M104.pdf
PDF 404 KB Posted
- Attached to
- Building 7 Boiler #2 Replacement
- Solicitation number
- 12-223-SOL-00177
About this file
J-1 Drawings M104
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M305.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
DA
TANK
EXISTING
FORCED
DRAFT
FAN
#1
EXISTING
BINDUCED
DRAFT
FAN
#1
8" VTR8" VTR8" VTR8" VTR8" VTR8" VTR
14"
VTR
2 2
EXISTING
DA TANK
4" SCW
24"ø
6" BFW
4 3.4 3 2.4 1.4 1
H
E
D
B
A
6" VTR
10" S100
6" S100
2" SR
1" SR
1" SR
4" S100
EXISTING
PRV-1
1" SR
4" S100
4" S100
1" SR
EXISTING
ST-1
1" D
6" VTR
PRSV-1
ST-1
ST-1
6" BFW
1" D
1" D 1" D 1" D
2" BFW
2" SR 4" S15
PRV-1 4" S15
3" PCR
1" D
1" D
1" D
1" S15
4" SCW
DOWN TO
BDHX-1 ON
FIRST FLOOR
EXISTING FORCE DRAFT FAN #2, INDUCED DRAFT
FAN #2 AND ASSOCIATED EQUIPMENT TO BE
REMOVED UNDER BOILER #2 INSTALLATION.
REMOVE EXISTING CONCRETE HOUSE KEEPING
PADS. PATCH FLOOR SLAB AND SMOOTH THE
FLOOR SURFACE.
REMOVE EXISTING STACK AND CAP EXISTING
ROOF OPENING. CONTRACTOR MUST MAINTAIN
ROOF WARRANTY.
IN FILL EXISTING HOLES IN FAN PLATFORM.
REFER TO STRUCTURAL PLANS FOR SPECIFIC
DETAILS.
EXISTING DA TANK AND ASSOCIATED SYSTEM
PIPING TO BE REMOVED REFER TO GENERAL
NOTE.
EXISTING DA TANK INSTALLED UNDER BOILER 1
INSTALLATION.
EXISTING BOILER #1 FORCED AND INDUCED
DRAFT FANS TO REMAIN.
EXISTING EXHAUST FAN TO BE REMOVED AND
EXISTING OPENING SHALL BE ENLARGED TO
INSTALL THE NEW ROOF TOP EXHAUST FAN.
ALL EXISTING CONCRETE PAD FOR DRAFT FANS
FOR BOILER # 2 TO BE REMOVED.
ADDITIVE OPTION #1: REMOVE ALL ABANDONED
PIPING ASSOCIATED WITH EXISTING ABANDONED
DEARATOR TANK.
EXISTING PIPE TO BE REMOVED AND CAPPED AT
EACH END.
8" S15
8" S15
2" SR
EXISTING
BINDUCED
DRAFT
FAN
#1
6" VTR
7 7
4" VTR9
GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE PRICING
FOR OPTIONS 1 THRU 8 AS LISTED ON
THIS DRAWING.
2. ALL EXISTING EQUIPMENT, PIPING,
VALVES TO REMAIN UNLESS OTHERWISE
NOTED.
DEMOLITION KEYED NOTES:
BOILER INSTALLATION SYSTEM SCHEDULE
PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT
1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.
2). INSTALL THREE NEW EXHAUST FANS.
1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT
FAN, AND COMBUSTION AIR FAN.
OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.
OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.
OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.
OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.
OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER
PIPING FOR BOTH NEW AND EXISTING BOILER).
BOILER 2
INSTALLATION
DEMOLITION
BOILER 2
INSTALLATION
NEW WORK
ADDITIVE
OPTIONS
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
Je ffe rs on
L ab or at or ie s F oo d an d
D ru g A dm in is tr at io n
N
C T
R R d Je ffe rs on , A
R
M104
BOILER 2 INSTALLATION - FAN
PLATFORM - MECHANICAL
DEMOLITION
06-26-12
FDA-SOI-06-00268
B ui ld in g
B oi le r
R ep la ce m en t
1/4" = 1’−0"
BOILER 2 INSTALLATION − FAN PLATFORM PLAN − MECHANICAL DEMOLITION
1 08/03/12 ADDENDUM #1
BID SET
File details come from the government source that posted it. Updated .