Amendment 5 PPI-31_P-204 Soil Guidance Section for NEPA-PAMS.pdf

PDF 53 KB Posted

Attached to
P-204, Design-Bid-Build, F-35 Training and Simulator Facility, Marine Corps Air Station MCAS Cherry Point, North Carolina
Solicitation number
N4008520R0015
Issued by

About this file

This federal solicitation is for design-bid-build services for a P-204 F-35 Training and Simulator Facility at Marine Corps Air Station Cherry Point in North Carolina. The Navy is seeking proposals for the design and construction of the facility, with a construction value between $25-100 million. Proposals are due on April 9, 2020 by 2:00pm EDT and pre-proposal inquiries must be submitted by March 30, 2020 at 5:00pm EDT. The NAICS code for this project is 236210 for industrial building construction. The small business size standard is $39.5 million and this solicitation is unrestricted with full and open competition. The wage determination number is NC20200065.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 8 P204 Drawings-Specs.pdf PDF
Amendment 0008.pdf PDF
Amendment 8 Attachment I -Updated Price Proposal Form_REVISED.pdf PDF
Amendment 0007-Update Proposal Submission.pdf PDF
Amendment 6 Attachment I-REVISED Price Proposal Form.pdf PDF
Amendment 0006.pdf PDF
Amendment 5.pdf PDF
Amendment 0005 PPI Responses.pdf PDF
Amendment 5 M-602.pdf PDF
Amendment 4 B286_Photos.zip ZIP file
Amendment 4 P204 B286 B4038 B4162 Existing FFE List Floor Plans.pdf PDF
Amendment 4 B4038_2of2.zip ZIP file
Amendment 0004.pdf PDF
Amendment 4-B286_As-Built Drawings.pdf PDF
Amendment 4 P204 FF E List for Contractors.xlsx XLSX spreadsheet
Amendment 4 B4038_1of2.zip ZIP file
Amendment 3-Attachment I - Price Proposal Form_REVISED.docx DOCX document
Amendment 3-P-204_Hazardous Survey.pdf PDF
Amendment 3-B4038_As-Built Drawings_01.pdf PDF
Amendment 3-P-204_Site Investigation Report.pdf PDF
Amendment 0003.pdf PDF
Amendment 3-B4038_As-Built Drawings_02.pdf PDF
P-204_Amendment-003.pdf PDF
Amendment 3-B4162_As-Built Drawings.pdf PDF
Amendment 0002 Extend Proposal Due Date.pdf PDF
Amendment 0001 Site Visit Cancelled.pdf PDF
Attachment I - Price Proposal Form.docx DOCX document
Attachment D - Small Business Subcontracting Record.docx DOCX document
Attachment F - Past Performance Questionnaire.docx DOCX document
1596300dwg17of26_Interiors.pdf PDF
Attachment E - Small Business Participation and Commitment Strategy.docx DOCX document
1596300dwg03of26_Civil-C.pdf PDF
1596300dwg24of26_Electrical.pdf PDF
1596300dwg11of26_Civil-CS.pdf PDF
1596300dwg25of26_Telecom-AV.pdf PDF
1596300dwg14of26_Structural.pdf PDF
1596300dwg26of26_Telecom.pdf PDF
Attachment B - SECNAV 5512.pdf PDF
1596300dwg20of26_Mechanical.pdf PDF
1596300spc02of04.pdf PDF
1596300dwg09of26_Civil-CG.pdf PDF
Attachment J - Site Visit Map to B-163.pdf PDF
1596300dwg16of26_Architectural.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
1596300dwg23of26_Electrical.pdf PDF
1596300dwg06of26_Civil-CE.pdf PDF
RFP- P204.pdf PDF
Attachment G - Small Business Subcontracting Plan.docx DOCX document
1596300dwg01of26_General.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Soil Guidance for P-204

The project site is located within OU-14 onboard the Air Station. This site location is in an area of known POL or chemical spills. Pre-characterization or soil sampling is not required prior to excavation. This information is provided to give the contractor's Industrial Hygiene Department to incorporation into their Health and Safety Plan to ensure worker safety.

If any soil which exhibits an abnormal or unnatural color, a chemical or petroleum odor, or is saturated with a chemical or petroleum is encountered during excavation, work should be immediately stopped in that area, and the Environmental Affairs Department (EAD) should be advised of the situation so that a course of action can be developed to address the contamination. No soil sampling or testing is to be conducted for the purpose of determining suspected contamination without consulting MCAS Cherry Point’s Environmental Affairs Department for proper procedure and guidance.

All excavated soil may be re-utilized as backfill at the same location from which it was removed unless petroleum contamination is discovered. If petroleum contamination were discovered, the soil would need to be segregated by PID (>/= 10 ppm or exhibits staining), properly stockpiled, tested, and disposed. If soil is to be stockpiled, then it should be stockpiled on plastic, bermed, and covered in accordance with NC DENR Groundwater Section Guidelines for the Investigation and Remediation of Soil and Groundwater, Vol. 1 dated July 2000 (Guidelines), or placed in a rolloff container and covered with plastic.

For this site located in the OU-14 boundary, any excess soil that cannot be re-utilized as backfill at the same location from which it was removed must be disposed of at a Subtitle D landfill facility at a minimum. Soil testing will be required. EAD must review and sign the waste manifests/bill of lading for the soil disposal prior to any of this soil leaving the Air Station. The manifest should also contain the amount of soil (weight) and supporting laboratory results for EAD to review. One composite sample must be taken and analyzed for each 200 cubic yards of the stockpile per DENR Guidelines in order to determine the proper method for disposal if contamination is detected. If contamination is discovered, the stockpile sample(s) shall be analyzed for the following but not limited to:

Std Method 5030 sample prep with Modified 8015 (CA GC-FID Method) - Gasoline Range Organics, Std Method 5030 and 3550 sample prep with Modified 8015 - Diesel Range Organics, EPA Method 9071 - Oil & Grease with Silica Gel wash

With possible TLCP

All soil materials that are sourced from off Government Property (Off Site Soils) will require analytical review and approval before use by the project. A Request For Off-Site Soil & Soil Authorizing forms can be completed through MCAS-CP EAD for this action.

If any action needed to complete the project, must intrude into the water table for any reason, the EAD must be notified and a health and safety plan for the work must be written for approval by EPA and NC State Environmental officials. Will Potter with MCAS-CP EAD will give guidance for this task. This action can be time consuming, so please let EAD know ASAP.

All disturbed areas must also be capped by either (1) covering the surficial soil with an impervious material such as concrete or asphalt, or (2) topping the excavated area with 12 inches of compacted, clean fill. Capping is required to prevent an increased exposure risk from both surficial exposure and contaminant leaching. Therefore, backfilled soils must be compacted to minimize infiltration of surface water through the soil column.