1596300dwg06of26_Civil-CE.pdf
PDF 12 MB Posted
- Solicitation number
- N4008520R0015
About this file
This solicitation seeks proposals for a design-bid-build project to construct a F-35 Training and Simulator Facility at Marine Corps Air Station Cherry Point in North Carolina. Proposals are due on April 9, 2020 by 2:00 PM Eastern time. The pre-proposal inquiry cutoff is March 30 by 5:00 PM Eastern. The magnitude of construction is estimated between $25-100 million. The NAICS code is 236210 for industrial building construction and the small business size standard is $39.5 million. This is an unrestricted acquisition with full and open competition. The wage determination is NC20200065 from January 3, 2020.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E R
O S
I O
N
A
N D
S
D
I M
E N
T
N
O T
E S
CE001
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
I S
S U
F
O
C
N
S T
R U
C T
I O
N
1. CONSTRUCTION MATERIALS THAT POSE A POTENTIAL CONTAMINATION
THREAT TO STORM WATER MUST BE MANAGED TO MINIMIZE EXPOSURE TO
STORM WATER. MATERIALS MUST BE KEPT IN SECURE CONTAINERS AND
PROPERLY LABELED. SOLID AND LIQUID WASTE AND OTHER WASTES MUST
BE DISPOSED OF PROPERLY IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE AND LOCAL DISPOSAL REQUIREMENTS. DISPOSAL MUST BE
CONSISTENT WITH APPLICABLE STATE AND/OR LOCAL WASTE DISPOSAL,
SANITARY SEWER OR SEPTIC SYSTEM REGULATIONS AND MUST PROVIDE
FOR THE PROPER DISPOSAL OF CONTAMINATED SOILS TO THE EXTENT
THESE ARE LOCATED WITHIN THE PERMITTED AREA.
2. HANDLING CONSTRUCTION CHEMICALS. MIXING, PUMPING, TRANSFERRING
OR OTHER HANDLING OF CONSTRUCTION CHEMICALS SUCH AS FERTILIZER,
LIME, ASPHALT, CONCRETE DRYING COMPOUNDS, AND ALL OTHER
POTENTIALLY HAZARDOUS MATERIALS MUST BE PERFORMED IN AN AREA
AWAY FROM ANY WATERCOURSE, DITCH OR STORM DRAIN.
3. THE FOLLOWING GOOD HOUSEKEEPING PRACTICES MUST BE FOLLOWED
ON SITE DURING THE CONSTRUCTION PROJECT:
A. AN EFFORT MUST BE MADE TO STORE ONLY ENOUGH PRODUCT
REQUIRED TO DO THE JOB.
B. ALL MATERIALS STORED ON SITE MUST BE STORED IN A NEAT, ORDERLY
MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER
A ROOF OR OTHER ENCLOSURE.
C. PRODUCTS MUST BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE
MANUFACTURER'S LABEL. SUBSTANCES MUST NOT BE MIXED WITH ONE
ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER.
D. WHENEVER POSSIBLE, ALL OF A PRODUCT MUST BE USED UP BEFORE
DISPOSING OF THE CONTAINER.
E. THE MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND
DISPOSAL MUST BE FOLLOWED.
4. AT NO TIME WILL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS
OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN
MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF
BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
5. UNTIL THE SITE IS PERMANENTLY STABILIZED, ALL EROSION AND SEDIMENT
BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE
INSPECTIONS OF ALL EROSION & SEDIMENT BMPS AFTER EACH RUNOFF
EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL
MAINTENANCE WORK, INCLUDING CLEANOUT, REPAIR, RE-PLACEMENT,
RE-GRADING, RE-SEEDING, RE-MULCHING, AND RE-NETTING MUST BE
PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS
EXPECTED, REPLACEMENT BMPS, OR MODIFICATION OF THOSE INSTALLED
IS REQUIRED.
6. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING
THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT
POLLUTION, THE CONTRACTOR MUST IMPLEMENT APPROPRIATE BEST
MANAGEMENT PRACTICES TO ELIMINATE THE POTENTIAL FOR
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.
7. THE CONTRACTOR MUST KEEP A SUPPLY OF EROSION CONTROL MATERIAL
(SILT FENCE, JUTE MESH, RIP RAP, ETC.) ON-SITE FOR MAINTENANCE AND
EMERGENCY REPAIRS.
8. ALL REGULATORY AGENCY PERMITS REQUIRED FOR THE SITE MUST BE
OBTAINED PRIOR TO SITE WORK COMMENCES.
9. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL UNDERGROUND
UTILITIES. CONTRACTOR MUST USE A THIRD PARTY FOR PRIVATE UTILITY
LOCATING AS NECESSARY. SILT FENCE TO BE PLACED OFFSET FROM
UTILITY LOCATIONS.
10. PERMANENTLY STABILIZE BY SEEDING PER PLANS. SPOILS TO BE PLACED
AROUND EXISTING STRUCTURES AND EQUIPMENT.
11. ANY OFF-SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST
COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE
REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED
BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM
DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST
BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID
WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT
OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS.
12. ADDITIONAL MEASURES MAY BE REQUIRED. THE CONTRACTOR IS
RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON-SITE. IF THE
APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE
INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS
NECESSARY TO STOP SEDIMENT FROM LEAVING THIS SITE.
13. EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION MUST BE
PROVIDED IN ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION MUST ONLY BE FOR AREAS WITHIN THE DELINEATED
LIMITS OF WORK. CALL “MISS UTILITY” AT 1-800-632-4949 48 HOURS PRIOR
TO THE START OF WORK. WHEN SAME DAY STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL MUST BE PLACED ON THE HIGH SIDE OF
THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION MUST BE BACKFILLED,
COMPACTED, AND STABILIZED AT THE END OF EACH WORKING DAY. OPEN
NO MORE TRENCH THAN CAN BE COMPLETED THE SAME DAY.
14. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT
OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER
CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL
SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND
B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED
AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.
1. TEMPORARY GROUND COVER MUST BE INSTALLED WITHIN SEVEN DAYS
OF STOPPING GRADING ACTIVITY AT ANY PHASE OF CONSTRUCTION.
1.1. BASH (BIRD AIRCRAFT STRIKE HAZARD) AREAS: MULCH CRIMPLED
IN-PLACE.
1.2. NON-BASH AREAS: BELOW SEEDING
1.2.1. MAY - JULY: GERMAN MILLET
1.2.2. AUGUST - APRIL: RYE GRAIN (NOT ANNUAL RYE GRASS)
2. PERMANENT GROUND COVER MUST BE INSTALLED WITHIN SEVEN DAYS
OF COMPLETION OF FINAL GRADING.
2.1. BASH AREAS: PREFERRED APPLICATION IS CENTIPEDE SOD.
HOWEVER, THE FOLLOWING SEEDING SPECIFICATION MAY BE USED:
2.1.1. JANUARY - MARCH: MIXTURE (40% FESCUE, 40% UNHULLED
BERMUDA, 20% CENTIPEDE)
2.1.2. APRIL - AUGUST: MIXTURE (50% HULLED BERMUDA, 30%
CENTIPEDE, 20% BAHIA)
2.1.3. SEPTEMBER - DECEMBER: MIXTURE (60% FESCUE, 40%
UNHULLED BERMUDA)
2.2. NON-BASH AREAS: BELOW SEEDING, BASH SEEDING MAY ALSO BE
USED:
2.2.1. SEPTEMBER - MAY: CENTIPEDE GRASS
2.2.2. JUNE: BERMUDA GRASS
2.2.3. JULY - AUGUST: NO APPLICATION
3. TEMPORARY SEEDING MUST BE FERTILIZED AS REQUIRED BY AN
INDEPENDENT SOIL ANALYSIS. INSPECT SEED WEEKLY AND PROVIDE
WATER AS NEEDED FOR GERMINATION. AFTER GERMINATION, WATER AT
1-INCH PER WEEK UNTIL FIRST MOWING.
4. EXAMINE AREAS TO RECEIVE SEED FOR COMPLIANCE WITH
REQUIREMENTS AND FOR CONDITIONS AFFECTING PERFORMANCE OF
WORK AND ESTABLISHMENT. DO NOT PROCEED WITH INSTALLATION
UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
5. DISPOSE OF ANY GROWTH, ROCKS, OR OTHER OBSTRUCTIONS WHICH
MIGHT INTERFERE WITH SEEDING OR LATER MAINTENANCE OPERATIONS.
REMOVE STONES OVER 38MM (1 1/2 INCHES) IN ANY DIMENSION AND
STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER.
6. GRADE SEED AREAS TO A SMOOTH, EVEN SURFACE WITH LOOSE,
UNIFORMLY FINE TEXTURE. ROLL AND RAKE, REMOVE RIDGES AND FILL
DEPRESSIONS TO MEET FINISH GRADES. DO NOT USE WET SEED OR
SEED WHICH IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR
STORAGE.
7. SOW SEED WITH A BRILLION TYPE SEEDING MACHINE OR WHERE
APPLICABLE AND RESTRICTED BY STEEP SLOPES OR OTHER AREAS NOT
ACCESSIBLE TO THE SEEDING MACHINE, BROADCAST OR DROP SEED
METHODS MAY BE USED. DO NOT BROADCAST OR DROP SEED WHEN
WIND VELOCITY EXCEEDS 5 MPH. EVENLY DISTRIBUTE SEED BY SOWING
EQUAL QUANTITIES IN 2 DIRECTIONS AT RIGHT ANGLES TO EACH OTHER,
AND 3 DIRECTIONS IN HIGH MAINTENANCE AREAS.
8. RAKE, HARROW OR OTHERWISE WORK THE SEED INTO THE SOIL 1/4" TO
1/2" DEEP. KEEP THE AREA WELL- WATERED UNTIL THE SEEDS
GERMINATE AND THE SEEDLINGS HAVE GROWN SUFFICIENTLY TO
ESTABLISH A LAWN, THEN WATER AS NEEDED.
9. MOW GRASS TO A HEIGHT OF 50MM (2 INCHES) AS SOON AS THERE IS
ENOUGH TOP GROWTH TO CUT WITH MOWER. REMOVE NO MORE THAN
40% OF GRASS LEAF GROWTH IN INITIAL OR SUBSEQUENT MOWINGS. DO
NOT DELAY MOWING UNTIL GRASS BLADES BEND OVER AND BECOME
MATTED.
TEMPORARY STABILIZATION
AREAS REQUIRING TEMPORARY STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS:
ANY DISTURBED AREA WITHIN FIFTY (50) FEET WITHIN TWO (2) DAYS OF THE MOST RECENT
OF A STREAM AND NOT AT FINAL GRADE. DISTURBANCE IF THAT AREA WILL REMAIN IDLE
FOR MORE THAN FOURTEEN (14) DAYS.
FOR ALL CONSTRUCTION ACTIVITIES, ANY
DISTURBED AREA, INCLUDING SOIL STOCKPILES WITHIN SEVEN (7) DAYS OF THE MOST RECENT
THAT WILL BE DORMANT FOR MORE THAN DISTURBANCE WITHIN THE AREA.
FOURTEEN (14) DAYS BUT LESS THAN NINETY (90)
DAYS, AND NOT WITHIN FIFTY (50) FEET OF A STREAM.
DISTURBED AREA THAT WILL BE PRIOR TO THE ONSET OF WINTER
IDLE OVER WINTER WEATHER/NOVEMBER 1ST.
NOTES:
WHERE VEGETATIVE STABILIZATION TECHNIQUES MAY CAUSE STRUCTURAL INSTABILITY OR ARE
OTHERWISE UNOBTAINABLE, ALTERNATIVE STABILIZATION TECHNIQUES MUST BE EMPLOYED. THESE
TECHNIQUES MAY INCLUDE MULCHING OR EROSION MATTING.OR NO MORE THAN 90 CALENDAR DAYS
(WHICHEVER IS SHORTER).
1. INSTALL EROSION AND SEDIMENT CONTROL (E&SC) DEVICES IN
ACCORDANCE WITH THE PLAN DRAWINGS.
2. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL
DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY (EVERY
7 CALENDAR DAYS) AND WITHIN 24 HRS. OF A ONE-INCH RAIN EVENT. IT
IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE
INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED
EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING.
TO FACILITATE RAINFALL MONITORING, A RAIN GAUGE IS REQUIRED TO
BE ON SITE.
3. REPAIR OR REPLACE INEFFECTIVE E&SC MEASURES IMMEDIATELY
AFTER IDENTIFICATION OR AS SOON AS WEATHER CONDITIONS ALLOW.
4. IDENTIFY AND INSTALL ADDITIONAL TEMPORARY E&SC DEVICES IN
AREAS DEEMED IN NEED OF PROTECTION.
5. REMOVE SEDIMENT FROM INLET PROTECTION DEVICES ONCE SEDIMENT
HAS REACHED 1/3 THE HEIGHT OF THE INLET PROTECTION DEVICE.
6. REMOVE SEDIMENT FROM BEHIND SILT FENCE AS NECESSARY TO
PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO
REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING
THE FENCE DURING CLEANOUT.
7. REMOVE SEDIMENT AND RESTORE SEDIMENT TRAPS TO ORIGINAL
DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF
THE DESIGN DEPTH OF THE TRAP. PLACE SEDIMENT IN DESIGNATED
DISPOSAL AREA, AND REPLACE GRAVEL FACING THAT IS IMPAIRED BY
SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR
PIPING. ENSURE SPILLWAY REMAINS A MINIMUM OF 1.5 FEET BELOW THE
EMBANKMENT LOW POINT. REPLACE DISPLACED RIPRAP IMMEDIATELY.
REMOVE STRUCTURE AND ALL UNSTABLE SEDIMENT AFTER PERMANENT
STABILIZATION, AND SMOOTH AREA TO BLEND WITH ADJOINING AREAS.
8. PERFORM DAILY INSPECTIONS AND REMOVAL OF TRACKED MATERIAL
FROM THE PROJECT SITE ONTO ADJACENT ROADS.
9. MAINTAIN WRITTEN INSPECTION AND REPAIR OR REPLACEMENT FORMS
ON SITE AT ALL TIMES FOR E&SC MEASURES.
10. A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN, LETTER OF
APPROVAL, AND NPDES CONSTRUCTION PERMIT MUST BE MAINTAINED
ON SITE AT ALL TIMES.
11. MAINTAIN THE GRAVEL CONSTRUCTION ENTRANCE IN A CONDITION TO
PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE.
THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER
EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT
AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO
PUBLIC ROADWAYS.
12. THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING "SELF
INSPECTIONS" INDICATING THE DATE BMPs ARE INSTALLED AND
STABILIZATION MEASURES (SEEDING/MULCHING OR SOD) ARE INITIATED.
THE "SELF INSPECTION" REPORTS MUST BE MAINTAINED ALONG WITH
THE "NPDES" INSPECTION REPORTS. BOTH INSPECTIONS ARE RECORDED
ON THE SAME REPORT FORM AND MUST BE MAINTAINED BY THE
CONTRACTOR AT THE ONSITE OFFICE. ONCE STABILIZATION HAS BEEN
ACCOMPLISHED INSPECTION RECORDS MUST BE FORWARDED TO EAD
AND ALL TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES
REMOVED.
13. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE
WITH ALL PERMITS AND PLANS, ANY CHANGES MUST BE APPROVED BY
THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND
SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL, AND NPDES
CONSTRUCTION PERMIT MUST BE MAINTAINED BY THE CONTRACTOR AT
THE ONSITE OFFICE. IF SOIL IS REMOVED FROM OR BROUGHT ONSITE,
THE APPLICABLE SOLID WASTE MANAGEMENT PERMIT NUMBER, EROSION
SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE
DISCLOSED.
1. OBTAIN APPROVAL OF PLAN AND ANY NECESSARY PERMITS, AND HOLD
A PRE-CONSTRUCTION CONFERENCE PRIOR TO COMMENCING ANY
WORK.
INITIAL PHASE
2. STAKE OUT ROADS AND STORM DRAINAGE STRUCTURES FOR
PRELIMINARY GRADING.
3. INSTALL GRAVEL CONSTRUCTION ENTRANCES.
4. INSTALL SEDIMENT TRAPS AND SILT FENCING AS SHOWN ON PLAN.
5. DEMOLISH EXISTING STRUCTURES, PAVEMENTS, UTILITIES, AND SITE
FEATURES.
6. CONSTRUCT CHANNELS AND ANY OTHER SEDIMENT CONTROL
PRACTICES SHOWN, PRIOR TO ROUGH GRADING ROADWAYS, SITE AND
STOCKPILING TOPSOIL AS NECESSARY.
INTERMEDIATE PHASE
7. INSTALL STORM SEWER CONVEYANCE PIPE AND STRUCTURES.
8. FINAL GRADE, INSTALL ALL OTHER UTILITIES, INCLUDING BUT NOT
LIMITED TO WATER, SEWER, GAS, COMMUNICATIONS, ELECTRICAL
POWER AND SITE LIGHTING. VEGETATIVELY STABILIZE AREAS WHERE
BUILDING CONSTRUCTION IS NOT IMMIMENT.
9. ONCE FINAL GRADE HAS BEEN ESTABLISHED AND NON-PAVED AREAS
HAVE BEEN STABILIZED STORM DRAIN NETWORK MUST BE FLUSHED OF
SEDIMENT.
FINAL PHASE
10. UPON COMPLETION OF CONSTRUCTION, THE ROADWAY, PARKING AND
CIRCULATION AREAS ARE PAVED, AND ALL AREAS PERMANENTLY
VEGETATIVELY STABILIZED WITH CENTIPEDE SOD.
11. AFTER SITE STABILIZATION, REMOVE TEMPORARY EROSION AND
SEDIMENT CONTROL MEASURES.
EROSIONS AND SEDIMENT
CONTROL NOTES
PERMANENT/TEMPORARY SEEDING,
FERTILIZING AND MULCHING NOTES MAINTENANCE AND INSPECTION NOTES SEQUENCE OF CONSTRUCTION
12803961
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
DONALD ELLIOT
(BY EMAIL 08JAN2020)
FIRE PUMP
HOUSE
X
LOC
L O C
LOCLOCLOCLOCLOC
L O C
LOC
L O C
L O C
LOC
LOC
L O C
L O C
LOC LOC
L O C
LOC LOC LOC LOC LOC L
O C
LOC
L O C
LOC
LO
C
L O C
LOC LOC
LOC
L O C
L O C
L O C
L O C
L O
CLOCLOC
L O S
L O S
L O S
L O S
LOSLOSLOS
LOSLOSLOS
L O S
L O S
LOS
LOS
LOS
L O S
LOS
LOS
LOS
LOS
LOS LOS LOS LOS LOS
LOS LOS L
O S
L O S
L O S
L O S
L O S
LOS
LOS
L O S
L O S
L O S
L O S
G G
G G
G G
G G
G G
G G
SEE SHEETS CE101, CE201, CE301
SEE SHEETS CE103, CE203, CE303
SEE SHEETS CE102, CE202, CE302
DN
TR
MECH
DMRT
MATSS MISSION PLANNING
COMMAND CTR & OBSERV
CORR
NECC ADMIN
SHIPPING / RECEIVING / SUPPLY
CONFERENCE
FMS REPAIR SHOP / MAINT STOR
MECH / ELEC
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
CORR
MANTRAP
ISEO
ISEO
ISEO
WHITE CELL EVAL
MECH
ELEC
ELEC
ISE LAB
ISEO
CORR
CBT
AUDIOVISUAL
MANTRAP
MENS
WOMENS
BREAK
MENS
WOMENS
PSO SEC CONF
APSO / GSSO
PSO SERVER
PSO
PATCH PANEL
JANITOR
TR
LOBBY
MATSS TRAINING
CORR
MENS
WOMENS
JAN
MOTHER'S RM
BREAK
RECEPTION
TLT
SEC OFFICE
SEC BADGE
SEC MGR
CORR
ISEO
ISEO
VEST
SEC SUPPLY / EQUIP
STO
TR
REPRO
EVAL / PROGRAM / MATSS SUPPORT
MATSS CONFERENCE
JPO
MATSS
MATSS
MATSS
MATSS
SITCC /
JMPS
COMMANDER
TRAINING OPS MGR
CONTRACT PILOT INST MGR
LM
MATSS TRAINING
CORR
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
MECH / ELEC
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
MECH / ELEC
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
FMS/OTW
IOS ROOM
COMP EQUIP ROOM
SERVER
BRIEF
DEBRIEF
CORR
CORR
CORR
CORR
CORR
CORR
CORR
LOCKER
LOCKER
CONFERENCE
COMP SUPPORT
IAM / ISSO
FIRE PUMP
SIM / HELMET PAD STOR
ELEC
PLAN
NORTH
O V
E R
A L
L
E
R O
S I O
N
C
O N
T R
L
P
A
N
CE100
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
OVERALL EROSION CONTROL PLAN
SCALE IN FEET
30' 60'
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.
3. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235 DESIGN
DOCUMENTS.
GENERAL NOTES
KEY PLAN
PLAN
NORTH
A1
I S
S U
N
S T
R U
C T
I O
N
1. THIS DRAWING WAS PREPARED IN ACCORDANCE WITH
THE NORTH CAROLINA EROSION & SEDIMENT CONTROL
PLANNING AND DESIGN MANUAL.
2. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING
ENVIRONMENTAL DUE DILIGENCE AND DETERMINING
THAT ALL IMPORTED FILL MEETS THE EPA & STATE DEQ
DEFINITION OF CLEAN FILL. CLEAN FILL MEANS THAT THE
FILL MATERIAL IS NOT CONTAMINATED BY SOLID
WASTES, INFECTIOUS WASTES, HAZARDOUS WASTES OR
CONSTRUCTION AND DEMOLITION DEBRIS (C&DD). IF
THESE TYPES OF WASTE ARE COMMINGLED WITH CLEAN
HARD FILL, ALL OF THE MATERIALS MUST BE HANDLED
AND DISPOSED OF AS SOLID WASTE, INFECTIOUS WASTE,
HAZARDOUS WASTE OR C&DD.
3. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS
INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT
LIMITED TO, VISUAL PROPERTY INSPECTIONS,
ELECTRONIC DATA BASE SEARCHES, REVIEW OF
PROPERTY USE HISTORY, SANBORN MAPS,
ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION
SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL
ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT
A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL
INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF
THE PROPERTY INDICATES THAT THE FILL MAY HAVE
BEEN SUBJECTED TO A SPILL OR RELEASE OF
REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN
AFFECTED BY A SPILL OR RELEASE OF A REGULATED
SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT
QUALIFIES AS CLEAN FILL.
4. SILT FENCE IS SHOWN IN THE APPROXIMATE LOCATION
OF PLACEMENT. ADDITIONAL SILT FENCE MUST BE
PLACED TO PROTECT ANY ADDITIONAL AREAS
DISTURBED DURING CONSTRUCTION.
5. SILT FENCE MUST BE INSTALLED IN ACCORDANCE WITH
BEST MANAGEMENT PRACTICES PRIOR TO LAND
DISTURBANCE. SILT FENCE MUST BE MAINTAINED
DURING CONSTRUCTION AND ONLY REMOVED WHEN A
UNIFORM 80% VEGETATIVE COVER HAS BEEN
ESTABLISHED AND APPROVED BY COR.
6. ALL WASTE MATERIAL MUST BE PROPERLY RECYCLED
OR DISPOSED OF PER LOCAL OR STATE REQUIREMENTS.
7. A NORTH AMERICAN GREEN SC150 OR ENGINEER
APPROVED EQUAL EROSION CONTROL BLANKET MUST
BE PLACED OVER SIDE SLOPES 3:1 OR GREATER.
8. TOP SOIL STOCKPILE, CONCRETE WASHOUT AND WASTE
DISPOSAL AREAS MAY BE PLACED IN A CENTRAL
LOCATION WITHIN THE LIMITS OF DISTURBANCE TO
ACCOMMODATE CONSTRUCTION AND MATERIAL
LAYDOWN REQUIREMENTS.
9. PERIMETER SEDIMENT CONTROL MEASURES (SILT
FENCE) MUST BE IMPLEMENTED AS THE FIRST STEP OF
GRADING AND WITHIN SEVEN (7) DAYS FROM THE START
OF GRUBBING AND MUST CONTINUE TO FUNCTION UNTIL
UPSLOPE AREAS DRAINING TO THEM ARE PERMANENTLY
STABILIZED.
10. STREETS DIRECTLY ADJACENT TO CONSTRUCTION
ENTRANCES AND RECEIVING TRAFFIC FROM THE
DEVELOPMENT AREA, MUST BE CLEANED DAILY TO
REMOVE SEDIMENT TRACKED OFF-SITE. IF APPLICABLE,
THE CATCH BASINS ON THESE STREETS NEAREST TO
THE CONSTRUCTION ENTRANCES MUST ALSO BE
CLEANED WEEKLY.
11. ALL EROSION AND SEDIMENT CONTROL PRACTICES
SPECIFIED ON THIS PLAN MUST CONFORM WITH DETAILS
AND SPECIFICATIONS OUTLINED IN THE CURRENT
VERSION OF THE NORTH CAROLINA EROSION &
SEDIMENT CONTROL PLANNING & DESIGN MANUAL OR
OTHER STANDARDS ACCEPTABLE TO NORTH CAROLINA
DEQ.
12. EROSION AND SEDIMENT CONTROL PRACTICES NOT
ALREADY SPECIFIED ON THIS PLAN MAY BE NECESSARY
DUE TO UNFORESEEN ENVIRONMENTAL CONDITIONS
AND/OR CHANGES IN DRAINAGE PATTERNS CAUSED BY
EARTH-MOVING ACTIVITY.
13. SOIL STOCKPILES, TOPSOIL OR OTHERWISE, MUST BE
SITUATED AWAY FROM STREETS, SWALES, OR OTHER
WATERWAYS AND MUST BE SEEDED AND/OR MULCHED IN
ACCORDANCE WITH THE NORTH CAROLINA DEQ
TIMEFRAME FOR STABILIZATION.
14. ON-SITE PERSONNEL MUST TAKE ALL NECESSARY
MEASURES TO COMPLY WITH APPLICABLE REGULATIONS
REGARDING FUGITIVE DUST EMISSIONS.
15. CONCRETE WASH WATER MUST NOT BE ALLOWED TO
FLOW TO STREAMS, DITCHES, STORM DRAINS, OR ANY
OTHER WATER CONVEYANCE. A SUMP OR PIT WITH NO
POTENTIAL FOR DISCHARGE MUST BE CONSTRUCTED IF
NEEDED TO CONTAIN CONCRETE WASH WATER. FIELD
TILE OR OTHER SUBSURFACE DRAINAGE STRUCTURES
WITHIN 10 FT. OF THE SUMP MUST BE CUT AND PLUGGED.
GENERAL EROSION CONTROL NOTES
6TH AVENUE
C
S
T R
E E
T
5TH AVENUE
4TH AVENUE
CE103,
CE203,
& CE303
CE102,
CE202,
& CE302
CE101,
CE201,
& CE301
12803962
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
LOC
O
CLOC
L O C
L O C
L O C
L O C
L O C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC LOC
LOC
LOC LOC LOC LOC LOC LOC
LOC
LOC LOC LOC
L O C
LOC LOC LOC LOC
L O C
L O
C LOC
LOCLOC
L O C
L O C
L O C
L O C
L O C
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOSLOSLOSLOSLOS
LOSLOS
LOSLOS
LOS
LOSLOSLOSLOS
LOS
LOSLOSLOSLOS
LOS
LOS
LOS
LOS
LOS
LOS LOS LOS LOS LOS
LOS
LOS LOS
LOS
LOS
LOS
LOS
LOS
LO
S
X X X
X X
X X
XXX
X X
X X
X X
X X
XXX
X X
X X
X X
X
X X X X X X X
X X
X X
X
X
S T
S T
S T
S T
ST STST ST
S T
S T
S T
S T
S T
S T
D
D D
END
1END
1END
BEGIN
PLAN
NORTH
I N
I T
I A
L
E
R O
S I O
N
C
O N
T R
A
N
A
R E
A
CE101
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
INITIAL EROSION CONTROL PLAN - AREA 1
SCALE IN FEET
30' 60'
M A
T C
H
L
I N
E
S
H E
T
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.
3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.
4. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235 DESIGN
DOCUMENTS.
5. SILT FENCE MUST BE UTILIZED IN ALL NON-PAVED AREAS. UTILIZE COMPOST
SOCKS IN ALL PAVED AREAS, SEE DETAIL C1 ON SHEET CE502.
6. SILT FENCE OR COMPOST SOCKS MUST BE PLACED AT THE LIMITS OF
DISTURBANCE.
1. SILT FENCE, SEE GENERAL NOTES 5 & 6
2. CONSTRUCTION ENTRANCE
3. INLET PROTECTION
4. FILTER RING
5. COMPOST SOCK, SEE GENERAL NOTES 5 & 6
GENERAL NOTES
WORK NOTES
KEY PLAN
PLAN
NORTH
A1
CE102 CE101
CE103
I S
S U
N
S T
R U
C T
I O
N
A3
CE501
A1
CE501
C3
CE501
A4
CE502
ESC LEGEND
CONSTRUCTION ENTRANCE
SILT FENCE
A1
CE501
A3
CE501
INLET PROTECTION
C3
CE501
A4
CE502
FILTER RING
12803963
C1
CE502
COMPOST SOCK
C1
CE502
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
XXXXX
X
X
X X
LOC
LOCLOC
L O C
LOC
L O C
L O C
L O C
L O C
L O C
L O C
LOCLOCLOCLOCLOC
LOCLOCLOCLOC
L O C
L O C
L O C
L O C
L O C
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOSLOSLOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOSLOS
LOSLOSLOS
LOSLOSLOS
L O S
L O S
L O S
L O S
L O S
LO
S
LOS
LOS LOS LOS LOS
LOS LOS
LOS
LOS
LOS
BEGIN
BEGIN1
BEGIN 1
END1
SEE GEN. NOTE 6
1 5
1 5
PLAN
NORTH
I N
I T
I A
L
E
R O
S I O
N
C
O N
T R
A
N
A
R E
A
CE102
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
INITIAL EROSION CONTROL PLAN - AREA 2
SCALE IN FEET
30' 60'
M A
T C
H
L
I N
E
S
E
GENERAL NOTES
WORK NOTES
KEY PLAN
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.
3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.
4. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235 DESIGN
DOCUMENTS.
5. SILT FENCE MUST BE UTILIZED IN ALL NON-PAVED AREAS. UTILIZE COMPOST
SOCKS IN ALL PAVED AREAS, SEE DETAIL C1 ON SHEET CE502.
6. CONTRACTOR MUST MAINTAIN ACCESS TO BUILDING 4066 INCLUDING TRUCK
ACCESS LOADING AREA THROUGHOUT DURATION OF CONSTRUCTION.
7. SILT FENCE OR COMPOST SOCKS MUST BE PLACED AT THE LIMITS OF
DISTURBANCE.
PLAN
NORTH
A1
CE102 CE101
CE103
I S
S U
N
S T
R U
C T
I O
N
ESC LEGEND
SILT FENCE
A3
CE501
1. SILT FENCE, SEE GENERAL NOTES 5 & 7
2. INLET PROTECTION
3. FILTER RING
4. CONSTRUCTION ENTRANCE
5. COMPOST SOCK, SEE GENERAL NOTES 5 & 7
6. STOCKPILE SOIL AREA
A3
CE501
C3
CE501
A4
CE502
A4
CE502
FILTER RING
INLET PROTECTION
C3
CE501
CONSTRUCTION ENTRANCE
A1
CE501
A1
CE501
12803964
C1
CE502
C1
CE502
COMPOST SOCK
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
C
L O C
LOC
LOC
L O C
LOC
LOC
L O C
L O C
L O C
L O C
L O C
LOC L
O C
L O C
LOC
L O C
LOC LOC LOC LOC
L O C
L O C
L O C
L O C
L O C
L O C
L O C
LOC
LOC
L O C
L O C
L O C
LOC
L O C
L O C
LOCLOCLOCLOCLOCLOC
LOCLOC
LOC
LOS LOS LOS LOS LOS LOS LOS LOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LO
S
C O M M
C O M M
C O M M
C O M M
C O M M
C O M M
S T
S T
S T
S T
S T
S T
S T
S T
BEGIN
END
PLAN
NORTH
I N
I T
I A
L
E
R O
S I O
N
C
O N
T R
A
N
A
R E
A
CE103
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
INITIAL EROSION CONTROL PLAN - AREA 3
SCALE IN FEET
30' 60'
GENERAL NOTES
WORK NOTES
KEY PLAN
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.
3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.
4. SILT FENCE MUST BE UTILIZED IN ALL NON-PAVED AREAS. UTILIZE COMPOST
SOCKS IN ALL PAVED AREAS, SEE DETAIL C1 ON SHEET CE502.
5. SILT FENCE OR COMPOST SOCKS MUST BE PLACED AT THE LIMITS OF
DISTURBANCE.
PLAN
NORTH
A1
CE102 CE101
CE103
I S
S U
N
S T
R U
C T
I O
N
ESC LEGEND
CONSTRUCTION ENTRANCE
SILT FENCE
A1
CE501
A3
CE501
1. SILT FENCE, SEE GENERAL NOTES 4 & 5
2. CONSTRUCTION ENTRANCE
3. INLET PROTECTION
4. FILTER RING
5. COMPOST SOCK, SEE GENERAL NOTES 4 & 5
A3
CE501
A1
CE501
C3
CE501
A4
CE502
INLET PROTECTION
C3
CE501
A4
CE502
FILTER RING
12803965
ALL WORK THIS SHEET IS A BID OPTION
BUILDING 286 DEMOLITION
C1
CE502
COMPOST SOCK
C1
CE502
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
LOC
O
CLOC
L O C
L O C
L O C
L O C
L O C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC LOC
LOC
LOC LOC LOC LOC LOC LOC
LOC
LOC LOC LOC
L O C
LOC LOC LOC LOC
L O C
L O
C LOC
LOCLOC
L O C
L O C
L O C
L O C
L O C
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOSLOSLOSLOSLOS
LOSLOS
LOSLOS
LOS
LOSLOSLOSLOS
LOS
LOSLOSLOSLOS
LOS
LOS
LOS
LOS
LOS
LOS LOS LOS LOS LOS
LOS
LOS LOS
LOS
LOS
LOS
LOS
LOS
LO
S
S
S
S S
S S
S S
ST ST ST ST
ST
ST
S T
S T
ST
D
D
D
DD
D
D
U D
U D
U D
U D
U D
U D
U D
U D
UD UD
U D
UD
R
D
C
O
C
O
R
D
R
D RD
C
O
C
O
RD
R
D
CO
R
D
R
D
R
D
C
O
R
D
R
D
R
D
R
D
C O
R
D
R
D
C
O
C
O
C
O
ST
R
D
R
D
R
D
S T
D
ST
D
S T
D
R
D
C O
C
O
R
D
R
D
C
O
R
D
C
O
R
D
R
D
C
O
R
D
C
O
R
D
R
D
R
D
R
D
R
D
R
D
C
O
C
O
R
D
R
D
R
D R
D
R
D
R
D
C O
C
O
R
D
R
D
R
D
R
D
D
D D
(SEE GEN.
NOTE 6)
(SEE GEN.
NOTE 6)
R
I D
G
I N
E
R
I
D
N
E
R I D
N
E
R I D
N
E
R I D
N
E
F L
W
N
E
F
L
N
E
F
L
N
E
F
L
N
E
F
L
N
E
TYP
TYP
TYP
TYP
BEGIN
END
BEGIN
END
BEGIN
END
BEGIN
END
BEGIN
BEGIN
10END
BEGIN10 END
BEGIN
10 END
10 BEGIN
10 END
10 END
BEGIN
END
BEGIN
END
8 9
8 9
8 9
8 9
PLAN
NORTH
I N
T E
R M
E D
I A
O
S I O
N
C
O N
T R
A
N
A
R E
A
CE201
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
INTERMEDIATE EROSION CONTROL PLAN - AREA 1
SCALE IN FEET
30' 60'
M A
T C
H
L
I N
E
S
E
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.
3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.
4. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235 DESIGN
DOCUMENTS.
5. SILT FENCE MUST BE UTILIZED IN ALL NON-PAVED AREAS. UTILIZE COMPOST
SOCKS IN ALL PAVED AREAS, SEE DETAIL C1 ON SHEET CE502.
6. CONTRACTOR MAY RELOCATE THE CONCRETE WASHOUT TO A LOCATION
APPROVAED BY COR.
7. SITE MUST BE TEMPORARILY STABILIZED IF LEFT IDLE FOR A PERIOD LONGER
THAN 14 DAYS.
8. SILT FENCE OR COMPOST SOCKS MUST BE PLACED AT THE LIMITS OF
DISTURBANCE.
9. TEMPORARY SEEDING AND MULCHING MUST BE STABILIZED WITH NETTING
OR MATTING, SEE DETAIL B2 ON SHEET CE501.
1. RELOCATE CONSTRUCTION ENTRANCE
2. TEMPORARY SEEDING AND MULCHING, SEE GENERAL NOTE 9
3. INLET PROTECTION
4. OUTLET PROTECTION
5. CONCRETE WASHOUT
6. FILTER RING
7. CONSTRUCTION ENTRANCE
8. SILT FENCE, SEE GENERAL NOTES 5 & 8
9. COMPOST SOCK, SEE GENERAL NOTES 5 & 8
10. ROLLED EROSION CONTROL PRODUCTS
GENERAL NOTES
WORK NOTES
KEY PLAN
PLAN
NORTH
A1
CE202 CE201
CE203
I S
S U
N
S T
R U
C T
I O
N
A1
A1
CE502
C3
CE501
A3
CE502
C1
CE501
ESC LEGEND
CONSTRUCTION ENTRANCE
SILT FENCE
A1
CE501
A3
CE501
A4
CE502
INLET PROTECTION
A3
CE502
A4
CE502
FILTER RING
12803966
A3
CE502
OUTLET PROTECTION
A1
CE501
A3
CE501
C1
CE502
B4
CE502
COMPOST SOCK
C1
CE502
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
XXXXX
X
X
X X
LOC
LOCLOC
L O C
LOC
L O C
L O C
L O C
L O C
L O C
L O C
LOCLOCLOCLOCLOC
LOCLOCLOCLOC
L O C
L O C
L O C
L O C
L O C
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOSLOSLOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOSLOS
LOSLOSLOS
LOSLOSLOS
L O S
L O S
L O S
L O S
L O S
LO
S
LOS
LOS LOS LOS LOS
LOS LOS
LOS
LOS
LOS
S
S
(SEE GEN.
NOTE 7)
7 END
7 BEGIN
4 5
4 5
4 5
4 5
PLAN
NORTH
I N
T E
R M
E D
I A
O
S I O
N
C
O N
T R
A
N
A
R E
A
CE202
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
INTERMEDIATE EROSION CONTROL PLAN - AREA 2
SCALE IN FEET
30' 60'
M A
T C
H
L
I N
E
S
E
GENERAL NOTES
WORK NOTES
KEY PLAN
1. TEMPORARY SEEDING AND MULCHING, SEE GENERAL NOTE 9
2. CONCRETE WASHOUT
3. CONSTRUCTION ENTRANCE
4. SILT FENCE, SEE GENERAL NOTES 5 & 8
5. COMPOST SOCK, SEE GENERAL NOTES 5 & 8
6. INLET PROTECTION
7. ROLLED EROSION CONTROL PRODUCTS
8. FILTER RING
9. SOIL STOCKPILE AREA
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.
3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.
4. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235 DESIGN
DOCUMENTS.
5. SILT FENCE MUST BE UTILIZED IN ALL NON-PAVED AREAS. UTILIZE COMPOST
SOCKS IN ALL PAVED AREAS, SEE DETAIL C1 ON SHEET CE502.
6. SITE MUST BE TEMPORARILY STABILIZED IF LEFT IDLE FOR A PERIOD LONGER
THAN 14 DAYS.
7. CONTRACTOR MAY RELOCATE THE CONCRETE WASHOUT TO A LOCATION
APPROVAED BY COR.
8. SILT FENCE OR COMPOST SOCKS MUST BE PLACED AT THE LIMITS OF
DISTURBANCE.
9. TEMPORARY SEEDING AND MULCHING MUST BE STABILIZED WITH NETTING
OR MATTING, SEE DETAIL B2 ON SHEET CE501.
PLAN
NORTH
A1
CE202 CE201
CE203
I S
S U
N
S T
R U
C T
I O
N
CE502
ESC LEGEND
SILT FENCE
A3
CE501
A4
CE502
FILTER RING
CONSTRUCTION ENTRANCE
A1
CE501
12803967
C1
CE501
A1
CE501
A3
CE501
C1
CE502
C3
CE501
B4
CE502
C1
CE502
COMPOST SOCK
A4
CE502
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
C
L O C
LOC
LOC
L O C
LOC
LOC
L O C
L O C
L O C
L O C
L O C
LOC L
O C
L O C
LOC
L O C
LOC LOC LOC LOC
L O C
L O C
L O C
L O C
L O C
L O C
L O C
LOC
LOC
L O C
L O C
L O C
LOC
L O C
L O C
LOCLOCLOCLOCLOCLOC
LOCLOC
LOC
LOS LOS LOS LOS LOS LOS LOS LOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LOS
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
L O S
LO
S
(SEE GEN.
NOTE 5)
R
I
D
N
E
R I D
N
E
F
L
N
E
FLOW LINE
F
L
N
E
F
L
N
E
F
L
N
E
F
L
N
E
5 6
5 6
5 6
7 7
5 6
5 6
5 6
PLAN
NORTH
I N
T E
R M
E D
I A
O
S I O
N
C
O N
T R
A
N
A
R E
A
CE203
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SCALE: 1" = 30'
P -2
F
-3
TR
A
IN
IN
G A
N D
S
IM
U
LA
TO
R
F A
C
IL
IT
Y
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
INTERMEDIATE EROSION CONTROL PLAN - AREA 3
SCALE IN FEET
30' 60'
1. RELOCATE CONSTRUCTION ENTRANCE
2. TEMPORARY SEEDING AND MULCHING, SEE GENERAL NOTE 8
3. INLET PROTECTION
4. CONCRETE WASHOUT
5. SILT FENCE, SEE GENERAL NOTES 4 & 7
6. COMPOST SOCK, SEE GENERAL NOTES 4 & 7
7. FILTER RING
8. SOIL STOCKPILE AREA
GENERAL NOTES
WORK NOTES
KEY PLAN
1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.
3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.
4. SILT FENCE MUST BE UTILIZED IN ALL NON-PAVED AREAS. UTILIZE COMPOST
SOCKS IN ALL PAVED AREAS, SEE DETAIL C1 ON SHEET CE502.
5. CONTRACTOR MAY RELOCATE CONCRETE WASHOUT TO A LOCATION
APPROVED BY COR.
6. SITE MUST BE TEMPORARILY STABILIZED IF LEFT IDLE FOR A PERIOD LONGER
THAN 14 DAYS.
7. SILT FENCE OR COMPOST SOCKS MUST BE PLACED AT THE LIMITS OF
DISTURBANCE.
8. TEMPORARY SEEDING AND MULCHING MUST BE STABILIZED WITH NETTING
OR MATTING, SEE DETAIL B2 ON SHEET CE501.
PLAN
NORTH
A1
CE202 CE201
CE203
I S
S U
N
S T
R U
C T
I O
N
A1
CE502
C3
CE501
ESC LEGEND
CONSTRUCTION ENTRANCE
SILT FENCE
A1
CE501
A3
CE501
C1
CE501
INLET PROTECTION
C3
CE501
A4
CE502
FILTER RING
12803968
ALL WORK THIS SHEET IS A BID OPTION
PARKING AT BUILDING 286 SITE
COMPOST SOCK
C1
CE502
A3
CE501
C1
CE502
A4
CE502
N40085-20-R-0015 rosie.shanks Typewritten Text
MCAS CP
| CE001 - EROSION AND SEDIMENT NOTES |
| CE100 - OVERALL EROSION CONTROL PLAN |
| CE101 - INITIAL EROSION CONTROL PLAN - AREA 1 |
| CE102 - INITIAL EROSION CONTROL PLAN - AREA 2 |
| CE103 - INITIAL EROSION CONTROL PLAN - AREA 3 |
| CE201 - INTERMEDIATE EROSION CONTROL PLAN - AREA 1 |
| CE202 - INTERMEDIATE EROSION CONTROL PLAN - AREA 2 |
| CE203 - INTERMEDIATE EROSION CONTROL PLAN - AREA 3 |
2020-01-23T08:36:04-0500
2020-01-23T08:37:15-0500
2020-01-23T08:37:17-0500
2020-01-23T08:37:45-0500
2020-01-23T08:38:15-0500
2020-01-23T08:38:57-0500
2020-01-23T08:39:27-0500
2020-01-23T08:39:28-0500
2020-01-27T07:44:14-0500
2020-01-27T07:44:27-0500
2020-01-27T07:44:29-0500
2020-01-27T07:44:31-0500
2020-01-27T07:44:33-0500
2020-01-27T07:44:35-0500
2020-01-27T07:44:37-0500
2020-01-27T07:44:38-0500
| 2020-01-28T20:17:11-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:17:27-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:17:27-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:17:28-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:17:28-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:17:29-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:17:29-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:17:30-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:18:09-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:18:31-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:18:32-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:18:32-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:18:33-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:18:34-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:18:34-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-01-28T20:18:35-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .