1596300spc04of04.pdf
PDF 3 MB Posted
- Solicitation number
- N4008520R0015
About this file
This document is a solicitation for design-bid-build services for the P-204 F-35 Training and Simulator Facility at Marine Corps Air Station Cherry Point in North Carolina. Proposals are due on April 9, 2020 at 2:00pm EDT, with pre-proposal inquiries due by March 30, 2020 at 5:00pm EDT. The magnitude of construction is estimated between $25-100 million. The NAICS code is 236210 for industrial building construction, with a small business size standard of $39.5 million. This acquisition will be conducted on an unrestricted basis with full and open competition. The wage determination is General Decision Number NC20200065 dated January 3, 2020.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO. 1590340
A/E CONTRACT NO.
N40085-18-D-0600
APPROPRIATION: MCON
P-204 F-35 TRAINING AND SIMULATOR FACILITY
Volume 4 of 4
At the
Marine Corps Air Station, Cherry Point, NC
(P-204)
SUBMITTED BY:
NAVFAC MIDLANT, CI Core 9324 Virginia Avenue
Norfolk, VA 23511
PREPARED BY:
Architectural: Erik Velazquez, R.A.
Structural: R. Christopher Pyle, P.E.
Plumbing/Mechanical: Ryan M. Browning P.E.
Electrical: Luther A. Woodruff, III, P.E.
Fire Protection: Andrew P Leahy, P.E.
Civil: Marty L. Crow, P.E.
Landscape Arch: Stephen L. Stritzl, RLA
Telecommunications: Luther A. Woodruff, III, RCDD
Design Manager (DM):
Rosie M. Shanks, RA, AIA, GPCP.
Date:
ACCEPTED BY:
For Commander, NAVFAC MIDLANT: ___________________________________
Date:
Name: Marty Crow, PE Discipline: Civil
Name: Stephen Stritzl, LS Discipline: Landscape
Name: Christopher Pyle, PE Discipline: Structural
Name: Erik Velazquez, RA Discipline: Architectural
Name: Andrew Leahy, PE Discipline: Fire Protection
Name: Charles W. Southall, PE Discipline: Plumbing, Mechanical
Name: Luther Woodruff, PE Discipline: Electrical
Name: Luther Woodruff, RCDD Discipline: Telecommunications
P-204 F-35 Training and Simulator Facility Work Order Number 1590340 MCAS Cherry Point, North Carolina
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 30 01.00 22 DESIGN, PROCUREMENT, AND INSTALLATION OF FURNITURE,
FIXTURES, AND EQUIPMENT
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 60 00.00 22 REQUIREMENTS FOR PESTICIDE AND HERBICIDE COORDINATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 78 30.00 22 GIS DATA DELIVERABLES
01 80 00 REPORTS
01 91 00.15 22 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
PROJECT TABLE OF CONTENTS Page 1
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 64 29 WOOD STRIP AND PLANK FLOORING
09 65 00 RESILIENT FLOORING
09 66 23.00 22 RESINOUS (EPOXY) TERRAZZO FLOORING
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 72 00 WALLCOVERINGS
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
PROJECT TABLE OF CONTENTS Page 2
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 51 13 LOCKERS AND BENCHES
DIVISION 12 - FURNISHINGS
12 22 00 CURTAINS AND DRAPES
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 61 13 UPHOLSTERED AUDIENCE SEATING
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 25 FACILITY GAS PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR
OUTPUT)
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED AND HEATING-HOT WATER PIPING SYSTEMS
23 81 23.00 20 COMPUTER ROOM AIR HANDLING UNITS (CRAH)
23 82 00.00 20 TERMINAL HEATING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR MCAS ENERGY MONITORING AND CONTROL
SYSTEM (EMCS)
25 05 11.02 CYBERSECURITY FOR HEATING, VENTILATION, AIR CONDITIONING
(HVAC) CONTROL SYSTEM
25 05 11.03 CYBERSECURITY MCAS FIRE ALARM CONTROL SYSTEM (FACS)
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
PROJECT TABLE OF CONTENTS Page 3
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 08 01.00 10 POWER SYSTEM STUDY FOR NEW CONSTRUCTION PROJECTS
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 12 21 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 13.00 20 SINGLE OPERATION GENERATOR SETS
26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 21 13 VAPOR MITIGATION
31 23 00.00 20 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 23 25 00
CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
11/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASME INTERNATIONAL (ASME)
ASME B40.100 (2013) Pressure Gauges and Gauge Attachments
ASTM INTERNATIONAL (ASTM)
ASTM D2688 (2015; E 2016) Standard Test Method for Corrosivity of Water in the Absence of Heat Transfer (Weight Loss Methods)
ASTM D596 (2001; R 2011) Reporting Results of Analysis of Water
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2016; SUPP 2016) Motors and Generators
1.2 SUMMARY
This section covers the provisions and installation procedures necessary for a complete and totally functional water system(s) chemical treatment.
Provide and install the system with all necessary System Components, Accessories, Piping Components, and Supplemental Components/Services.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Water Treatment System; G
Water Analysis; G
Spare Parts
Field Instructions
SECTION 23 25 00 Page 1
Tests; G
SD-10 Operation and Maintenance Data
Water Treatment System
1.4 QUALITY CONTROL
1.4.1 Safety
Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to operating personnel shall be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Install safety devices so that proper operation of equipment is not impaired.
1.4.2 Drawings
Because of the small scale of the drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. Carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions.
1.5 DELIVERY, STORAGE, AND HANDLING
Protect all equipment delivered and placed in storage from the weather, humidity and temperature variations, dirt and dust, or other contaminants.
1.6 MAINTENANCE
Submit spare parts data for each different item of material and equipment specified, after approval of the detail drawings, not later than 1 months prior to the date of beneficial occupancy. The data shall include a complete list of parts and supplies, with source of supply
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
a. Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacturing of such products, that are of a similar material, design and workmanship and that have been in satisfactory commercial or industrial use for two years prior to bid opening.
b. The two-year use shall include applications of equipment and materials under similar circumstances and of similar size. The two years experience shall have been satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures. Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown.
c. All products shall be supported by a service organization. Submit a certified list of qualified permanent service organizations for support of the equipment, including their addresses and
SECTION 23 25 00 Page 2 qualifications. These service organizations shall be reasonably convenient to the equipment installation and shall be able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
d. The selected service organization shall provide the chemicals required, the concentrations required, and the water treatment equipment sizes and flow rates required. The company shall provide all chemicals required for the chilled water systems and fill the systems with chemicals to the levels specified. The chemical shall meet the requirements of this specification as well as the recommendations from the manufacturers of the condenser and cooling tower. Acid treatment chemicals shall not be used.
2.2 NAMEPLATES
Each major component of equipment shall have the manufacturer's name, address, type or style, and catalog or serial number on a plate securely attached to the item of equipment. Nameplates shall be provided for:
a. Pump(s)
b. Pump Motor(s)
2.3 ELECTRICAL WORK
Electrical equipment, motors, motor efficiencies, and wiring shall be in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Provide electrical motor driven equipment specified complete with motors, motor starters, and controls. Electrical characteristics and enclosure type shall be as shown, and unless otherwise indicated, all motors of 1 horsepower and above with open, dripproof, or totally enclosed fan cooled enclosures, shall be high efficiency type. Field wiring shall be in accordance with manufacturer's instructions. Each motor shall conform to NEMA MG 1 and be of sufficient size to drive the equipment at the specified capacity without exceeding the nameplate rating of the motor.
All motors shall be continuous duty with the enclosure specified. Provide motor starters complete with thermal overload protection and other appurtenances necessary for the motor control indicated. Furnish motors with a magnetic across-the-line or reduced voltage type starter as required by the manufacturer. Motor starter shall be provided with NEMA 1 enclosures. Manual or automatic control and protective or signal devices required for the operation specified and any control wiring required for controls and devices specified, but not shown, shall be provided.
2.4 GAUGES
Gauges shall conform to ASME B40.100 , Class 1, 2, or 3, Style X, Type I or III as required, 4-1/2 inches in diameter with phenolic or metal case.
2.5 WATER ANALYSIS
Conditions of make-up water to be supplied to the boilers, cooling towers and chilled water systems reported in accordance with ASTM D596 are as follows:
SECTION 23 25 00 Page 3
Date of Sample
Temperature degrees C
Silica (SiO 2) ppm (mg/L)
Insoluble ppm (mg/L)
Iron, total (Fe) ppm (mg/L)
Aluminum (Al) ppm (mg/L)
Calcium (Ca) ppm (mg/L)
Magnesium (Mg) ppm (mg/L)
Carbonate (HCO 3) ppm (mg/L)
Sulfate (SO 4) ppm (mg/L)
Chloride (Cl) ppm (mg/L)
Nitrate (NO 3) ppm (mg/L)
Turbidity ntu pH
Residual Chlorine ppm (mg/L)
Total Alkalinity ppm (mg/L)
Non-Carbonate Hardness ppm (mg/L)
Total Hardness ppm (mg/L)
Dissolved Solids ppm (mg/L)
Conductivity micromho/cm
2.6 CHILLED WATER SYSTEM
A 2 gallon shot feeder shall be provided on the chilled water piping as indicated. The feeder shall be furnished with an air vent, gauge glass, funnel, valves, fittings, and piping.
2.6.1 Chilled Water Treatment
Treat chilled water with either a borax/nitrite type treatment or a molybdate type treatment. Both types of treatment can be used with glycol. Borax/nitrite treatment shall be maintained at the limits of 600 to 1000 ppm nitrite, 40 - 50 ppm copper corrosion inhibitor (TT or MBT), and pH of 8.5 to 9.5. Molybdate treatment shall be maintained at the limits of 100 to 125 ppm molybdate, 40 - 50 ppm copper corrosion inhibitor
SECTION 23 25 00 Page 4
(TT or MBT), and pH of 8.0 to 9.0.
2.6.2 Chilled Water Test Kits
One test kit of each type required to determine the water quality as outlined within the operation and maintenance manuals shall be provided (e.g. pH and nitrite or molybdate).
2.7 LOW AND MEDIUM TEMPERATURE HOT WATER BOILERS AND HEAT EXCHANGERS
Low and medium temperature hot water boilers are defined as those operating below 350 degrees F, ( 250 degrees F for Low Temperature).
2.7.1 Chemical Feeder
A 5 gallon shot feeder shall be provided on the hot water piping as indicated. Size and capacity of feeder shall be based on local requirements and water analysis. The feeder shall be furnished with an air vent, gauge glass, funnel, valves, fittings, and piping.
2.7.2 Low and Medium Temperature Hot Water Treatment
Hot water shall be treated with either a borax/nitrite type treatment or a molybdate type treatment. Both types of treatment can be used with glycol. Borax/nitrite treatment shall be maintained at the limits of 600 to 1000 ppm nitrite, 40 - 50 ppm copper corrosion inhibitor (TT or MBT) and pH of 8.5 to 9.5. Molybdate treatment shall be maintained at the limits of 100 to 125 ppm molybdate, 40 - 50 ppm copper corrosion inhibitor (TT or MBT) and pH of 8.0 to 9.0.
2.7.3 Test Kit Requirements
One test kit of each type required to determine the water quality as outlined within the operation and maintenance manuals shall be provided (e.g. pH and nitrite or molybdate).
2.8 SUPPLEMENTAL COMPONENTS/SERVICES
Drain and makeup water piping shall comply with the requirements of Section 22 00 00 PLUMBING, GENERAL PURPOSE. Drains which connect to sanitary sewer systems shall be connected by means of an indirect waste.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy, before performing any work.
3.2 INSTALLATION
Provide all chemicals, equipment and labor necessary to bring all system waters in conformance with the specified requirements. Perform all work in accordance with the manufacturer's published diagrams, recommendations, and equipment warranty requirements.
SECTION 23 25 00 Page 5
3.3 PIPING
Connections between dissimilar metals shall be made with a dielectric union.
3.4 TESTS
If the waters of the mechanical systems are not in conformance with the specified requirements or in accordance with manufacturer's recommendations, the water treatment company shall take corrective action to enable compliance. Daily operational tests shall be performed in the directed frequencies to maintain required control to prevent corrosion, scaling and damage to equipment during operation Submit test schedules, at least 2 weeks prior to the start of related testing, for the condenser/chilled/boiler/condensate/feedwater water quality tests. The schedules shall identify the date, time, frequency and collection location for each test.
3.4.1 Chilled Water Testing (monthly)
Once a month, the following tests will be performed on chilled water.
pH
Nitrite or Molybdate ppm (mg/L)
Conductivity micromho/cm
3.4.2 Hot Water Boiler Water Quality Testing
3.4.2.1 Low and Medium Temperature Systems (monthly)
Monthly testing shall be completed and recorded for the following parameters.
pH
Nitrite or Molybdate ppm (mg/L)
3.4.3 Quality Assurance Testing
Conduct QA testing periodically by an independent water treatment lab/consultant to verify to managers that the mechanical and water treatment systems are being maintained properly. Provide the QA evaluation reports to the government COR.
3.4.3.1 Chilled Water Quality Assurance Testing (quarterly)
Quarterly, the following tests shall be performed on chilled water.
pH
SECTION 23 25 00 Page 6
Nitrite or Molybdate ppm (mg/L)
Conductivity micromho/cm
Iron (total, as Fe(2)O(3)) ppm (mg/L)
Written evaluation summary
3.4.3.2 Hot Water Boiler Water Quality Assurance Testing
a. Quarterly testing of Low and Medium Temperature Systems shall be completed and recorded for the following parameters.
pH
Nitrite or Molybdate ppm (mg/L)
Iron (total, as Fe(2)O(3)) ppm (mg/L)
Written evaluation summary
b. The hot water boiler water shall be analyzed once a month for a period of 1 year by an independent consultant. The analysis shall include the following information recorded in accordance with ASTM D596.
pH
Sulfite (Na2SO3) ppm (mg/L)
Hardness(as CaCO3) ppm (mg/L)
Iron (total, as Fe(2)O(3)) ppm (mg/L)
Written evaluation summary
3.4.4 Corrosion Testers
Install corrosion coupon and rack systems to verify corrosion control in the systems. Testers or coupons are installed in flowing system water through a sidestream or rack system. Both mild steel and copper metal samples are to be tested in the corrosion testers in accordance with ASTM D2688. Samples are to be replaced and analyzed every 3 months.
Rates of corrosion less than 3 mpy for steel and 0.2 mpy for copper are acceptable. Corrosion testers shall be installed on the piping systems of the following systems.
Chilled water system Hot water loop
SECTION 23 25 00 Page 7
3.5 INSPECTIONS
3.5.1 Inspection General Requirements
Thirty days after project completion, inspect the cooling tower and condenser for problems due to corrosion, scale, and biological growth. If the cooling tower and condenser are found not to conform to the manufacturer's recommended conditions, and the water treatment company recommendations have been followed; the water treatment company shall provide all chemicals and labor for cleaning or repairing the equipment as required by the manufacturer's recommendations.
3.5.2 Boiler/Piping Test
Thirty day after project completion, inspect the boiler and condensate piping for problems due to corrosion and scale. If the boiler is found not to conform to the manufacturer's recommendations, and the water treatment company recommendations have been followed, the water treatment company shall provide all chemicals and labor for cleaning or repairing the equipment as required by the manufacturer's recommendations. If corrosion is found within the condensate piping, proper repairs shall be made by the water treatment company.
-- End of Section --
SECTION 23 25 00 Page 8
SECTION 23 52 43.00 20
LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR OUTPUT)
05/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z21.13/CSA 4.9 (2017; Errata 2018) Gas-Fired Low Pressure Steam and Hot Water Boilers
ASME INTERNATIONAL (ASME)
ASME BPVC SEC IV (2017) BPVC Section IV-Rules for Construction of Heating Boilers
ASME CSD-1 (2016) Control and Safety Devices for Automatically Fired Boilers
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
NATIONAL BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS (NBBI)
NBBI NB-23 PART 1 (2013) National Board Inspection Code - Part 1 Installation
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2016; SUPP 2016) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 31 (2016) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2018) National Fuel Gas Code
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-430-07 (2019) Operations And Maintenance:
SECTION 23 52 43.00 20 Page 1
Inspection And Certification Of Boilers And Unfired Pressure Vessels, With Change 5
UNDERWRITERS LABORATORIES (UL)
UL 795 (2016) UL Standard for Safety Commercial-Industrial Gas Heating Equipment
1.2 RELATED REQUIREMENTS
Section 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS, applies to this section, with the additions and modifications specified herein.
1.3 DESIGN REQUIREMENTS
Boiler must be suitable for installation in the space shown with ample room for opening doors and cleaning and removal and replacement of tubes.
Boiler must be designed and tested in accordance with ASME BPVC SEC IV , ASME CSD-1, NFPA 54 , NFPA 31 , NFPA 70 and ANSI Z21.13/CSA 4.9 . Boiler must be installed in accordance with NBBI NB-23 PART 1 . Paint boiler in accordance with manufacturer's recommendations. Boiler design working pressure must be 160 psig.
1.3.1 Boiler Installation Requirements
1.3.1.1 Location
Install Boiler(s) and associated hot water pumps in a mechanical room inside the facility in accordance with NBBI NB-23 PART 1 . Provide ample clearance around boilers to allow access for inspection, maintenance and repair. Passageways around all sides of boilers must have an unobstructed minimum width of 36 inches or the clearances recommended by the boiler manufacturer whichever is greater.
1.3.1.2 Combustion Air
Provide supply of air for combustion and ventilation. Provide directly vented air intake and combustion ductwork. Provide metallic air intake ductwork in accordance with Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS with boiler manufacturer's written instructions. Insulate air intake ductwork in accordance with Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS. Provide Boiler Flue Vent in accordance with Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS and boiler manufacturer' written instructions.
1.3.2 Detail Drawings
1.3.2.1 Drawings
Show boiler hot water isolation valves, emergency disconnect switch, and complete boiler gas train on the contract drawings.
1.3.2.2 Fuel Train / Wiring Diagram
Submit fuel train and wiring diagram.
SECTION 23 52 43.00 20 Page 2
1.3.3 Water Analysis
Provide test reports of water analysis. UFC 3-240-13FN Industrial Water Treatment must be followed for all boiler installations.
1.4 SAFETY STANDARDS
Hot water boilers, burners and supplementary control devices, safety interlocks, or limit controls required under this specification, must meet requirements of the following standards as applicable:
a. Gas-Fired Units: ASME CSD-1, ASME BPVC SEC IV , NFPA 54 , NFPA 70 , ANSI Z21.13/CSA 4.9 or UL 795 .
Controls not covered by the above must have a UL label, UL listing mark, or must be listed in the Factory Mutual Approval Guide.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Fuel Train
Wiring Diagram
SD-03 Product Data
Boilers; G
Boiler Trim and Control Equipment; G
Burners and Control Equipment; G
SD-06 Test Reports
Operational Tests; G
Water Analysis
SD-07 Certificates
Boilers; G
Burners and Control Equipment
Boiler Trim and Control Equipment
SD-08 Manufacturer's Instructions
Boilers
SD-10 Operation and Maintenance Data
SECTION 23 52 43.00 20 Page 3
Energy Efficient Equipment for Boilers; S
Boilers, Data Package 4
Submit in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
SD-11 Closeout Submittals
Posted Operating Instructions for Heating Water Boilers
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:
2.1.1 Energy Efficient Equipment for Boilers
Provide boilers meeting the efficiency requirements as stated within this section and provide documentation in conformance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph ENERGY EFFICIENT EQUIPMENT.
2.2 BOILERS
Shall conform to the applicable requirements of ASME BPVC SEC IV and ASME CSD-1. Boiler shall be natural gas fired, fully condensing, and fire tube design. The boiler shall be factory-fabricated, factory-assembled, and factory-tested, fire-tube condensing boiler with heat exchanger sealed pressure tight, built on a steel base; including insulated jacket;
flue-gas vent; combustion-air intake connections; water supply, return, and condensate drain connections; and controls. Provide each boiler complete with burner and fuel system, a forced or induced draft fan, an automatic electronic control system complete with combustion and flame safeguard controls, firing sequence programmer, safety interlocks, limit controls and central control panel, and such trim and appurtenances as are peculiar to water units as specified herein. Units shall be factory-wired and assembled except for such readily installed appurtenances as safety valves, water columns, and pressure gages. Units shall be complete and ready for operation when connected to water, fuel, and electrical supplies. The heater exchanger shall bear the ASME "H" stamp for 160 psi working pressure and shall be National Board listed. The heat exchanger shall be constructed of a fully welded 316L stainless steel or cast aluminum and of fire tube design. The heat exchanger shall be designed for a single or multi-pass water flow, but must meet the scheduled water side pressure drop. There shall be no banding material, bolts, gaskets or "O" rings in the heat exchanger design. The condensate collection basin shall be fully welded 316L stainless steel. Boiler shall include an intake air filter with a factory installed air pressure switch. The pressure switch will alert the end user on the screen of the boiler that the intake filter is dirty and needs to be changed. The pressure vessel shall be in accordance with ASME Section IV pressure vessel code.
SECTION 23 52 43.00 20 Page 4
2.3 BURNERS AND CONTROL EQUIPMENT
2.3.1 Gas-Fired Power Burner
Spark ignition with 100 percent main-valve shutoff with electronic flame supervision. Forced draft single burner premix design. The burner shall be capable of a minimum 5:1 gas train turndown without loss of combustion efficiency. Boiler shall be equipped with a modulating blower system to precisely control the fuel/air mixture to provide modulating boiler firing rates for maximum efficiency. The burner firing sequence of operation shall include pre-purge, firing, modulation, and post-purge operation.
Burner controls and safety equipment shall conform to the applicable requirements of ASME CSD-1, NFPA 54 , ANSI Z21.13/CSA 4.9 and UL 795 .
Mount controls; including operating switches, indicating lights, gages, alarms, motor starters, fuses, and circuit elements of control systems on a single control panel or cabinet designed for separate mounting not on the burner.
2.4 BOILER TRIM AND CONTROL EQUIPMENT
Boiler trim shall comply with ASME BPVC SEC IV and additional appurtenances specified below. Non-recycling control interlocks shall have the reset located on control interlock. Provide in accordance with ASME CSD-1 and ASME BPVC SEC IV .
2.4.1 Emergency Disconnect Switch
Provide and locate on wall outside boiler room entrance or just inside door, when boiler room door is on building exterior as required by ASME CSD-1 to allow rapid and complete shutdown of the boiler in the event of an emergency. Emergency switch must be a fuse-type safety switch.
Switch must be red and furnished with a label indicating function of switch.
2.4.2 Relief Valves
Provide relieving capacity for the full output of boiler installed.
Safety relief-valve piping must conform to ASTM A53/A53M, schedule 40 steel pipe and be piped full-size to a floor drain.
2.4.3 Condensate Neutralization Kit
Factory-supplied condensate trap with condensate trip sensor, high capacity condensate receiver prefilled with appropriate medium.
2.4.4 Primary Boiler Pump
Provide boiler with primary boiler pump as indicated on drawings and in accordance with Section 23 64 26 CHILLED AND HEATING-HOT WATER SYSTEMS.
2.4.5 Pressure Gage
Provide with a scale equivalent to 1.5 time outlet water pressure with a 6 inch diameter. Locate one on supply water piping and one on the return water piping. Provide in accordance with Section 23 64 26 CHILLED AND
HEATING-HOT WATER SYSTEMS.
SECTION 23 52 43.00 20 Page 5
2.4.6 Thermometer
Provide thermometer with a scale equivalent to 1.5 times outlet water temperature. Provide one located on supply water piping and one on return water piping. Provide in accordance with Section 23 64 26 CHILLED AND
HEATING-HOT WATER SYSTEMS.
2.4.7 Drain Tapping
Provide drain valve and piping to a floor drain.
2.4.8 Make-up Water Station
2.4.8.1 Pressure Reducing Station
Provide a water pressure-reducing valve and relief valve, or a combination of the two in the makeup water line to the boiler to maintain a water pressure of as indicated on the drawings of the hot water system.
Provide a 3/4 inch globe valve by-pass around this valve.
2.4.8.2 Backflow Preventers
Section 22 00 00 PLUMBING, GENERAL PURPOSE. Locate upstream of by-pass.
2.4.9 Feedwater Treatment Feeder
See Section 23 64 26 CHILLED AND HEATING-HOT WATER SYSTEMS and Section 23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS for chemical shot feeder requirements.
2.4.10 Combustion Regulator
Provide adjustable temperature, thermostatic immersion type that must limit boiler water temperature to a maximum of 250 degrees F. Control must actuate burner through an electric relay system to maintain boiler water temperature within normal prescribed limits at loads within rated capacity of boiler.
2.4.11 Air Vent Valve
Provide with screwed connection, stainless steel disk, and stainless steel seats to vent entrapped air.
2.4.12 High Temperature Limit Switch
Provide adjustable immersible aquastat type with a temperature setting above that of the combustion regulator and below that of the lowest relief valve setting. Aquastat must function to cause a safety shutdown by closing fuel valves, and shutting down burner equipment , activating a red indicating light, and sounding an alarm in the event that boiler water temperature rises to the high temperature limit setting. A safety shutdown due to high temperature must require manual reset before operation can resume and prevent recycling of burner equipment. Pre-set high temperature limit devices that cannot be easily tested are not allowed.
2.4.13 Low Water Level Cutoff Switch
Provide float actuated type. Low water level cutoff must cause a safety
SECTION 23 52 43.00 20 Page 6 shutdown by closing fuel valves, and shutting down burner equipment , activating a red indicating light, and sounding an alarm in the event that water level drops below the lowest safe permissible water level established by the boiler manufacturer and ASME BPVC SEC IV . A safety shutdown due to low water must require manual reset before operation can resume and prevent recycling of burner equipment.
2.4.14 Boiler Safety Control Circuits
Provide boiler safety control circuits, including control circuits for burner and draft fan, must be single-phase, two-wire one-side grounded, and not over 120 volts. Provide safety control switching in ungrounded conductors. Provide overcurrent protection. In addition to circuit grounds, ground metal parts which do not carry current to a grounding conductor.
2.4.15 Indicating Lights
Each safety interlock requiring a manual reset must have an individually labeled red indicating light. Non-recycling control interlocks must have the reset located on the control itself. Red indicating lights on the control panel may be omitted if the burner combustion control system has a Keyboard Display Module installed that will identify the lockout information required in Item c. below. Indicating lights must have colors as follows:
a. Amber: Ignition on
b. Green: Main fuel safety shut-off valves open
c. Red (One for Each): Safety lockout, flame failure, low water level, and high temperature
d. Blue: Draft
Boiler Control Panel
Boiler controls shall feature a standard, factory-installed LCD screen display with the following standard features:
a. Password Security: Boiler shall have a different password security code for the User and the Installer to access adjustable parameters.
b. Indicating Lights: LCD screen shall display all indicating lights.
c. Service reminder: Boiler shall have the ability to display a yellow colored service notification screen based upon months of installation, hours of operation, and number of boiler cycles. All notifications are adjustable by the installer.
d. Anti-cycling control: Boiler shall have the ability to set a time delay after a heating demand is satisfied allowing the boiler to block a new call for heat. The boiler will display an anti-cycling blocking on the screen until the time has elapsed or the water temperature drops below the anti-cycling differential parameter. The anti-cycling control parameter is adjustable by the installer.
e. Primary pump control: Boiler shall have the ability to control the primary pump to maintain boiler required flow.
SECTION 23 52 43.00 20 Page 7
f. BMS integration with 0-10 volts dc input: The Control shall allow an option to Enable and control set point temperature or control firing rate by sending the boiler a 0-10 volts input signal.
g. Data logging: Boiler shall have non-volatile data logging memory including last 10 lockouts, hours running and ignition attempts and should be able to view on boiler screen.
h. Cascade Controller: The boiler shall have a built in Cascade controller to sequence and rotate lead boiler to ensure equal runtime while maintaining modulation of all boilers without utilization of an external controller.
The factory installed, internal cascade controller shall include:
(1) Lead lag.
(2) Efficiency optimization: The Control module shall allow multiple boilers to fire at minimum firing rate in lieu of Lead/Lag.
(3) Front end loading.
(4) Rotation of lead boiler: The Control module shall change the lead boiler every hour for the first 24 hours after initializing the Cascade.
Following that, the leader will be changed once every 24 hours.
i. Building Automation System Interface: Factory installed BACnet gateway interface to enable building automation system to monitor, control, and display boiler status and alarms.
2.4.16 Alarm Bell
Provide alarm bell, electrically operated, with a manual disconnect switch. Disconnect switch must be type and wired so that switching off alarm following a safety shutdown will not prevent alarm from sounding again upon recurrence of a subsequent safety shutdown condition.
2.4.17 Post-Combustion Purge
Provide controls and wiring necessary to ensure operation of draft fan for a period of not less than 15 seconds or of sufficient duration to provide four complete air changes in the boiler combustion chamber (whichever is greater) following shutdown of burner upon satisfaction of heat demand and in accordance with ASME CSD-1 . Upon completion of post-combustion purge period, draft fan must automatically shutdown until next restart.
2.4.18 Draft
Intake ductwork in accordance with Section 23 00 00 AIR SUPPLY,DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS and boiler manufacturer's written instructions. Insulate air intake ductwork in accordance with Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.
Boiler Flue, Combustion Intake Supports
Provide in accordance with Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS.
SECTION 23 52 43.00 20 Page 8
2.5 ELECTRIC MOTORS
Electric motors must meet requirements of NEMA MG 1. Motors less than 1 hp must meet NEMA High Efficiency requirements. Motors 1 hp and larger must meet NEMA Premium Efficiency requirements. Motors which are an integral part of the packaged boiler system must be the highest efficiency available by the manufacturer of the packaged boiler. Motors must be variable speed.
PART 3 EXECUTION
3.1 EQUIPMENT INSTALLATION
Install equipment in accordance with manufacturer's installation instructions and NBBI NB-23 PART 1 . Grout equipment mounted on concrete foundations before installing piping. Install piping in such a manner as not to place a strain on equipment. Do not bolt flanged joints tight unless they match. Grade, anchor, guide, and support piping without low pockets. Feedwater treatment feeders must be mounted so that the top of the feeder is no higher than 48 inches above the finished floor.
3.2 EQUIPMENT FOUNDATIONS
Locate equipment foundations as indicated, designed, and made of sufficient size and weight to preclude shifting of equipment under operating conditions or under abnormal conditions that could be imposed upon the equipment. Foundations must meet requirements of the equipment manufacturer. Concrete and grout must conform to Section 03 30 00
CAST-IN-PLACE CONCRETE.
3.3 MANUFACTURER'S FIELD SERVICES
Furnish the services of an engineer or technician approved by the boiler manufacture for installation inspection, startup, and tests of equipment as specified below. After installation of equipment the engineer or technician shall provide a signed certificate or certified written statement that the equipment is installed in accordance with the manufacturer's recommendations. Services of more than one engineer or technician may be required based on types of specific equipment. One engineer or technician as appointed by the Contractor shall supervise and be responsible for the overall installation, start-up, test, and check-out of systems. This person shall remain on the job until each unit has been in successful operation for 3 days and accepted.
3.4 BOILER CLEANING
Before being placed in service, flush out boiler with potable water, drain, and charge with chemically treated water. Protect boiler and appurtenances against internal corrosion until testing is completed and boiler is accepted. Professional services are required for cleaning/treatment process.
3.5 FIELD QUALITY CONTROL
Perform and furnish everything required for inspections and tests as specified herein to demonstrate that boiler and auxiliary equipment, as installed, are in compliance with contract requirements. Start-up and operate the system. During this time, clean strainers until no further accumulation of foreign material occurs. Exercise care to minimize loss
SECTION 23 52 43.00 20 Page 9 of water when strainers are cleaned. Adjust safety and automatic control instruments as necessary to place them in proper operation and sequence.
Test instrumentation must be calibrated and have full scale readings from
1.5 to 2 times test values.
3.5.1 Operational Tests
Furnish the services of an engineer or technician approved by the boiler manufacturer of installation, startup, operational and safety testing.
This person must remain on the job until each boiler has been successfully operated. Furnish and perform everything required for inspections and tests of the boiler and auxiliary equipment. Test instrumentation must be calibrated and have full-scale reading from 1.5 to 2 times test values.
Demonstrate proper operability of combustion control, flame safeguard control and safety interlocks. Provide a detailed description of all boiler startup and operational tests in the Commissioning Plan.
3.5.1.1 Preliminary Operational Test
Operate the boilers continuously for a period of at least 8 hours to demonstrate proper operability of the combustion control, flame safeguard control, and safety interlocks.
3.5.1.2 Acceptance Operational Test and Inspection
Prior to requesting an acceptance test, conduct a satisfactory operational test for at least 8 hours, and provide a certified statement that the equipment is installed per all requirements of this guide. Contracting Officer, upon receipt of the notice from the Contractor, will request a boiler inspection by a Naval Facilities Engineering and Expeditionary Warfare Center (EXWC) NAVFAC boiler inspector. Fifteen days advance notice is required for scheduling inspector to conduct acceptance operational test and inspection. All boilers and pressure vessels require certifications in accordance to UFC 3-430-07 prior to turning over to the Government. Request in writing that the government start the certification and acceptance testing procedure 120 days prior to the anticipated turnover date. The government boiler inspector shall be present and witness the startup of boiler systems. The Contractor is responsible for coordinating with the Boiler Inspector.
SECTION 23 52 43.00 20 Page 10
SECTION 23 64 10
WATER CHILLERS, VAPOR COMPRESSION TYPE
11/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI 550/590 I-P (2015; ERTA 2016) Performance Rating Of Water-Chilling and Heat Pump Water-Heating Packages Using the Vapor Compression Cycle
AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)
ABMA 11 (2014) Load Ratings and Fatigue Life for Roller Bearings
ABMA 9 (2015) Load Ratings and Fatigue Life for Ball Bearings
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ANSI/ASHRAE 15 & 34 (2016) ANSI/ASHRAE Standard 15-Safety Standard for Refrigeration Systems and ANSI/ASHRAE Standard 34-Designation and Safety Classification of Refrigerants
AMERICAN WELDING SOCIETY (AWS)
AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes
ASME INTERNATIONAL (ASME)
ASME BPVC SEC VIII D1 (2017) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
ASTM INTERNATIONAL (ASTM)
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM D520 (2000; R 2011) Zinc Dust Pigment
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building
SECTION 23 64 10 Page 1
Materials
ASTM F104 (2011) Standard Classification System for Nonmetallic Gasket Materials
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2016; SUPP 2016) Motors and Generators
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 82 Protection of Stratospheric Ozone
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Self-Contained Water Chillers, Vapor Compression Type; G
Posted Instructions
Verification of Dimensions
Refrigerant
Demonstrations
Water Chiller - Field Acceptance Test Plan; G
SD-06 Test Reports
Field Acceptance Testing; G
Water Chiller - Field Acceptance Test Plan; G
Water Chiller - Field Acceptance Test Report
Water Chiller - Field Acceptance Test Report
System Performance Tests; G
SD-07 Certificates
Refrigeration System; G
Ozone Depleting Substances Technician Certification
SD-08 Manufacturer's Instructions
SECTION 23 64 10 Page 2
Water Chiller - Installation Instructions; G
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G
SD-11 Closeout Submittals
Indoor Air Quality During Construction; S
1.3 CERTIFICATIONS
1.3.1 Ozone Depleting Substances Technician Certification
All technicians working on equipment that contain ozone depleting refrigerants must be certified as a Section 608 Technician to meet requirements in 40 CFR 82 , Subpart F. Provide copies of technician certifications to the Contracting Officer at least 14 calendar days prior to work on any equipment containing these refrigerants.
1.4 SAFETY REQUIREMENTS
Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to operating personnel must be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Safety devices must be installed so that proper operation of equipment is not impaired. Welding and cutting safety requirements must be in accordance with AWS Z49.1 .
1.5 DELIVERY, STORAGE, AND HANDLING
Stored items must be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and during installation will be the Contractor's responsibility. Any materials found to be damaged must be replaced at the Contractor's expense. During installation, piping and similar openings must be capped to keep out dirt and other foreign matter.
1.6 PROJECT REQUIREMENTS
1.6.1 Verification of Dimensions
The Contractor must become familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
PART 2 PRODUCTS
2.1 STANDARD COMMERCIAL PRODUCTS
Materials and equipment will be standard Commercial cataloged products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship. These products must have a two year record of satisfactory field service prior to bid opening. The two year record of service must include applications of equipment and materials under similar circumstances and of similar size.
Products having less than a two year record of satisfactory field service will be acceptable if a certified record of satisfactory field service for not less than 6000 hours can be shown. The 6000 hour service record must
SECTION 23 64 10 Page 3 not include any manufacturer's prototype or factory testing. Satisfactory field service must have been completed by a product that has been, and presently is being sold or offered for sale on the commercial market through the following copyrighted means: advertisements, manufacturer's catalogs, or brochures.
2.2 MANUFACTURER'S STANDARD NAMEPLATES
Nameplates are required on major components if the manufacturer needs to provide specific engineering and manufacturing…
This is the start of the file's text. The full file is on GovTribe.