M301.pdf

PDF 2 MB Posted

Attached to
Building 7 Boiler #2 Replacement
Solicitation number
12-223-SOL-00177
Issued by

About this file

J-1 Drawings M301

View the file

Other files

File Type Posted
amendment 3.pdf PDF
NCTR Air Permit.pdf PDF
attachment 2- list of attendees.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
attachment 1- list of attendees.pdf PDF
S102.pdf PDF
M304.pdf PDF
M402.pdf PDF
M501.pdf PDF
M306.pdf PDF
M401.pdf PDF
E103.pdf PDF
M303.pdf PDF
M702.pdf PDF
M302.pdf PDF
M203.pdf PDF
M404.pdf PDF
M102.pdf PDF
M200.pdf PDF
E106.pdf PDF
M403.pdf PDF
M104.pdf PDF
M305.pdf PDF
M202.pdf PDF
E202.pdf PDF
M103.pdf PDF
M201.pdf PDF
M101.pdf PDF
M601.pdf PDF
M204.pdf PDF
E201.pdf PDF
M703.pdf PDF
E104.pdf PDF
01120018 Add 01 Specs 080312.pdf PDF
12-223-SOL-00177.pdf PDF
M100.pdf PDF
E301.pdf PDF
S101.pdf PDF
E101.pdf PDF
G100.pdf PDF
E102.pdf PDF
E105.pdf PDF
M701.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOILER

M301

M301

BOILER PLATFORM

BOILER

BOILER

NOTE:

CONTRACTOR SHALL PROVIDE ECONOMIZER PLATFORM

FOR EXISTING FIRE TUBE BOILER #1

BSE-2

6 5

GENERAL NOTES:

1. CONTRACTOR SHALL INSTALL NEW PLATFORM FOR

EXISTING FIRE TUBE BOILER ECONOMIZER, SIMILAR TO

PLATFORM SHOWN ON THIS DRAWING.

2. CONTRACTOR SHALL INCLUDE COST OF ANY PIPING

MODIFICATION REQUIRED TO INSTALL THE ECONOMIZER

PLATFORM ON EXISTING BOILER.

KEYED NOTES :

STACK ECONOMIZER.

PLATFORM FOR ECONOMIZER

BOILER PLATORM/LADDER.

BOILER STACK. REFER TO FLOOR PLANS FOR

ROUTING OF THE STACK.

INSTALL PIPING AND VALVES TO ECONOMIZER SO

THAT ACCESS TO ALL ISOLATION VALVES CAN

BE DONE EASILY AT THE ECONOMIZER PLATFORM.

CONTRACTOR SHALL PROVIDE DETAILED

DIMENSIONED PIPING LAYOUT TO ENGINEER/OWNER

FOR REVIEW BEFORE FABRICATION AND INSTALLATION.

STEAM DISCHARGE PIPE.

STEAM RELIEF PIPING.

RELIEF VALVES. REFER TO BOILER SPECIFICATION.

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

Je ffe rs on

L ab or at or ie s F oo d an d

D ru g A dm in is tr at io n

N

C T

R R d Je ffe rs on , A

R

M301

MAIN HEADER SECTIONS

06-26-12

FDA-SOI-06-00268

B ui ld in g

B oi le r

R ep la ce m en t

1 08/03/12 ADDENDUM #1

1/2" = 1’−0"

ENLARGED PLAN − BOILER AND PLATFORMS

1/2" = 1’−0"

SECTION − FRONT ELEVATION − BOILER AND PLATFORMS

1/2" = 1’−0"

SECTION − SIDE ELEVATION − BOILER AND PLATFORMS

BID SET

BOILER 2 INSTALLATION − HVAC ECONOMIZER RISER

BOILER 2 INSTALLATION − BOILER RISER

File details come from the government source that posted it. Updated .