This file contains civil engineering drawings and specifications for a dental clinic replacement project at Marine Corps Recruit Depot (MCRD) Parris Island, SC. The drawings detail site plans, demolition plans, grading and drainage plans, erosion control plans, and utility plans across three construction phases.

The project involves demolishing existing Buildings 602 and 674, and constructing a new dental clinic with elevated foundations to protect against flooding. Key components include installation of new water, sanitary sewer, and storm drainage systems; construction of parking lots and sidewalks with precast interlocking concrete pavers; ground improvements including aggregate piers and earthquake drains; mechanical yard enclosure; and connection to the district steam system. The plans show detailed utility layouts, including a 10" PVC water main, 8" fire service line, 4" domestic service line, and various storm drain structures. Construction will be phased, with Phase 1 involving temporary steam line installation, Phase 2 focusing on new clinic construction, and Phase 3 covering demolition of the existing clinic and construction of additional parking. Extensive erosion control measures and tree protection requirements are specified throughout all phases.

View the file

Other files

File Type Posted
AMD 0010 - WD SC20250008.pdf PDF
N4008525R2500 AMD 0010.pdf PDF
N4008525R2500 AMD 0009.pdf PDF
USMC ESS_Standard Equip List-v6.1.xlsx XLSX spreadsheet
N4008525R2500 AMD 0008.pdf PDF
N4008525R2500 AMD 0007.pdf PDF
AMD 0006 - Technical Amendment 0008 Continuation Sheet.pdf PDF
N4008525R2500 AMD 0006.pdf PDF
AMD 0006 - Technical Amendment 0008.pdf PDF
AMD 0005 - Technical Amendment 0007 Continuation Sheet.pdf PDF
AMD 0005 - 21-54-23019_CP CPT-2-PPD.xls XLS spreadsheet
AMD 0005 - CPT-1_forAPILE.xls XLS spreadsheet
AMD 0005 - 21-54-23019_SP CPT-1-PPD.xls XLS spreadsheet
AMD 0005 - Technical Amendment 0007.pdf PDF
AMD 0005 - 21-54-23019_CP CPT-2-BSC.XLS XLS spreadsheet
AMD 0005 - 21-54-23019_SP CPT-1 - VsResults.xlsx XLSX spreadsheet
N4008525R2500 AMD 0005.pdf PDF
AMD 0005 - 21-54-23019_SP CPT-1-BSC.XLS XLS spreadsheet
AMD 0005 - 21-54-23019 P-7889 Dental Clinic Replacment - Full Report.pdf PDF
N4008525R2500 AMD 0004.pdf PDF
Geo Tech portion P-7889 MCRD PARRIS ISLAND CORRECTED FINAL BASIS OF DESIGN - 26 AUGUST 2024.pdf PDF
674002.PDF PDF
3 of 23 Foundation Plan Building P-88-A (602).pdf PDF
602001.PDF PDF
4 of 23 Foundation Details Building P-88-A (602).pdf PDF
602002.PDF PDF
674001.PDF PDF
602003.PDF PDF
674003.PDF PDF
Technical Amendment 0006 Continuation Sheet.pdf PDF
100 Corrected Final Haz Mat Report B602 and B674 Parris Island - March 2024.pdf PDF
N4008525R2500 AMD 0003.pdf PDF
P7889 VISIT SITE SIGN IN SHEET.pdf PDF
N4008525R2500 AMD 0002.pdf PDF
Technical Amendment 0003.pdf PDF
Technical Amendment 0002.pdf PDF
Attachment C - Price Proposal Form REVISED.docx DOCX document
N4008525R2500 AMD 0001.pdf PDF
Technical Amendment 0004.pdf PDF
Attachment H - Small Business Subcontracting Plan.docx DOCX document
1686626dwg04of14_LANDSCAPE.pdf PDF
1686626dwg11of14_ELECTRICAL.pdf PDF
Attachment D - Construction Experience Data Sheet.docx DOCX document
1686626dwg12of14_AUDIOVISUAL.pdf PDF
Attachment G - Small Business Participation Commitment Document (SBPCD).docx DOCX document
1686626dwg08of14_PLUMBING.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
1686626dwg07of14_GENERAL SERIES.pdf PDF
Attachment C - Price Proposal Form.docx DOCX document
1686626dwg10of14_GENERAL SERIES.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BJ101

BO

RI

N G

L O

G S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

B J1 B J1 .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

* SEE VF SHEETS FOR BORING LOCATIONS.

12908791

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text No. 41212 4121241212

BJ102

RI

N G

L O

G S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

B J1 B J1 .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

* SEE VF SHEETS FOR BORING LOCATIONS.

12908792

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BJ103

RI

N G

L O

G S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

B J1 B J1 .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

* SEE VF SHEETS FOR BORING LOCATIONS.

12908793

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BJ104

RI

N G

L O

G S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

B J1 B J1 .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

* SEE VF SHEETS FOR BORING LOCATIONS.

12908794

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BJ105

RI

N G

L O

G S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

B J1 B J1 .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

* SEE VF SHEETS FOR BORING LOCATIONS.

12908795

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BJ106

RI

N G

L O

G S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

B J1 B J1 .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

* SEE VF SHEETS FOR BORING LOCATIONS.

12908796

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BJ107

RI

N G

L O

G S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

B J1 B J1 .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

* SEE VF SHEETS FOR BORING LOCATIONS.

12908797

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BJ108

RI

N G

L O

G S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

B J1 B J1 .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

* SEE VF SHEETS FOR BORING LOCATIONS.

12908798

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

C-001

SI

TE

V

IC

IN

IT

Y

PR

O

JE

C

T

LO

C

AT

IO

N

M

AP

PLAN NORTH

PROJECT LOCATION MAP

AS NOTED

SITE VICINITY &

PROJECT LOCATION MAP

0 1500' 3000' 6000'

SCALE: 1"=3000'

SITE VICINITY MAP

0 100' 200' 400'

SCALE: 1"=200'

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

C .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

PROJECT LOCATION

NEW CLINIC SITE

HAUL ROUTE

WAK

E

BL

VD

BOULEVARDDE FRANCE

MALECON DRIVE

MAIN GATE

12908799

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

C-002

G

EN

ER

AL

N O

TE

S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

C .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

CONSTRUCTION NOTES

1. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES WHETHER SHOWN ON THE PLANS

OR NOT. BEFORE DISRUPTING SERVICE OF ANY UTILITY, THE CONTRACTOR SHALL CONTACT

THE CONTRACTING OFFICER AND THE RESPONSIBLE UTILITY AUTHORITY. DAMAGE TO EXISTING UTILITIES AS A RESULT OF CONSTRUCTION ACTIVITIES SHALL BE REPAIRED IMMEDIATELY BY

THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT AND AT NO COST TO THE

AFFECTED UTILITY AUTHORITY.

2. UNLESS INDICATED OTHERWISE, EXISTING UTILITIES SHALL REMAIN IN SERVICE AND IN PLACE.

IF RELOCATION OF EXISTING UTILITIES IS FOR THE CONTRACTOR'S CONVENIENCE,

INTERRUPTION OF SERVICE SHALL BE KEPT TO A MINIMUM AND SHALL BE DONE AT THE

CONTRACTOR'S EXPENSE, AND ONLY WITH THE WRITTEN APPROVAL OF THE CONTRACTING

OFFICER. PRIOR TO RELOCATING EXISTING UTILITIES, THE CONTRACTOR SHALL COORDINATE

THE WORK WITH THE CONTRACTING OFFICER IN ORDER TO MINIMIZE DISRUPTIONS.

3. THE CONTRACTOR SHALL OBSERVE AND COMPLY WITH ALL STATE EPA REQUIREMENTS AND

FEDERAL AND LOCAL LAWS REQUIRED FOR THE PROTECTION OF PUBLIC HEALTH, SAFETY, AND

ENVIRONMENTAL QUALITY.

4. THE CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY SIGNS,

BARRICADES, TEMPORARY FENCING AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL

NECESSARY PRECAUTIONS FOR THE PROTECTION, CONVENIENCE AND SAFETY OF THE PUBLIC.

5. THE CONTRACTOR, AT HIS/HER OWN EXPENSE, SHALL KEEP THE PROJECT AND ITS

SURROUNDING AREAS FREE FROM DUST NUISANCE. THE WORK SHALL BE IN CONFORMANCE

WITH THE SPECIFICATIONS AND AIR POLLUTION STANDARDS OF THE STATE ENVIRONMENTAL

PROTECTION AGENCY. THE CONTRACTING OFFICER MAY REQUIRE SUPPLEMENTARY

MEASURES AS NECESSARY.

6. IN THE EVENT ANY ARTIFACTS OR HUMAN REMAINS ARE UNCOVERED DURING CONSTRUCTION

OPERATION, THE CONTRACTOR SHALL IMMEDIATELY SUSPEND WORK AND NOTIFY THE

CONTRACTING OFFICER.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE WITH THE APPLICABLE

PROVISIONS OF THE WATER QUALITY STANDARDS AND WATER POLLUTION CONTROL

STANDARDS OF THE STATE EPA.

8. AN ARBORIST SHALL BE PRESENT TO OVERSEE ANY PRUNING OR ROOT CUTTING OF LIVE OAK

TREES.

GRADING NOTES

1. ALL GRADING WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.

2. THE CONTRACTOR SHALL NOT PERFORM ANY GRADING OPERATION WHICH CAUSES FALLING

ROCKS, SOIL OR DEBRIS, IN ANY FORM, TO FALL, SLIDE OR FLOW INTO BASE DRAINAGE

SYSTEMS, ONTO ADJOINING STREETS OR INTO NATURAL WATERCOURSES. SHOULD SUCH

VIOLATIONS OCCUR, THE CONTRACTOR MAY BE CITED AND THE CONTRACTOR SHALL

IMMEDIATELY MAKE ALL REMEDIAL ACTIONS NECESSARY AT NO ADDITIONAL COST TO THE

GOVERNMENT.

3. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATERS FROM DAMAGING THE

CUT FACE OF AN EXCAVATION OR THE SLOPED SURFACES OF A FILL. FURTHERMORE,

ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SEDIMENT-LADEN RUNOFF FROM

LEAVING THE SITE.

4. ALL SLOPES AND EXPOSED AREAS SHALL BE SODDED OR PLANTED AS SOON AS FINAL GRADES

HAVE BEEN ESTABLISHED. PLANTING SHALL NOT BE DELAYED UNTIL ALL GRADING WORK HAS

BEEN COMPLETED. GRADING TO FINAL GRADE SHALL BE CONTINUOUS AND ANY AREA WITHIN

WHICH WORK HAS BEEN INTERRUPTED OR DELAYED SHALL BE PLANTED.

5. FILLS ON SLOPES STEEPER THAN 5:1 SHALL BE KEYED.

6. NO GRADING WORK SHALL BE DONE ON SATURDAYS, SUNDAYS OR HOLIDAYS AT ANY TIME

WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER.

7. THE LIMITS OF THE AREA TO BE CLEARED, CLEARED AND GRUBBED, OR GRADED SHALL BE

FLAGGED BY THE CONTRACTOR BEFORE THE COMMENCEMENT OF THE GRADING WORK.

8. ALL GRADING OPERATIONS SHALL BE PERFORMED IN CONFORMANCE WITH THE APPLICABLE

PROVISIONS OF THE STATE EPA WATER POLLUTION CONTROL AND WATER QUALITY

STANDARDS AND THE NPDES PERMIT FOR THE PROJECT.

9. TEMPORARY EROSION CONTROL PROCEDURES SHALL BE SUBMITTED TO THE CONTRACTING

OFFICER FOR APPROVAL PRIOR TO APPLICATION FOR THE GRADING PERMIT.

10. DURING CONSTRUCTION, PREVENTIVE MEASURES SHALL BE USED TO CONTROL FORESEEABLE

DUST, AND EROSION AND SEDIMENTATION PROBLEMS WHICH MAY ARISE AS WORK

PROGRESSES. THE CONTRACTOR SHALL SPRINKLE THE SOIL AT THE SITE, HAUL ROADS, AND

OTHER AREAS DISTURBED BY OPERATIONS, OR TREAT WITH DUST SUPPRESSANTS.

11. ALL EXPOSED AREAS WHICH ARE NOT AT FINAL GRADE AND WHICH ARE TO BE LEFT EXPOSED

LONGER THAN 2 WEEKS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION TO THE

SATISFACTION OF THE CONTRACTING OFFICER.

HAZARDOUS MATERIALS NOTES

1. ALL HAZARDOUS MATERIALS BROUGHT TO THE SITE BY THE CONTRACTOR SHALL BE REMOVED

AT PROJECT COMPLETION. HAZARDOUS MATERIALS STORED DURING CONSTRUCTION SHALL BE

COVERED AND PROTECTED FROM THE ELEMENTS.

2. ANY HAZARDOUS (E.G. LEAD WASTE) OR NON-REGULATED WASTE (E.G. PETROLEUM SPILLS)

PRODUCED DURING CONSTRUCTION, MUST BE PROFILED AND MANIFESTED. ENVIRONMENTAL

DIVISION MUST REVIEW AND SIGN PROFILES AND MANIFESTS AS THE GENERATOR.

SITE & UTILITY DEMOLITION NOTES

1. SAW CUT ON A SMOOTH AND STRAIGHT LINE AT THE BOUNDARY BETWEEN THE EXISTING

PAVEMENT (CONCRETE OR BITUMINOUS) THAT IS TO REMAIN AND THAT TO BE REMOVED.

2. ALL TRENCHES EXCAVATED TO REMOVE EXISTING UTILITIES SHALL BE BACKFILLED WITH

STRUCTURAL FILL AND COMPACTED IN 6 INCH LIFTS. THE LEVEL OF COMPACTION EFFORT

SHALL BE AS REQUIRED IN SPECIFICATION SECTION 31 23 00.00 20, "EXCAVATION AND FILL".

3. ALL DEMOLITION DEBRIS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF OFF

GOVERNMENT PROPERTY. ALL DEBRIS SHALL BE DISPOSED OF IN A LANDFILL LICENSED BY THE

STATE OF SOUTH CAROLINA TO RECEIVE THE SPECIFIC DEMOLITION DEBRIS. CONTRACTOR IS

RESPONSIBLE FOR ANY PERMITS OR FEES ASSOCIATED WITH DISPOSAL OF DEMOLISHED AND

REMOVED MATERIALS IN ACCORDANCE WITH LOCAL REGULATIONS.

4. THE BURNING OF CONSTRUCTION DEBRIS OR TRASH ON GOVERNMENT PROPERTY IS NOT

ALLOWED.

5. ANY TYPE OF BLASTING ON THIS PROJECT IS NOT ALLOWED.

6. DEMOLISH AND REMOVE ALL UNDERGROUND UTILITIES AS SHOWN ON THE PLANS. PRIOR TO

DEMOLITION, COORDINATE WITH UTILITY PROVIDERS AND OWNER AS NECESSARY FOR VALVE

CLOSURES, RE-ROUTING ETC.

7. PROVIDE TEMPORARY UTILITY MEASURES AS REQUIRED.

8. REFER TO THE SPECIFICATIONS FOR UTILITY OUTAGE REQUIREMENTS.

9. COORDINATE DEMOLITION OF ALL ITEMS WITH PROPOSED IMPROVEMENTS.

10. FIELD VERIFY EXISTING SANITARY SERVICES AND MAINTAIN SANITARY SEWER SERVICE TO

EXISTING BUILDINGS ADJACENT TO (UPSTREAM OF) THE PROJECT.

11. UTILITY LOCATIONS INDICATED ARE APPROXIMATE, AND MUST BE FIELD VERIFIED BY THE

CONTRACTOR.

12. WATER AND SANITARY UTILITIES ARE OWNED BY BEAUFORT-JASPER WATER AND SEWER

AUTHORITY (BJWSA). THE CONTRACTOR MUST COORDINATE ALL WORK THROUGH MR. JOSEPH

GENTILE, MCRD PARRIS ISLAND CONTRACT OFFICER REPRESENTATIVE UTILITIES

PRIVATIZATION CONTRACT (TELEPHONE: 843-228-4587, EMAIL: joseph.gentile@usmc.mil).

13. ADJUST TOP ELEVATIONS OF EXISTING CLEANOUTS, VALVES, MANHOLES, ETC OF ALL UTILITIES, THAT ARE TO REMAIN, TO FLUSH WITH FINISHED GRADE. FOR UTILITIES THAT ARE TO REMAIN, REPLACE ALL UTILITY FRAME AND COVERS WITH H-20 TRAFFIC RATED. ADJUST HOSE

CONNECTIONS OF EXISTING FIRE HYDRANTS TO CLEARANCES INDICATED FOR NEW FIRE

HYDRANTS.

GENERAL NOTES

1. THE AREA WITHIN CONSTRUCTION LIMITS AND NEW UTILITY ROUTES SHALL BE THE LIMITS OF

NEW CONSTRUCTION.

2. PRIOR TO ANY GROUND DISTURBANCE ACTIVITIES, THE CONTRACTOR SHALL OBTAIN A DIGGING

PERMIT FROM BASE PUBLIC WORKS DEPARTMENT (PWD) PRIOR TO THE START OF EXCAVATION

BY CONTACTING THE CONTRACTING OFFICER 30 CALENDAR DAYS IN ADVANCE.

3. PRIOR TO THE START OF ANY GROUND DISTURBANCE ACTIVITIES, THE CONTRACTOR SHALL

FIELD VERIFY THE EXACT LOCATION AND DEPTH OF ALL EXISTING UTILITIES THAT ARE WITHIN THE LIMITS OF NEW CONSTRUCTION. COORDINATE UTILITY LOCATIONS WITH THE CONTRACTING

OFFICER.

4. ANY EXISTING FEATURE, STRUCTURE, SIDEWALK, CURB/GUTTER, PAVEMENT, UTILITY, ETC.

DISTURBED OR DAMAGED DURING CONSTRUCTION, WHICH ARE TO REMAIN, SHALL BE

RESTORED TO A CONDITION THAT IS EQUAL TO OR BETTER THAN ORIGINAL CONDITION AT THE

EXPENSE OF THE CONTRACTOR.

5. THE UNDERGROUND PIPES, CABLES OR DUCT LINES KNOWN TO EXIST AS INDICATED BY BASE UTILITY MAPS, TOPOGRAPHIC SURVEY, AND FROM AS-BUILT DRAWING RECORDS ARE INDICATED

ON THE PLANS. THE CONTRACTOR SHALL VERIFY THE LOCATIONS AND DEPTHS OF ALL

FACILITIES AND EXERCISE PROPER CARE IN EXCAVATING IN THE AREA. WHEREVER

CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN ON THE PLANS, THE

CONTRACTOR SHALL EXPOSE THE EXISTING LINES AT THE PROPOSED CONNECTIONS TO

VERIFY THEIR LOCATION, SIZE AND DEPTH PRIOR TO EXCAVATION FOR THE NEW LINES.

6. THE CONTRACTOR SHALL PROVIDE SAFE ACCESS TO AND FROM ALL DRIVEWAYS AND STREETS.

ACCESS TO ALL EXISTING DRIVEWAYS, PAVED OR UNPAVED, SHALL BE PROVIDED AT ALL TIMES

DURING CONSTRUCTION. SIDEWALKS AND PEDESTRIAN PATHWAYS SHALL REMAIN OPEN AND

PROTECTED. IF WORK IS REQUIRED WITHIN PEDESTRIAN AREAS, PROVIDE RE-ROUTING

AROUND AFFECTED AREAS.

7. TREE PROTECTION FENCING IS REQUIRED TO BE INSTALLED AROUND ALL TREES SCHEDULED TO REMAIN. TREE PROTECTION FENCING SHALL BE HIGH VISIBILITY, AT LEAST 4' TALL PLACED

AT THE EXTENT OF EACH TREE'S CANOPY DRIPLINE. NO PARKING OF VEHICLES, STORAGE OF

EQUIPMENT, MATERIALS, AND SUPPLIES, PLACEMENT OF PORTABLE TOILETS OR

CONSTRUCTION TRAILERS SHALL BE ALLOWED IN THESE AREAS. CONTACT THE NATURAL

RESOURCES BRANCH OF THE ENVIRONMENTAL DIVISION AT (843) 228-3066 FOR ASSISTANCE

WITH THIS CONDITION.

8. BATS, WHICH ARE PROTECTED BY LAW, MAY USE THESE FACILITIES AND SURROUNDING TREES.

AT LEAST FIVE (5) DAYS PRIOR TO DEMOLITION ACTIVITY, CONTRACTOR WILL NEED TO CONTACT

THE NATURAL RESOURCES MANAGER IN ORDER TO REMOVE ANY BATS THAT MAY BE UTILIZING

THE STRUCTURE. CONTACT THE NATURAL RESOURCES BRANCH OF THE ENVIRONMENTAL

DIVISION AT (843) 228-3066 FOR ASSISTANCE WITH THIS CONDITION.

9. ALL PROJECT RELATED ACTIVITIES SHALL COMPLY WITH THE MIGRATORY BIRD TREATY ACT (MBTA). ACTIVE NESTS (I.E., NESTS WITH EGGS OR CHICKS) ARE PROTECTED YEAR-ROUND BY MBTA. IF AN ACTIVE NEST IS FOUND AT ANY TIME, STOP WORK IMMEDIATELY AND CONTACT THE NATURAL RESOURCES SECTION AT (843) 228-3066. PROJECT RELATED ACTIVITIES THAT WILL REQUIRE DISTURBANCE, REMOVAL OF AN ACTIVE NEST, OR THAT CAUSES A BREEDING BIRD TO

LEAVE THE NEST FOR PROLONGED LENGTHS OF TIME ARE NOT PERMITTED. ALL PROJECT

ACTIVITIES INVOLVING VEGETATION TRIMMING OR VEG REMOVAL REQUIRES AN INSPECTION OF

THE AREA FOR NESTING BIRDS TO BE MADE WITHIN 72 HOURS OF START OF THE PROJECT

BASED ON THE FOLLOWING NESTING SEASON REQUIREMENTS: 1 MARCH - 31 AUGUST;

PRIMARILY AFFECTS FORESTED AREAS, LANDSCAPED TREES, SHRUBS, GRASSLANDS AND

BUILDINGS. THIS REQUIREMENT CAN FLUCTUATE DEPENDING ON THE SPECIES AND OTHER

CONDITIONS, I.E. WEATHER, CLIMATE, NEST FAILURE/RE-NESTING ATTEMPTS, SO SOME TIME

FRAMES MAY FLUCTUATE OR HAVE TO BE ADJUSTED BASED ON CHANGING CONDITIONS AND

ACTUAL NESTING CONDITIONS. IF NESTS CONTAINING EGGS OR CHICKS ARE FOUND,

CONSTRUCTION ACTIVITIES MUST WAIT UNTIL THEY HAVE FLEDGED FROM THE NEST. IF

VEGETATION REMOVAL WILL COMMENCE THREE DAYS OR MORE AFTER THE INITIAL NEST

CHECK IS PERFORMED, THE CHECK MUST BE REPEATED PRIOR TO IMPLEMENTATION OF SUCH

ACTIVITIES.

10. REPORT ALL MATERIALS RECYCLED AS A RESULT OF THE DEMOLITION PROCESS TO THE BASE

RECYCLE MANAGER (BRAD WOODS, 843-228-3430, THOMAS.WOODS@USMC.MIL) VIA SOLID

WASTE / RECYCLE REPORT.

11. TOPOGRAPHIC SURVEY FIELDWORK WAS COMPLETED ON OCTOBER 20,2021 BY SOUTHEASTERN

LAND SURVEYING, INC.

12. BASIS OF DATUMS

HORIZONTAL: (GPS STATIC MEASUREMENTS)

SC NAD 83 G18 (GRS 1980 ELLIPSOID)

ARCHER - REFERENCE POSITION

DESIGNATION - ARCHER

PID NO. AI7195

VERTICAL:

NAVD 88

866 8445 TIDAL 1 - REFERENCE POSITION

(TRANSFERRED TO ARCHER BY DIFFERENTIAL LEVELING)

DESIGNATION - 866 8445 TIDAL 1 (VERTICAL ORDER, FIRST, CLASS II)

PID NO. CK0787

13. AZIMUTHS ARE BASED ON NORTH BEING AN AZIMUTH OF 0°.

12908800

ADDITIONAL NOTES

1. I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING

THAT I ACCEPT RESPONSIBILITY OF THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE

BEST OF MY KNOWLEDGE AD BELIEF THAT THE DESIGN IS CONSISTENT WITH THE

REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED,

PERSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE

TERMS AND CONDITIONS OF SCR100000.

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

ABBREVIATIONS LEGEND

ABANDONED

ASPHALTIC CONCRETE

BUILDING

BENCHMARK

CURB & GUTTER

CATCH BASIN

CHILLED WATER

COLUMN

CONCRETE MASONRY UNIT

CLEANOUT

COMMUNICATION

CONSTRUCTION JOINT

CONTINUOUS

CONTRACTION JOINT

EASTING

DUCTILE IRON

DOWNSPOUT

ELECTRICAL BOX

ELECTRICAL BOX

EXISTING

EXPANSION JOINT

FIRE DEPARTMENT CONNECTION

FINISH FLOOR

FIRE HYDRANT

NATURAL GAS

GRATE INLET

HANDICAPPED CURB RAMP

INVERT

LIGHT POLE

ON CENTER

UTILITY PEDESTAL

PRE-MOLDED EXPANSION JOINT

POST INDICATOR VALVE

POLYVINYL CHLORIDE PIPE

REINFORCED CONCRETE PIPE

REDUCED PRESSURE BACKFLOW PREVENTER

ROOF DRAIN

ROOF DRAIN MANHOLE

REQUIRED WORK PROVIDED BY CONTRACTOR

SANITARY CLEANOUT

STORM DRAIN CATCH BASIN

STORM DRAIN MANHOLE

SANITARY MANHOLE

SANITARY SEWER

SANITARY SEWER MANHOLE

STANDPIPE

SUBSURFACE DRAIN

SIDEWALK

ELECTRICAL EQUIPMENT (SWITCH)

ELECTRICAL EQUIPMENT (TRANSFORMER)

TOP OF CURB

TOP ELEVATION

UNDER GROUND

UNKNOWN

WATER

WATER GATE VALVE #4

WATER METER

WATER MANHOLE

WATER GATE VALVE

ABND

AC

BLDG

BM

C & G

CB

CHW OR CW

COL

CMU

CO

COMM

CONST. JT.

CONT

CT. JT.

E

DI

DS

E.BOX

EB

EX OR EXST

EXP. JT.

FDC

FF OR FFE

FH

G

GI

HC

INV

LP

OC

PED

PEJ

PIV

PVC

RCP

RPBV

RD

RDMH

REQ'D

SCO

SDCB

SDMH

SMH

SS

SSMH

STP

SUD

SW

S T

TC

TE

UG

UNK

W

W GV 4

WM

WMH

WV

CONCRETE SIDEWALK

CONCRETE CURB & GUTTER

DOMESTIC WATER LINE

FIRE HYDRANT & VALVE ASSEMBLY

GATE VALVE & VALVE BOX (GV)

STORM DRAIN PIPE

SANITARY SEWER

SANITARY SEWER MANHOLE (SSMH)

GRADE CONTOURS

POINT OF CONNECTION NEW TO EXISTING

FIRE WATER LINE

SANITARY CLEANOUT (SSCO)

LIGHT POLE

CONCRETE CURB

UNDERGROUND POWER

WATER METER & BOX

SIGN

JUNCTION BOX

FW x

SS x

SD x

W

FW

SS

UTILITY POLE AND GUY WIRE

TREE

ELECTRICAL SWITCH

AERIAL POWER

STEAM & CONDENSATE LINE ST

UNDERGROUND COMMUNICATIONS LINE

L E G E N D

BUILDING

ASPHALT PAVING

DESCRIPTION EXISTING REQ'D DEMOLITION

CONCRETE PAVING

ABBREVIATION WORD

FW x

SS x

S

X X X X X X

COMMUNICATIONS MANHOLE

INFILTRATION TEST LOCATION & NUMBER

BOLLARD

POST INDICATOR VALVE (PIV)

FIRE DEPARTMENT CONNECTION (FDC)

NUC

DRAINAGE SWALE

ELECTRIC MANHOLE (EMH)

NUP

X

CHAIN LINK FENCE (CLF)

ROOF DRAIN PIPE

NATURAL GAS MAIN

FIRE DEPARTMENT CONNECTION MAIN

RD

X

X

X X X X X

X

X

SD x

SEE ELECTRICAL

SEE ELECTRICAL

SEE COMM

G x

X X X

ABANDONED

ABOVE GROUND STEAM

SUBSURFACE DRAIN SUD

X X X

DOWNSPOUT

CO

DS

SOIL BORING LOCATION & NUMBER B-1

INLET PROTECTION

SILT FENCE

AGGREGATE/STONE

ST

M

WW

MX

S

COMM

E

EM

INF-1

EMP

T COMM

RREINFORCED CONCRETE PAVING

ST x

TEST PIT LOCATION AND NUMBER TP-1

CONTROL POINT

TELEPHONE MANHOLE

COMMUNICATION PEDESTAL/BOX

TEL

C

JB

GRATE INLET

b

PRECAST INTERLOCKING

CONCRETE PAVERS

CONCRETECONC

WATER QUALITY INLETWQI

CURB INLETCI

BACKFLOW PREVENTER BFP

STEAM & CONDENSATE SHUTOFF VALVE

WW

C-003

G

EN

ER

AL

N O

TE

S, L

EG

EN

D

A

BB

RE

VI

AT

IO

N

S

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

C .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

CONSTRUCTION PHASING:

GENERAL NOTES:

1. CONTRACTOR MUST ADHERE TO COMPLETION OF PRIOR PHASE WORKS PRIOR TO COMMENCEMENT OF NEXT PHASE.

CONTRACTOR MUST ACCOMMODATE OWNER ACTIVITY DURATION AS INDICATED. IF CONTRACTING OFFICER GRANTS REQUIREMENT DEVIATION TO PERMIT EARLY START OF ANY NEXT PHASE ACTIVITIES, REGARDLESS OF AMOUNT AND DURATION OF WORK, EACH CALENDAR DAY OF EARLY START IS CONSIDERED FULL CALENDAR SCHEDULE DAY GAINED

BY THE GOVERNMENT AND THE GOVERNMENT MUST BE COMPENSATED ACCORDINGLY.

2. ACTIVITIES LISTED BELOW REPRESENT MAJOR ACTIVITIES WITHIN EACH PHASE, HOWEVER, THE LIST IS NOT INCLUSIVE OF ALL ACTIVITIES REQUIRED TO COMPLETE EACH PHASE. ACTIVITIES WITHIN EACH PHASE MAY BE COMPLETED CONCURRENTLY OR IN A DIFFERENT ORDER THAN WHAT IS SHOWN BELOW, UNLESS INDICATED OTHERWISE IN THE

CONTRACT DOCUMENTS.

PHASE I:

1. INSTALL TEMPORARY CONSTRUCTION FENCING.

2. DEMOLITION OF SIDEWALK AND PAVEMENT IN LOCATION OF TEMPORARY ABOVE GROUND STEAM LINE.

3. INSTALL TEMPORARY ABOVE GROUND STEAM LINE.

4. DEMOLITION OF PORTION OF EXISTING ABOVE GROUND STEAM PIPING AND SUPPORTS.

5. REMOVE CONSTRUCTION FENCING.

PHASE II:

1. SITE PREPARATION AND MOBILIZATION.

2. INSTALL CONSTRUCTION FENCE AND CONSTRUCTION EXIT.

3. PRIOR TO COMMENCING FOLLOWING PHASE 2 WORK, INSTALL INITIAL EROSION AND SEDIMENT CONTROL MEASURES TO

INCLUDE TREE PROTECTION.

4. DEMOLISH SITE IMPROVEMENTS (INCLUDES BUT IS NOT LIMITED TO BLDG. 602, FOUNDATIONS, PAVEMENT, SITE UTILITIES, ABOVE AND UNDERGROUND STRUCTURES, ETC.)

5. ROUGH GRADE AND INSTALL GROUND IMPROVEMENT MEASURES.

6. COMMENCE BUILDING FOUNDATION.

7. INSTALL UTILITIES (SANITARY, WATER, STORM, GAS, ELECTRICAL, TELECOM, STEAM, ETC.) INCLUDING OFFSITE UTILITIES.

8. INSTALL PHASE 2 STABILIZATION EROSION AND SEDIMENT CONTROL.

9. CONSTRUCT NEW CLINIC.

10. CONSTRUCT NEW MECHANICAL YARD ENCLOSURE.

11. INSTALL PAVEMENT INCLUDING BUT NOT LIMITED TO SIDEWALK, PARKING LOTS, PADS, ETC.

12. INSTALL ABOVE GROUND INFRASTRUCTURE (SIGNAGE, SITE FURNISHINGS, ETC.)

13. FINAL PUNCH WORK AND BUILDING ACCEPTANCE.

14. INSTALL LANDSCAPING.

15. REMOVE SITE EROSION AND SEDIMENT CONTROL MEASURES AND CONSTRUCTION FENCE.

16. AFTER REMOVAL OF EROSION AND SEDIMENT CONTROL MEASURES, PROVIDE 30 CALENDAR DAYS FOR OWNER INITIAL

OUTFITTING AND TRANSITION PRIOR TO BEGINNING PHASE 3 WORK.

PHASE III:

1. AFTER OWNER HAS VACATED BUILDING 674, SITE PREPARATION AND MOBILIZATION

2. INSTALL CONSTRUCTION FENCE AND CONSTRUCTION EXIT.

3. PRIOR TO COMMENCING THE FOLLOWING PHASE 3 WORK, INSTALL INITIAL EROSION AND SEDIMENT CONTROL MEASURES TO

INCLUDE TREE PROTECTION.

4. DEMOLISH SITE IMPROVEMENTS (INCLUDES BUT IS NOT LIMITED TO BLDG. 674, FOUNDATIONS, PAVEMENT, SITE UTILITIES, ABOVE AND UNDERGROUND STRUCTURES, ETC.)

5. ROUGH GRADE.

6. INSTALL UTILITIES (STORM, ELECTRICAL, TELECOM, ETC.)

7. INSTALL PHASE 3 STABILIZATION EROSION AND SEDIMENT CONTROL.

8. CONSTRUCT NEW PARKING LOT AND SIDEWALKS.

9. INSTALL ABOVE GROUND INFRASTRUCTURE (SIGNAGE, SITE FURNISHINGS, ETC.)

10. FINAL PUNCH WORK.

11. INSTALL LANDSCAPING.

12. REMOVE EROSION AND SEDIMENT CONTROL MEASURES AND CONSTRUCTION FENCE.

12908801

AutoCAD SHX Text

PIV

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

CO

SS

S

S b b b b bb

C u x C u x C u x

TEL

C

C

TEL

Cu x

Cu x

Cu x Cu x

Cu x

ET

ET

E

EM

EM

EM

E x

E u x

E u x

E u x

W

M

Wx

W x

W x

C u x

C u x

C u x

E

S

S

EM

EM

JB

S

JB

CO

CO

CO

CO

ST

x

ET

ET

ET

ET

A A

A A

A

A

F

EM

EM

W

W

W

W

WW

W

M

WM

E

E

E

A

TEL

TEL

E

EA

P

EAP

E

SS x

SS x

T44

T37

T38

T40 T39

T41

T10 b

W W

S S TEL

TEL

JB

FLP=14.99'

FLP=14.95'

W

JB

C

SS S

WV

b b

R

AM

P

RAMP

CSA

WM

W x

Wx

SD x

SD x

JB

SD

x

SS

x

SS

x

SS x SS x

SS

x

SS

x

SS

x

W

ET

EPANEL

X 2

E u x

E u x

E u x

EUP

E x

E x

ST 28

SD x

ST 11

ST 5

ST 4

SD

x

SD

x

SD x SD x SD x

SD

x

ST 19

ST 20

ST 21

ST 22

ST 23

ST 24

ST 25

ST 29

ST 30

SS 4

SS x

SS x SS x

ASPHALT

CONC. P

'KING

CONC.

RAMP

CHILL

PAD

HOT BOX

LANDING

PROPANE

DOCK

8"-16" BRICK WALL

AS

PH

AL

T

ASPHALT

AS

PH

AL

T

8" CONC.

WALL

8"

CONC.

WALL 10" CONC. WALL

10" CONC. WALL

6" TRENCH DRAIN

8" CONC. WALL

8" B

RICK W

ALL

8" B

RICK W

ALL

8" B

RICK W

ALL

CONC/BRICK BARRIERS

C O

N C

/B R

IC

K

BA

R

R

IE

R S

ABDAN'D CONC. P

AD

CSA

FFE:15.54' FFE:15.53'

Wx

FFE: 12.84'

FF

E

FFE:15.47'

FFE:15.48'FFE:15.55'

FFE:15.58'

CSAFFE:15.51'

FFE:11

.17

FFE:11

.25

FFE:15

.53

FFE: 12

.52

FFE:12

.53

'FFE:12

.53

FFE:11

.19

FFE:11

.09

FFE:11

.17

FFE:12

.48

' FFE: 10

.43

FFE:15.47'

.49

CSA

CSA

W x

W x

W x

Wx

Wx

Wx

SS x SS x

A

A

E

T

SD x SD x

ST 27

E

SS 3

STxST x

ST

x

STx

13 13

11 8

SD

x

SD

x

Wx Wx Wx Wx Wx Wx Wx

Wx Wx Wx Wx Wx Wx Wx Wx

B-1

B-2

B-3 INF-1

INF- 2

TP-2

CPT-1

B-5

B-6

INF-3

CPT-2

B-4

SET REBAR & CAP

N=188058.5566

E=2097092.8585

ELEV=7.78'

SET REBAR & CAP

N=188078.6813

E=2097606.0704

ELEV=9.32'

SET REBAR & CAP

N=188621.9972

E=2097134.4011

ELEV=13.55'

Wx Wx Wx Wx Wx Wx Wx

W

W x

Wx

Wx

Wx

Wx

10" WATER MAIN

16" DIP WATER MAIN

12" W

ATER MAIN

12" W

ATER MAIN

FH

P

I00

FH PI0110FH PI0030

6" WATER

BLD

G 60

1 S

TORY

BLDG 674

2 STORY

6" WATER

12" WATER MAIN

FH PI0026

VF103

VF102

VF101

O

VE

RA

LL

E

XI

ST

IN

G S

IT

E

C O

N D

IT

IO

N S

PL

AN

PLAN NORTH

SITE CONDITIONS PLAN

1" = 50'

OVERALL EXISTING

0 25' 50' 100'

SCALE: 1"=50'

NOTES:

1. SEE SHEETS C-002 & C-003 FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS.

2. TOPOGRAPHIC SURVEY FIELDWORK WAS COMPLETED ON OCTOBER

20,2021 BY SOUTHEASTERN LAND SURVEYING, INC.

3. BASIS OF DATUMS

HORIZONTAL: (GPS STATIC MEASUREMENTS)

SC NAD 83 G18 (GRS 1980 ELLIPSOID)

ARCHER - REFERENCE POSITION

DESIGNATION - ARCHER

PID NO. AI7195

VERTICAL:

NAVD 88

866 8445 TIDAL 1 - REFERENCE POSITION

(TRANSFERRED TO ARCHER BY DIFFERENTIAL LEVELING)

DESIGNATION - 866 8445 TIDAL 1 (VERTICAL ORDER, FIRST, CLASS II)

PID NO. CK0787

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

V F .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

BLVD. DE FRANCE

ALASKA ST.

BLDG. 670

PHASE 3 LIMITS

PHASE 2 LIMITS

PHASE 1 LIMITS

BLDG. 6002

12908802

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

S

S b b b b bb

T26 T25 T22 T21

T24

T20

C u x C u x C u x C u x C u x

C u x C u x C u x

C u x

TEL

C

C

TEL

Cu x Cu x

Cu x

Cu x

Cu x

Cu x

Cu x Cu x

Cu x

Cu x

ET

ET

E

EM

EM

EM

E x

E x

E x

E u x

E u x

E u x

E u x

WW

M

Wx W x

W x

W x

W x

C u x

C u x

C u x

C u x

C u x

C u x

C u x

E u x

E u x

E u x

E u x

E

EM

EM

JB

CO

CO

CO

ST

x

ST

x

ET

ET

SIGN

A A

A

A

A

EM

WW

WW

WW

WW

WW

M

WM

E

E

A

E

EA

P

EA

P

RAMP

EAP

T32 T31

T30 T29

T28

T27

T11

T45

T49

T44

T43

T42

T53

T52

T54

T51

T50

T10

T12 T13 T14 T15 T18 T19

T23

T48

T47

T46 b

WW

WW

JB

WW

JB

C

SS S

EA

P

WV

b b

WM

W x

W x

W x

W x

Wx

Wx

SD

x

JB

SD

x

SD

x

SS

x

SS

x

SS

x

SS x SS x SS x

SS

x

SS

x

WW

X

C u x

ET

EPANEL

X 2

E u x

E u x

E u x

E u x

E u x

E u x

EUP

E x

E x

E x

E x

E x

E x

ST 28

ST 15

SD x

SD x

ST 14

ST 11

ST 9

ST 2

ST 5

ST 3

ST 4

ST 7

SD

x

SD

x

SD

x

SD

x

ST 13

ST 12

SD x SD x SD x SD x

ST 10

ST 8

SD x SD x

ST 6

SD

x

SD

x

ST 1

ST 19

ST 20

ST 21

ST 22

ST 23

ST 24

ST 25

ST 29

ST 33

SD x SD x

ST 30

ST 31

ST 32

SS 5

SS 9

SS 8

SS 10

SS 11

SS 12 SS 13

SS x SS x SS x

VIDPOLE

BOLLARDS METAL TYP. X 3

BOLLARDS

METAL TYP.

X 7

FLAGPOLES X 4

SIGNAL

RAMP

RAMP

RAMPRAMP

12" BRICK WALL

BLD

G 60

CONC. P'KING LOT

CONCRETE

CONC. P

'KING

CHILL

PAD

LANDING

PROPANE

8"-16" BRICK WALL

AS

PH

AL

T

PA

RK

IN

G

ASPHALT

AS

PH

AL

T

ASPHALT

16"

DIMEN

WALL

18"

CONC.

WALL

8" BRICK WALL

8" B

RICK W

ALL

8" B

RICK W

ALL

8" B

RICK W

ALL

CONC/BRICK BARRIERS

C O

N C

/B R

IC

K

BA

R

R

IE

R S

ABDAN'D CONC. P

AD

Wx

Wx

FFE: 12.84'

CSA

FFE:11

.17

FFE:11

.25

FFE:15

.53

FFE: 12

.52

FFE:12

.53

'FFE:12

.53

FFE:11

.19

FFE:11

.09

FFE:11

.17

FFE:12

.48

' FFE: 10

.43

CSA

CSA

W x

W x

W x

W x

W x

W x

W x

SS x SS x SS x SS x

T

SD x SD x SD x SD x

ELEC. BREAKERS X 4

FREESTANDING

MECH. GATE

E

RAMP

T16

T17

STx STx

ST

x

ST

x

STx

STx

13 13

SD

x

SD

x

SD

x

SD

x

SD

x

Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx

Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx

B-1

B-2

B-3 INF-1

INF- 2

TP-2

CPT-1

CPT-2

SS x

SET REBAR & CAP

N=188058.5566

E=2097092.8585

ELEV=7.78'

E=2097134.4011

ELEV=13.55'

Wx Wx

WW

W x

W x

W x

Wx

Wx

Wx

10" WATER MAIN

16" DIP WATER MAIN

12" W

ATER MAIN

12" W

ATER MAIN

FH

P

I00

FH PI0110FH PI0030

6" WATER

BLD

G 60

1 S

TORY

MATCHLINE

SHEET VF103

VF102

EX

IS

TI

N

G S

IT

E

C O

N D

IT

IO

N S

PL

AN

PH

AS

E

II

PLAN NORTH

CONDITIONS PLAN - PHASE II

1" = 30'

EXISTING SITE

0 15' 30' 60'

SCALE: 1"=30'

NOTES:

1. SEE SHEETS C-002 & C-003 FOR GENERAL NOTES,

LEGEND, AND ABBREVIATIONS.

DES BDS DRW BDS CHK DRG

F

IL

E

N A M E P .0 C

V F .d w g

P

LO

TT

E D W e d n e sd a y, A u g u st

:1 p m

U S E R b re n t.

sa ye rs

SCALE:

PROJECT NO:

CONSTR CONTR NO:

NAVFAC DRAWING NO:

AS NOTED

A

B

C

D

1 2 3 4

1 2 3 4

SHEET: OF

A

B

C

D

SEAL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

FIRE PROTECTION

CHIEF ENG/ARCH

BRANCH MGR

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

DE

NT

AL

C

LI

NI

C

RE

PL

AC

EM

EN

T

DATE

P-7889

PA

RR

IS

IS

LA

ND

, S C

MC

RD

PA

RR

IS

IS

LA

ND

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

M

ID

LA

N

T D

C C

O R

E

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

MT / SVR

EJA

DSN

DLB

08/19/2024

Approved by Jason J. Root, NAVFAC / MFPO VIA SAT-TO Memo Dated 08/08/2024 Tracey Bond, Defense Health Agency VIA SAT-TO Memo Dated 08/19/2024

T34

OAK 28": DRIP 31'

T10

PALM 12": DRIP 5'

T16

PALM UNK. DRIP & SIZE

T13

PALM 12": DRIP 5'

T14

PALM 11": DRIP 4'

T15

PALM 12": DRIP 9'

T37

OAK 28": DRIP 23'

T36

MAGNOLIA 6": DRIP 4'

T32

PALM 11": DRIP 7'

T23

PALM 12": DRIP 4'

T22

OAK 31": DRIP 38'

T21

OAK 24": DRIP 20'

T19

PALM 12": DRIP 6'

T31

OAK 32": DRIP 32'

T 1

PINE 34": DRIP 32

T2

PINE 30": DRIP 27'

T3

PINE 26": DRIP 24'

T5

OAK 32": DRIP 24'

T6

PALM 11": DRIP 6'

T4

PALM 12": DRIP 6'

T7

CEDAR 48": DRIP 21'

T8

OAK 42": DRIP 27'

T9

PALM 11": DRIP 4'

T11

PALM 9": DRIP 4'

T12

PALM 11": DRIP 4'

T17

PALM UNK. DRIP & SIZE

T18

PALM 12": DRIP 6'

T20

PALM 9": DRIP 4'

T33

OAK 28": DRIP 28'

T35

OAK 26": DRIP 22'

T27

OAK 50": DRIP 38'

T30

PALM 12": DRIP 9'

T39

PALM 14": DRIP 8'

T25

OAK 36": DRIP 43'

T24

PALM 12": DRIP 9'

T26

OAK 45": DRIP 36'

T38

PALM 14": DRIP 5'

T29

PALM 11": DRIP 6'

T28

2 X PALM 12": DRIP 6'

T43

OAK 28": DRIP 23'

T46

OAK 12": DRIP 15'

T41

PALM 14": DRIP 6'

T40

PALM 14": DRIP 5'

T42

OAK 30": DRIP 32'

T45

MAGNOLIA 10": DRIP 16'

T44

OAK 28": DRIP 20'

T49

PALM 11": DRIP 7'

T52

OAK 28": DRIP 20'

T47

PALM 11": DRIP 8'

T48

PALM 11": DRIP 8'

T51

OAK 10": DRIP 11'

T50

OAK 22": DRIP 22'

T53

OAK 26": DRIP 23'

T56

OAK 14": DRIP 19'

T54

OAK 16": DRIP 26'

T55

OAK 26": DRIP 30'

T57

OAK 14": DRIP 12'

ST 27

TOP OF GRATE=12.12'

UNK INV & SIZE IN FROM RD(S)

INV OF UNK SIZE OUT(E)=8.01'

GRATE INACCESSIBLE

ST 16

TOP OF CURB INLET=8.85'

INV 24"RCP IN(W)=4.65'

INV 24"RCP OUT(E)=4.55'

ST 13

TOP OF GRATE=8.12'

INV OF UNK SIZE OUT(E)=5.33'

SILTED/FULL

ST 14

TOP OF GRATE=7.77'

INV 18"RCP IN(N) TO SUT SAVER

INV 18"RCP IN(S) 3.87'

INV 24"RCP OUT(W) 3.90'

ST 15

TOP OF CURB INLET=8.46'

INV 24"RCP IN(W)=4.12'

INV 24"RCP OUT(E)=4.16'

ST 30

HOODED GRATE TOP=12.50'

INV 12"RCP IN(S)=7.80'

INV 12"RCP OUT(N)=7.80'

ST 29

TOP OF GRATE:13.18'

INV 12"RCP OUT(N) 7.93'

ST 23

TOP OF GRATE=10.01'

INV 12"RCP IN(NE)=5.29'

INV 12"RCP OUT(SW)=5.29'

ST 24

TOP OF GRATE=10.09'

INV 12"RCP IN(NW)=5.97'

INV 12"RCP OUT(SW)=5.97'

ST 22

TOP OF GRATE=10.11'

INV 12"RCP IN(NE)=4.78'

INV 12"RCP OUT(SW)=4.69'

ST 21

TOP OF GRATE=10.21'

INV TABLE=4.20'

ST 19

TOP OF CURB INLET=9.46'

INV 18"RCP OUT(NE)=4.81'

ST 25

TOP OF GRATE=10.03'

INV OF UNK DIA OUT(NW) +/- 7.53'

GRATE SILTED

ST 1

TOP OF CURB INLET=9.29'

INV 12"RCP OUT(S)=6.12'

ST 2

TOP OF GRATE=7.26'

INV 12"RCP IN(N)=4.04'

INV 15"RCP IN(E)=3.79'

INV 15"RCP OUT(W)=3.79'

INV UNK SIZE (N/S) APPROX. TO

MH=4.21'

ST 3

TOP OF GRATE=7.43'

INV 12"RCP IN (N) 4.61'

INV 18"RCP IN(W) 3.99'

INV 18"RCP OUT(E) 3.93'

ST 5

TOP OF GRATE=6.83'

INV 12"RCP OUT (S)=4.97'

ST 6

TOP OF GRATE=7.44'

INV 18"RCP IN(E)=4.14'

INV 18" RCP OUT(W)=4.14'

INV UNK SIZE & DIRECTION=4.86'

ST 4

CURB INLET TOP=7.21'

INV 12"RCP IN(N)=4.47'

INV 12"RCP OUT(S)=4.35'

ST 7

TOP OF JUNCT. BOX=7.57'

INV 18"RCP IN(E)=3.88'

INV 12"RCP IN(S)=3.88'

INV 18" RCP OUT(W)=3.82'

ST 8

TOP OF JUNCT. BOX=7.41'

INV12" RCP IN(E)=4.19'

INV 12" RCP IN(S)=4.19'

INV 12" RCP OUT(N)=4.19'

ST 9

TOP OF GRATE INLET=7.13'

INV OUT(W)=4.04'

UNCERTAIN DIAMETER OUT

ST 11

TOP OF HOODED GRATE=7.16'

INV 18"RCP IN(W)=3.88'

INV 18"RCP OUT(E)=3.88'

ST 12

TOP OF GRATE=7.59'

INV 18"RCP IN(W)=3.72'

INV 18" RCP OUT(N)=3.72'

INV UNCERTAIN SIZE OUT(E)=3.72'

ST 17

TOP OF CURB INLET=9.06'

INV 24"RCP IN(W)=4.81'

INV 24"RCP OUT(E)=4.77'

ST 18

TOP OF GRATE=9.53'

INV 24"RCP IN(W)=4.93'

INV 24"RCP OUT(E)=4.97'

GRATE INACCESSIBLE

HOLDING WATER

ST 20

TOP OF GRATE=10.07'

INV TABLE=3.60'

SUT SAVER

ST 26

TOP OF JUNCT. BOX=15.37'

INV 18" RCP UNK DIRECTION=6.59'

OFF-SITE

ST 28

TOP OF GRATE=11.73'

INV OF UNK SIZE IN(W)=6.53'

INV OF UNK. SIZE OUT(E)=6.53'

GRATE INACCESSIBLE

ST 33

TOP OF JUNCT. BOX=12.94'

INV 12"RCP IN(S)=3.34'

INV 12"RCP OUT(N) 3.04'

ST 32

HOODED GRATE TOP=12.18'

INV 12"RCP IN(SW)=7.78'

INV 12"RCP OUT(N)=6.17'

ST 31

HOODED GRATE=12.39'

INV12"RCP IN(S)=7.89'

INV12"RCP OUT(N)=7.89'

ST 10

TOP OF JUNCT. BOX=8.02'

INV 18"RCP IN(E)=3.78'

INV 18"RCP OUT(W)=3.84'

TREE LABELS

STORM STRUCTURE LABELS

SS 10

SSMH TOP=7.93'

INV 8"PVC IN(W)=3.47'

INV 8"PVC OUT(E)=3.46'

SS 13

SSMH TOP=7.83'

INV PVC IN(W)=2.64'

INV PVC OUT(E)=2.54'

UNK DIAMETER IN/OUT

SS1

SS MANHOLE TOP=9.96'

INV 8"PVC IN(W)=4.52'

INV 8"PVC OUT(E)=4.52'

SS 2

SSMH TOP=9.18'

INV 8"PVC OUT(W)=4.32'

INV 8"PVC OUT(N)=7.32'

INV 8"PVC OUT(E)=4.28'

SS 3

CLEAN OUT

SS 5

SSMH TOP=8.35'

INV 8"PVC IN(W)=3.99'

INV8"PVC OUT(S)=3.97'

SS 6

SSMH TOP=8.60'

INV 8"PVC IN(W)=3.05'

INV 8"PVC IN(N)=3.64'

INV 8"PVC OUT(S)=3.04'

SS 4

SS MANHOLE TOP=12.24'

INV 6"PVC IN(W)=9.34'

INV 8"PVC IN(N)=8.74'

INV 8"PVC OUT(S)=8.72'

SS 7

SSMH TOP=6.91'

UNK. INV. & SIZE

OUTSIDE SURVEY LIMITS

SS 8

SSMH TOP=8.70'

INV 6"PVC IN(NE)=5.74'

INV 8"PVC OUT(S)=5.72'

SS 9

SSMH TOP=8.30'

INV 8"PVC IN(N)=4.54'

INV 8"PVC OUT(E)=4.40'

SS 11

SSMH TOP=8.25'

INV 8"PVC IN(W)=2.94'

INV 8"PVC OUT(E)=2.92'

SS 12

SSMH TOP=7.93'

INV 8"PVC IN(W)=3.01'

INV 8"PVC OUT(E)=3.01'

SANITARY STRUCTURE LABELS

BLVD. DE FRANCE

ALASKA ST.

12908803

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text Y

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

S

S

C u x C u x

C

C

TEL

Cu x Cu x

Cu x

Cu x

Cu x

Cu x

Cu x Cu x

Cu x

Cu x

E x

E x

E x

WW Wx W x

W x

W x

S

S

EM

EM

JB

S

JB

CO

CO

ST

x

ET

ET

ET

ET

SIGN

A

F

EM

EM

WW

WW

WW

WW

M

WM

E

E

A

TEL

TEL

E

EA

P

EA

P

E

SS x

SS x

SS x

T35

T36

T1 T2

T3

T4

T5

T6 T7 T9

T8

T34

T33

T32 T31

T30 T29

T11

T44

T37

T38

T40 T39

T41

T43

T42

T53

T52

T54

T51

T50

T55 T56

T57

T10

T12 T13

WW

WW

10" RD PIPE: INV=17.18'

STUBS OUT OF WALL

FLP=14.99'

FLP=14.95'

JB

EA

P

WV

b

10" RD PIPE: INV=17.23'

STUBS OUT OF WALL

10" RD PIPE: INV=17.10'

STUBS OUT OF WALL

CONC. BBQ PAD - SILTED

R

AM

P

RAMP

CSA

W x

W x

W x

Wx

Wx

SD

x

SD x

SD x

SD x

SD x

SD x

SS

x

SS

x

SS

x

SS

x

SS x SS x

SS

x

SS

x

SS

x

SS

x

SS

x

WW

X

C u x

EUP

E x

E x

E x

E x

E x

E x

ST 28

ST 26

ST 18

ST 17

SD x ST 16

ST 15

SD x

SD x

ST 14

ST 11

SD

x

SD

x

SD

x

SD

x

ST 13

ST 12

SD x SD x

ST 10

ST 19

ST 20

ST 21

ST 22

ST 23

ST 29

ST 33

SD x

SD x

ST 30

ST 31

ST 32

SS 4

SS 1

SS 2

SS 5

SS 7

SS 9

SS 8

SS x

SS x

SS x

VIDPOLE

METAL TYP.

X 7

BLDG 670

ASPHALT

CONC. P

'KING

CONC.

RAMP

CHILL

PAD

HOT BOX

LANDING

PROPANE

DOCK

8"-16" BRICK WALL

ASPHALT

AS

PH

AL

T

PA

RK

IN

GAS

PH

AL

T

ASPHALT

AS

PH

AL

T

8" CONC.

WALL

8"

CONC.

WALL 10" CONC. WALL

10" CONC. WALL

6" TRENCH DRAIN

8" CONC. WALL

16"

DIMEN

WALL

8" B

RICK W

ALL

CONC/BRICK BARRIERS

C O

N C

/B R

IC

K

BA

R

R

IE

R S

CSA

FFE:15.54' FFE:15.53'

Wx

Wx

FFE: 12.84'

FF

E

FFE:15.47'

FFE:15.48'FFE:15.55'

FFE:15.58'

CSAFFE:15.51' FFE:12

.53

'FFE:12

.53

FFE:11

.19

FFE:11