About this file

This is a solicitation for a design-bid-build project to construct an F-35 training and simulator facility at Marine Corps Air Station Cherry Point in North Carolina. The project magnitude is estimated between $25-100 million. Proposals are due on April 9, 2020. Pre-proposal inquiries are due by March 30, 2020. The NAICS code is 236210 and the small business size standard is $39.5 million. This is an unrestricted solicitation with full and open competition. The wage determination in effect is NC20200065. The Department of the Navy Naval Facilities Engineering Command is the issuing agency.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 8 P204 Drawings-Specs.pdf PDF
Amendment 0008.pdf PDF
Amendment 8 Attachment I -Updated Price Proposal Form_REVISED.pdf PDF
Amendment 0007-Update Proposal Submission.pdf PDF
Amendment 6 Attachment I-REVISED Price Proposal Form.pdf PDF
Amendment 0006.pdf PDF
Amendment 5.pdf PDF
Amendment 5 PPI-31_P-204 Soil Guidance Section for NEPA-PAMS.pdf PDF
Amendment 5 M-602.pdf PDF
Amendment 4 B286_Photos.zip ZIP file
Amendment 4 P204 B286 B4038 B4162 Existing FFE List Floor Plans.pdf PDF
Amendment 4 B4038_2of2.zip ZIP file
Amendment 0004.pdf PDF
Amendment 4-B286_As-Built Drawings.pdf PDF
Amendment 4 P204 FF E List for Contractors.xlsx XLSX spreadsheet
Amendment 4 B4038_1of2.zip ZIP file
Amendment 3-Attachment I - Price Proposal Form_REVISED.docx DOCX document
Amendment 3-P-204_Hazardous Survey.pdf PDF
Amendment 3-B4038_As-Built Drawings_01.pdf PDF
Amendment 3-P-204_Site Investigation Report.pdf PDF
Amendment 0003.pdf PDF
Amendment 3-B4038_As-Built Drawings_02.pdf PDF
P-204_Amendment-003.pdf PDF
Amendment 3-B4162_As-Built Drawings.pdf PDF
Amendment 0002 Extend Proposal Due Date.pdf PDF
Amendment 0001 Site Visit Cancelled.pdf PDF
Attachment I - Price Proposal Form.docx DOCX document
Attachment D - Small Business Subcontracting Record.docx DOCX document
Attachment F - Past Performance Questionnaire.docx DOCX document
1596300dwg17of26_Interiors.pdf PDF
Attachment E - Small Business Participation and Commitment Strategy.docx DOCX document
1596300dwg03of26_Civil-C.pdf PDF
1596300dwg24of26_Electrical.pdf PDF
1596300dwg11of26_Civil-CS.pdf PDF
1596300dwg25of26_Telecom-AV.pdf PDF
1596300dwg14of26_Structural.pdf PDF
1596300dwg26of26_Telecom.pdf PDF
Attachment B - SECNAV 5512.pdf PDF
1596300dwg20of26_Mechanical.pdf PDF
1596300spc02of04.pdf PDF
1596300dwg09of26_Civil-CG.pdf PDF
Attachment J - Site Visit Map to B-163.pdf PDF
1596300dwg16of26_Architectural.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
1596300dwg23of26_Electrical.pdf PDF
1596300dwg06of26_Civil-CE.pdf PDF
RFP- P204.pdf PDF
Attachment G - Small Business Subcontracting Plan.docx DOCX document
1596300dwg01of26_General.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

J 1 25

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0005 4/22/2020

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

See Item 6

NORFOLK VA 23511-3095

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N4008520R0015

9B. DATED (SEE ITEM 11)

3/12/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

***THE PROPOSAL DUE DATE REMAINS UNCHANGED***

The purpose of this amendment is to:

1. Provide responses to remaining PPIs, please see attachments

See Continuation Page

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

N4008520R0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

CONTINUATION PAGE

Questi on No.

REFERENCE QUESTION GOVERNMENT

RESPONSE

Poste d on Amen d No.

Page Section Para.

1 13 Factor 1 5 Factor 1, Corporate Experience states “Scope: New construction of a simulator facility”. Will similar complex construction types be viewed as relevent such as active hospitals which have Operating Rooms or CT Scans, IT Facilities, or Laboratories with heavy coordination between with owner or contractor provided prefabricated equipment (similar to simulators) be considered as relevant experience?

Propose according to the RFP

2 With the virus and everyone trying yo work from home subcontractors are asking for 3 week extension will this be possible?

Please see Amendment

RFP Given the current cripling effect the COVID19 Pandemic has placed on the entire country, General Contractors, Subcontractors, and Vendors are all subject to it. Some are having to work from home, others aren't allowed to work or can't access files/information they need, and at best, those that are working are not able to operate at full speed in terms of estimating, take-offs, pricing efforts, etc.

Please consider a two week bid extension from April 9th to April 23rd to allow the necessary time for the market to propose on this project in unforeseen and uncontrollable circumstances.

Please see Amendment

4 S-513 Joist reinforcing detail is given on C3/S-513, please indicate where this is need on the structural drawings as this detail is not referenced.

Joist hanger detail C3/S- 513 is provided as an option for locations where hanging loads fall between joist locations.

5 05 12 00 05 12 00-2.6.2 clarifies zinc rich primer for all structural steel. This is a significant cost premium over standard primer, espeically on non-exposed structural steel.

Please confirm it is requried.

Standard shop primer may be used for interior, non-exposed structural steel.

6 05 12 00 AISC certified erector and fabricator are required per 05 12 00-1.3. Please consider removing the AISC certified erector requirement for additional competition.

AISC certifications may be waived provided a similar certification and QC program is being followed. Refer to IBC 2015 Section 1704.2.5 for additional special inspection requirements in lieu of approved detailed fabrication and quality control procedures.

7 21 00 00 Please confirm that no clean agent fire suppression systems are required in any rooms such as server rooms, simulator areas, etc.

Confirmed. Clean agent system is not required for this project.

8 21 30 00 Please confirm which start method will be required on the controller for the fire pump, and if a transfer switch is needed.

Refer to Specification 21 30 00, section 2.7.1 for start method and ATS requirements.

9 M-603 The Duct Silencer Schedule on M- 603 has lines for DS-13 and DS-14 with no information listed next to

it. Please confirm only DS-1 through DS-6 is applicable.

Only DS-1 through DS-6 are required. DS-13 and DS-14 were printed by error and can be disregarded.

10 RFP Item 1.2 Under item 1.2 General Overview of Contract - Description of Work it is noted, "The facility will be a reinforced concrete masonry unit building with seismic upgrades on a pile supported reinforced concrete slab on grade foundation." The structural plans do not show a pile foundation, the geotechnical report does not recommend one, and there is not a specification for a pile foundation.

Confirmed. Piles are not anticipated for this project.

Please confirm that there will NOT be a pile foundation required.

11 Attachment I CLIN 0001AF is for the sampling, and then exavataion, handling, and disposal of petroleum contaminated soil. Please separate the soil sampling and make it its own unit price CLIN (i.e.

5 soil samples @ $____ ea), as there is a chance that tested soil may come back clean and not need to be removed. Unless the Gov't wants all excavated soils treated as contaminated?

Provide bid as specified. 0002

12 C-008, C-

Plans C-008 and C-009 indicate contaminated soils located within the limits of construction (and confirmed in CLIN 0001AF). The water table in this area will likely be encountered during construction. Due to the contaminated soils, the water will also be contaminated and will need to be treated and legally disposed of. Please provide a quantity and unit price line item on the bid form for treatment of contaminated water.

Bid Form has been edited to include a line item “Treatment of Contaminated Groundwater” as requested with a quantity of 250,000 gallons

14 01 45 00.00

1.5.2 The Quality Control spec reads

that a commssioning authority is to be provided for the project in

1.5.2.1. Spec 01 91 00.15 22, 1.1

very clearly notes the CxA will be provided by the Gov't. Please confirm these are the same firm/person, and will be provided by the Gov't.

CxA is to be provided by govt.

15 1 Solicitation In light of “Stay at Home Orders” issued across multiple states, counties and cities, and the uncertainty resulting from the national emergency declared as a result of the COVID-19 Pandemic. Our operations, and that of the subcontractor market, have been severely impacted. For this reason we are requesting a 2 week extension of this bid.

Please see Amendment

Due to Amendment 0001 cancelling the site visit, will the demolition contractors have the opportunity to visit the jobsite to view the three buildings to be demolished? Will there be an opportunity for general contractors and any other subcontractors to visit the jobsite?

Due to COVID-19 pandemic and the increasing state and local governments issuing “shelter in place” policies, there will no longer be a site visit for this solicitation.

Please utilize the drawings and specifications when preparing your proposal.

17 A4/A526 Please provide a specification for the pre-cast concrete sills at the windows as shown on detail A4/A526.

Refer to specification 04 20 00, section 2.2.4.

18 Is the general contractor to submit pricing as shown on pages 25-27 of 29 of the RFP, with Item No's 0001, 0002, 0003, 0004, 0005, 0006 and 0007 or is the general contractor to submit pricing as shown in Document 00 22 13.00 20 - Supplementary Instructions to Offerors with CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0002, 0003, 0004, 0005, 0006 and 0007? Please clarify the bid form.

Please use Attachment I- Price Proposal Form

With the virus and everyone trying yo work from home subcontractors are asking for 3 week extension will this be possible?

Please see Amendment

20 Will there be any Blast requirments on the glazing as non shown?

Blast rating is not required.

21 Please consider pushing the bid date on this Solicitation at least one week to 16 April. There is quite a bit of work bidding right now at Cherry Point and Camp Lejeune and everyone is a bit displaced. A short extension would help this bid considerably.

Thank you.

Please see Amendment

22 Drawing A-611 indicates OH-FS as a Fire Shutter for opening 195B.

The details on drawing A-522 show a non rated OH coiling door.

Also, spec section 08 33 23 doesn’t refer to any fire rating for the coiling door/ shutter. Please clarify if this opening is a rated opening and if so please provide additional specs/ details on the required opening rating and shutter construction.

Fire rating is not required for the overhead coiling door.

23 Solicitation

Request for electronic bid submission on bid due date in lieu of hard copies for reasons stated above in question 1.

Please bid per RFP 0003

24 Telecom

In the Combination Floor Box Schedule on Drawing TN601 there is a column labeled 'Telecom Outlet Type'. It has the outlets listed as x/x/x with each x being an outlet type. A sequence that appears multiple times is 1/SP/S. I know that the Nmber 1 stands for a Type 1 outlet and the 'S' stands for a SIPR Outlet (See Note 2 on TN601). However there is no where that 'SP' is defined. I assume it means that it is a spare outlet and doesnt require cabling but I can't be sure? What does the 'SP' stand for?

SP stands for space and is to be left open.

25 4 CLIN 3 With the current "work from home" requirement being enforced by most companies would it be acceptable to provide an email from our banking institution demonstrating adequate financial resources in place of a signed bank reference?

Our banking institution is unable to provide such a letter without going into the office location, and at this time they are all working from home.

26 1 14 Amendment 0001 cancels the site visit previously scheduled for 24 March, is NAVFAC scheduling an alternative site walk for this solicitation.

No 0003

27 2 02 41 00 1.2.2 The specifications state the following: "It is the contractor's responsibility to provide pricing to remove and dispose of all existing furniture and equipment in the building at the time of the initial building walk-through's. Since the site walk was cancelled NAVFAC will need to provide contractors with a detailed list of all equipment, along with photos, of the building contents which will need to be disposed.

See attached FFE list, FFE floorplan, and existing building photos for B286 and B4038.

28 4 02 41 00 1.6.1 Is construction water available on MCBCP and if there available is there a cost for water usage.

Water is always available for base contract work at the fill station located at the water plant free of charge.

If a contractor desires water to be setup at a construction trailer, the contractor must hire a licensed plumber to install a tap and have backflow prevention installed and tested.

Paperwork must be submitted to the Base.

This is all at the contractors expense.

Usually during demo work all utilities are demo'd as well, so having water at the demo site is dependent on if the contract calls for water utilities to be demo'd. If water will remain at the bldgs.

contractors must install a backflow preventer on the desired hydrant and have a licensed tester test the assembly and submit the certified paperwork to the Base.

29 1 1.1 The specifications state that the Government will employ the services of an independent, Commissioning Firm. Please provide the number of calendar days that the Commissioning Firm will require so that those days can be incorporated in the Contractors schedule.

The Commissioning Firm is employed by the Government and will require approximately 58 days.

30 6-7 3.1 Pursuant to the demolition specifications the contractor is required to salvage/recycle numerous items from the existing building, the lack of a site walk prevents contractors from acturately performing a qualified takeoff from the plans provided. If a site walk is not going to be provided will NAVFAC provide the detailed drawings of the the buildings to be demolished along with photos.

General Demolition sheets are included in the set which do include drawings and some existing photos.

Also see attached Site Investigation Report for additional existing photos. See attached existing As-Built drawings for buildings B4038 and B4162.

Additional drawings and photos will be forthcoming as the Base is currently in the process of gathering additional information and will be distributed as they become available.

31 8 3.10 The specifications state that the following: "Offsite disposal of contaminated material shall be in accordance with design documents and base requirements." MCBCP, as the generator of hazardous waste must currently have a detailed disposal plan which would be incorporated in the base requirements for disposal, please make this document available to contractors.

The Base does not have a detailed disposal plan.

We do not identify any disposal sites. All language is similar to “dispose in accordance with local, state, and federal regulations” or “as directed by the COR”. ***Additional Response 4/20/20: If any soil is found with contamination, the Contractor will need to inform Base EAD (Environmental Affairs Department). They will need to have the material tested for disposal. The test required will depend on type of material.

Contractor shall test any soils that require disposal whether clean or known contamination. No soils can be disposed of onboard MCAS Cherry

Point. See attached Soil Guidance document for reference.***

32 1-4 1.2 Specifications require the contractor to remove and dispose of PCB containing lighting ballasts and associated mercury-containing lamps. The lack of a site visit prevents the contractor from acturately identifying the size and level of effort required to remove each unit. Could NAVFAC provide a detailed list along with photos, and height of units from floor.

See attached Site Investigation Report for existing building photos. See attached drawings for existing as-built drawings. See attached Hazardous Materials Report for the project. Additional drawings and photos will be forthcoming.

33 3.(a) With the current "work from home" requirement being enforced by most companies would it be acceptable to provide an email from our banking institution demonstrating adequate financial resources in place of a signed bank reference?

Our banking institution is unable to provide such a letter without going into the office location, and at this time they are all working from home.

34 3.(b)( 1)

Would the government consider revising experience requirements to require a minimum of 1 project.

Please bid per RFP 0003

35 CD20

Demolish and remove domestic waterline…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

36 CD20

Demolish and remove electrical duct…without the ability to perform a site visit can you provide the depth of the duct to be removed. Additionally, is the duct encased in concrete or slurry.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

37 CD20

Demolish and remove communications duct bank…without the ability to perform a site visit can you provide the depth of the duct to be removed. Additionally, is the duct encased in concrete or slurry.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

38 CD20

Demolish and remove 4" PVC sanitary sewer pipe and cap…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

39 CD20

Demolish and remove 8" PVC sanitary sewer pipe and cap…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

40 CD20

Demolish and remove 18" RCP Storm Sewer…is this actually a sewer line or is it the storm water line.

This is what the survey calls a Storm Sewer. It is a culvert that conveys runoff under the entrances

41 CD20

Demolish and remove 18" RCP Storm Sewer…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

42 CD20

Demolish and remove domestic waterline…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

43 CD20

Demolish and remove electrical duct…without the ability to perform a site visit can you provide the depth of the duct to be removed. Additionally, is the duct encased in concrete or slurry.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

44 CD20

Demolish and remove communications duct bank…without the ability to perform a site visit can you provide the depth of the duct to be removed. Additionally, is the duct encased in concrete or slurry.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

45 CD20

Demolish and remove 6" clay sanitary sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

46 CD20

Demolish and remove 8" clay sanitary sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

47 CD20

Demolish and remove 8" PVC sanitary sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

48 CD20

Demolish and remove 12" clay sanitary sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

49 CD20

Demolish and remove 12" clay storm sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

50 CD20

Demolish and remove 15" clay storm sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

51 7 1.2 e Would the government consider revising experience requirements to require a minimum of 1 project.

Please bid per RFP 0003

52 22 4.2 i Could you authorize an electronic submission of the Price Proposal as well as the Non-Price Proposal due to the actual travel restrictions?

Please bid per RFP 0003

53 Could the you provide the CAD drawings for the project plans.

Please use the drawings and specs provided in this solicitation.

54 PW114 The Plumbing drawings are calling for inverts @ say 23.75 This does not match with structural or Architectural with base slab @100.00 Please advise what floor level the plumbing drawings should be using.

The real world elevations of the FFE is 27.00' as shown on sheet CG101. The Plumbing inverts correlate with civil.

55 A-700 The Room Finish Schedule on A- 602 and Floor Finish Plan on A-700 conflict with each other. Room 115 COMP SUPPORT shows the grid for RAF-1 on drawing A-700, but the finish schedule does not show any raised access floor for this room.

Please advise if raised access flooring is needed for Room 115

COMP SUPPORT.

Provide RAF-1 / CPT-2 at 115 COMP SUPPORT.

56 TY100-

TY501

There are no CCTV cameras shown on the security drawings. Please indicate quantity of cameras required so we can include rough in

There are no CCTV cameras to be provided.

57 Div 28 Please provide specification for access control, intrusion detection, and CCTV for CLIN 0005

DELETE CLIN 0005. ESS

equipment will be provided by the Government.

58 TN506 Confirm that antennae shown are provided by the government

GPS antennas shown are to be provided by Lockheed Martin which will be coordinated with Government.

59 31 21 13 and S-101

Specification 31 21 13 is given for Vapor Mitigation. Structural drawings indicate to use 20 MIL Vapor Barrier. The spec calls out a soil-gas retarder membrane that is 40mils thick in 2.1.2. Please verify what barrier should be used.

Spec section 31 21 13 will be updated accordingly to indicate 20MIL vapor barrier as indicated in Amendment #003.

60 08 71 00 The hardware schedule included in specification section 087100 has door numbers listed for some sets, but does not have door numbers listed for sets 4.0, 7.0, 8.0, 12.0,

17.0 and 19.0. Please provide the door numbers required for these hardware Sets.

Refer to Amendment #003.

00003

61 08 71 00 The hardware schedule included in specification section 087100 does not include door numbers 103, 104, 105, 106A, 106B, 107, 108, 110, 111, 112, 113, 114, 115, 116, 117, 119B, 120, 121, 122, 123, 124, 125, 126, 127A, 127B, 127C, 128, 131, 132, 133, 134, 135, 136, 137, 138A, 138B, 138C, 139, 140, 141, 142, 143, 144, 145A, 145B, 145C, 146, 147, 148, 149, 150, 151, 152, 153, 154A, 154B, 154C, 155, 156, 157, 158, 159, 160 161 162A, 162B, 162C, 163 164, 165, 166, 167, 168, 169, 170A 170B, 170C, 171A, 171B, 172, 173, 174, 175, 176, 177, 178, 179, 180, 181, 184, 185, 186, 188, 189, 190B, 191, 192, 193, 195A, 195B, 196B, 199, 201, 202, 204, 205, 206, 208B, 210, 211, 212, 213, 214, 215, 217, 218, 219, 220, 221A, 221B, 222, 223, 224, 225, 226, 227 228A, 228B, 229A, 229B, 230A, 230B, 231, 232, 233, 234 and 235. Please confirm the required hardware sets for each opening listed above.

Refer to Amendment #003.

62 08 71 00 The hardware schedule included in specification section 087100 has for hardware set 17.0 description:

Card Access – STC Assembly, but there is not any information on the door schedule to show which doors will need to have the card

Refer to Amendment #003.

readers. Please list all door numbers requiring card readers.

63 08 71 00 The hardware schedule included in specification section 087100 has a hardware set 19.0 description:

Card + Combination Lock Access – STC Assembly, but there is not any information on the door schedule to show which doors will need to have the combination lock or the card readers. Please provide a list of these door numbers

Refer to Amendment #003.

64 D1/A546 Please specify the material type for the fascia that is labeled on the Window Shade Detail.

Please specify a satin finish for the window fascia’s for WS-1

65 A121 Please specify the extent of the PLAM-1 drop ceiling as noted on Note 14 on A602.

The L-shaped portion that is being shown with a Gypsum finish on A-121 for rooms 197 and 197 (both the vertical and horizontal portions of the drop ceiling) will be finished in PLAM-1.

66 00 10 00 4.2 If we elect to email our price proposal and subcontracting plan, when would we need to submit the original copy of the bid bond?

Will the original copy of the bid bond need to be received before or after the bid date/time.

Please submit a copy with your price proposal and mail the original in.

67 4 08 41 13 1.4.2 Will OBE be an acceptable Manufacture?

OBE is an acceptable manufacturer. Product must meet specification requirements of 08 41 13.

68 C1/S313 Plan sheet S-114 references Detail C1/S-313, at center of page (two locations). Plan sheet C1/S-313 is not available. Please provide plan sheet and/or associated Detail C1/S-313.

S-114 reference to C1/S-313 should reference A1/S-312. S- 114 will be updated accordingly.

69 09 90 00 1.3.1 Please consider removing the SSPC QP 1 Certification required, as this certification is typically for marine and industrial projects.

Refer to Amendment #003

70 tn701 1. On drawing TN701 Note B2 FMS One-Line it depicts seven (7) runs of 8-strand OM3 fiber. On drawing TN201 the matrix for this fiber reflects a 1U fiber enclosure and only 48-strands of fiber.

FPP3 on TN701 shall be a 72 port patch panel in lieu of 48 port.

a. Can we use a 12-strand fiber and a 4U enclosure which is standard for strand count, we see 6,12 and 24 to be standard fiber counts and not a custom order with a long lead time like the 8-strand (the adapter panels will need to be 12-strand, they are not made in an )

12-strand fiber and 4U enclosure is acceptable

71 TH07 1. On drawing TN07 Note C2 Telecom One-Line it depicts eight

(8) runs of 12-strand SM OS1 fiber.

That is correct. 0004

a. On drawings TN202, the matrix and the note C2 reflects fiber in both racks as well as the matrix. What is the requirement.

Provide fiber per one-line to fiber patch panels of racks. For example one-line shows

(1) 12 strand to rack B1;

fiber patch panel in B2 is spare.

b. On drawing TN204 Note C3 reflects a fiber enclosure in all three secure racks but the One Line drawing on TN07 only shows one (1) 24-strand. What is the requirement.

The requirement is one 12 strand fiber to S5.

This would be a half populated patch panel;

not all ports will have cabling.

c. On drawing TN205 Note C3 reflects a fiber enclosure in one rack but the matrix reflects two racks. What is the requirement.

Provide for D1 rack in elevation. B2 was left in table accidently and should ignored on

TN205.

72 TN501 1. On drawing TN501 Note A3 depicts a television wall plate with a data jack (A) and a Coaxial jack

(B) and two blanks.

Yes. That is correct. 0004

a. On drawings TN602 the matrix for the wall plates shows the TV data jack in the voice column. What is the requirement?

The data jack should be classified as UCLAS data in lieu of phone. They should be terminated at a UCLAS patch panel.

73 TN602 1. On drawing TN602 Comm Rm 130 room 184 conf. should that first item be a TV?

This is referring to the outlet in184-1 floorbox.

See combo box schedule sheet TN601 for outlet types. 184-1 shall be Type 4 / Space / Type S outlet. Only using 3 gangs of 8.

74 1. Will all of the conduit pathways for the copper and fiber backbone be in the plenum space and not installed below the slab?

Yes all backbone cabling shall be routed in plenum overhead as shown on TN004.

75 3.5.1.4 1. 3.5.1.4 Final Verification Testing. This is not something that we have seen on any other projects is this truly a requirement of the Telecom Contractor?

Yes this testing per section 3.5.1.4 is required. Coordinate with base telephone for completion.

76 Door Hardware

Will there be some updates to the hardware for each door or are we supposed to tr and determine what is needed from the Hardware Schedule. It has some doors noted

(24) but not all.

Please refer to previously issued Amendment 003 for supplemental information.

77 24 00 10 00 The RFP includes a CLIN schedule on pages 24-27 of the RFP.

Further, Attachement I - Price Proposal Form (00 22 13.00 20) was provided.

Please confirm for the Price Proposal only Attachment I is required to be completed for the Price Proposal. (Note on Attachment I, CLIN 3 has a typo and is listed as CLIN 4)

Please use Price Proposal Form Attachment I

78 22 00 10 00 4.2 The Proposal Submission Instructions allows for the Price Proposal Form as well as the Small Business Subcontracting Plan to be submitted Electronically. The rest of the proposal is to be delivered to NAVFAC's office as Hard Copies.

Due to the pandemic and Government Offices limiting access and unable to accept deliveries, we suggest all Price and Non- Cost/Price proposals be submitted electronically.

Please provide means to submit the propsoals electronically.

Please see Amendment

79 21 09 90 00 3.13.

Specification 09 90 00 Paints and Coatings Section 3.13.2 Interior Paint Tables calls for the High Performance Architectural Latex - Scrubbable Coating System for all Accent Color Walls to be scuffmaster or equal to and for the Scrub Test to be greater than 13,100 cycles per ASTM D2486.

Scuffmaster's normal eggshell product is only 8,000 scrub cycles and to get to the 13,100 you would have to use their premium coat texture product that is applied by an air spray gun only. With all other walls being just regular paint with a solid color, is the premium product desired to add the texture on the accent walls?

8,000 scrub cycles with no special applications is acceptable for accent walls.

80 08 71 00 The hardware schedule included in specification section 087100 has for hardware set 17.0 description:

Card Access – STC Assembly, but there is not any information on the door schedule to show which doors will need to have the card readers. Please list all door numbers requiring card readers.

Refer to Amendment #003.

81 08 71 00 The hardware schedule included in specification section 087100 has a hardware set 19.0 description:

Card + Combination Lock Access – STC Assembly, but there is not any information on the door schedule to show which doors will need to have the combination lock or the card readers. Please provide a list of these door numbers

Refer to Amendment #003.

82 A0002 The answer to PPI 12 in Amendment 0002 is to "Provide bid as specified." The GET Geotechnical report specifically states the groundwater table was measured at depths ranging from

6.5 to 9.5 feet below existing grade. Seasonal fluctuations of +- 2 to 3 feet are common. Land Management Group was consulted, and confirmed the Seasonal High Water Table would be at 21 to 36 inches below the ground surface. The GET report also verifies in section 1.2 that the 6 acre site is within a LUC boundary due to existing contaminated soil and groundwater conditions. C-008 verifies this as LUC Area 14, and notes than any groundwater encountered must be containerized, treated, and properly disposed of. It is unreasonable to expect the General Contractor to know how much groundwater they will encounter over the life of the project. There is no way to quantify that during the bid. This is identical to the amount of contaminated soil that will be encountered. CLIN 0001AF sheds the risk for the soil by providing an estimated quantity of soils, and a unit price. We are simply asking for a very similar CLIN to be added for contaminated ground water encountered. Please provide an estimated quantity of

The response in Amendment 002 was a typo. It was revised in Amendment 003 to read the following: "Bid Form has been edited to include a line item “Treatment of Contaminated Groundwater” as requested with a quantity of 250,000 gallons". See attached revised Bid Form.

contaminated groundwater to be included in the bid, and a unit price for any amounts above or below that amount.

83 Amendment

5 of 12 The Gov't answers the question;

"Bid Form has been edited to include a line item “Treatment of Contaminated Groundwater” as requested with a quantity of 250,000 gallons". Is NAVFAC going to povide an updated Attachment I -Bid Form?

Revised Bid Form was inadvertantly excluded in previous amendment and will be issued. See attached.

84 Electrical We do not see any specific electrical equipment manufacturers listed in the specificaions, please provide required manufacturers if required.

Specific electrical equipment manufacturers will not be provided and is not required.

85 Electrical What type of raceways are required for the fire alarm system?

One location in the specifications indicates GRC another location indicates EMT.

Provide RMC or IMC per 28 31 76 2.27.

86 Electrical EL701 Sheet EL701 indicates lighting control Bridge Modules and Area Controllers which are not shown on the drawings. Please clarify quantities and locations.

Area controllers and bridge module quanties and locations are to be determined once a manufacturer is selected. Quantity and locations will vary based upon system.

87 Electrical EL701 Sheet EL701 indicates Lighting Control Panels, these are not shown on the drawings. Please provide quantity and location. Is there only one as indicated on one-line diagram?

There is to be one lighting control panel to operate outdoor lighting circuits in rm 234.

88 Electrical Are multiple single-phase circuits allowed in a single conduit for branch circuiting homeruns (i.e.

from the panel to a local grid box)?

Yes but per E-001 all wiring must be to NEC.

All variations/changes to circuits must submitted for review and approval prior to installation.

00004

89 Electrical If multiple single phase-circuits are allowed in a single conduit, how many current-carrying conductors are allowed in a single conduit?

Limit multi circuit branch wiring to 3 circuits. Neutrals shall not be shared.

90 Electrical E-001 When sizing branch circuit conductors for homeruns to panels, are we to follow the parameters set on drawing E-001 General Note 14, or do we follow the conductor sizes noted on the panel schedules for each individual circuit?

These are set forth as minimums. Please use conductor sizes indicated in panelboards which have been modified for voltage drop.

91 Door Hardware

The hardware schedule also shows a lot of door to be STC rated (does not identify which STC) that are not listed on the door schedule as such. Here is what we found, by hardware set and the door numbers that are not reflected on the door schedule: HW Set 14.0 Door 208A HW 17.0 Doors 113, 191, HW Set 20.0 Doors 115,116,117,176,177 and 178 HW Set 23.0 Doors 114, 175 HW Set 28.0 Doors 105, 108, 109, 201, 202, 204, 205, 206, 208A, 210, 211, 213, 214, 215, 217, 218, and 219

Provide STC ratings per the door schedule on sheets A-611 & A-612

92 01 45 00.00

The Quality Control Spec, section

1.5.8 Submittal Reviewer is

requiring a registered architect or PE reivew each submittal. It is A-typical for a contractor to have a registered architect on a DBB project team, and licensed PE's are not common, even on experienced DOD project teams. On similar NAVFAC projects, we have seen this exact language read the submittals need reviewed by someone with 10 years or more experience. Please confirm if this requirement can be switched.

Second paragraph under 01 45 00.00 20 which reads, "Each submittal must be reviewed by a registered architect or professional engineer."

can be struck out.

Replace with "Each submittal must be reviewed by an individual with 10 years of construction experience".

93 AV TA002 On the Equipment and cabling FP- A and FP-B it say provided by LM please clarify what LM is and are we to assume this carries throughout the rest of the T pages when shown.

LM is Lockheed Martin, who is contracted through the Government and will provide/install equipment where indicated. This is also shown on the "Audiovisual Project Responsibility Matrix" on TA001

94 23 09 13 1.7 This paragraph references 01 30 00 Administrative Requirements. It states that the Instrumentation and Control Devices for HVAC is to be by a first tier subcontractor.

Spec Section 01 30 00 only states information about "First Tier Contractor Requirements for Asbestos Containing Materials".

Please confirm if the Instrumentation and Control Devices for HVAC is to be by a first tier subcontractor.

Both TABS and Instrumentation and control devices for HVAC are required to be performed by first tier subcontractor. 01 30 00 section will have section 1.5 added to read as follows:

“1.5 FIRST TIER

CONTRACTOR FOR

TABS AND

INSTRUMENTATION

FOR HVAC

Accomplish all contract requirements of Section

23 05 93 TESTING,

ADJUSTING AND

BALANCING FOR HVAC,

and Section 23 09 13

INSTRUMENTATION

AND CONTROL DEVICES

FOR HVAC directly with a first tier subcontractor.”

95 00 10 00 Small Business Subcontracting Targets are listed for SB, SDB, HubZone, WOSB and SDVOSB.

Please confirm that there are no small business subcontracting targets for Veteran Owned Small Businesses (VOSB), as none are shown.

Please establish based on what is identified in the RFP.

96 Will there be any Blast requirments on the glazing as non shown?

*See response to #20 0005

97 Drawing A-611 indicates OH-FS as a Fire Shutter for opening 195B.

The details on drawing A-522 show a non rated OH coiling door.

Also, spec section 08 33 23 doesn’t refer to any fire rating for the coiling door/ shutter. Please clarify if this opening is a rated opening and if so please provide additional specs/ details on the required opening rating and shutter construction.

*See response to #22 0005

98 PW114 The Plumbing drawings are calling for inverts @ say 23.75 This does not match with structural or Architectural with base slab @100.00 Please advise what floor level the plumbing drawings should be using.

*See response to #54 0005

99 4 08 41 13 1.4.2 Will OBE be an acceptable Manufacture?

*See response to #67 0005

100 Fire Protection

Is it the intent to have the six (6) ISO Rooms and FMS/OTW rooms on one dedicated sprinkler system that supplies only those areas?

Since the plans identify the supply connection points to supply each of these six (6) areas, is it the intent to install isolation valves for each of these six area?

Refer to contract drawing FX601, Details A1, C1, C2. Simulator zone feed main shall be provided with flow control assembly in the fire pump room per FX601, Detail A1.

Additionally, each simulator pod (consisting of Comp Equipment Room, IOS Room, FMS/OTW) shall be provided with flow control assembly with Inspector's Test Connection in locations shown on the contract drawings. Flow switch for associated simulator pod sprinkler system shall automatically shut down the simulator equipment for that specific pod per FX601, Detail C2.

101 tn701 1. On drawing TN701 Note B2 FMS One-Line it depicts seven (7) runs of 8-strand OM3 fiber. On drawing TN201 the matrix for this fiber reflects a 1U fiber enclosure and only 48-strands of fiber.

*See response to #70 0005

102 a. Can we use a 12-strand fiber and a 4U enclosure which is standard for strand count, we see 6,12 and 24 to be standard fiber counts and not a custom order with a long lead time like the 8-strand (the adapter panels will need to be 12-strand, they are not made in an )

*See response to #70a 0005

103 01 30 01.00

1.2 The second paragraph in

Paragraph 1.2 states that The Government FF&E and A/V estimates on the Section 00 22

13.00 20 SUPPLEMENTARY

INSTRUCTIONS to OFFERORS (Bid Schedule/Price Proposal Form) for the FF&E and A/V Planned Modifications are $2,112,028.92.

Spec Section 00 22 13.00 20 - CLIN 0006 has the FF&E to be $959,228.92 and CLIN 0007 has the A/V to be $2,234,676.04.

Please confrim which pricing is to be used in the price proposal form.

Please use $2,112,028.92 ($959,228.92 for FF&E and $1,152,800 for AV)

104 00 10 00 Factor 2 (page 15 of 49) references Attachment C - Small Business Subcontracting Record. In the attachments of the RFP, Attachment C is the Construction Experience Project Data Sheet (to be used for Factor 1) and Attachment D is the Small Business Subcontracting Record. Please confirm that Attachment C noted under Factor 2 is to be Attachment D in the RFP attachments.

Confirmed. 0005

105 00 10 00 Factor 4 (page 19 of 49) references Attachment D - PPQ. In the attachments of the RFP, Attachment D is the Small Business Subcontracting Plan and Attachment F is the PPQ. Please confirm that Attachment D noted under Factor 4 is to be Attachment F in the RFP attachments.

Confirmed. 0005

106 General

Is this project tax exempt? No 0005

107 General

Are trade specific permits required for this project?

Contractor is responsible for obtaining the Land Disturbance Permit prior to construction.

00005

108 Electrical

Are any of the floor boxes required to be Fire Classified?

No floor boxes are required to have a fire classification.

109 Electrical/M ech

The corridor and under raised floor cable tray is not clearly defined, can you provide further design clarification.

Please see cable tray symbol definition on TN001. The tag associated with cable trays shows the size, type, network and elevation above ( negative number for below) finished floor.

Corridor cable trays are stacked in some instances which is apparent by two tags showing two trays with different networks and different heights. It may appear as one tray but that is because it is being viewed from the top and a tray under the other would be hidden by the highest tray. Cable trays under access floor can be better viewed on 400 series sheets.

110 General

Challenges for prime contractors bidding on this project as a result of the Covid 19 issues. It has been difficult to contact subcontractors and suppliers who are not working from their offices. We respectfully request another two week extension to allow prime contractors time to better prepare their cost estimates.

Please bid per RFP 0005

111 Site work Clin 0002 Has building B286 Demolition. Does this inclued everthing out side of the building footprint along with CD 203 underground or is this to be associated with the Clin 0003 price for all work for parking lot?

All demo work associated with building 286 should be included in CLIN 0002, including sheet CD203.

112 Fire protection

Is it the intent to have the six (6) ISO Rooms and FMS/OTW rooms on one dedicated sprinkler system that supplies only those areas?

Since the plans identify the supply connection points to supply each of these six (6) areas, is it the intent to install isolation valves for each of these six area?

*See response to #100 0005

113 09 67 23.16 3.10.

The Coating Inspector is specified to be a QC Specialist, working for the QC Manager and be qualified in accordance with Section 01 45

00.00 10, 01 45 00.00 20 and 01 45

00.00 40 Quality Control. Spec Section 01 45 00.00 10 was not included in the RFP. Spec Section 01 45 00.00 20 does not mention the qualifcations of the Coating Inspector. Spec Section 01 45

00.00 40 was not included in the RFP. Please specify the qualifications of the Coating Inspector.

Bid per contract documents; intent is to follow requirements for QC specialists as noted throughout Spec Section 01 45 00.00 20.

114 00 22 13.00

Please confirm that CLIN 0001AG - Price for containment, treatment and proposal disposal of contaminated groundwater in accordance with the drawings and specifications that was added in Amendment 3/4 is NOT to be included in the CLIN 0001 Summary (includes CLIN's 0001AA thru 0001AF) and it is a stand alone price.

Correct. CLIN 0001AG is not included in the CLIN 0001 Summary and is a separate price.

(End of Summary)