
2.2.5 Cover Plates
Sheet metal to close panel edge and end conditions, and where panels change direction or butt. Polyethylene-coated, self-adhesive, 2 inch wide joint tape may be provided in lieu of cover plates on flat-surfaced decking butt joints.
Fabricate cover plates for abutting floor deck units from the specified structural-quality steel sheets not less than nominal 18 gage thick before galvanizing. Provide 6 inch wide cover plates and form to match the contour of the floor deck units.
2.2.6 Column Closures
Sheet metal, minimum 0.0358 inch thick or metal rib lath.
2.2.7 Shear Connectors
Provide shear connectors in accordance with AWS D1.1/D1.1M headed stud Type B. Submit stud manufacture's certification that the studs delivered conform to the material requirements. Submit stud manufacture's test reports for the last completed in-plant quality control mechanical tests.
2.2.8 Ridge and Valley Plates for Roof Decks
Fabricate plates from the specified structural-quality steel sheets, not less than nominal 0.0358 inch thick before galvanizing. Provide plates of minimum 4-1/2 inch wide and bent to provide tight fitting closures at ridges and valleys. Provide a minimum length of ridge and valley plates of 10 feet .
2.2.9 Metal Closure Strips for Roof Decks
Fabricate strips from the specified commercial-quality steel sheets not less than nominal 0.0358 inch thick before galvanizing. Provide strips from the configuration required to provide tight-fitting closures at open ends and sides of steel roof decking.
2.2.10 Galvanized Steel Angles for Roof Decks
Provide hot-rolled carbon steel angles conforming to ASTM A36/A36M, and hot-dip galvanized in accordance with ASTM A123/A123M .
SECTION 05 30 00 Page 5
2.2.11 Mechanical Fasteners (Screws)
Provide self-drilling screws as indicated, for anchoring the roof deck to structural supports and adjoining units.
2.2.12 Miscellaneous Accessories
Furnish the manufacturer's standard accessories to complete the deck installation. Furnish metal accessories of the same material as the deck.
PART 3 EXECUTION
3.1 EXAMINATION
Prior to installation of decking units and accessories, examine worksite to verify that as-built structure will permit installation of decking system without modification.
3.2 INSTALLATION
Install steel deck units in accordance with 29 CFR 1926 , Subpart R – Steel Erection, ANSI/SDI QA/QC , ANSI/SDI C , ANSI/SDI RD , SDI DDM04 and approved shop drawings. Place units on structural supports, properly adjusted, leveled, and aligned at right angles to supports before permanently securing in place. Damaged deck and accessories including material which is permanently stained or contaminated, deformed, or with burned holes shall not be installed. Extend deck units over three or more supports unless absolutely impractical. Report inaccuracies in alignment or leveling to the Contracting Officer and make necessary corrections before permanently anchoring deck units. Locate deck ends over supports only.
Lap roof deck 2 inches at ends. Butt composite floor deck at ends Do not use unanchored deck units as a work or storage platform. Do not fill unanchored deck with concrete. Permanently anchor units placed by the end of each working day. Do not support suspended ceilings, light fixtures, ducts, utilities, or other loads by steel deck not scheduled to receive concrete fill. Distribute loads by appropriate means to prevent damage.
3.2.1 Attachment
Immediately after placement and alignment, and after correcting inaccuracies, permanently fasten steel deck units to structural supports and to adjacent deck units by welding or screw attachment as indicated on the design drawings and in accordance with manufacturer's recommended procedure. Clamp or weight deck units to provide firm contact between deck units and structural supports while performing welding or fastening.
Anchoring the deck to structural supports with powder-actuated fasteners or pneumatically driven fasteners is prohibited. Attachment of adjacent deck units by button-punching is prohibited.
3.2.1.1 Welding
Do not weld any decking to cold formed steel rafters. Perform welding in accordance with AWS D1.3/D1.3M using methods and electrodes recommended by the manufacturers of the base metal alloys being used. Ensure only operators previously qualified by tests prescribed in AWS D1.3/D1.3M make welds. Immediately recertify, or replace qualified welders, that are producing unsatisfactory welding. Holes and similar defects will not be acceptable. Attach shear connectors as shown and welded as per AWS D1.1/D1.1M through the steel deck to the steel member. Immediately clean welds by chipping and wire brushing. Heavily coat welds, cut edges
SECTION 05 30 00 Page 6 and damaged portions of coated finish with zinc-dust paint conforming to
ASTM A780/A780M .
3.2.1.2 Mechanical Fastening
Anchor roof deck to structural supports and adjoining units with mechanical fasteners where indicated. Drive screws to properly clamp deck to supporting steel.
3.2.1.3 Sidelap Fastening
Lock sidelaps between adjacent floor deck units together as indicated.
3.2.2 Openings
Cut or drill all holes and openings required in coordination with the drawings, specifications, and other trades. Frame and reinforce openings through the deck in conformance with SDI DDP . Reinforce holes and openings 6 to 12 inch across by 0.0474 inch thick steel sheet at least 12 inch wider and longer than the opening and be fastened to the steel deck at each corner of the sheet and at a maximum of 6 inch on center. Reinforce holes and openings larger than 12 inches as indicated.
3.2.3 Deck Damage
SDI MOC3, for repair of deck damage.
3.2.4 Touch-Up Paint
3.2.4.1 Roof Deck
After roof decking installation, wire brush, clean, and touchup paint the scarred areas on top and bottom surfaces of metal roof decking. The scarred areas include scrapes, bruises, and rust spots. Touchup galvanized surfaces with galvanizing repair paint.
3.2.4.2 Floor Deck
For floor decking installation, wire brush, clean, and touchup paint the scarred areas on the top and bottom surfaces of the metal floor decking and on the surface of supporting steel members. Include welds, weld scars, bruises, and rust spots for scarred areas. Touched up the galvanized surfaces with galvanizing repair paint.
3.2.5 Accessory Installation
3.2.5.1 Adjusting Plates
Provide in locations…
This is the start of the file's text. The full file is on GovTribe.