This solicitation is for design-bid-build construction services for an F-35 Training and Simulator Facility at Marine Corps Air Station Cherry Point in North Carolina. The project magnitude is between $25-100 million, it is being solicited on an unrestricted basis with full and open competition under NAICS code 236210. Proposals are due on April 9, 2020 with pre-proposal inquiries due by March 20. The wage determination is NC20200065 dated January 3, 2020. The Naval Facilities Engineering Command is the contracting agency.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 8 P204 Drawings-Specs.pdf PDF
Amendment 0008.pdf PDF
Amendment 8 Attachment I -Updated Price Proposal Form_REVISED.pdf PDF
Amendment 0007-Update Proposal Submission.pdf PDF
Amendment 6 Attachment I-REVISED Price Proposal Form.pdf PDF
Amendment 0006.pdf PDF
Amendment 5.pdf PDF
Amendment 0005 PPI Responses.pdf PDF
Amendment 5 PPI-31_P-204 Soil Guidance Section for NEPA-PAMS.pdf PDF
Amendment 5 M-602.pdf PDF
Amendment 4 B286_Photos.zip ZIP file
Amendment 4 P204 B286 B4038 B4162 Existing FFE List Floor Plans.pdf PDF
Amendment 4 B4038_2of2.zip ZIP file
Amendment 4-B286_As-Built Drawings.pdf PDF
Amendment 4 P204 FF E List for Contractors.xlsx XLSX spreadsheet
Amendment 4 B4038_1of2.zip ZIP file
Amendment 3-Attachment I - Price Proposal Form_REVISED.docx DOCX document
Amendment 3-P-204_Hazardous Survey.pdf PDF
Amendment 3-B4038_As-Built Drawings_01.pdf PDF
Amendment 3-P-204_Site Investigation Report.pdf PDF
Amendment 0003.pdf PDF
Amendment 3-B4038_As-Built Drawings_02.pdf PDF
P-204_Amendment-003.pdf PDF
Amendment 3-B4162_As-Built Drawings.pdf PDF
Amendment 0002 Extend Proposal Due Date.pdf PDF
Amendment 0001 Site Visit Cancelled.pdf PDF
Attachment I - Price Proposal Form.docx DOCX document
Attachment D - Small Business Subcontracting Record.docx DOCX document
Attachment F - Past Performance Questionnaire.docx DOCX document
1596300dwg17of26_Interiors.pdf PDF
Attachment E - Small Business Participation and Commitment Strategy.docx DOCX document
1596300dwg03of26_Civil-C.pdf PDF
1596300dwg24of26_Electrical.pdf PDF
1596300dwg11of26_Civil-CS.pdf PDF
1596300dwg25of26_Telecom-AV.pdf PDF
1596300dwg14of26_Structural.pdf PDF
1596300dwg26of26_Telecom.pdf PDF
Attachment B - SECNAV 5512.pdf PDF
1596300dwg20of26_Mechanical.pdf PDF
1596300spc02of04.pdf PDF
1596300dwg09of26_Civil-CG.pdf PDF
Attachment J - Site Visit Map to B-163.pdf PDF
1596300dwg16of26_Architectural.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
1596300dwg23of26_Electrical.pdf PDF
1596300dwg06of26_Civil-CE.pdf PDF
RFP- P204.pdf PDF
Attachment G - Small Business Subcontracting Plan.docx DOCX document
1596300dwg01of26_General.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

***THE PROPOSAL DUE DATE REMAINS UNCHANGED***

The purpose of this amendment is to:

1. Provide photos, see attachments

2. Provide responses to PPIs

1. CONTRACT ID CODE PAGE OF PAGES

J 1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008520R0015

X 9B. DATED (SEE ITEM 11)

12-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Apr-2020

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520R0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

Quest ion No.

REFERENCE QUESTION GOVERNMENT

RESPONSE

Poste d on Amen d No.

Page Section Para.

1 13 Factor 1 5 Factor 1, Corporate Experience states “Scope: New construction of a simulator facility”. Will similar complex construction types be viewed as relevent such as active hospitals which have Operating Rooms or CT Scans, IT Facilities, or Laboratories with heavy coordination between with owner or contractor provided prefabricated equipment (similar to simulators) be considered as relevant experience?

Propose according to the RFP

00002

2 With the virus and everyone trying yo work from home subcontractors are asking for 3 week extension will this be possible?

Please see Amendment

00002

3 RFP Given the current cripling effect the COVID19 Pandemic has placed on the entire country, General Contractors, Subcontractors, and Vendors are all subject to it. Some are having to work from home, others aren't allowed to work or can't access files/information they need, and at best, those that are working are not able to operate at full speed in terms of estimating, take-offs, pricing efforts, etc. Please consider a two week bid extension from April 9th to April 23rd to allow the necessary time for the market to propose on this project in unforeseen and uncontrollable circumstances.

Please see Amendment

00002

4 S-513 Joist reinforcing detail is given on C3/S-513, please indicate where this is need on the structural drawings as this detail is not referenced.

Joist hanger detail C3/S-513 is provided as an option for locations where hanging loads fall between joist locations.

00002

5 05 12 00 05 12 00-2.6.2 clarifies zinc rich primer for all structural steel. This is a significant cost premium over standard primer, espeically on non-exposed structural steel.

Please confirm it is requried.

Standard shop primer may be used for interior, non-exposed structural steel.

00002

6 05 12 00 AISC certified erector and fabricator are required per 05 12 00-1.3. Please consider removing the AISC certified erector requirement for additional competition.

AISC certifications may be waived provided a similar certification and QC program is being followed. Refer to IBC 2015 Section 1704.2.5 for additional special inspection requirements in lieu of approved detailed fabrication and quality control procedures.

00002

7 21 00 00 Please confirm that no clean agent fire suppression systems are required in any rooms such as server rooms, simulator areas, etc.

Confirmed. Clean agent system is not required for this project.

00002

8 21 30 00 Please confirm which start method will be required on the controller for the fire pump, and if a transfer switch is needed.

Refer to Specification 21 30 00, section 2.7.1 for start method and ATS requirements.

00002

9 M-603 The Duct Silencer Schedule on M- 603 has lines for DS-13 and DS- 14 with no information listed next to it. Please confirm only DS-1 through DS-6 is applicable.

Only DS-1 through DS- 6 are required. DS-13 and DS-14 were printed by error and can be disregarded.

00002

10 RFP Item 1.2

Under item 1.2 General Overview of Contract - Description of Work it is noted, "The facility will be a reinforced concrete masonry unit building with seismic upgrades on a pile supported reinforced concrete slab on grade foundation." The structural plans do not show a pile foundation, the geotechnical report does not recommend one, and there is not a specification for a pile foundation.

Please confirm that there will NOT be a pile foundation required.

Confirmed. Piles are not anticipated for this project.

11 Attachment I CLIN 0001AF is for the sampling, and then exavataion, handling, and disposal of petroleum contaminated soil. Please separate the soil sampling and make it its own unit price CLIN (i.e. 5 soil samples @ $____ ea), as there is a chance that tested soil may come back clean and not need to be removed. Unless the Gov't wants all excavated soils treated as contaminated?

Provide bid as specified.

00002

12 C-008, C-009

Plans C-008 and C-009 indicate contaminated soils located within the limits of construction (and confirmed in CLIN 0001AF). The water table in this area will likely be encountered during construction. Due to the contaminated soils, the water will also be contaminated and will need to be treated and legally disposed of. Please provide a quantity and unit price line item on the bid form for treatment of contaminated water.

Bid Form has been edited to include a line item “Treatment of Contaminated Groundwater” as requested with a quantity of 250,000 gallons

00002

14 01 45 00.00

1.5.2 The Quality Control spec reads

that a commssioning authority is to be provided for the project in

1.5.2.1. Spec 01 91 00.15 22, 1.1

very clearly notes the CxA will be provided by the Gov't. Please confirm these are the same firm/person, and will be provided by the Gov't.

CxA is to be provided by govt.

00002

15 1 Solicitation In light of “Stay at Home Orders” issued across multiple states, counties and cities, and the uncertainty resulting from the national emergency declared as a result of the COVID-19 Pandemic. Our operations, and that of the subcontractor market, have been severely impacted. For this reason we are requesting a 2 week extension of this bid.

Please see Amendment

16 Due to Amendment 0001 cancelling the site visit, will the demolition contractors have the opportunity to visit the jobsite to view the three buildings to be demolished? Will there be an opportunity for general contractors and any other subcontractors to visit the jobsite?

Due to COVID-19 pandemic and the increasing state and local governments issuing “shelter in place” policies, there will no longer be a site visit for this solicitation. Please utilize the drawings and specifications when preparing your proposal.

00002

17 A4/A526 Please provide a specification for the pre-cast concrete sills at the windows as shown on detail A4/A526.

Refer to specification 04 20 00, section 2.2.4.

00002

18 Is the general contractor to submit pricing as shown on pages 25-27 of 29 of the RFP, with Item No's 0001, 0002, 0003, 0004, 0005, 0006 and 0007 or is the general contractor to submit pricing as shown in Document 00 22 13.00 20 - Supplementary Instructions to Offerors with CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0002, 0003, 0004, 0005, 0006 and 0007?

Please clarify the bid form.

Please use Attachment I- Price Proposal Form

00002

19 With the virus and everyone trying yo work from home subcontractors are asking for 3 week extension will this be possible?

Please see Amendment

00002

20 Will there be any Blast requirments on the glazing as non shown?

Blast rating is not required.

00002

21 Please consider pushing the bid date on this Solicitation at least one week to 16 April. There is quite a bit of work bidding right now at Cherry Point and Camp Lejeune and everyone is a bit displaced. A short extension would help this bid considerably.

Thank you.

Please see Amendment

22 Drawing A-611 indicates OH-FS as a Fire Shutter for opening 195B. The details on drawing A- 522 show a non rated OH coiling door.

Also, spec section 08 33 23 doesn’t refer to any fire rating for the coiling door/ shutter. Please clarify if this opening is a rated opening and if so please provide additional specs/ details on the required opening rating and shutter construction.

Fire rating is not required for the overhead coiling door.

00003

23 Solicitati on

Request for electronic bid submission on bid due date in lieu of hard copies for reasons stated above in question 1.

Please bid per RFP 00003

24 Telecom In the Combination Floor Box Schedule on Drawing TN601 there is a column labeled 'Telecom Outlet Type'. It has the outlets listed as x/x/x with each x being an outlet type. A sequence that appears multiple times is 1/SP/S. I know that the Nmber 1 stands for a Type 1 outlet and the 'S' stands for a SIPR Outlet (See Note 2 on TN601). However there is no where that 'SP' is defined. I assume it means that it is a spare outlet and doesnt require cabling but I can't be sure? What does the 'SP' stand for?

SP stands for space and is to be left open.

00003

25 4 CLIN 3 With the current "work from home" requirement being enforced by most companies would it be acceptable to provide an email from our banking institution demonstrating adequate financial resources in place of a signed bank reference? Our banking institution is unable to provide such a letter without going into the office location, and at this time they are all working from home.

Please bid per RFP 00003

26 1 14 Amendment 0001 cancels the site visit previously scheduled for 24 March, is NAVFAC scheduling an alternative site walk for this solicitation.

No 00003

27 2 02 41 00 1.2.2 The specifications state the following: "It is the contractor's responsibility to provide pricing to remove and dispose of all existing furniture and equipment in the building at the time of the initial building walk-through's. Since the site walk was cancelled NAVFAC will need to provide contractors with a detailed list of all equipment, along with photos, of the building contents which will need to be disposed.

See attached FFE list, FFE floorplan, and existing building photos for B286 and B4038.

00004

28 4 02 41 00 1.6.1 Is construction water available on MCBCP and if there available is there a cost for water usage.

Water is always available for base contract work at the fill station located at the water plant free of charge.

If a contractor desires water to be setup at a construction trailer, the contractor must hire a licensed plumber to install a tap and have backflow prevention installed and tested.

Paperwork must be submitted to the Base.

This is all at the contractors expense.

Usually during demo work all utilities are demo'd as well, so having water at the demo site is dependent on if the contract calls for water utilities to be demo'd. If water will remain at the bldgs.

contractors must install a backflow preventer on the desired hydrant and have a licensed tester test the assembly and submit the certified paperwork to the Base.

00003

29 1 1.1 The specifications state that the Government will employ the services of an independent, Commissioning Firm. Please provide the number of calendar days that the Commissioning Firm will require so that those days can be incorporated in the Contractors schedule.

The Commissioning Firm is employed by the Government and will require approximately 58 days.

00004

30 6-7 3.1 Pursuant to the demolition specifications the contractor is required to salvage/recycle numerous items from the existing building, the lack of a site walk prevents contractors from acturately performing a qualified takeoff from the plans provided. If a site walk is not going to be provided will NAVFAC provide the detailed drawings of the the buildings to be demolished along with photos.

General Demolition sheets are included in the set which do include drawings and some existing photos.

Also see attached Site Investigation Report for additional existing photos. See attached existing As-Built drawings for buildings B4038 and B4162.

Additional drawings and photos will be forthcoming as the Base is currently in the process of gathering additional information and will be distributed as they become available.

00003

31 8 3.10 The specifications state that the following: "Offsite disposal of contaminated material shall be in accordance with design documents and base requirements." MCBCP, as the generator of hazardous waste must currently have a detailed disposal plan which would be incorporated in the base requirements for disposal, please make this document available to contractors.

The Base does not have a detailed disposal plan. We do not identify any disposal sites. All language is similar to “dispose in accordance with local, state, and federal regulations” or “as directed by the COR”.

00003

32 1-4 1.2 Specifications require the contractor to remove and dispose of PCB containing lighting ballasts and associated mercury-containing lamps. The lack of a site visit prevents the contractor from acturately identifying the size and level of effort required to remove each unit. Could NAVFAC provide a detailed list along with photos, and height of units from floor.

See attached Site Investigation Report for existing building photos. See attached drawings for existing as-built drawings. See attached Hazardous Materials Report for the project. Additional drawings and photos will be forthcoming.

33 3.(a) With the current "work from home" requirement being enforced by most companies would it be acceptable to provide an email from our banking institution demonstrating adequate financial resources in place of a signed bank reference? Our banking institution is unable to provide such a letter without going into the office location, and at this time they are all working from home.

Please bid per RFP 00003

34 3.(b)( 1)

Would the government consider revising experience requirements to require a minimum of 1 project.

Please bid per RFP 00003

35 CD20

Demolish and remove domestic waterline…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

36 CD20

Demolish and remove electrical duct…without the ability to perform a site visit can you provide the depth of the duct to be removed. Additionally, is the duct encased in concrete or slurry.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

37 CD20

Demolish and remove communications duct bank…without the ability to perform a site visit can you provide the depth of the duct to be removed. Additionally, is the duct encased in concrete or slurry.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

38 CD20

Demolish and remove 4" PVC sanitary sewer pipe and cap…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

39 CD20

Demolish and remove 8" PVC sanitary sewer pipe and cap…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

40 CD20

Demolish and remove 18" RCP Storm Sewer…is this actually a sewer line or is it the storm water line.

This is what the survey calls a Storm Sewer. It is a culvert that conveys runoff under the entrances

41 CD20

Demolish and remove 18" RCP Storm Sewer…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

42 CD20

Demolish and remove domestic waterline…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

43 CD20

Demolish and remove electrical duct…without the ability to perform a site visit can you provide the depth of the duct to be removed. Additionally, is the duct encased in concrete or slurry.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

44 CD20

Demolish and remove communications duct bank…without the ability to perform a site visit can you provide the depth of the duct to be removed. Additionally, is the duct encased in concrete or slurry.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

45 CD20

Demolish and remove 6" clay sanitary sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

46 CD20

Demolish and remove 8" clay sanitary sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

47 CD20

Demolish and remove 8" PVC sanitary sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

48 CD20

Demolish and remove 12" clay sanitary sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

49 CD20

Demolish and remove 12" clay storm sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

50 CD20

Demolish and remove 15" clay storm sewer pipe…without the ability to perform a site visit can you provide the depth of the line to be removed.

VF100’s series sheets for locations of existing site utilities and sheet C-002 for existing sanitary sewer and existing storm inverts

00003

51 7 1.2 e Would the government consider revising experience requirements to require a minimum of 1 project.

Please bid per RFP 00003

52 22 4.2 i Could you authorize an electronic submission of the Price Proposal as well as the Non-Price Proposal due to the actual travel restrictions?

Please bid per RFP 00003

53 Could the you provide the CAD drawings for the project plans.

Please use the drawings and specs provided in this solicitation.

00003

54 PW114 The Plumbing drawings are calling for inverts @ say 23.75 This does not match with structural or Architectural with base slab @100.00 Please advise what floor level the plumbing drawings should be using.

The real world elevations of the FFE is 27.00' as shown on sheet CG101. The Plumbing inverts correlate with civil.

00003

55 A-700 The Room Finish Schedule on A- 602 and Floor Finish Plan on A- 700 conflict with each other.

Room 115 COMP SUPPORT shows the grid for RAF-1 on drawing A-700, but the finish schedule does not show any raised access floor for this room. Please advise if raised access flooring is needed for Room 115 COMP

SUPPORT.

Provide RAF-1 / CPT-2 at 115 COMP

SUPPORT.

00003

56 TY100-

TY501

There are no CCTV cameras shown on the security drawings.

Please indicate quantity of cameras required so we can include rough in

There are no CCTV cameras to be provided.

00003

57 Div 28 Please provide specification for access control, intrusion detection, and CCTV for CLIN 0005

DELETE CLIN 0005.

ESS equipment will be provided by the Government.

58 TN506 Confirm that antennae shown are provided by the government

GPS antennas shown are to be provided by Lockheed Martin which will be coordinated with Government.

00003

59 31 21 13 and S-101

Specification 31 21 13 is given for Vapor Mitigation. Structural drawings indicate to use 20 MIL Vapor Barrier. The spec calls out a soil-gas retarder membrane that is 40mils thick in 2.1.2. Please verify what barrier should be used.

Spec section 31 21 13 will be updated accordingly to indicate 20MIL vapor barrier as indicated in Amendment #003.

00003

60 08 71 00 The hardware schedule included in specification section 087100 has door numbers listed for some sets, but does not have door numbers listed for sets 4.0, 7.0, 8.0, 12.0,

17.0 and 19.0. Please provide the door numbers required for these hardware Sets.

Refer to Amendment #003.

00003

61 08 71 00 The hardware schedule included in specification section 087100 does not include door numbers 103, 104, 105, 106A, 106B, 107, 108, 110, 111, 112, 113, 114, 115, 116, 117, 119B, 120, 121, 122, 123, 124, 125, 126, 127A, 127B, 127C, 128, 131, 132, 133, 134, 135, 136, 137, 138A, 138B, 138C, 139, 140, 141, 142, 143, 144, 145A, 145B, 145C, 146, 147, 148, 149, 150, 151, 152, 153, 154A, 154B, 154C, 155, 156, 157, 158, 159, 160 161 162A, 162B, 162C, 163 164, 165, 166, 167, 168, 169, 170A 170B, 170C, 171A, 171B, 172, 173, 174, 175, 176, 177, 178, 179, 180, 181, 184, 185, 186, 188, 189, 190B, 191, 192, 193, 195A, 195B, 196B, 199, 201, 202, 204, 205, 206, 208B, 210, 211, 212, 213, 214, 215, 217, 218, 219, 220, 221A, 221B, 222, 223, 224, 225, 226, 227 228A, 228B, 229A, 229B, 230A, 230B, 231, 232, 233, 234 and 235. Please confirm the required hardware sets for each opening listed above.

Refer to Amendment #003.

62 08 71 00 The hardware schedule included in specification section 087100 has for hardware set 17.0 description:

Card Access – STC Assembly, but there is not any information on the door schedule to show which doors will need to have the card readers. Please list all door numbers requiring card readers.

Refer to Amendment #003.

00003

63 08 71 00 The hardware schedule included in specification section 087100 has a hardware set 19.0 description:

Card + Combination Lock Access

– STC Assembly, but there is not any information on the door schedule to show which doors will need to have the combination lock or the card readers. Please provide a list of these door numbers

Refer to Amendment #003.

00003

64 D1/A546 Please specify the material type for the fascia that is labeled on the Window Shade Detail.

Please specify a satin finish for the window fascia’s for WS-1

00003

65 A121 Please specify the extent of the PLAM-1 drop ceiling as noted on Note 14 on A602.

The L-shaped portion that is being shown with a Gypsum finish on A-121 for rooms 197 and 197 (both the vertical and horizontal portions of the drop ceiling) will be finished in PLAM-1.

00003

66 00 10 00 4.2 If we elect to email our price proposal and subcontracting plan, when would we need to submit the original copy of the bid bond?

Will the original copy of the bid bond need to be received before or after the bid date/time.

Please submit a copy with your price proposal and mail the original in.

00003

67 4 08 41 13 1.4.2 Will OBE be an acceptable Manufacture?

OBE is an acceptable manufacturer. Product must meet specification requirements of 08 41 13.

00003

68 C1/S313 Plan sheet S-114 references Detail C1/S-313, at center of page (two locations). Plan sheet C1/S-313 is not available. Please provide plan sheet and/or associated Detail C1/S-313.

S-114 reference to C1/S-313 should reference A1/S-312. S- 114 will be updated accordingly.

69 09 90 00 1.3.1 Please consider removing the SSPC QP 1 Certification required, as this certification is typically for marine and industrial projects.

Refer to Amendment #003

00003

70 tn701 1. On drawing TN701 Note B2 FMS One-Line it depicts seven (7) runs of 8-strand OM3 fiber. On drawing TN201 the matrix for this fiber reflects a 1U fiber enclosure and only 48-strands of fiber.

FPP3 on TN701 shall be a 72 port patch panel in lieu of 48 port.

00004

a. Can we use a 12-strand fiber and a 4U enclosure which is standard for strand count, we see 6,12 and 24 to be standard fiber counts and not a custom order with a long lead time like the 8-strand (the adapter panels will need to be 12-strand, they are not made in an )

12-strand fiber and 4U enclosure is acceptable

00004

71 TH07 1. On drawing TN07 Note C2 Telecom One-Line it depicts eight

(8) runs of 12-strand SM OS1 fiber.

That is correct. 00004

a. On drawings TN202, the matrix and the note C2 reflects fiber in both racks as well as the matrix. What is the requirement.

Provide fiber per one-line to fiber patch panels of racks. For example one-line shows (1) 12 strand to rack B1; fiber patch panel in B2 is spare.

00004

b. On drawing TN204 Note C3 reflects a fiber enclosure in all three secure racks but the One Line drawing on TN07 only shows one (1) 24-strand. What is the requirement.

The requirement is one 12 strand fiber to S5.

This would be a half populated patch panel;

not all ports will have cabling.

00004

c. On drawing TN205 Note C3 reflects a fiber enclosure in one rack but the matrix reflects two racks. What is the requirement.

Provide for D1 rack in elevation. B2 was left in table accidently and should ignored on

TN205.

00004

72 TN501 1. On drawing TN501 Note A3 depicts a television wall plate with a data jack (A) and a Coaxial jack

(B) and two blanks.

Yes. That is correct. 00004

a. On drawings TN602 the matrix for the wall plates shows the TV data jack in the voice column. What is the requirement?

The data jack should be classified as UCLAS data in lieu of phone.

They should be terminated at a UCLAS patch panel.

00004

73 TN602 1. On drawing TN602 Comm Rm 130 room 184 conf. should that first item be a TV?

This is referring to the outlet in184-1 floorbox.

See combo box schedule sheet TN601 for outlet types. 184-1 shall be Type 4 / Space / Type S outlet. Only using 3 gangs of 8.

00004

74 1. Will all of the conduit pathways for the copper and fiber backbone be in the plenum space and not installed below the slab?

Yes all backbone cabling shall be routed in plenum overhead as shown on TN004.

00004

75 3.5.1.4 1. 3.5.1.4 Final Verification Testing. This is not something that we have seen on any other projects is this truly a requirement of the Telecom Contractor?

Yes this testing per section 3.5.1.4 is required. Coordinate with base telephone for completion.

00004

76 Door Hardwar e

Will there be some updates to the hardware for each door or are we supposed to tr and determine what is needed from the Hardware Schedule. It has some doors noted

(24) but not all.

Please refer to previously issued Amendment 003 for supplemental information.

00004

77 24 00 10 00 The RFP includes a CLIN schedule on pages 24-27 of the RFP. Further, Attachement I - Price Proposal Form (00 22 13.00

20) was provided.

Please confirm for the Price Proposal only Attachment I is required to be completed for the Price Proposal. (Note on Attachment I, CLIN 3 has a typo and is listed as CLIN 4)

Please use Price Proposal Form Attachment I

00004

78 22 00 10 00 4.2 The Proposal Submission Instructions allows for the Price Proposal Form as well as the Small Business Subcontracting Plan to be submitted Electronically. The rest of the proposal is to be delivered to NAVFAC's office as Hard Copies.

Due to the pandemic and Government Offices limiting access and unable to accept deliveries, we suggest all Price and Non-Cost/Price proposals be submitted electronically.

Please provide means to submit the propsoals electronically.

Please see Amendment

79 21 09 90 00 3.13.

Specification 09 90 00 Paints and Coatings Section 3.13.2 Interior Paint Tables calls for the High Performance Architectural Latex - Scrubbable Coating System for all Accent Color Walls to be scuffmaster or equal to and for the Scrub Test to be greater than 13,100 cycles per ASTM D2486.

Scuffmaster's normal eggshell product is only 8,000 scrub cycles and to get to the 13,100 you would have to use their premium coat texture product that is applied by an air spray gun only. With all other walls being just regular paint with a solid color, is the premium product desired to add the texture on the accent walls?

8,000 scrub cycles with no special applications is acceptable for accent walls.

00004

80 08 71 00 The hardware schedule included in specification section 087100 has for hardware set 17.0 description:

Card Access – STC Assembly, but there is not any information on the door schedule to show which doors will need to have the card readers. Please list all door numbers requiring card readers.

Refer to Amendment #003.

00004

81 08 71 00 The hardware schedule included in specification section 087100 has a hardware set 19.0 description:

Card + Combination Lock Access

– STC Assembly, but there is not any information on the door schedule to show which doors will need to have the combination lock or the card readers. Please provide a list of these door numbers

Refer to Amendment #003.

82 A0002 The answer to PPI 12 in Amendment 0002 is to "Provide bid as specified." The GET Geotechnical report specifically states the groundwater table was measured at depths ranging from

6.5 to 9.5 feet below existing grade. Seasonal fluctuations of +- 2 to 3 feet are common. Land Management Group was consulted, and confirmed the Seasonal High Water Table would be at 21 to 36 inches below the ground surface. The GET report also verifies in section 1.2 that the 6 acre site is within a LUC boundary due to existing contaminated soil and groundwater conditions. C-008 verifies this as LUC Area 14, and notes than any groundwater encountered must be containerized, treated, and properly disposed of. It is unreasonable to expect the General Contractor to know how much groundwater they will encounter over the life of the project. There is no way to quantify that during the bid. This is identical to the amount of contaminated soil that will be encountered. CLIN 0001AF sheds the risk for the soil by providing an estimated quantity of soils, and a unit price. We are simply asking for a very similar CLIN to be added for contaminated ground water encountered. Please provide an estimated quantity of contaminated groundwater to be included in the bid, and a unit price for any amounts above or below that amount.

The response in Amendment 002 was a typo. It was revised in Amendment 003 to read the following:

"Bid Form has been edited to include a line item “Treatment of Contaminated Groundwater” as requested with a quantity of 250,000 gallons". See attached revised Bid Form.

00004

83 Amendm ent 3

5 of 12 The Gov't answers the question;

"Bid Form has been edited to include a line item “Treatment of Contaminated Groundwater” as requested with a quantity of 250,000 gallons". Is NAVFAC going to povide an updated Attachment I -Bid Form?

Revised Bid Form was inadvertantly excluded in previous amendment and will be issued. See attached.

84 Electrica l

We do not see any specific electrical equipment manufacturers listed in the specificaions, please provide required manufacturers if required.

Specific electrical equipment manufacturers will not be provided and is not required.

00004

85 Electrica l

What type of raceways are required for the fire alarm system?

One location in the specifications indicates GRC another location indicates EMT.

Provide RMC or IMC per 28 31 76 2.27.

00004

86 Electrica l

EL701 Sheet EL701 indicates lighting control Bridge Modules and Area Controllers which are not shown on the drawings. Please clarify quantities and locations.

Area controllers and bridge module quanties and locations are to be determined once a manufacturer is selected. Quantity and locations will vary based upon system.

00004

87 Electrica l

EL701 Sheet EL701 indicates Lighting Control Panels, these are not shown on the drawings. Please provide quantity and location. Is there only one as indicated on one-line diagram?

There is to be one lighting control panel to operate outdoor lighting circuits in rm 234.

00004

88 Electrica l

Are multiple single-phase circuits allowed in a single conduit for branch circuiting homeruns (i.e.

from the panel to a local grid box)?

Yes but per E-001 all wiring must be to NEC.

All variations/changes to circuits must submitted for review and approval prior to installation.

00004

89 Electrica l

If multiple single phase-circuits are allowed in a single conduit, how many current-carrying conductors are allowed in a single conduit?

Limit multi circuit branch wiring to 3 circuits. Neutrals shall not be shared.

00004

90 Electrica l

E-001 When sizing branch circuit conductors for homeruns to panels, are we to follow the parameters set on drawing E-001 General Note 14, or do we follow the conductor sizes noted on the panel schedules for each individual circuit?

These are set forth as minimums. Please use conductor sizes indicated in panelboards which have been modified for voltage drop.

91 Door Hardwar e

The hardware schedule also shows a lot of door to be STC rated (does not identify which STC) that are not listed on the door schedule as such. Here is what we found, by hardware set and the door numbers that are not reflected on the door schedule: HW Set 14.0 Door 208A HW 17.0 Doors 113, 191, HW Set 20.0 Doors 115,116,117,176,177 and 178 HW Set 23.0 Doors 114, 175 HW Set 28.0 Doors 105, 108, 109, 201, 202, 204, 205, 206, 208A, 210, 211, 213, 214, 215, 217, 218, and 219

Provide STC ratings per the door schedule on sheets A-611 & A-

00004

92 01 45 00.00

The Quality Control Spec, section

1.5.8 Submittal Reviewer is

requiring a registered architect or PE reivew each submittal. It is A-typical for a contractor to have a registered architect on a DBB project team, and licensed PE's are not common, even on experienced DOD project teams. On similar NAVFAC projects, we have seen this exact language read the submittals need reviewed by someone with 10 years or more experience. Please confirm if this requirement can be switched.

Second paragraph under 01 45 00.00 20 which reads, "Each submittal must be reviewed by a registered architect or professional engineer."

can be struck out.

Replace with "Each submittal must be reviewed by an individual with 10 years of construction experience".

00004

93 AV TA002 On the Equipment and cabling FP-A and FP-B it say provided by LM please clarify what LM is and are we to assume this carries throughout the rest of the T pages when shown.

LM is Lockheed Martin, who is contracted through the Government and will provide/install equipment where indicated. This is also shown on the "Audiovisual Project Responsibility Matrix" on TA001

00004

94 23 09 13 1.7 This paragraph references 01 30 00 Administrative Requirements.

It states that the Instrumentation and Control Devices for HVAC is to be by a first tier subcontractor.

Spec Section 01 30 00 only states information about "First Tier Contractor Requirements for Asbestos Containing Materials".

Please confirm if the Instrumentation and Control Devices for HVAC is to be by a first tier subcontractor.

Both TABS and Instrumentation and control devices for HVAC are required to be performed by first tier subcontractor. 01 30 00 section will have section 1.5 added to read as follows:

“1.5 FIRST TIER

CONTRACTOR FOR

TABS AND

INSTRUMENTATION

FOR HVAC

Accomplish all contract requirements of Section

23 05 93 TESTING,

ADJUSTING AND

BALANCING FOR

HVAC, and Section 23 09 13

INSTRUMENTATION

AND CONTROL

DEVICES FOR HVAC

directly with a first tier subcontractor.”

95 00 10 00 Small Business Subcontracting Targets are listed for SB, SDB, HubZone, WOSB and SDVOSB.

Please confirm that there are no small business subcontracting targets for Veteran Owned Small Businesses (VOSB), as none are shown.

Please establish based on what is identified in the RFP.

(End of Summary of Changes)