1596300dwg03of26_Civil-C.pdf
PDF 12 MB Posted
- Solicitation number
- N4008520R0015
About this file
This solicitation is for design-bid-build services for an F-35 Training and Simulator Facility at Marine Corps Air Station Cherry Point in North Carolina. The Navy is seeking proposals by April 9, 2020 for the construction of this facility with an estimated value between $25-100 million. The project will be awarded on an unrestricted basis with full and open competition under NAICS code 236210 and size standard of $39.5 million. Inquiries are due by March 30th and the wage determination is NC20200065 from January 3, 2020.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C I V
L
N
O T
E S
L
E G
E N
D
A
D
A
B B
R E
V I A
T I O
N S
C-001
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
I S
S U
E
F
R
N
S T
R U
C T
I O
N
PIPE LABEL (SIZE, TYPE, ID)
STORM SEWER
BUILDINGS
RIGHT-OF-WAY LINE
PROPERTY LINE
FENCE
CURB AND GUTTER
PEDESTAL
LIGHT POLE /CONCRETE BASE
LIGHT POLE
POWER POLE
GAS METER
ROOF DRAIN
CATCH BASIN
DROP INLET
MONITOR WELL
WELL
FIRE HYDRANT
WATER METER
VALVE
SANITARY CLEANOUT
MANHOLE
WATER
SANITARY SEWER
ELECTRIC & TELEPHONE LINE
TRAFFIC BOX
SIGN
MAIL BOX
TREE
BUSH/HEDGE
CONCRETE
TEMP0RARY BENCHMARK(TBM)
ELEVATIONS
TOP OF CURB
ELEVATIONS
TOP OF WALL
ELEVATIONS
UTILITY
STRUCTURE ID
PIPE LABEL (SIZE, TYPE, ID)
SYMBOL/ABREVIATION DESCRIPTION
GROUND LIGHT
UNKNOWN LINE
1. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A CURRENT TITLE
REPORT AND THEREFORE MAY NOT SHOW ANY/ALL EASEMENTS OR
RESTRICTIONS THAT MAY AFFECT THE PROPERTY AS SHOWN.
2. THIS PROPERTY APPEARS TO FALL IN FLOOD ZONE "X" AS SHOWN ON
PANEL 6432J OF THE FLOOD INSURANCE RATE MAPS FOR THE CITY OF
HAVELOCK, COMMUNITY NO.: 370265, DATED JULY 2, 2004. FLOOD ZONE
INFORMATION SHOWN HEREON IS NOT GUARANTEED AND WAS
APPROXIMATELY SCALED FROM THE FLOOD INSURANCE RATE MAPS FOR
THE CITY/COUNTY INDICATED. MSA, P.C. IS NOT A PARTY IN DETERMINING
THE REQUIREMENTS FOR FLOOD INSURANCE ON THE PROPERTY SHOWN.
FOR FURTHER INFORMATION AND TO CONFIRM THE FLOOD ZONE FOR THIS
PROPERTY, CONTACT THE LOCAL COMMUNITY FLOOD OFFICIAL. FLOOD
ZONE DETERMINATION IS BASED ON THE FLOOD INSURANCE RATE MAPS
AND DOES NOT IMPLY THAT THIS PROPERTY WILL OR WILL NOT BE FREE
FROM FLOODING OR DAMAGE.
3. NORTH MERIDIAN SHOWN HEREON IS BASED ON NORTH CAROLINA STATE
PLANE COORDINATE SYSTEM, NAD83, AS REFERENCED FROM MCAS
CHERRY POINT SURVEY CONTROL POINT(S) "12-93 HOR". COORDINATE
VALUES SHOWN ARE EXPRESSED IN U.S. SURVEY FEET.
4. ELEVATIONS SHOWN HEREON BASED ON NAVD88 AND WERE ESTABLISHED
FROM MCAS CHERRY POINT VERTICAL CONTROL STATION "12-93 HOR",
ELEVATION=21.68.
5. THIS SURVEY DOES NOT ADDRESS THE EXISTENCE OR NONEXISTENCE OF
WETLANDS, ENVIRONMENTAL HAZARDS, CEMETERIES OR ANY
UNDERGROUND STRUCTURE NOT OBSERVED DURING THE COURSE OF THE
SURVEY.
6. LOCATION OF UNDERGROUND NON-GRAVITY UTILITIES SHOWN ON THIS
SURVEY ARE BASED ON SURFACE INDICATIONS OF SUBTERRANEAN USE
AND PAINT MARKINGS FIELD LOCATED BY MSA, P.C. AS PAINTED BY
CLARION SERVICES, LLC. THIS SURVEY DOES NOT GUARANTEE THE
EXISTENCE OR NONEXISTENCE OF UNDERGROUND UTILITIES.
7. THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE DIRECT AND
RESPONSIBLE CHARGE OF GREGORY M. ZOBY, L.S. (LIC. NO. 2991) FROM AN
ACTUAL GROUND/AIRBORNE SURVEY MADE UNDER MY SUPERVISION; THAT
THE IMAGERY AND/OR ORIGINAL DATA WAS OBTAINED ON JANUARY 16,
2018; AND THAT THIS PLAT, MAP OR DIGITAL GEOSPATIAL DATA INCLUDING
METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE
NOTED.
1. ALL WORK IS SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF
GOVERNMENT REGULATORY AGENCIES AND THE CONTRACTING
OFFICER.
2. OBTAIN ALL NECESSARY PERMITS AND LICENSES REQUIRED BY THE
STATE OF NORTH CAROLINA OR OTHER GOVERNMENT REGULATORY
AGENCIES INVOLVED UNDER THIS CONTRACT.
3. CONDUCT ALL WORK IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS AND GOVERNMENT CODES, ORDINANCES, AND
REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY
BETWEEN REQUIREMENTS, INCORPORATE WHICHEVER IS MOST
STRINGENT. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT
IS MOST STRINGENT, SUBMIT ISSUE TO THE CONTRACTING OFFICER IN
WRITING. THE DECISION OF THE CONTRACTING OFFICER IS
CONSIDERED FINAL.
4. DO NOT COMMENCE SITE WORK (GRADING, EXCAVATING, AND
CONSTRUCTION) ON THE PROJECT UNTIL THE APPROPRIATE EROSION
AND SEDIMENT CONTROL MEASURES ARE IN PLACE AS SPECIFIED ON
THESE PLANS.
5. VERIFY LIMITS OF WORK IN THE FIELD WITH THE CONTRACTING
OFFICER PRIOR TO BEGINNING WORK.
6. MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES THROUGH THE
DURATION OF THE PROJECT. SUBMIT CONSTRUCTION RECORD
DRAWINGS TO THE CONTRACTING OFFICER.
7. DURING CONSTRUCTION OF THE PROJECT, TRACK ANY CONTRACTING
OFFICER-APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN
DEPICTED ON APPROVED CONSTRUCTION DRAWINGS. USE THESE
REVISIONS TO PREPARE RECORD DRAWINGS OF COMPLETED
CONSTRUCTION.
8. NOTE ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND
CONFIGURATIONS, AND ANY OTHER CHANGES OR DEVIATIONS FROM
THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED
CONSTRUCTION DRAWINGS. THIS INCLUDES BURIED OR CONCEALED
CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED
DURING CONSTRUCTION.
AC ASPHALT CONCRETE, AIR CONDITIONER
AASHTO AMERICAN ASSOCIATION OF STATE
HIGHWAY AND TRANSPORTATION OFFICIALS
ABC AGGREGATE BASE COURSE
APPROX APPROXIMATE
AT/FP ANTI TERRORISM/FORCE PROTECTION
BEQ BACHELOR ENLISTED QUARTERS
BM BENCHMARK
BLDG BUILDING
CC CENTER TO CENTER
C/L CENTERLINE
CI CAST IRON, CURB INLET
CO CLEANOUT
COR CONTRACTING OFFICER REPRESENTATIVE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CTRS CENTERS
DB DUCTBANK
DI DROP INLET, DUCTILE IRON
DIA DIAMETER
DIP DUCTILE IRON PIPE
DP DRY DETENTION POND
Ø DIAMETER
E EASTING
EL ELEVATION
ELEV ELEVATION
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPNL ELECTRICAL PANEL
EQ EQUAL
EW EACH WAY
FES FLARED END SECTION
FFE FINISHED FLOOR ELEVATION
GEN GENERATOR
GOV GOVERNMENT OWNED VEHICLE
HDPE HIGH DENSITY POLYETHYLENE
HORIZ HORIZONTAL
ID INSIDE DIAMETER
INV INVERT
KSI KIPS PER SQUARE INCH
LB POUNDS
LOC LIMITS OF CONSTRUCTION
LP LIGHT POLE
MAG MAGNETIC
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MJ MECHANICAL JOINT
MUTCD MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES
N NORTHING
NCDOT NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION
NLD NAIL AND DISC
NTS NOT TO SCALE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
OC ON CENTER
OD OUTSIDE DIAMETER
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
PAVT PAVEMENT
PCC PORTLAND CEMENT CONCRETE
PIV POST INDICATOR VALVE
POV PRIVATELY OWNED VEHICLE
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
R, RAD RADIUS
RD ROOF DRAIN
RCP REINFORCED CONCRETE PIPE
REQ'D REQUIRED
SF SQUARE FEET
SQ SQUARE
STA STATION
STD STANDARD
T/W TAXIWAY
T&B TOP AND BOTTOM
TPED TELEPHONE PEDESTAL
TRAV TRAVERSE
TYP TYPICAL
UNO UNLESS OTHERWISE NOTED
VERT VERTICAL
W/ WITH
WWF WELDED WIRE FABRIC
WV WATER VALVE
BUILDING
SEWER MANHOLE
CONCRETE PAVEMENT
BOLLARD
SIGN
DOMESTIC WATER LINE
SANITARY SEWER LINE
NATURAL GAS LINE
ROOF DRAIN LEADER
FIRE HYDRANT
WATER VALVE
POST INDICATOR VALVE
LOC
SEWER CLEANOUT
NATURAL GAS METER
DRAIN BASIN
HEADWALL/ENDWALL
M
CO
S
PIPE FLOW ARROW
PROPOSED CONTOUR
SLOPE ARROW
SPOT ELEVATION
0.5%
LIMITS OF CONSTRUCTION/DISTURBANCE
UNDERGROUND TELECOM LINE
COMMUNICATIONS MANHOLE
C
STORM DRAIN MANHOLE
ROOF DRAIN
RD
CONCRETE HEADER CURB
D
CIVIL ABBREVIATIONS
GENERAL CIVIL NOTES
CIVIL LEGENDSURVEY NOTESSURVEY LEGEND
LIGHT DUTY ASPHALT PAVEMENT
NUMBER OF PARKING SPACES9
CONCRETE CURB AND GUTTER
HEAVY DUTY ASPHALT PAVEMENT
FIRE WATER LINE
LIMITS OF SURVEY
LOS
W
FP
SS
G
ST
COMM
CONCRETE SWALE
SIDEWALK
STORM SEWER LINE
DEMOLISH AND REMOVE ASPHALT PAVEMENT
DEMOLISH AND REMOVE BUILDING AND
FOUNDATIONS
DEMOLISH AND REMOVE CONCRETE
SIDEWALK
DEMOLISH AND REMOVE GRAVEL SURFACE
COURSE
DEMOLISH AND REMOVE LINEAR SITE
FEATURE/UTILTY
DEMOLISH AND REMOVE SITE FEATURE
DEMOLISH AND REMOVE CONCRETE
PAVEMENT
ABANDON IN PLACE UTILITY
P-235 WATER LINE
P-235 FIRE PROTECTION LINE
P-235 STEAM LINE
E
TELECOM LINECOMM
UK
G NATURAL GAS LINE
FP
XX
W
SS
W
EXISTING CONTOUR
UNDERGROUND ELECTRIC LINE
E
P-235 SANITARY SEWER LINESS
LIGHT POLE
P-235 ELECTRIC LINEE
P-235 TELECOM LINECOMM
LOS LIMITS OF SURVEY
12803938
MILL AND OVERLAY
MILL AND OVERLAY
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
DONALD ELLIOT
(BY EMAIL 08JAN2020)
X
I S
T I N
G
S
T O
M
A
S
N
I T
A R
Y
S
E W
E R
S T
R U
C T
U R
E
T
A B
L E
S
C-002
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
I S
S U
N
S T
R U
C T
I O
N
12803939
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
LOCLOC
O C
LOC
L O
C LOC LOC LOC
L O C
L O C
L O C
LOC
L O S
LOSLOS
L O S
L O S
LOS LOS LOS
LOS
L O S
LOS
L O S
G G
G G
DN
TR
MECH
DMRT
MATSS MISSION PLANNING
COMMAND CTR & OBSERV
CORR
NECC ADMIN
SHIPPING / RECEIVING / SUPPLY
CONFERENCE
FMS REPAIR SHOP / MAINT STOR
MECH / ELEC
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
CORR
MANTRAP
ISEO
ISEO
ISEO
WHITE CELL EVAL
MECH
ELEC
ELEC
ISE LAB
ISEO
CORR
CBT
AUDIOVISUAL
MANTRAP
MENS
WOMENS
BREAK
MENS
WOMENS
PSO SEC CONF
APSO / GSSO
PSO SERVER
PSO
PATCH PANEL
JANITOR
TR
LOBBY
MATSS TRAINING
CORR
MENS
WOMENS
JAN
227MOTHER'S RM
BREAK
RECEPTION
TLT
SEC OFFICE
SEC BADGE
SEC MGR
CORR
ISEO
ISEO
VEST
SEC SUPPLY / EQUIP
STO
TR
REPRO
EVAL / PROGRAM / MATSS SUPPORT
209MATSS CONFERENCE
JPO
MATSS
MATSS
MATSS
MATSS
SITCC /
JMPS
COMMANDER
TRAINING OPS MGR
CONTRACT PILOT INST MGR
LM
MATSS TRAINING
CORR
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
MECH / ELEC
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
MECH / ELEC
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
CORR
CORR
CORR
CORR
CORR
CORR
LOCKER
LOCKER
CONFERENCE
COMP SUPPORT
IAM / ISSO
FIRE PUMP
SIM / HELMET PAD STOR
ELEC
7 714
6TH AVENUE
R
O
O
S
E
V
E
T
V
D
C
S
T
6TH AVENUE TO BE CLOSED
THROUGHOUT DURATION OF
PROJECT CONSTRUCTION
CONTRACTOR
STAGING AND
LAYDOWN AREA
L
S
L
O
C
U
G
T
E
CONTRACTOR
STAGING AND
LAYDOWN AREA
CONTRACTOR HAUL ROUTE
PROJECT P-235
PROPOSED 5TH
AVENUE EXTENSION
5TH AVENUE
CONTRACTOR
STAGING AND
LAYDOWN AREA
CONTRACTOR HAUL ROUTE
4TH AVENUE
E
S
T
BID OPTIONS
BUILDING 286 DEMOLITION,
PARKING AT BUILDING 286 SITE
S I T
E
A
C C
E S
F
E T
Y
P
L A
N
C-003
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SITE ACCESS & SAFETY PLAN
SCALE: 1" = 300'
PLAN
NORTH
I S
S U
N
S T
R U
C T
I O
N
A1
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET C-007 FOR SITE ACCESS AND SAFETY NOTES.
3. CONTRACTOR MUST COORDINATE WITH BASE CONSTRUCTION OFFICE AND
RECEIVE APPROVAL OF STAGING, LAYDOWN AREA, AND HAUL ROUTES PRIOR
TO CONSTRUCTION.
GENERAL NOTES
SCALE IN FEET
300' 600'
12803940
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
LOC
O
CLOC
L O C
L O C
L O C
L O C
L O C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC LOC
LOC
LOC LOC LOC LOC LOC LOC
LOC
LOC LOC LOC
L O C
LOC LOC LOC LOC
L O C
L O
C LOC
LOCLOC
L O C
L O C
L O C
L O C
L O C
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOSLOSLOSLOSLOS
LOSLOS
LOSLOS
LOS
LOSLOSLOSLOS
LOS
LOSLOSLOSLOS
LOS
LOS
LOS
LOS
LOS
LOS LOS LOS LOS LOS
LOS
LOS LOS
LOS
LOS
LOS
LOS
LOS
LO
S
XX XX XX XX XX XX XX XX XX XX XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XX
X X
X X
X X
X X
X X
X X
XX XX XX XX
X X
X X
XX
F-35 TRAINING AND SIMULATOR FACILITY
T R
A F
F
N
T R
P
H A
S I N
G
P
L A
N
A
R E
A
C-004
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
TRAFFIC CONTROL & PHASING PLAN - AREA 1
SCALE IN FEET
30' 60'
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET C-007 FOR SITE ACCESS AND SAFETY NOTES.
3. CONTRACTOR MUST SUBMIT CONSTRUCTION TRAFFIC CONTROL PLANS FOR
APPROVAL TO COR PRIOR TO ROADWAY CLOSURES. COR WILL BE
ESTABLISHED AT PRECONSTRUCTION KICKOFF MEETING.
4. ALL CONSTRUCTION BARRICADES, SIGNAGE, AND SPACING MUST MEET
MUTCD REQUIREMENTS.
5. TEMPORARY CONSTRUCTION FENCE TYPE 1 MUST BE USED ON PAVED
AREAS, SEE DETAIL B1, SHEET C-501.
6. AT LEAST ONE LANE OF 5TH AVENUE MUST REMAIN OPEN AT ALL TIMES.
GENERAL NOTES
WORK NOTES
KEY PLAN
PLAN
NORTH
A1
PLAN
NORTH
I S
S U
N
S T
R U
C T
I O
N
C-005 C-004
C-006
1. TEMPORARY CONSTRUCTION FENCE
2. TEMPORARY LANE CLOSURE
3. TEMPORARY DOUBLE SWING GATE
4. CONTRACTOR MUST MAINTAIN ACCESS TO BUILDING 4221 AT ALL
TIMES
5. D STREET MUST NOT BE DEMOLISHED UNTIL PROPOSED
DRIVEWAY IN AREA 2 HAS BEEN COMPLETED AND APPROVED BY
COR
C1
C-501
A1
C-501
C2
C-501
M A
T C
H
L
I N
E
S
E
12803941
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
XXXXX
X
X
X X
LOC
LOCLOC
L O C
LOC
L O C
L O C
L O C
L O C
L O C
L O C
LOCLOCLOCLOCLOC
LOCLOCLOCLOC
L O C
L O C
L O C
L O C
L O C
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOSLOSLOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOSLOS
LOSLOSLOS
LOSLOSLOS
L O S
L O S
L O S
L O S
L O S
LO
S
LOS
LOS LOS LOS LOS
LOS LOS
LOS
LOS
LOS
XXXXXXXXXXXX
XXXX
X X
X X
X X
X X
X X
XX XX XX XX
X X
XX XX XX XX XX XX
EXISTING GRAVEL DRIVE
T R
A F
F
N
T R
A
S I N
G
P
L A
N
A
R E
A
C-005
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
TRAFFIC CONTROL & PHASING PLAN - AREA 2
SCALE IN FEET
30' 60'
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET C-007 FOR SITE ACCESS AND SAFETY NOTES.
3. ALL CONSTRUCTION BARRICADES, SIGNAGE, AND SPACING MUST MEET
MUTCD REQUIREMENTS.
4. TEMPORARY CONSTRUCTION FENCE TYPE 1 MUST BE USED ON PAVED
AREAS, SEE DETAIL B1, SHEET C-501.
GENERAL NOTES
WORK NOTES
KEY PLAN
PLAN
NORTH
A1
PLAN
NORTH
I S
S U
N
S T
R U
C T
I O
N
1. TEMPORARY CONSTRUCTION FENCE
2. TEMPORARY DOUBLE SWING GATE
3. CONTRACTOR MUST CONSTRUCT ACCESS ROAD PRIOR TO
EXISTING PAVEMENT DEMOLITION IN AREA 2
4. CONTRACTOR MUST MAINTAIN GRAVEL ACCESS DRIVE
THROUGHOUT CONSTRUCTION
5. DRIVEWAY MUST BE COMPLETE AND APPROVED PRIOR TO D
STREET AND GRAVEL DRIVE DEMOLITION
C1
C-501
C-005 C-004
C-006
C2
C-501
M A
T C
H
L
I N
E
S
E
12803942
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
C
L O C
LOC
LOC
L O C
LOC
LOC
L O C
L O C
L O C
L O C
L O C
LOC L
O C
L O C
LOC
L O C
LOC LOC LOC LOC
L O C
L O C
L O C
L O C
L O C
L O C
L O C
LOC
LOC
L O C
L O C
L O C
LOC
L O C
L O C
LOCLOCLOCLOCLOCLOC
LOCLOC
LOC
LOS LOS LOS LOS LOS LOS LOS LOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LO
S
XX XX XX
X X
X X
X X
X X
X X
X X
X X
XX
X X
X X
X X
X X
X X
XXXXXXXXXXXXXX
XX
X X
XXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
T R
A F
F
N
T R
A
S I N
G
P
L A
N
A
R E
T
I O
N
C-006
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
TRAFFIC CONTROL & PHASING PLAN - AREA 3 BID OPTION
SCALE IN FEET
30' 60'
GENERAL NOTES
WORK NOTES
KEY PLAN
PLAN
NORTH
A1
PLAN
NORTH
I S
S U
N
S T
R U
C T
I O
N
1. TEMPORARY CONSTRUCTION FENCE
2. TEMPORARY DOUBLE SWING GATE
C1
C-501
C-005 C-004
C-006
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET C-007 FOR SITE ACCESS AND SAFETY NOTES.
3. ALL CONSTRUCTION BARRICADES, SIGNAGE, AND SPACING MUST MEET
MUTCD REQUIREMENTS.
4. TEMPORARY CONSTRUCTION FENCE TYPE 1 MUST BE USED ON PAVED
AREAS, SEE DETAIL B1, SHEET C-501.
C2
C-501
12803943
ALL WORK THIS SHEET IS A BID OPTION
BUILDING 286 DEMOLITION
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
T
E
A
C C
E S
S
A
F
E T
Y
N
O T
E S
C-007
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
I S
S U
N
S T
R U
C T
I O
N
I. CONTRACTOR ACCESS AND STAGING
1. CONTRACTOR WILL UTILIZE THE SLOCUM GATE TO 6TH AVENUE AS AN
ACCESS AND HAUL ROUTE FOR ALL CONTRACTOR PERSONNEL,
VEHICLES, EQUIPMENT, AND DELIVERIES. ACCESS ROUTES AND HAUL
ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE
CONTRACTING OFFICER AND MAY CHANGE BASED ON OPERATIONAL
REQUIREMENTS OF THE PROJECT SITE.
2. CONTRACTOR MUST COORDINATE ACTIVITIES AND MAINTAIN ALL
ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS
UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS,
AIRFIELD, AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO
EMERGENCY AND SECURITY VEHICLE RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO
CONSTRUCTION ACTIVITIES, CONTRACTOR MUST NOTIFY THE
CONTRACTING OFFICER, POLICE, LOCAL FIRE AUTHORITY, AND ALL
OTHER EMERGENCY SERVICES OF THE CLOSURE.
4. CONTRACTOR MUST MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE
FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY
BASIS. ALL DEBRIS HAULING TRUCKS MUST FULLY COVER LOADS WHEN
HAULING MATERIALS FROM THE SITE.
5. CONTRACTOR MUST RESTRICT ALL OPERATIONS TO AREAS WITHIN THE
CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE WITH THE
CONTRACTING OFFICER.
6. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND
STOCKPILE AREA FOR MATERIALS AND EQUIPMENT. LOCATIONS OF
CONTRACTOR'S STAGING AREAS ARE SHOWN ON SHEET C-003.
CONTRACTOR MUST CONTACT THE MCAS CHERRY POINT REAL ESTATE
DEPARTMENT TO OBTAIN SITE APPROVAL FOR THESE OR OTHER
AREAS. CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE
DIRECTION OF THE CONTRACTING OFFICER AND MAY CHANGE BASED
ON OPERATIONAL REQUIREMENTS OF THE PROJECT SITE AND
AIRFIELD.
7. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S
EQUIPMENT AND VEHICLES MUST BE PARKED IN THE STAGING AREA.
8. CONTRACTOR MUST PROVIDE AND INSTALL AT THE CONSTRUCTION
ENTRANCE A PROFESSIONALLY PAINTED SIGN, MEETING CONTRACTING
OFFICER APPROVAL, TO DIRECT MATERIAL
SUPPLIERS, EMPLOYEES, AND DELIVERIES TO THE CONSTRUCTION
SITE. THE SIGN MUST READ “CONSTRUCTION VEHICLES ONLY - NO
VENDORS ALLOWED.”
9. CONTRACTOR MUST PROVIDE (TO THE CONTRACTING OFFICER) A
MINIMUM NOTICE OF 48 HOURS PRIOR TO CONSTRUCTION DELIVERIES
TO THE BASE. DELIVERIES MUST BE SCHEDULED MONDAY-FRIDAY, 8:00
AM TO 3:00 PM.
10. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO
SEARCH BY SECURITY WHEN ENTERING THE BASE AND MAY
EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A CURRENT AND
VALID PHOTO IDENTIFICATION PER BASE SECURITY REQUIREMENTS,
AND ALL VEHICLES MUST HAVE CURRENT AND VALID REGISTRATION
AND INSURANCE.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL MUST BE RESPONSIBLE
FOR COORDINATING WITH THE BASE SECURITY OFFICE IN OBTAINING
PROPER SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING
THE BASE AND ALL SECURE AREAS.
12. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER
AREAS DISTURBED BY THE CONTRACTOR MUST BE RESTORED TO
THEIR ORIGINAL CONDITION OR BETTER TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
13. EXISTING CONDITIONS OF ALL ROADWAYS ALONG THE CONTRACTOR
HAUL ROUTE MUST BE DOCUMENTED BY PHOTOS OR VIDEO PRIOR TO
THE START OF WORK TO ENSURE ROAD IS RESTORED TO
PRE-CONSTRUCTION CONDITIONS FOLLOWING COMPLETION OF THE
PROJECT.
II. COORDINATION AND COMMUNICATION
1. CONTRACTOR MUST PROVIDE AN OPERATIONS PLAN FOR APPROVAL
BY THE CONTRACTING OFFICER THAT INDICATES MEASURES FOR
MAINTENANCE OF TRAFFIC ON ROADS AS WELL AS POTENTIAL OR
PLANNED DISRUPTIONS OF BASE OPERATIONS.
2. CONTRACTOR MUST APPOINT A PRIMARY CONSTRUCTION
SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE CONTRACTING
OFFICER, WHO MUST BE PRESENT ON THE CONSTRUCTION SITE AT ALL
TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE
WORK IS IN PROGRESS. THE PRIMARY CONSTRUCTION
SUPERINTENDENT WILL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO MUST BE AVAILABLE ON A
24-HOUR BASIS. WHEN THE CONTRACTOR'S PRIMARY CONSTRUCTION
REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN
ALTERNATE REPRESENTATIVE MUST BE PROVIDED. CONTRACTOR
MUST PROVIDE NAMES AND CONTACT INFORMATION OF
REPRESENTATIVES TO THE CONTRACTING OFFICER PRIOR TO THE
START OF CONSTRUCTION ACTIVITIES.
3. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING CONSTANT
COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE
CONTRACTING OFFICER. ALL CONSTRUCTION ACTIVITIES PLANNED BY
THE CONTRACTOR MUST BE REVIEWED AND APPROVED BY THE
CONTRACTING OFFICER.
III. TRAFFIC CONTROL
1. CONTRACTOR MUST PROVIDE A MINIMUM NOTICE OF ONE (1) WEEK TO
BASE AND THE CONTRACTING OFFICER FOR ROAD CLOSURE PRIOR TO
THE ROAD REQUIRING CLOSURE. THE CONTRACTOR MUST PROVIDE
BARRICADES, LIGHTS, SIGNAGE AND OTHER PROTECTIVE DEVICES IN
ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD).
2. PRIOR TO CONSTRUCTION, CONTRACTOR MUST CORDON OFF THE
CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS BY USING
BARRICADES APPROVED BY THE CONTRACTING OFFICER.
3. ALL CONSTRUCTION EQUIPMENT AND VEHICLES MUST BE MARKED
WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH
ARE CLEARLY VISIBLE. CONTRACTOR MUST PROVIDE EACH VEHICLE
WITH A FLAG ATTACHED TO THE VEHICLE WHICH SHOULD BE AT LEAST
3 FEET SQUARE HAVING INTERNATIONAL ORANGE AND WHITE
CHECKERED PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
4. ONLY RUBBER-TIRE VEHICLES ARE ALLOWED ON EXISTING PAVEMENT
TO REMAIN.
5. PEDESTRIAN TRAFFIC WILL ONLY BE PERMITTED TO ACCESS EXISTING
FACILITIES WITHIN THE CONSTRUCTION LIMITS. PROVIDE DESIGNATED
PEDESTRIAN ACCESS ROUTES TO EXISTING FACILITIES DURING
CONSTRUCTION.
6. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL
DEVICES, THE CONTRACTOR MUST REQUEST THE CONTRACTING
OFFICER TO SCHEDULE AN INSPECTION. NO ROADWAY CAN BE
RE-OPENED UNTIL THE CONTRACTING OFFICER HAS COMPLETED
INSPECTION AND APPROVED IN WRITING THE RE-OPENING OF ACTIVE
AREAS.
7. ANY DAMAGE TO ROADS AND PAVEMENTS TO REMAIN DUE TO
CONSTRUCTION EQUIPMENT OR TRAFFIC MUST BE REPAIRED TO
RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL CONDITION
TO THE SATISFACTION OF THE CONTRACTING OFFICER.
IV. EQUIPMENT AND STOCKPILE HEIGHT
1. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT
OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY
FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR AC
150/5370-2E AND AC 150/5300-13 (CURRENT EDITIONS). WHEN
EQUIPMENT IS EXPECTED TO PENETRATE THE AIRFIELD APPROACH
SURFACES OR WHEN CRANES ARE USED ON-SITE, CONTRACTOR MUST
SUBMIT AN FAA FORM 7460-1 TO THE REGIONAL OFFICE A MINIMUM OF
90 DAYS IN ADVANCE. PERMISSION TO USE CRANES MUST BE ISSUED
BY BASE OPERATIONS AND THE CONTRACTING OFFICER AFTER
APPROVAL BY THE FAA.
2. DURING PERIODS OF LOW VISIBILITY, VEHICLES AND EQUIPMENT MUST
BE IDENTIFIED BY AN APPROPRIATELY SIZED FLASHING OR STEADY
BURNING AMBER BEACON MOUNTED ON THE UPPER MOST PART OF
THE VEHICLE OR EQUIPMENT SUCH THAT IT IS CONSPICUOUS FROM
ANY DIRECTION INCLUDING FROM THE AIR.
3. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES MUST HAVE
BOOMS OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
4. CONTRACTOR MUST NOT STOCKPILE CONSTRUCTION MATERIALS,
SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD
PENETRATE AVIATION SURFACES. ALL STOCKPILES ADJACENT TO
AIRCRAFT OPERATIONS AREA MUST BE IDENTIFIED WITH A 360-DEGREE
RED OBSTRUCTION LIGHT PLACED AT THE HIGHEST POINT OF THE
STOCKPILE. STOCKPILING OF MATERIAL WITHIN THE AIRFIELD SAFETY
AREAS IS PROHIBITED.
V. EXCAVATION AND TRENCHES
1. ALL EXCAVATION, TRENCHING, SHEETING, SHORING, AND BRACING
MUST BE PROVIDED AS REQUIRED IN ACCORDANCE WITH LOCAL,
STATE, AND FEDERAL REGULATIONS, INCLUDING OSHA (29 CFR 1926)
AND EM 385-1-1 (USCE SAFETY MANUAL) AND THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (MUTCD).
2. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE
MUST BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH
FLASHING RED LIGHTS ACCEPTABLE TO THE CONTRACTING OFFICER.
3. CONTRACTOR MUST PROVIDE A MINIMUM NOTICE OF 15 DAYS TO THE
CONTRACTING OFFICER AND ASSOCIATED UTILITY COMPANIES BEFORE
PROCEEDING WITH ANY EXCAVATION OR CONNECTION TO AN EXISTING
UTILITY SYSTEM. CONTRACTOR MUST OBTAIN A DIG PERMIT FROM THE
CONTRACTING OFFICER PRIOR TO ANY EXCAVATION ACTIVITIES.
4. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS IS
REQUIRED. THE CONTRACTOR MUST SUBMIT A DEWATERING PLAN
FOR CONTRACTING OFFICER APPROVAL AT NO ADDITIONAL COST TO
THE GOVERNMENT.
5. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND
READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER THE
MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND
COMPACT TRENCHES AS SPECIFIED. ALL TRENCHING ACTIVITIES MUST
TAKE PLACE IN ACCORDANCE WITH THE APPROVED EROSION AND
SEDIMENT CONTROL NOTES ON SHEET CE001.
6. A MAXIMUM OF 100 LINEAR FEET OF EXCAVATED TRENCH MAY BE OPEN
AT ANY TIME DURING CONSTRUCTION.
7. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS,
INCLUDING PROVIDING SHORING AND PIPE SUPPORTS, TO PROTECT
ALL EXPOSED PIPING WITHIN TRENCH EXCAVATIONS. ANY DAMAGE
INCURRED MUST BE REPAIRED IMMEDIATELY BY THE CONTRACTOR AT
NO ADDITIONAL COST TO THE PROJECT AND TO THE SATISFACTION OF
ORPHAN AND/OR COR.
VI. ENVIRONMENTAL REQUIREMENTS
1. THE PROJECT IS LOCATED WITHIN THE DEFINED LIMITS OF OPERABLE
UNIT 14. THIS OPERABLE UNIT HAS A RECORD OF DETERMINATION
(ROD) THAT REQUIRE CERTAIN REPORTING ACTIONS BE COMPLETED IN
ORDER TO BE IN COMPLIANCE WITH THE ROD. NO DEWATERING
ACTIVITIES CAN OCCUR IN THESE AREAS WITHOUT PRIOR WRITTEN
APPROVAL. SUCH WRITTEN APPROVAL FOR THIS PROJECT MUST BE
OBTAINED THROUGH AND BY THE CHERRY POINT ENVIRONMENTAL
AFFAIRS DEPARTMENT (EAD). THE CONTRACTOR MUST ALLOW A
MINIMUM OF 60 DAYS TO OBTAIN THIS WRITTEN APPROVAL AND MUST
PROVIDE AMPLE NOTIFICATION TO THE CONTRACTING OFFICER TO
ALLOW FOR THE 60 DAY PERMITTING PERIOD AND PROJECT WORK TO
OCCUR WITHIN THE CONTRACT PERFORMANCE PERIOD.
2. MONITORING WELLS EXIST IN THE AREA OF WORK. ALL MONITORING
WELLS MUST BE PROTECTED FROM DEMOLITION ACTIVITES BY THE
CONTRACTOR. ALL DAMAGE MUST BE REPAIRED BY THE CONTRACTOR
AT HIS OWN EXPENSE. REPORT ANY DAMAGE TO THE CONTRACTING
OFFICER IMMEDIATELY. IF ANY MONITORING WELLS MUST BE
RELOCATED, CONTACT CHERRY POINT EAD FOR RELOCATION
PROCEDURES AND TO DETERMINE NEW LOCATION. RELOCATION OF
ANY MONITORING WELLS MUST BE AT THE CONTRACTOR'S EXPENSE.
3. SEE SHEET C-008 FOR ENVIRONMENTAL AND SITE CONTAMINATION
NOTES. SEE SHEETS C-010 TO C-016 FOR SITE CONTAMINATION
REFERENCE DRAWINGS.
VII. EXISTING FACILITIES ACCESS AND SECURITY
1. MAINTAIN PEDESTRIAN ACCESS TO ALL EXISTING FACILITIES TO REMAIN
AT ALL TIMES DURING CONSTRUCTION.
VIII. OTHER ACCESS AND SAFETY REQUIREMENTS
1. CONTRACTOR MUST MAINTAIN SAFETY PRACTICES THAT CONFORM TO
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR SECURING ALL MATERIALS AND
EQUIPMENT NECESSARY TO COMPLETE THE PROJECT.
3. STOCKPILED MATERIAL MUST BE CONSTRAINED IN A MANNER TO
PREVENT MOVEMENT RESULTING FROM WIND CONDITIONS.
4. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM
CONSTRUCTION PERSONNEL AND ACTIVITIES MUST BE REMOVED FROM
THE PROJECT LIMITS.
5. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING
FROM CONTRACTOR'S OPERATIONS MUST BE PROPERLY DISPOSED OF
IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY
REQUIREMENTS AND PROPERLY REMOVED FROM THE PROJECT SITE.
IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED
DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR MUST
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
6. IF CONSTRUCTION REQUIRES THE DISRUPTION OR DISCONNECTION OF
ANY WATER LINES OR FIRE HYDRANTS ON PROJECT PROPERTY OR
ADJOINING PROPERTY, THE CONTRACTOR MUST PROVIDE A MINIMUM
ADVANCE NOTICE OF 15 DAYS TO CHERRY POINT FIRE AND
EMERGENCY SERVICES.
7. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE CLIENT
REPRESENTATIVE SAFETY REQUIREMENTS WILL RESULT IN THE
SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY
CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
8. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH BASE
SAFETY AND OPERATIONS MUST IMMEDIATELY BE REMOVED FROM THE
WORK AREA AND MUST NOT BE PERMITTED TO RETURN THROUGHOUT
THE REMAINDER OF THE PROJECT.
9. ALL HOT WORK REQUIRES APPROVAL OF CHERRY POINT FIRE AND
EMERGENCY SERVICES. THE CONTRACTOR MUST OBTAIN A PERMIT ON
A WEEKLY BASIS. A MINIMUM COOLDOWN TIME OF 120 MINUTES MUST
BE OBSERVED FOLLOWING ALL HOT WORK.
10. CONTRACTOR IS SUBJECT TO ALL BASE CLOSURES INCLUDING
FEDERAL HOLIDAYS, NATURAL DISASTER CLOSURES, AND NATIONAL
SECURITY CLOSURES.
11. ALL SPILLS OF ENVIRONMENTALLY HARMFUL MATERIAL MUST BE
REPORTED TO CHERRY POINT EAD IMMEDIATELY. CLEANUP OF ALL
SPILLS MUST BE PERFORMED IN ACCORDANCE WITH EAD AND STATE
REQUIREMENTS.
SITE ACCESS AND SAFETY NOTES
12803944
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
V I R
O N
M E
N T
N
T A
M I N
A T
I O
N
N
O T
E S
C-008
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
I S
S U
N
S T
R U
C T
I O
N
ENVIRONMENTAL AND SITE
CONTAMINATION NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING EROSION AND
SEDIMENTATION CONTROL MEASURES IN ACCORDANCE WITH THE
PLANS APPROVED BY NCDEQ.
2. BORROW SITE:
2.a. SOIL CAN NOT BE REMOVED FROM OR BROUGHT ONTO THE
PROJECT SITE UNLESS THE AREA HAS BEEN SPECIFIED IN THE
EROSION CONTROL PLAN.
2.b. IF SOIL IS REMOVED FROM THE SITE THE PLAN SHOULD INDICATE
THE PERMIT NUMBER ISSUED BY THE DIVISION OF LAND QUALITY
OF THE LOCATION RECEIVING THE SOIL AND THE VOLUME OF SOIL
BEING TRANSFERRED.
2.c. IF THE SOIL IS GOING TO A PERMITTED LANDFILL REGULATED BY
THE DIVISION OF SOLID WASTE MANAGEMENT THE PERMIT
NUMBER SHOULD BE IDENTIFIED.
2.d. ADDITIONALLY IF SOIL IS BEING BROUGHT TO THE SITE FROM A
BORROW AREA THE APPLICABLE PERMIT NUMBER SHOULD BE
INDICATED AND THE VOLUME OF SOIL BEING TRANSFERRED
IDENTIFIED.
3. INSPECTIONS DURING CONSTRUCTION:
3.a. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION
CONTROL DEVICES AND STORM WATER OUTFALLS BE INSPECTED
WEEKLY (EVERY 7 CALENDAR DAYS) AND WITHIN 24 HRS OF
ONE-INCH RAIN EVENT. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN
RECORDS UNTIL THE AREA HAS BEEN STABILIZED, EVIDENT BY
95% VEGETATIVE GROWTH FOR AREAS PROVIDED
SEEDING/SODDING AND COR APPROVAL.
3.b. TO FACILITATE RAINFALL MONITORING A RAIN GAUGE IS
REQUIRED TO BE ON SITE.
3.c. ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR
CONDUCTING A SELF INSPECTION INDICATING THE DATE BMPS
ARE INSTALLED AND STABILIZATION MEASURES
(SEEDING/MULCHING OR SOD) ARE INITIATED.
3.d. BOTH INSPECTIONS ARE RECORDED ON THE SAME REPORT FORM
AND MUST BE MAINTAINED BY THE CONTRACTOR AT THE ONSITE
OFFICE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED
INSPECTION RECORDS MUST BE FORWARDED TO EAD AND ALL
TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES
REMOVED.
3.e. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
COMPLIANCE WITH ALL PERMITS AND PLANS, ANY CHANGES MUST
BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF
THE EROSION AND SEDIMENTATION (ES) CONTROL PLAN, ES
LETTER OF APPROVAL, NPDES CONSTRUCTION PERMIT, AND
NPDES CERTIFICATE OF COVERAGE MUST BE MAINTAINED BY THE
CONTRACTOR AT THE ONSITE OFFICE.
3.f. IF SOIL IS REMOVED FROM OR BROUGHT ONSITE, THE
APPLICABLE SOLID WASTE MANAGEMENT PERMIT NUMBER,
EROSION SEDIMENTATION PERMIT OR MINE PERMIT NUMBER WILL
BE DISCLOSED.
4. NCDEQ DOES NOT APPROVE THE USE OF STRAW BALES FOR
RETARDING OR FILTERING SEDIMENT.
5. RYE GRASS IS NOT IN THE APPROVED SEEDING SPECIFICATIONS OR
ACCEPTABLE FOR NURSE COVER FOR PERMANENT GRASS COVER.
6. BOTH THE AUTHORIZATION TO CONSTRUCT AND STATE LETTER
INDICATING APPROVAL OF SPECS AND PLANS MUST BE POSTED AT THE
CONSTRUCTION ENTRANCE. SHOULD THE PROJECT INVOLVE TEST
WELL DRILLING IN AN EFFORT TO DETERMINE SOURCE WATER
QUALITY, APPROVAL MAY BE GRANTED BEFORE PLAN/SPEC SUBMITTAL.
7. NEWLY INSTALLED WATER SUPPLY SYSTEMS, TO INCLUDE
DISTRIBUTION LINES, WELLS, FILTERS, AND STORAGE TANKS MUST BE
DISINFECTED AS REQUIRED IN T15A:18C.1001-.1004. AND AWWA C651.
BACTERIOLOGICAL TESTING IS REQUIRED AFTER DISINFECTION
INCORPORATING TEST METHOD 312 FOR TOTAL COLIFORM AND TEST
METHOD 316 FOR FECAL/E.COLI.
8. THE PROJECT SITES INCLUDE LOCATIONS WITHIN OPERABLE UNIT 14
(OU-14) AREA AND OTHER LOCATIONS OUTSIDE OF ANY OPERABLE UNIT
(OU). THESE OU SITE LOCATIONS ARE IN AN AREA OF POTENTIAL POL
OR CHEMICAL SPILLS. HISTORICAL SOIL SAMPLE DATA FROM OUTSIDE
THE OU AREAS SHOWED NO SIGNIFICANT INFORMATION OF
CONTAMINATION. PRE-CHARACTERIZATION OF SOIL SAMPLING IS NOT
REQUIRED PRIOR TO EXCAVATION. THIS INFORMATION IS PROVIDED TO
GIVE THE CONTRACTOR'S INDUSTRIAL HYGIENE DEPARTMENT TO
INCORPORATION INTO THEIR HEALTH AND SAFETY PLAN TO ENSURE
WORKER SAFETY.
9. IF ANY SOIL WHICH EXHIBITS AN ABNORMAL OR UNNATURAL COLOR, A
CHEMICAL OR PETROLEUM ODOR, OR IS SATURATED WITH A CHEMICAL
OR PETROLEUM IS ENCOUNTERED DURING EXCAVATION, WORK
SHOULD BE IMMEDIATELY STOPPED IN THAT AREA, AND THE
ENVIRONMENTAL AFFAIRS DEPARTMENT (EAD) SHOULD BE ADVISED OF
THE SITUATION SO THAT A COURSE OF ACTION CAN BE DEVELOPED BY
THE CONTRACTOR TO ADDRESS THE CONTAMINATION. NO SOIL
SAMPLING OR TESTING IS TO BE CONDUCTED FOR THE PURPOSE OF
DETERMINING SUSPECTED CONTAMINATION WITHOUT CONSULTING
MCAS CHERRY POINT'S ENVIRONMENTAL AFFAIRS DEPARTMENT FOR
PROPER PROCEDURE AND GUIDANCE. ALL EXCAVATED SOIL MAY BE
RE-UTILIZED AS BACKFILL AT THE SAME LOCATION FROM WHICH IT WAS
REMOVED UNLESS PETROLEUM CONTAMINATION IS DISCOVERED. IF
PETROLEUM CONTAMINATION IS DISCOVERED, THE SOIL NEEDS TO BE
SEGREGATED BY PID (>/= 10 PPM OR EXHIBITS STAINING), PROPERLY
STOCKPILED, TESTED, AND DISPOSED. IF SOIL IS STOCKPILED, THEN IT
SHOULD BE STOCKPILED ON PLASTIC, BERMED, AND COVERED IN
ACCORDANCE WITH NC DEQ GROUNDWATER SECTION GUIDELINES
FOR THE INVESTIGATION AND REMEDIATION OF SOIL AND
GROUNDWATER, VOL. 1 DATED JULY 2000 (GUIDELINES), OR PLACED IN
A ROLLOFF CONTAINER AND COVERED WITH PLASTIC.
10. FOR THIS SITE, ANY EXCESS SOIL THAT CANNOT BE RE-UTILIZED AS
BACKFILL AT THE SAME LOCATION FROM WHICH IT WAS REMOVED
MUST BE DISPOSED OF AT A PROPER FACILITY. SOME SOIL TESTING
MAY BE REQUIRED. EAD MUST REVIEW AND SIGN THE WASTE
MANIFECTS/BILL OF LADING FOR THE SOIL DISPOSAL PRIOR TO ANY OF
THIS SOIL LEAVING THE AIR STATION. THE MANIFEST SHOULD ALSO
CONTAIN THE AMOUNT OF SOIL (WEIGHT) AND SUPPORTING
LABORATORY RESULTS FOR EAD TO REVIEW. ONE COMPOSITE SAMPLE
MUST BE TAKEN AND ANALYZED FOR EACH 200 CUBIC YARDS OF THE
STOCKPILE PER NCDEQ GUIDELINES IN ORDER TO DETERMINE THE
PROPER METHOD FOR DISPOSAL IF CONTAMINATION IS DETECTED. IF
CONTAMINATION IS DISCOVERED, THE STOCKPILE SAMPLE(S) MUST BE
ANALYZED FOR THE FOLLOWING BUT NOT LIMITED TO: STD METHOD
5030 AND 3550 SAMPLE PREP WITH MODIFIED 8015 - DIESEL RANGE
ORGANICS, EPA METHOD 9071 - OIL & GREASE WITH SILICA GEL WASH
WITH POSSIBLE TLCP.
11. ALL DISTURBED AREAS MUST ALSO BE CAPPED BY EITHER (1)
COVERING THE SURFICIAL SOIL WITH AN IMPERVIOUS MATERIAL SUCH
AS CONCRETE OR ASPHALT, OR (2) TOPPING THE EXCAVATED AREA
WITH 12 INCHES OF COMPACTED, CLEAN FILL. CAPPING IS REQUIRED
TO PREVENT AN INCREASED EXPOSURE RISK FROM BOTH SURFICIAL
EXPOSURE AND CONTAMINANT LEACHING. THEREFORE, BACKFILLED
SOILS MUST BE COMPACTED TO MINIMIZE INFILTRATION OF SURFACE
WATER THROUGH THE SOIL COLUMN.
12. CONTACT EAD IF THE PROJECT REQUIRES FILL SOIL FROM OFF-SITE
SOURCES TO COMPLETE THE PROJECT. IF AT ANY TIME THE PROJECT
REQUIRES ANY SOIL TO BE REMOVED FROM THE AIR STATION
PROPERTY, EAD SHOULD BE NOTIFIED FOR APPROVAL BEFORE SUCH
ACTION IS TAKEN.
13. IN CONTAMINATED AREAS, IF DEWATERING IS REQUIRED DURING
EXCAVATION, ALL WATER MUST BE CONTAINERIZED. GROUNDWATER
MUST BE TESTED, TREATED AND DISPOSED OF PROPERLY IN
ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS.
14. FOR THIS AREA LOCATED WITHIN OU-14, IF AT ANY TIME THE PROJECT
EXCAVATION REQUIRES THE WORK TO ENTER THE DEPTH OF THE
GROUND WATER TABLE WITHIN THIS AREA, SPECIAL APPROVAL IS
REQUIRED FROM THE STATE OF NC AND EPA. THE MCAS CHERRY
POINT EAD MUST BE NOTIFIED AND A HEALTH AND SAFETY PLAN FOR
THE WORK MUST BE WRITTEN FOR APPROVAL. THESE ACTIONS MUST
BE DIRECTED THROUGH EAD'S WILL POTTER (252)466-5376.
CONTRACTOR MUST GIVE NOTICE AS SOON AS POSSIBLE TO ENSURE
TIMELY APPROVAL.
15. DISPOSAL OF ANY WATER TO THE SANITARY SEWER, STORM SEWER
OR INDUSTRIAL WASTE SYSTEMS IS PROHIBITED. CONTRACTOR MUST
CAPTURE, TREAT, AND DISPOSE OF PROPERLY IN ACCORDANCE WITH
FEDERAL, STATE, AND LOCAL REQUIREMENTS.
16. DUE TO THE CONCERN OF AFFF CONTAMINATION TO SOIL AND
GROUNDWATER WITH IMPENDING SAMPLING GUIDELINES,
CONTRACTOR MUST COORDINATE WITH EAD PRIOR TO ANY SAMPLING
TO DETERMINE IF PFOS/PFOA IS TO BE INCLUDED. COORDINATE WITH
EAD FOR PROPER DISPOSAL FOLLOWING SAMPLING.
17. A PORTION OF THE PROJECT SITE IS LOCATED WITHIN OPERABLE UNIT
14, AN AREA OF KNOWN GROUNDWATER CONTAMINATION. SEE SHEET
C-016 FOR OPERABLE UNIT 14 BOUNDARY. THIS AREA IS SUBJECT TO
LAND USE CONTROLS INCLUDING:
17.a. EXCAVATION/CUTTING THROUGH AN EXISTING FOUNDATION OF
BUILDINGS WILL REQUIRE THE INSTALLATION/TESTING OF A
VAPOR BARRIER TO PREVENT VAPOR INTRUSION THROUGH THE
AFFECTED FOUNDATION AREA.
17.b. RESTRICTION OF EXCAVATION INTO THE GROUNDWATER TABLE
WITHOUT PRIOR APPROVAL FROM CHERRY POINT EAD, EPA AND
NCDEQ. WORK CANNOT BEGIN UNTIL REGULATORY APPROVAL IS
RECEIVED, WHICH CAN TAKE UP TO 2 MONTHS FOR REVIEW. THIS
APPROVAL IS COORDINATED THROUGH THE ENVIRONMENTAL
AFFAIRS DEPARTMENT AND IS DEPENDENT ON HAVING A PROPER
HEALTH & SAFETY (H&S) PLAN SUBMITTED FOR REVIEW. THE H&S
PLAN MUST SHOW THAT THE CONTRACTOR IS AWARE OF THE
POTENTIAL CONTAMINATION IN THIS AREA, AND THE STEPS TO BE
TAKEN TO MINIMIZE EXPOSURE TO WORKER AND THE
ENVIRONMENT DURING CONSTRUCTION AND DISPOSAL OF ANY
WASTES TAKEN OFFSITE. THE CONTRACTOR IS RESPONSIBLE FOR
ALL TREATMENT AND DISPOSAL OF CONTAMINATED MATERIALS.
18. POINT OF CONTRACT FOR CERCLA (COMPREHENSIVE ENVIRONMENTAL
RESPONSE, COMPENSATION, AND LIABILITY ACT) ISSUES IS WILL
POTTER, (252)466-5376, WILLIAM.R.POTTER@USMC.MIL
19. WASTEWATERS GENERATED REQUIRE TESTING FOR PFAS/PFOA
CONTAMINATION (ALONG WITH ANTICIPATED PETROLEUM AND
CHLORINATED SOLVENT CONTAMINATION), AND PROPER DISPOSAL IS
REQUIRED IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL
REQUIREMENTS. PFOS/PFOA DETECTIONS OVER 70 PPT CANNOT BE
DISPOSED THROUGH INDUSTRIAL/WASTEWATER TREATMENT SYSTEM
AND REQUIRE ADDITIONAL TREATMENT.
12803945
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
| C-001 - CIVIL NOTES, LEGEND, AND ABBREVIATIONS |
| C-002 - EXISTING STORM DRAIN AND SANITARY SEWER STRUCTURE TABLES |
| C-003 - SITE ACCESS & SAFETY PLAN |
| C-004 - TRAFFIC CONTROL & PHASING PLAN - AREA 1 |
| C-005 - TRAFFIC CONTROL & PHASING PLAN - AREA 2 |
| C-006 - TRAFFIC CONTROL & PHASING PLAN - AREA 3 BID OPTION |
| C-007 - SITE ACCESS AND SAFETY NOTES |
| C-008 - ENVIRONMENTAL AND CONTAMINATION NOTES |
2020-01-23T08:23:20-0500
2020-01-23T08:23:40-0500
2020-01-23T08:23:42-0500
2020-01-23T08:23:43-0500
2020-01-23T08:24:22-0500
2020-01-23T08:24:24-0500
2020-01-23T08:24:24-0500
2020-01-23T08:24:54-0500
2020-01-27T07:27:44-0500
2020-01-27T07:27:58-0500
2020-01-27T07:28:01-0500
2020-01-27T07:28:03-0500
2020-01-27T07:28:05-0500
2020-01-27T07:28:07-0500
2020-01-27T07:28:09-0500
2020-01-27T07:28:11-0500
| 2020-01-28T20:06:57-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:07:15-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:07:15-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:07:16-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:07:16-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:07:51-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:07:52-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:08:27-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:08:42-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:09:01-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:09:02-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:09:02-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:09:03-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:09:03-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:09:04-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:09:05-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .