M102.pdf

PDF 534 KB Posted

Attached to
Building 7 Boiler #2 Replacement
Solicitation number
12-223-SOL-00177
Issued by

About this file

J-1 Drawings M102

View the file

Other files

File Type Posted
amendment 3.pdf PDF
NCTR Air Permit.pdf PDF
attachment 2- list of attendees.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
attachment 1- list of attendees.pdf PDF
M203.pdf PDF
M404.pdf PDF
M200.pdf PDF
E106.pdf PDF
M403.pdf PDF
M104.pdf PDF
M305.pdf PDF
S102.pdf PDF
M304.pdf PDF
M402.pdf PDF
M501.pdf PDF
M306.pdf PDF
M401.pdf PDF
E103.pdf PDF
M303.pdf PDF
M702.pdf PDF
M302.pdf PDF
M202.pdf PDF
E202.pdf PDF
M103.pdf PDF
M201.pdf PDF
M101.pdf PDF
M601.pdf PDF
M204.pdf PDF
E201.pdf PDF
M703.pdf PDF
E104.pdf PDF
01120018 Add 01 Specs 080312.pdf PDF
12-223-SOL-00177.pdf PDF
M100.pdf PDF
E301.pdf PDF
S101.pdf PDF
M301.pdf PDF
E101.pdf PDF
G100.pdf PDF
E102.pdf PDF
E105.pdf PDF
M701.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14" HEADER

EXISTING

14" S100 MAIN

STEAM HEADER

DOWN

6" SR

SAMPLING

STATION

14" HEADER

BSE-1

8" S100

4" SCW

3" NG

2" SR

4" BFW

1" DCW

1 1/2" BD

2" FOS & 1" FOR

M302

4 3.4 3 2.4 1.4 1

H

E

D

B

A

EXISTING

BOILER 1

8" S100

4" S15

6" S15

4" S15

3" S15

3" S15

3" S15

6" SR

2 1/2" SCW

4" SCW

4" BFW

4" BFW

4" V

4" SCW

3" NG

6" NG6" NG

EXISTING BOILER #2 AND ASSOCIATED EQUIPMENT

AND PIPING TO BE REMOVED.

REMOVE EXISTING STEAM PIPING BACK TO THIS

POINT. CAP AT POINT OF DEMOLITION.

EXISTING COLUMN TO REMAIN. PROTECT AND

SECURE DURING BOILER DEMOLITION. rEFER TO

STRUCTURAL DRAWINGS.

EXISTING STEAM UNIT HEATER TO BE REMOVED.

REMOVE ALL ASSOCIATED CONTROLS AND

SUPPORTS. CAP PIPING AT POINT OF DEMOLITION.

EXISTING CONDENSATE STORAGE TANK AND ALL

ASSOCIATED PIPING TO BE REMOVED. THIS WILL BE

ADDITIVE OPTION #1. SEE GENERAL NOTE # 1.

EXISTING 3" S15 TO BE REMOVED.

EXISTING 14" S100 HEADER TO BE REMOVED TO

EXIST ISOLATION VALVE.

ALL EXISTING BFW TO BE REMOVED.

EXISTING 14" S100 HEADER TO REMAIN.

EXISTING BOILER # 1 TO REMAIN.

4" NATURAL GAS PIPE INSTALLED IN PHASE 1 TO BE

REMOVED AND RE-ROUTED TO THE NEW FIRE TUBE

BOILER #2. THE REMOVED PIPING TO BE REUSED.

ADDITIVE OPTION 1: REMOVE ABANDONED PIPING

ASSOCIATED WITH EXISTING DEAERATOR TANK.

ADDITIVE OPTION 2: REMOVE EXISTING FEED WATER

PIPING ASSOCIATED WITH EXISTING FEED WATER

PUMP.

1" BD

6" BFW

6" SR

4" V

2 1/2" SCW

2 1/2" SCW

6" VTR

1" BFW

1. CONTRACTOR SHALL PROVIDE PRICING

FOR OPTIONS 1 THRU 8 AS LISTED ON

THIS DRAWING.

2. ALL EXISTING EQUIPMENT, PIPING,

VALVES TO REMAIN UNLESS

OTHERWISE NOTED.

4" SCW

2 1/2" SCW

VTR

VTR

VTR

FOS

FOR

4" FOS

4" SR

4" SCW

6" NG

UNIT

HEATER

UNIT

HEATER

14" S100

3" NG

3" S15

14" S100

4" S15

4" V

1" BD

4" V

1" BD

1" SR

4" FOS

4" BFW

2" FOS

4" BFW

6" BFW 6" BFW

6" BFW

4" BFW

4" OF

121213

6" S100 6" S100

UP TO

PRV

ABOVE

6" SR DOWN

TO SURGE

TANK ON

FIRST

FLOOR

4" PCR

UP TO

DA TANK

ABOVE

4" PCR

DOWN TO

POLISHE

R BELOW

4" SCW

UP TO

DA TANK

ABOVE

1310" BFW

GENERAL NOTES:

DEMOLITION KEYED NOTES:

BOILER INSTALLATION SYSTEM SCHEDULE

PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT

1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.

2). INSTALL THREE NEW EXHAUST FANS.

1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT

FAN, AND COMBUSTION AIR FAN.

OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.

OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.

OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.

OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.

OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER

PIPING FOR BOTH NEW AND EXISTING BOILER).

BOILER 2

INSTALLATION

DEMOLITION

BOILER 2

INSTALLATION

NEW WORK

ADDITIVE

OPTIONS

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

Je ffe rs on

L ab or at or ie s F oo d an d

D ru g A dm in is tr at io n

N

C T

R R d Je ffe rs on , A

R

M102

BOILER 2 INSTALLATION -

MEZZANINE FLOOR PLAN -

MECHANICAL DEMOLITION

06-26-12

FDA-SOI-06-00268

B ui ld in g

B oi le r

R ep la ce m en t

1/4" = 1’−0"

BOILER 2 INSTALLATION − MEZZANINE FLOOR PLAN − MECHANICAL DEMOLITION

1 08/03/12 ADDENDUM #1

BID SET

File details come from the government source that posted it. Updated .