This document contains mechanical schedules and specifications for a dedicated outdoor air unit and fan coil units to be installed at a Marine Corps Air Station as part of a federal construction project. Key details include specifications for a dedicated outdoor air unit to serve multiple air handling units, including supply and exhaust fan data, cooling and heating coil specifications, and electrical requirements. Also included are schedules for multiple fan coil units serving various facility spaces with specifications for cooling and heating coils, fan data, and electrical characteristics. The document provides necessary mechanical equipment details for contractors to understand project requirements and prepare bids for the design-bid-build project solicited through solicitation number N4008520R0015 for construction of an F-35 training and simulator facility at Marine Corps Air Station Cherry Point, North Carolina. Proposals for the project valued between $25-100 million are due on April 9, 2020.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND
NOTES.
GENERAL NOTES
DUCT CONSTRUCTION SCHEDULE
SYSTEM LOCATION DESCRIPTION PRESSURE CLASS
(IN WG)
LEAKAGE CLASS
ROUND RECTANGULAR
SEAL CLASS DALT/
QTY
DUCT TEST
PRESSURE (IN WG)
SUPPLY AIR UPSTREAM OF VAV BOXES (AHU-1 & AHU-2)
SUPPLY AIR DOWNSTREAM OF UNIT (AHU-3)
RETURN AIR
EXHAUST AIR (INLCUDING BUT NOT LIMITED DOAU-1)
TRANSFER AIR
TREATED OUTSIDE AIR (INLCUDING BUT NOT LIMITED DOAU-1 & DHOAU-1)
UNTREATED OUTSIDE AIR (INLCUDING BUT NOT LIMITED DOAU-1 & DHOAU-1)
COMBUSTION AIR INTAKE
BOILER COMBUSTION AIR VENT
CONCEALED / MECH AREA
CONCEALED / MECH AREA
CONCEALED / MECH AREA
CONCEALED
CONCEALED / MECH AREA
MECH AREA / DATA CENTER
MECH AREA
MECH AREA
SINGLE WALL
SINGLE WALL
DOUBLE WALL
SINGLE WALL
SINGLE WALL
SINGLE WALL
SINGLE WALL
SINGLE WALL
SINGLE WALL
A
A
A
A
A
A
A
A
A
YES / 25% 2.5+ 2.5
+ 1.0
- 2.0
- 2.0
+/- 1.0
+ 2.0
- 2.0
- 6.0
+ 10.0
YES / 25% 1.0
YES / 25% 2.0
YES / 25% 2.0
- 1.0
YES / 25% 2.0
YES / 25% 2.0
PIPING CONSTRUCTION SCHEDULE
SYSTEM MATERIAL INSULATION
CHILLED WATER
CONDENSATE DRAIN
HEATING HOT WATER
TYPE L COPPER, SCHEDULE 40 STEEL CELLULAR GLASS, POLYISOCYANURATE
FLEXIBLE ELASTOMERIC
MINERAL FIBER
INSULATION JACKET NOTES
TYPE L COPPER
TYPE L COPPER, SCHEDULE 40 STEEL AS SPECIFIED
AS SPECIFIED
AS SPECIFIED
SUPPLY AIR UPSTREAM OF VAV/CAV BOXES OR
DIRECT DISCHARGE FROM UNIT (AHU-FMS#)
CONCEALED / MECH AREA SINGLE WALL A YES / 100% 4.0+ 4.0 3 6
SUPPLY AIR DOWNSTREAM OF VAV BOXES (AHU-1, AHU2 & AHU-FMS#) CONCEALED SINGLE WALL A+ 1.0 3 6 YES / 25% 1.0
CONCEALED / MECH AREA
SUPPLY AIR DOWNSTREAM OF FCU SINGLE WALL A+ 1.0 3 6 YES / 25% 1.0CONCEALED / MECH AREA
1. PROVIDE UNITS WITH FILTER RACK ON THE UNIT INTAKE AND MERV 8 FILTER.
NOTES:
1. PROVIDE MERV 8 AND MERV 13 PLEATED FILTER UPSTREAM OF COILS. PROVIDE MERV 8 FOR EXHAUST.
2. E.S.P. DOES NOT ACCOUNT FOR FILTER LOADING. INCLUDE A MINIMUM OF 0.5 INCHES WG FOR MERV 8 AND 0.75 INCHES WG FOR MERV 13.
3. PROVIDE BACNET INTERFACE FOR BUILDING DIRECT DIGITAL CONTROL SYSTEM.
4. PROVIDE DOAU(S) WITH VFD(S) FOR EACH INDIVIDUAL SUPPLY FAN AND EXHAUST FAN. PROVIDE WITH SINGLE POINT OF CONNECTION FOR THE EXHAUST FAN BANK, AND SINGLE
POINT OF CONNECTION FOR SUPPLY FAN BANK. DIVISION 26 TO PROVIDE SAFETY SWITCH FOR THE SUPPLY AND EXHAUST FAN BANKS (ONE (1) EACH).
5. UNIT SHALL BE MODULAR AND SHALL BE ABLE TO FIT THROUGH A 84" BY 72" OPENING.
6. DOAU COOLING COIL SHALL BE SIZED AT 50% SENSIBLE AND TOTAL EFFECTIVENESS. ENERGY WHEEL SHALL PERFORM AS SCHEDULED.
NOTES:
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 12 APRIL 2018
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
C
I C
O R
E N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
IR
G
IN
IA
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
O R
T H
C A
R O
L
IN
A
AS NOTED
P -2
F
-3
T R
A
IN
IN
G
A N
D S
IM
U
L A
T O
R F
A C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
1596300
CJC/RMS
MCAS CP
DONALD ELLIOTT
(BY EMAIL)
08 JAN 2020
C
R e v it P ro je c ts
\B L D
G P
-1
-M
-C e n tr a l_ rm b ro w n in g .r v t
/2
/2
:4 :0
A
M
M-602
M E
C H
A N
IC
A
L S
C H
E D
U
LE
S
CD
12804223
RMB RLS
N40085-20-R-0015
DEDICATED OUTDOOR AIR UNIT SCHEDULE 1 OF 2
MARK
LOCATION SUPPLY FAN EXHAUST FAN COOLING COIL DATA HEATING COIL DATA
RM. NAME RM. NUMBER CFM
EXTERNAL SP
(IN WG)
MOTOR
(QTY) HP
CFM
EXTERNAL SP
(IN WG)
MIN MOTOR
HP
TOTAL
(MBH)
SENSIBLE
(MBH)
EAT
°FDB
EAT
°FWB
LAT
°FDB
LAT
°FWB
ENT WTR
TEMP °F
EXT WTR
TEMP °F
GPM
WTR P.D.
(FT WC)
MAX COIL
FV (FPM)
PIPE INLET
SIZE (IN)
FOULING FACTOR
(HR-FT^2-F/BTU)
MBH
LAT
°FDB
ENT WTR
TEMP °F
EXT WTR
TEMP °F
GPM
WTR P.D.
(FT WC)
MAX COIL
FV (FPM)
PIPE INLET
SIZE (IN)
FOULING FACTOR
(HR-FT^2-F/BTU)
DOAU-1 MECH 231 6540 2.2 (2) 5.0 5490 2.4 (2) 5.0 503 223 83.0 75.0 52 52 44 56 82.4 10 500 2.5 0.00001 219 55 130 110 21.9 5 500 2 0.0001
DEDICATED OUTDOOR AIR UNIT SCHEDULE 2 OF 2
MARK
ENERGY WHEEL DATA
SUPPLY FAN(S)
ELECTRICAL DATA
EXHAUST FAN(S)
ELECTRICAL DATA
ENERGY WHEEL
ELECTRICAL DATA VFD/STARTER/
DISCONNECT
PROVIDED BY
NOTESSUMMER CONDITIONS WINTER CONDITIONS
MCA V/PH/HZ MCA V/PH/HZ MCA V/PH/HZOUTSIDE
AIR CFM
OUTSIDE AIR
EAT (DB/WB)
OUTSIDE AIR
LAT (DB/WB)
OUTSIDE AIR PRESSURE
DROP (IN WG)
ENTERING
EXHAUST CFM
EXHAUST
EAT (DB/WB)
EXHAUST
LAT (DB/WB)
EXHAUST AIR PRESSURE
DROP (IN WG)
OUTSIDE AIR
EAT (DB/WB)
OUTSIDE AIR
LAT (DB/WB)
OUTSIDE AIR PRESSURE
DROP (IN WG)
ENTERING
EXHAUST CFM
EXHAUST
EAT (DB/WB)
EXHAUST
LAT (DB/WB)
EXHAUST AIR PRESSURE
DROP (IN WG)
DOAU-1 6540 85/80.1 81.6/69.0 1.0 5490 80/62 84.1/76.7 1.0 24/21 55.8/44.5 1.0 5490 70/53 32.6/28.3 1.0 14.7A 460/3/60 14.0A 460/3/60 1.5A 460/3/60 DIVISION 23 1,2,3,4,5,6
FAN COIL UNIT SCHEDULE
MARK
LOCATION SERVED
TYPE CFM
FAN COOLING COIL DATA HEATING COIL DATA
V/PH/HZ
MCA
TOTAL
FLA
VFD/STARTER/
DISCONNECT
PROVIDED BY
NOTES
RM NAME RM NUMBER
ESP
(IN WG)
(QTY)
HP
SENSIBLE
MBH
TOTAL
MBH
ENT AIR LVG AIR ENT WTR
TEMP
(°F)
EXT WTR
TEMP
(°F)
GPM
MAX COIL
FV (FPM)
WTR PD
(FT HD)
PIPING
RUNOUT SIZE
(IN)
FOULING
FACTOR
(HR-FT^2-F/BTU)
MBH
ENT AIR
(°F) DB
LVG AIR
(°F) DB
ENT WTR
TEMP (°F)
WTR TEMP
ΔT (°F)
GPM
MAX COIL
FV (FPM)
WTR PD
(FT HD)
PIPING
RUNOUT SIZE
(IN)
FOULING
FACTOR
(HR-FT^2-F/BTU)
(°F)
DB
(°F)
WB
(°F)
DB
(°F)
WB
FCU-1-171 DMRT 171 HORIZONTAL 540 0.6 (1) 1/2 14.6 20.1 80 67 55 55 44 56 3.4 500 10 1 0.00001 8.3 55 85 130 20 0.9 500 10 3/4 0.00001 460/3/60 1.5 0.36 DIVISION 23 1
FCU-1-195 SHIPPING/RECEIVING/SUPPLY 195 HORIZONTAL 540 0.6 (1) 1/2 14.6 20.1 80 67 55 55 44 56 3.4 500 10 1 0.00001 8.3 55 85 130 20 0.9 500 10 3/4 0.00001 460/3/60 1.5 0.36 DIVISION 23 1
FCU-1-232 ELEC 232 HORIZONTAL 540 0.6 (1) 1/2 14.6 20.1 80 67 55 55 44 56 3.4 500 10 1 0.00001 8.3 55 85 130 20 0.9 500 10 3/4 0.00001 460/3/60 1.5 0.36 DIVISION 23 1
FCU-1-234 ELEC 234 HORIZONTAL 540 0.6 (1) 1/2 14.6 20.1 80 67 55 55 44 56 3.4 500 10 1 0.00001 8.3 55 85 130 20 0.9 500 10 3/4 0.00001 460/3/60 1.5 0.36 DIVISION 23 1
FCU-1-235 FIRE PUMP 235 HORIZONTAL 540 0.6 (1) 1/2 14.6 20.1 80 67 55 55 44 56 3.4 500 10 1 0.00001 8.3 55 85 130 20 0.9 500 10 3/4 0.00001 460/3/60 1.5 0.36 DIVISION 23 1
FCU-2A-129 ELEC 129 HORIZONTAL 510 0.6 (1) 1/2 13.8 19.0 80 67 55 55 44 56 3.2 500 10 1 0.00001 - - - - - - - - - - 460/3/60 1.88 1.08 DIVISION 23 1
FCU-2B-178 PSO SERVER 178 HORIZONTAL 510 0.6 (1) 1/2 11.0 11.4 72 60 52 52 44 56 1.9 500 10 3/4 0.00001 - - - - - - - - - - 460/3/60 1.88 1.08 DIVISION 23 1
FCU-2B-191 AUDIOVISUAL 191 HORIZONTAL 510 0.6 (1) 1/2 11.0 11.4 72 60 52 52 44 56 1.9 500 10 3/4 0.00001 - - - - - - - - - - 460/3/60 1.88 1.08 DIVISION 23 1
FCU-3-228 MECH / ELEC 228 HORIZONTAL 960 0.6 (1) 1 25.9 35.8 80 67 55 55 44 56 6.0 500 10 1 0.00001 3.3 55 85 130 20 0.5 500 10 3/4 0.00001 460/3/60 2.55 0.40 DIVISION 23 1
FCU-3-229 MECH / ELEC 229 HORIZONTAL 960 0.6 (1) 1 25.9 35.8 80 67 55 55 44 56 6.0 500 10 1 0.00001 3.3 55 85 130 20 0.5 500 10 3/4 0.00001 460/3/60 2.55 0.40 DIVISION 23 1
FCU-3-230 MECH / ELEC 230 HORIZONTAL 960 0.6 (1) 1 25.9 35.8 80 67 55 55 44 56 6.0 500 10 1 0.00001 3.3 55 85 130 20 0.5 500 10 3/4 0.00001 460/3/60 2.55 0.40 DIVISION 23 1
FCU-3-233 MECH 233 HORIZONTAL 960 0.6 (1) 1 25.9 35.8 80 67 55 55 44 56 6.0 500 10 1 0.00001 3.3 55 85 130 20 0.5 500 10 3/4 0.00001 460/3/60 2.55 0.40 DIVISION 23 1
FCU-4-231 MECH 231 HORIZONTAL 1230 0.6 (1) 1 33.2 45.9 80 67 55 55 44 56 7.7 500 10 1 1/2 0.00001 4.8 55 85 130 20 0.5 500 10 3/4 0.00001 460/3/60 2.55 1.13 DIVISION 23 1
FCU-5-130 TR 130 HORIZONTAL 930 0.6 (1) 1 20.1 20.7 72 60 52 52 44 56 3.5 500 10 1 0.00001 - - - - - - - - - - 460/3/60 2.08 0.91 DIVISION 23 1
FCU-5-199 TR 199 HORIZONTAL 930 0.6 (1) 1 20.1 20.7 72 60 52 52 44 56 3.5 500 10 1 0.00001 - - - - - - - - - - 460/3/60 2.08 0.91 DIVISION 23 1
FCU-5-220 TR 220 HORIZONTAL 930 0.6 (1) 1 20.1 20.7 72 60 52 52 44 56 3.5 500 10 1 0.00001 - - - - - - - - - - 460/3/60 2.08 0.91 DIVISION 23 1
FCU-6-115 COMP SUPPORT 115 HORIZONTAL 1750 0.6 (1) 1 37.8 39.0 72 60 52 52 44 56 6.5 500 10 1 0.00001 - - - - - - - - - - 460/3/60 3.13 2.5 DIVISION 23 1
FCU-7-101 VEST 101 VERTICAL 570 0.7 - - - - - - - - - - - - 0.00001 10.7 55 85 130 20 1.1 500 10 3/4 0.00001 460/3/60 0.38 0.13 DIVISION 23 1
EXPANSION TANK SCHEDULE
MARK SYSTEM TYPE
TOTAL VOLUME
(GAL)
ACCEPTANCE VOLUME
(GAL)
MAX PRESSURE
(PSI)
MAX TEMP
(°F)
NOTES
ET-1 CHILLED WATER 34.0 14.2 125 93.0
ET-2 HEATING HOT WATER 22.0 10.4 125 130.0
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
1/
/2
D
U C
T C
O N
S T
R U
C T
IO
N
S C
H E
D U
LE
R
E V
IS
E
D 1/
/2
D
U C
T C
O N
S T
R U
C T
IO
N
S C
H E
D U
LE
R
E V
IS
E
D 4/
/2
| Sheets |
| M-602 - MECHANICAL SCHEDULES |
File details come from the government source that posted it. Updated .