This solicitation is for design-bid-build construction services for a new F-35 Training and Simulator Facility at Marine Corps Air Station Cherry Point in North Carolina. The project magnitude is between $25-100 million. Proposals are due on April 9, 2020 by 2:00pm EDT, with pre-proposal inquiries accepted until March 30th. The work is being solicited on an unrestricted basis with full and open competition. The NAICS code is 236210 for industrial building construction, with a small business size standard of $39.5 million. The soliciting agency is the Department of the Navy Naval Facilities Engineering Command. Wage determinations for the project have been published.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 8 P204 Drawings-Specs.pdf PDF
Amendment 0008.pdf PDF
Amendment 8 Attachment I -Updated Price Proposal Form_REVISED.pdf PDF
Amendment 0007-Update Proposal Submission.pdf PDF
Amendment 6 Attachment I-REVISED Price Proposal Form.pdf PDF
Amendment 0006.pdf PDF
Amendment 5.pdf PDF
Amendment 0005 PPI Responses.pdf PDF
Amendment 5 PPI-31_P-204 Soil Guidance Section for NEPA-PAMS.pdf PDF
Amendment 5 M-602.pdf PDF
Amendment 4 B286_Photos.zip ZIP file
Amendment 4 P204 B286 B4038 B4162 Existing FFE List Floor Plans.pdf PDF
Amendment 4 B4038_2of2.zip ZIP file
Amendment 0004.pdf PDF
Amendment 4-B286_As-Built Drawings.pdf PDF
Amendment 4 P204 FF E List for Contractors.xlsx XLSX spreadsheet
Amendment 4 B4038_1of2.zip ZIP file
Amendment 3-Attachment I - Price Proposal Form_REVISED.docx DOCX document
Amendment 3-P-204_Hazardous Survey.pdf PDF
Amendment 3-B4038_As-Built Drawings_01.pdf PDF
Amendment 3-P-204_Site Investigation Report.pdf PDF
Amendment 0003.pdf PDF
Amendment 3-B4038_As-Built Drawings_02.pdf PDF
P-204_Amendment-003.pdf PDF
Amendment 3-B4162_As-Built Drawings.pdf PDF
Amendment 0002 Extend Proposal Due Date.pdf PDF
Amendment 0001 Site Visit Cancelled.pdf PDF
Attachment I - Price Proposal Form.docx DOCX document
Attachment D - Small Business Subcontracting Record.docx DOCX document
Attachment F - Past Performance Questionnaire.docx DOCX document
1596300dwg17of26_Interiors.pdf PDF
Attachment E - Small Business Participation and Commitment Strategy.docx DOCX document
1596300dwg03of26_Civil-C.pdf PDF
1596300dwg24of26_Electrical.pdf PDF
1596300dwg11of26_Civil-CS.pdf PDF
1596300dwg25of26_Telecom-AV.pdf PDF
1596300dwg14of26_Structural.pdf PDF
1596300dwg26of26_Telecom.pdf PDF
Attachment B - SECNAV 5512.pdf PDF
1596300dwg20of26_Mechanical.pdf PDF
1596300spc02of04.pdf PDF
1596300dwg09of26_Civil-CG.pdf PDF
Attachment J - Site Visit Map to B-163.pdf PDF
1596300dwg16of26_Architectural.pdf PDF
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
1596300dwg23of26_Electrical.pdf PDF
1596300dwg06of26_Civil-CE.pdf PDF
RFP- P204.pdf PDF
Attachment G - Small Business Subcontracting Plan.docx DOCX document
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

D

LOC

L O

CLOC

L O C

L O C

L O C

L O C

L O C

LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC

LOC

LOC LOC

LOC

LOC LOC LOC LOC LOC LOC

LOC

LOC LOC LOC

L O C

LOC LOC LOC LOC

L O C

L O

C LOC

LOCLOC

L O C

L O C

L O C

L O C

L O C

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

LOSLOSLOSLOSLOS

LOSLOS

LOSLOS

LOS

LOSLOSLOSLOS

LOS

LOSLOSLOSLOS

LOS

LOS

LOS

LOS

LOS

LOS LOS LOS LOS LOS

LOS

LOS LOS

LOS

LOS

LOS

LOS

LOS

LO

S G

G G

G G

G G

G G

G G

G G

G G

G G

G

DN

TR

MECH

DMRT

MATSS MISSION PLANNING

COMMAND CTR & OBSERV

CORR

NECC ADMIN

SHIPPING / RECEIVING / SUPPLY

CONFERENCE

FMS REPAIR SHOP / MAINT STOR

MECH / ELEC

FMS/OTW

IOS ROOM

COMP EQUIP ROOM

SERVER

BRIEF

DEBRIEF

CORR

CORR

MANTRAP

ISEO

ISEO

ISEO

WHITE CELL EVAL

MECH

ELEC

ELEC

ISE LAB

ISEO

CORR

CBT

AUDIOVISUAL

MANTRAP

MENS

WOMENS

BREAK

MENS

WOMENS

PSO SEC CONF

APSO / GSSO

PSO SERVER

PSO

PATCH PANEL

JANITOR

TR

LOBBY

MATSS TRAINING

CORR

MENS

WOMENS

JAN

MOTHER'S RM

BREAK

RECEPTION

TLT

SEC OFFICE

SEC BADGE

SEC MGR

CORR

ISEO

ISEO

VEST

SEC SUPPLY / EQUIP

STO

TR

REPRO

EVAL / PROGRAM / MATSS SUPPORT

MATSS CONFERENCE

JPO

MATSS

MATSS

MATSS

MATSS

SITCC /

JMPS

COMMANDER

TRAINING OPS MGR

CONTRACT PILOT INST MGR

LM

MATSS TRAINING

CORR

FMS/OTW

IOS ROOM

COMP EQUIP ROOM

SERVER

BRIEF

DEBRIEF

CORR

MECH / ELEC

FMS/OTW

IOS ROOM

COMP EQUIP ROOM

SERVER

BRIEF

DEBRIEF

CORR

FMS/OTW

IOS ROOM

COMP EQUIP ROOM

SERVER

BRIEF

DEBRIEF

CORR

MECH / ELEC

FMS/OTW

IOS ROOM

COMP EQUIP ROOM

SERVER

BRIEF

DEBRIEF

CORR

FMS/OTW

IOS ROOM

COMP EQUIP ROOM

SERVER

BRIEF

DEBRIEF

CORR

CORR

CORR

CORR

CORR

CORR

CORR

LOCKER

LOCKER

CONFERENCE

COMP SUPPORT

IAM / ISSO

FIRE PUMP

SIM / HELMET PAD STOR

ELEC

D

D

D

DD

D

D

U D

U D

U D

U D

U D

U D

U D

U D

UD UD

U D

UD

D

DD

F-35 TRAINING AND SIMULATOR FACILITY

PLAN

NORTH

F I N

A L

E

R O

S I O

N

C

O N

T R

O

P

A

N

A

R E

A

CE301

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

SCALE: 1" = 30'

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FINAL EROSION CONTROL PLAN - AREA 1

SCALE IN FEET

30' 60'

M A

T C

H

L

I N

E

S

S

H E

T

C

1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.

2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.

3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.

4. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235 DESIGN

DOCUMENTS.

1. PERMANENT SOD, SEE LANDSCAPE PLANS.

GENERAL NOTES

WORK NOTES

KEY PLAN

PLAN

NORTH

A1

CE302 CE301

CE303

I S

S U

F

N

S T

R U

C T

I O

N

HATCH LEGEND

PERMANENT SOD SEE LANDSCAPE PLANS

LIGHT DUTY ASPHALT PAVEMENT

HEAVY DUTY ASPHALT PAVEMENT

CONCRETE PAVEMENT

SIDEWALK

CONCRETE SWALE

2" MILL AND OVERLAY

12803969

A4

CE501

N40085-20-R-0015 rosie.shanks Typewritten Text

MCAS CP

DONALD ELLIOT

(BY EMAIL 08JAN2020)

XXXXX

X

X

X X

LOC

LOCLOC

L O C

LOC

L O C

L O C

L O C

L O C

L O C

L O C

LOCLOCLOCLOCLOC

LOCLOCLOCLOC

L O C

L O C

L O C

L O C

L O C

LOC LOC LOC LOC LOC LOC LOC LOC LOC

LOC

LOSLOSLOS

L O S

L O S

L O S

L O S

L O S

L O S

L O S

LOSLOS

LOSLOSLOS

LOSLOSLOS

L O S

L O S

L O S

L O S

L O S

LO

S

LOS

LOS LOS LOS LOS

LOS LOS

LOS

LOS

LOS

PLAN

NORTH

F I N

O

S I O

N

C

O N

T R

A

N

A

R E

A

CE302

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

SCALE: 1" = 30'

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FINAL EROSION CONTROL PLAN - AREA 2

SCALE IN FEET

30' 60'

M A

T C

H

L

I N

E

S

S

H E

T

GENERAL NOTES

WORK NOTES

KEY PLAN

1. PERMANENT SOD, SEE LANDSCAPE PLANS.

1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.

2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.

3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.

4. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235 DESIGN

DOCUMENTS.

PLAN

NORTH

A1

CE302 CE301

CE303

I S

S U

N

S T

R U

C T

I O

N

LIGHT DUTY ASPHALT PAVEMENT

HEAVY DUTY ASPHALT PAVEMENT

SIDEWALK

CONCRETE SWALE

CONCRETE PAVEMENT

12803970

A4

CE501

N40085-20-R-0015 rosie.shanks Typewritten Text

MCAS CP

C

L O C

LOC

LOC

L O C

LOC

LOC

L O C

L O C

L O C

L O C

L O C

LOC L

O C

L O C

LOC

L O C

LOC LOC LOC LOC

L O C

L O C

L O C

L O C

L O C

L O C

L O C

LOC

LOC

L O C

L O C

L O C

LOC

L O C

L O C

LOCLOCLOCLOCLOCLOC

LOCLOC

LOC

LOS LOS LOS LOS LOS LOS LOS LOS

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

LOS

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

L O S

LO

S

PLAN

NORTH

F I N

O

S I O

N

C

O N

T R

A

N

A

R E

A

CE303

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

SCALE: 1" = 30'

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FINAL EROSION CONTROL PLAN - AREA 3

SCALE IN FEET

30' 60'

1. PERMANENT SOD, SEE LANDSCAPE PLANS

GENERAL NOTES

WORK NOTES

KEY PLAN

1. SEE SHEET C-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.

2. SEE SHEET CE001 FOR EROSION AND SEDIMENT NOTES.

3. SEE SHEET CE100 FOR GENERAL EROSION CONTROL NOTES.

4. IF BUILDING 286 DEMOLITION BID OPTION IS EXECUTED AND THE PARKING AT

BUILDING 286 SITE IS NOT, THE SITE SHALL BE PERMANENTLY STABILIZED

WITH SOD. GRADE SITE TO POSITIVELY DRAIN TO EXISTING INLETS, MATCH

EXISTING DRAINAGE PATTERNS.

5. IF BUILDING 286 DEMOLITION AND PARKING AT BULIDING 286 SITE BID

OPTIONS ARE BOTH EXECUTED, PERMANENTLY STABILIZE THE SITE AS

SHOWN. SEE LANDSCAPING PLANS FOR DETAILS.

PLAN

NORTH

A1

CE302 CE301

CE303

I S

S U

N

S T

R U

C T

I O

N

LIGHT DUTY ASPHALT PAVEMENT

HEAVY DUTY ASPHALT PAVEMENT

CONCRETE PAVEMENT

SIDEWALK

12803971

ALL WORK THIS SHEET IS A BID OPTION

SEE GENERAL NOTES

A4

CE501

N40085-20-R-0015 rosie.shanks Typewritten Text

MCAS CP

EXIT DIAGRAM

NOTES:

1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.

2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE DRAINAGE.

3. AGGREGATE SIZE MUST BE IN ACCORDANCE WITH NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (NCDOT CLASS A

STONE 2"-6").

4. GRAVEL PAD MUST HAVE A MINIMUM THICKNESS OF 6".

5. PAD WIDTH MUST BE EQUAL TO FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.

6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%.

7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.

8. WHEN WASHING IS REQUIRED, IT MUST BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT

TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE).

9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY

CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT REMOVE MUD AND DIRT.

10. MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.

M

I N

M

I N

M

I

N

M

I

N

FLOW

FLOW

ENTRANCE ELEVATION

(IF NEEDED)

M

I N

M

A X

NOTE:

1. HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH

INCH OPENINGS SHALL BE FITTED OVER ALL

BLOCK OPENINGS TO HOLD GRAVEL IN PLACE.

2. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM

DRAIN. THE FIRST ROW OF BLOCKS MUST BE PLACED HERE FOR LATERAL SUPPORT.

3. ONE BLOCK (AS SHOWN) MUST BE PLACED ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE

BOTTOM ROW TO ALLOW FOR POOL DRAINAGE.

FOUNDATION SET 2" BELOW

CREST OF STORM DRAIN

SEDIMENT

DROP INLET

W/ GRATE

TEMPORARYSEDIMENT POOL

GRAVEL

DEWATERING

RUNOFF WATER

WITH SEDIMENT

WIRE SCREEN

BLOCK AND GRAVEL SECTION

WIRE SCREEN

DROP INLET GRATE

GRAVEL FILTER SHOULD

HAVE SLOPE OF 2:1

CONCRETE BLOCK

DEWATERING

BLOCK AND GRAVEL PERSPECTIVE

10 MIL. PLASTIC LINING

LATH & FLAGGING

ON ALL SIDES

SANDBAG

(TYP.)

A A

10' MIN.

V A

R I E

S

10 MIL. PLASTIC

LINING

SANDBAG

BERM

1. THE CONTRACTOR MUST PROVIDE A DESIGNATED AREA FOR CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER CHUTES, HOPPERS, AND THE REAR OF THE VEHICLES. THIS AREA MUST HAVE A CONCRETE WASHOUT FACILITY AND MUST BE CONSTRUCTED ACCORDING TO

THE DETAIL SHOWN.

2. THE CONCRETE WASHOUT FACILITY MUST BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAINS, OPEN DITCHES, OR WATER BODIES.

3. WASHOUT DISCHARGE FROM THE CLEANING OF CONCRETE TRUCKS, TOOLS, AND OTHER EQUIPMENT MUST NOT BE DISCHARGED INTO

STORM DRAINS, OPEN DITCHES, STREETS, OR STREAMS.

4. EXCESS CONCRETE MUST NOT BE DISPOSED OF ON SITE. ALL EXCESS CONCRETE MUST BE TRANSPORTED OFF-SITE AND DISPOSED OF

PROPERLY.

5. IT IS PROHIBITED TO WASHOUT THE MIXING DRUM OF CONCRETE TRUCKS ON-SITE.

PLAN

SECTION A-A

NOTES:

C1 CONCRETE WASHOUT

NTS

C3 INLET PROTECTION

NTS

A1 CONSTRUCTION ENTRANCE

NTS

A3 SILT FENCE

NTS

B2 NETTING AND MATTING

NTS

NOTES:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S

INSTRUCTIONS AND NCDEQ EROSION AND SEDIMENT

CONTROL PLANNING AND DESIGN MANUAL SECTION 6.14.

A4 PERMANENT SOD

NTS

NOTES:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S

INSTRUCTIONS AND NCDEQ EROSION AND SEDIMENT

CONTROL PLANNING AND DESIGN MANUAL SECTION 6.12.

2. SEE SHEET CE001 FOR ADDITIONAL DETAILS.

NOTES:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NCDEQ

EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.62.

E R

O S

I O

N

C

O N

T R

T

A I L

S

CE501

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

I S

S U

N

S T

R U

C T

I O

N

12803972

N40085-20-R-0015 rosie.shanks Typewritten Text

MCAS CP

SEEDBED PREPARATION

GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCCESSFUL PLANT

ESTABLISHMENT. A GOOD SEEDBED IS WELL-PULVERIZED, LOOSE, AND

UNIFORM. WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE

MAY BE LEFT WITH A MORE IRREGULAR SURFACE OF LARGE CLODS AND

STONES.

LIMING - APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF

THE pH (ACIDITY) OF THE SOIL IS NOT KNOWN, AN APPLICATION OF

GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1 TO 1 1/2

TONS/ACRE ON COARSE-TEXTURED SOILS AND 2-3 TONS/ACRE ON

FINE-TEXTURED SOILS IS USUALLY SUFFICIENT. APPLY LIMESTONE

UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS

WITH A pH OF 6 OR HIGHER NEED NOT BE LIMED.

FERTILIZER - BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE

NOT POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE.

BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6

INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND

FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION.

SECTION PLAN

NOTES:

1. COMPOST FILTER SOCK IS SILTSOXXTM BY FILTREXX OR APPROVED EQUAL.

2. FILTER MEDIA TO MEET APPLICATION REQUIREMENTS.

COMPOST FILTER SOCK (12")

AREA PROTECTED

WORK AREA

WORK AREA

AREA PROTECTED

COMPOST FILTER SOCK

WATER FLOW

PAVEMENT SURFACE

CONCRETE BLOCK (10' O.C.)

CONCRETE BLOCK (10' O.C.)

C1 COMPOST SOCK

NTS

A1 TEMPORARY SEEDING AND MULCHING

NTS

NOTES:

1. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT

LESS THAN 6".

2. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP

THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE

THE MAXIMUM ALLOWABLE WATER DEPTH OR TO THE

TOP OF THE BANK, WHICHEVER IS LESS.

3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE

INSTALLED BETWEEN THE RIPRAP AND SOIL

FOUNDATION.

5. RIP RAP APRON TO CONFORM TO THE NC EROSION AND

SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.

6. INSPECT RIP RAP OUTLET STRUCTURES WEEKLY AND

AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL

EVENTS TO SEE IF ANY EROSION AROUND OR BELOW

THE RIP RAP HAS TAKEN PLACE, OR IF STONES HAVE

BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED

REPAIRS TO PREVENT FURTHER DAMAGE.

PIPE OUTLET TO WELL-DEFINED CHANNEL

A A

PLAN

SECTION AA

FILTER BLANKET, MIRAFI

600X OR APPROVED EQUAL

10'

D

A3 OUTLET PROTECTION

NTS

M

I

N

SECTION A-A

A

PLAN

A

1' 3'

NC DOT #5 OR #57

WASHED STONE

CLASS B RIPRAP

A4 FILTER RING

NTS

B4 ROLLED EROSION CONTROL PRODUCTS

NTS

NOTES:

1. INSTALL IN ACCORDANCE WITH

MANUFACTURER'S

INSTRUCTIONS AND NCDEQ

EROSION AND SEDIMENT

CONTROL PLANNING AND

DESIGN MANUAL SECTION 6.17.

2. EROSION CONTROL BLANKETS

MUST BE NORTH AMERICAN

GREEN SC150 OR APPROVED

EQUAL.

NOTES:

1. SEE SHEET CE001 FOR ADDITIONAL DETAILS.

E R

O S

I O

N

C

O N

T R

T

A I L

S

CE502

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

P -2

F

-3

TR

A

IN

IN

G A

N D

S

IM

U

LA

TO

R

F A

C

IL

IT

Y

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

I S

S U

N

S T

R U

C T

I O

N

12803973

N40085-20-R-0015 rosie.shanks Typewritten Text

MCAS CP

CE301 - FINAL EROSION CONTROL PLAN - AREA 1
CE302 - FINAL EROSION CONTROL PLAN - AREA 2
CE303 - FINAL EROSION CONTROL PLAN - AREA 3
CE501 - EROSION CONTROL DETAILS - 1
CE502 - EROSION CONTROL DETAILS - 2

2020-01-23T08:41:01-0500

2020-01-23T08:41:29-0500

2020-01-23T08:41:53-0500

2020-01-23T08:41:53-0500

2020-01-23T08:41:54-0500

2020-01-27T07:46:26-0500

2020-01-27T07:46:38-0500

2020-01-27T07:46:40-0500

2020-01-27T07:46:41-0500

2020-01-27T07:46:43-0500

2020-01-28T20:33:54-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:34:28-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:34:29-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:34:29-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:34:30-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:35:35-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:35:53-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:35:53-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:35:53-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-01-28T20:35:54-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

File details come from the government source that posted it. Updated .