M102.pdf
PDF 534 KB Posted
- Attached to
- Building 7 Boiler #2 Replacement
- Solicitation number
- 12-223-SOL-00177
About this file
J-1 Drawings M102
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14" HEADER
EXISTING
14" S100 MAIN
STEAM HEADER
DOWN
6" SR
SAMPLING
STATION
14" HEADER
BSE-1
8" S100
4" SCW
3" NG
2" SR
4" BFW
1" DCW
1 1/2" BD
2" FOS & 1" FOR
M302
4 3.4 3 2.4 1.4 1
H
E
D
B
A
EXISTING
BOILER 1
8" S100
4" S15
6" S15
4" S15
3" S15
3" S15
3" S15
6" SR
2 1/2" SCW
4" SCW
4" BFW
4" BFW
4" V
4" SCW
3" NG
6" NG6" NG
EXISTING BOILER #2 AND ASSOCIATED EQUIPMENT
AND PIPING TO BE REMOVED.
REMOVE EXISTING STEAM PIPING BACK TO THIS
POINT. CAP AT POINT OF DEMOLITION.
EXISTING COLUMN TO REMAIN. PROTECT AND
SECURE DURING BOILER DEMOLITION. rEFER TO
STRUCTURAL DRAWINGS.
EXISTING STEAM UNIT HEATER TO BE REMOVED.
REMOVE ALL ASSOCIATED CONTROLS AND
SUPPORTS. CAP PIPING AT POINT OF DEMOLITION.
EXISTING CONDENSATE STORAGE TANK AND ALL
ASSOCIATED PIPING TO BE REMOVED. THIS WILL BE
ADDITIVE OPTION #1. SEE GENERAL NOTE # 1.
EXISTING 3" S15 TO BE REMOVED.
EXISTING 14" S100 HEADER TO BE REMOVED TO
EXIST ISOLATION VALVE.
ALL EXISTING BFW TO BE REMOVED.
EXISTING 14" S100 HEADER TO REMAIN.
EXISTING BOILER # 1 TO REMAIN.
4" NATURAL GAS PIPE INSTALLED IN PHASE 1 TO BE
REMOVED AND RE-ROUTED TO THE NEW FIRE TUBE
BOILER #2. THE REMOVED PIPING TO BE REUSED.
ADDITIVE OPTION 1: REMOVE ABANDONED PIPING
ASSOCIATED WITH EXISTING DEAERATOR TANK.
ADDITIVE OPTION 2: REMOVE EXISTING FEED WATER
PIPING ASSOCIATED WITH EXISTING FEED WATER
PUMP.
1" BD
6" BFW
6" SR
4" V
2 1/2" SCW
2 1/2" SCW
6" VTR
1" BFW
1. CONTRACTOR SHALL PROVIDE PRICING
FOR OPTIONS 1 THRU 8 AS LISTED ON
THIS DRAWING.
2. ALL EXISTING EQUIPMENT, PIPING,
VALVES TO REMAIN UNLESS
OTHERWISE NOTED.
4" SCW
2 1/2" SCW
VTR
VTR
VTR
FOS
FOR
4" FOS
4" SR
4" SCW
6" NG
UNIT
HEATER
UNIT
HEATER
14" S100
3" NG
3" S15
14" S100
4" S15
4" V
1" BD
4" V
1" BD
1" SR
4" FOS
4" BFW
2" FOS
4" BFW
6" BFW 6" BFW
6" BFW
4" BFW
4" OF
121213
6" S100 6" S100
UP TO
PRV
ABOVE
6" SR DOWN
TO SURGE
TANK ON
FIRST
FLOOR
4" PCR
UP TO
DA TANK
ABOVE
4" PCR
DOWN TO
POLISHE
R BELOW
4" SCW
UP TO
DA TANK
ABOVE
1310" BFW
GENERAL NOTES:
DEMOLITION KEYED NOTES:
BOILER INSTALLATION SYSTEM SCHEDULE
PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT
1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.
2). INSTALL THREE NEW EXHAUST FANS.
1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT
FAN, AND COMBUSTION AIR FAN.
OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.
OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.
OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.
OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.
OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER
PIPING FOR BOTH NEW AND EXISTING BOILER).
BOILER 2
INSTALLATION
DEMOLITION
BOILER 2
INSTALLATION
NEW WORK
ADDITIVE
OPTIONS
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
Je ffe rs on
L ab or at or ie s F oo d an d
D ru g A dm in is tr at io n
N
C T
R R d Je ffe rs on , A
R
M102
BOILER 2 INSTALLATION -
MEZZANINE FLOOR PLAN -
MECHANICAL DEMOLITION
06-26-12
FDA-SOI-06-00268
B ui ld in g
B oi le r
R ep la ce m en t
1/4" = 1’−0"
BOILER 2 INSTALLATION − MEZZANINE FLOOR PLAN − MECHANICAL DEMOLITION
1 08/03/12 ADDENDUM #1
BID SET
File details come from the government source that posted it. Updated .