This solicitation is for design-bid-build construction services for a new F-35 Training and Simulator Facility at Marine Corps Air Station Cherry Point in North Carolina. The Navy is seeking lump sum pricing for the construction of the new facility, demolition of existing buildings B4038 and B4162, all associated site work, excavation and disposal of unsuitable soils, demolition and disposal of buried debris, and handling of any contaminated soils. Proposals are due on April 9, 2020. The pre-proposal inquiry cutoff is March 30, 2020. The magnitude of construction is estimated between $25-100 million. The NAICS code is 236210 and the small business size standard is $39.5 million. This is an unrestricted solicitation with full and open competition. The wage determination is NC20200065.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-204 F-35 Training and Simulator Facility Work Order Number 1590340 MCAS Cherry Point, North Carolina
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001 Summary
Total Price for CLIN
0001AA
0001AB
0001AC
0001AD
0001AE
0001AF
| CLIN 0001 Total |
| $_________ _ |
CLIN 0001AA. Price for the entire work for Facility F-35 Training and Simulator Facility, complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AB, 0001AC, 0001AD, 0001AE, 0001AF 0002, 0003, 0004, 0005, and 0006.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0001AA |
| 0001AA |
| F-35 Training and Simulator Facility |
| $______ ____ |
CLIN 0001AB. Price for the entire work for demolition of existing facilities B4038 and B4162, in accordance with the drawings and specifications, but excluding work described in CLIN 0001AA, 0001AC, 0001AD, 0001AE, 0001AF 0002, 0003, 0004, 0005, and 0006.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0001AB |
| 0001AB |
| Demolition of existing facilities B4038 and B4162 |
| $______ ____ |
CLIN 0001AC. Price for the entire project Site Work, outside the facility's 5 foot line, complete in accordance with the drawings and specifications but excluding work described in CLIN 0001AA, 0001AC, 0001AD, 0001AE, 00001AF, 0002, 0003, 0004, 0005, and 0006.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR 0001AC |
| 0001AC |
| Site Work |
| $______ ____ |
CLIN 0001AD. Price for undercut and disposal of geotechnically unsuitable subgrade soils and replacement with imported structural fill material within general building and pavement limits, complete, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AD(UNIT PRICE X NO. UNITS |
| 0001AD |
| Undercut of geotechnically unsuitable subgrade soils and replacement with imported structural fill material |
| CY |
| $_____ ____ |
| 19,000 |
| $______ ____ |
CLIN 0001AE Price for demolition, excavation and disposal of buried concrete and debris greater than 1 cubic yard in size, encountered within planned excavation limits and not identified in the Contract Documents, complete, in accordance with the drawings and specifications and in accordance with the following schedule (Note: Pieces of buried concrete and debris encountered within the planned excavation limits smaller than 1 cubic yard in size shall be considered to be incidental to the work.):
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AE(UNIT PRICE X NO. UNITS |
| CLIN 0001AE |
| Demolition, excavation and disposal of buried concrete and debris greater |
| CY |
| $___ ____ |
| 300 |
| $__________ |
CLIN 0001AF. Price for excavation, handling, storage, sampling, analysis and disposal of petroleum contaminated soil (TPH <200 ppm) at a permitted licensed facility, complete, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AF(UNIT PRICE X NO. UNITS |
| 0001AF |
| Excavation, handling, storage, sampling, analysis and disposal of petroleum contaminated soil at a permitted licensed facility |
| TONS |
| $___ ____ |
| 150 |
| $___ ____ |
CLIN 0002 Option Item No. 1 - Price for BID OPTION – B286 DEMOLITION. Price includes the following:
Price for providing all work in connection with B286 DEMOLITION Bid Option not included in Base Bid CLINS in accordance with drawings and specifications.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0002 |
| 0002 |
| Entire work associated with the demolition of B286 |
| $___ ____ |
CLIN 0003 Option Item No. 2 - Price for BID OPTION - Construction of parking lot in Area 3. Price includes the following: Price for providing all work in connection with the Parking Lot - Area 3 Bid Option in location of previously demolished B286.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0004 |
| 0004 |
| Entire work associated with the portion of parking lot - Area 3 in location of previously demolished B286. |
| $___ ____ |
CLIN 0004 Option Item No. 3 - Price for BID OPTION – west parking lot. Price includes the following: Price for providing all work in connection with the Parking Lot Bid Option west of the existing "troop walk" in accordance with drawings and specifications.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0004 |
| 0004 |
| Entire work associated with the portion of the parking lot due west of the existing "troop walk". |
| $___ ____ |
CLIN 0005 BID OPTION Item No. 4 - Price includes the following:
Price for provision, design, installation, testing, and associated training for the Electronic Security System (ESS) equipment necessary for this facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV) complete in accordance with the drawings and specifications. Equipment includes items such as Premise Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video recorders, workstations, and the communication cabling connecting these devices together.
Include the price for supporting, permanent infrastructure under CLIN 0001 - BASE PRICE. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door hardware, mounting hardware, and power connections. Exterior supporting infrastructure includes items such as exterior ductbanks, manholes, utility poles, utility connections, and power connections.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0005 |
| 0005 |
| Electronic Security System (ESS) equipment |
| $__________ |
CLIN 0006 Planned Modification Item 1 - Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| GOVERNMENT FF&E ESTIMATE |
| HAR (NTE 5%) |
| HAR AMOUNT (GOVT FF&E ESTIMATE x HAR%) |
| TOTAL FF&E ESTIMATED AMOUNT FOR CLIN 0005 |
(GOVT FF&E ESTIMATE + HAR AMOUNT)
| 0006 |
| FF&E |
| $959,228.92_ |
| 5% |
| $___________ |
| $_________________ |
CLIN 0007 Planned Modification Item 2 - Price includes the following:
Price for providing work in connection with all labor, material, equipment, transportation and supervision required for the Audio/Visual (A/V) complete in accordance with the plans and specifications and the following schedule:
| CLIN |
| ITEM |
| GOVERNMENT A/V ESTIMATE |
| A/V |
(HAR NTE 5%)
| HAR AMOUNT (GOVT A/V ESTIMATE x HAR%) |
| TOTAL A/V ESTIMATED AMOUNT FOR CLIN 0006 (GOVT A/V ESTIMATE + HAR AMOUNT) |
| 0007 |
| Audio/Visual (A/V) |
| $2,234,676.04__ |
| 5% |
| $____________ |
| $________________ |
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA, 0001AB, 0001AC. For CLINs 0001AD, 0001AE, 0001AF, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. CLIN 0001AD: Geotechnically Unsuitable Subgrade Soil Removal, Disposal, and Replacement: Unit price for all work in connection with the removal, disposal, and replacement of geotechnically unsuitable subgrade soil (i.e. soft subgrade soils) with imported structural backfill or imported aggregate as specified. Unsuitable subgrade soil determinations shall be made by the Government Geotechnical Engineer and approved by the Contracting Officer. The price shall include removal of geotechnically unsuitable soils encountered at the planned footing subgrades or identified during proofrolling of planned subgrades, disposal at the specified disposal facility, and backfilling the excavation with compacted imported structural backfill or imported aggregate. Soils disturbed by the contractor's construction activities, or that are excessively wet and soft due to lack of proper site maintenance and protection measures, and lack of specified drainage or excavation dewatering will not be considered unsuitable. Unit price shall include all handling and transportation. The volume of material removed and imported backfill required shall be neat quantities determined based on field measurements (length x width x depth) of the completed excavation to remove the unsuitable soil as approved by the Contracting Officer. Any work under these CLIN's will not proceed without prior written approval of the Contracting Officer and direction of the Government Geotechnical Engineer.
c. For CLIN 0001AE: Unit price for providing demolition and excavation of buried concrete and debris that is encountered within planned excavation limits and not identified in the Contract Documents for demolition, greater than 1 cubic yard in size. Buried concrete and debris meeting the specified criteria will be field verified by the Contracting Officer prior to removal and will be segregated from the surrounding soil during demolition and excavation operations. Pieces of buried concrete and debris encountered within the planned excavation limits smaller than 1 cubic yard in size shall be considered to be incidental to the work. Unit price shall include all work in connection with buried concrete and debris removal and disposal and replacement with clean imported structural backfill or other material specified. Unit price shall include removal and disposal of buried concrete and debris encountered within planned excavations at a permitted licensed disposal facility and backfilling the excavation with compacted clean imported structural backfill or other material specified. Unit price shall include handling and transportation. The volume of buried concrete and debris removed will be based on approved truck scale measurement and the quantity will be approved by the Contracting Officer. Any work under this CLIN will not proceed without prior written approval and field verification from the Contracting Officer.
d. CLIN 0001AF: Unit price for providing all work in connection with excavation, handling, storage, sampling, analysis and disposal of petroleum contaminated soil (TPH <200 ppm) at a permitted licensed facility. Sampling shall consist of one composite soil sample (obtained by combining and homogenizing a minimum of three smaller samples from representative sampling points) for each 200 loose cubic yards of material. Soil samples shall be analyzed for Total Petroleum Hydrocarbons (TPH) diesel range and gasoline range organics (DRO & GRO), and Benzene, Toluene, Methylbenzene, and Xylenes (BTEX), plus other analytes required by the treatment/disposal facility. Unit price shall include all work in connection with petroleum contaminated soil removal and disposal and replacement with clean imported structural backfill. Unit price shall include removal, treatment, and disposal of petroleum contaminated soils encountered within planned excavations at a permitted licensed treatment/disposal facility and backfilling the excavation with compacted clean imported structural backfill. Unit price shall include handling and transportation. The volume of petroleum contaminated soil removed will be based on approved truck scale measurement and the quantity will be approved by the Contracting Officer. Any work under this CLIN will not proceed without prior written approval and field verification from the Contracting Officer.
e. The Government reserves the unilateral right to award CLIN 0002, 0003, 0004, 0005, and 0006 to the Contractor at the proposed price. A firm fixed proposed price is required for CLIN 0002, 0003, 0004, 0005, and 0006.
f. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
g. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
h. If CLIN 0002, 0003, 0004, and 0005 are exercised, bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
1.3 PLANNED MODIFICATION BID NOTES
These notes apply to Planned Modification CLINs.
a. The estimated amount for FF&E and A/V has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E and A/V including freight and installation charges. The Government FF&E and A/V Estimate is only an estimated amount.
b. If awarded, line items will be funded separately after completion of FF&E and A/V design package review by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in Section 01 30 01.00 20 DESIGN PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES, AND EQUIPMENT.
c. Bonding is not required for the design, procurement and installation of FF&E and A/V equipment.
d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E and A/V not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E and A/V. The proposed HAR is a fixed percentage. The HAR amount will be determined/adjusted as the FF&E and A/V amounts are finalized.
e. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V.
f. If awarded, the FF&E and A/V modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E and A/V as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E and A/V package was submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government's award of the modification is in the last six months of the contract.
g. Adequate time for the installation of FF&E and A/V must be allotted in the Construction Schedule after all other trades have completed their work in the installation areas. The projected installation periods required by the vendors in the FF&E and A/V proposals must be honored in the construction schedule, with additional time allotted for complete FF&E and A/V punch lists, prior to building turnover. Overtime costs for FF&E and A/V installation must not be passed along to the government as part of the Planned Modification costs, unless a compressed schedule has been required/approved by NAVFAC.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document -- Document 00 22 13.00 20 Page 7