E201.pdf
PDF 176 KB Posted
- Attached to
- Building 7 Boiler #2 Replacement
- Solicitation number
- 12-223-SOL-00177
About this file
J-1 Drawings E201
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. THE ELECTRICAL CONTRACTOR SHALL DISCONNECT POWER TO ANY AND ALL LIGHTS, WIRING DEVICES AND HVAC
EQUIPMENT PRIOR TO MOVING, REMOVAL OR INSTALLATION. FOR DEMO'D EQUIPMENT REMOVE ALL RELATED SWITCHES, DISCONNECTS, WIRE AND CONDUIT IN ITS ENTIRETY EXCEPT AS IT WILL SERVE NEW DEVICES OR THE
EXISTING DEVICES AND EQUIPMENT WHICH ARE TO REMAIN.
B. THE ELECTRICAL CONTRACTOR IS ADVISED TO VISIT THE SITE TO FAMILIARIZE THEMSELF WITH ALL EXISTING CONDITIONS PRIOR TO THE BID AND FIELD VERIFY DISTANCES, QUANTITIES AND RELEVANT CONDITIONS. THE
CONTRACTOR SHALL PROVIDE ALL REQUIREMENTS FOR COMPLETED INSTALLATIONS.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION IN AREAS OF RENOVATION. ALL WIRING DEVICES, LIGHT FIXTURES, WIRE, AND CONDUIT THAT IS TO BE REMOVED SHALL BE EITHER STORED, AS DIRECTED BY THE OWNER, RELOCATED AS SHOWN ON THE NEW FLOOR PLANS, OR ELSE REMOVED FROM THE PREMISES. EXISTING
DEVICES AND EQUIPMENT THAT ARE ABANDONED SHALL BE REMOVED.
D. ALL EXISTING CONDUCTORS THAT ARE NOT USED SHALL BE REMOVED BACK TO THE SERVING PANELBOARD. THE ASSOCIATED CIRCUIT BREAKERS SHALL BE LABELED AS "SPARE", AND EXISTING CONDUIT SHALL REMAIN FROM THE PANEL TO ABOVE ACCESSIBLE CEILING SPACE, WHERE SUCH EXISTS. REMOVE ALL OTHER ABANDONED CONDUIT
WHERE EVER IT IS ACCESSIBLE.
E. APPROPRIATE MEASURES SHALL BE TAKEN TO ASSURE CONTINUITY OF EXISTING CIRCUITS THAT REMAIN. ALL OUTAGES WHICH MAY RESULT SHALL BE COORDINATED WITH THE OWNER PRIOR TO THE COMMENCEMENT OF WORK.
THE ELECTRICAL CONTRACTOR SHALL ONLY SPLICE CONDUCTORS AS PERMITTED AND ENSURE THAT EXISTING CIRCUIT CONTINUITY FOR EVERY DEVICE IS MAINTAINED. INACCESSIBLE CONDUIT MAY BE ABANDONED IN PLACE. ALL JUNCTION BOXES ASSOCIATED WITH THIS SCOPE THAT ARE TO REMAIN MUST BE ACCESSIBLE PER NEC.
F. ALL EXISTING BRANCH LIGHTING CIRCUITS THAT ARE AFFECTED BY DEMOLITION, ADDITION OR RELOCATION SHALL BE FIELD TESTED FOR MAXIMUM LOAD AT THE PANEL BOARD. PROVIDE AS-BUILT MARK-UP DRAWINGS SHOWING RESULTING LOAD VALUES FOR EACH CIRCUIT. IMMEDIATELY NOTIFY ENGINEER OF ANY CIRCUIT EXEEDING 70 PERCENT OF AMPERAGE RATING OF THE OVER-CURRENT PROTECTIVE DEVICE (OCPD). IF THE PEAK CIRCUIT LOAD EXCEEDS 80% OF THE CONDUCTOR RATING OR OCPD RATING FOR THOSE CIRCUITS AFFECTED BY THIS SCOPE OF WORK, SOME PORTION OF THAT CIRCUIT WILL BE REQUIRED TO RECIRCUITED TO A NEW BREAKER AT THE SERVING
PANELBOARD. COORDINATE ALL REQUIREMENTS WITH ENGINEER.
G. PROVIDE NEW PANEL SCHEDULE DIRECTORY WITH UPDATED INFORMATION FOR ALL PANELS AFFECTED BY
DEMOLITION, ADDITION OR RELOCATION OF EQUIPMENT.
H. PROVIDE FOR FULLY OPERATIONAL MODIFICATIONS AND INSTALLATIONS.
I. E.C. SHALL PROVIDE FOR THE DEMOLITION STIPULATIONS OF THE ENGINEER, UTILITIES AND OTHER DESIGN DISCIPLINES.
J. COORDINATE WITH OWNER A MIN. OF 5 WORKING DAYS IN ADVANCE FOR ALL OUTAGES OF ANY SERVICE UTILITIES. REFER TO SPECIFICATION FOR ADDITIONAL REQUIREMENTS REGARDING ALL OUTAGES OF ANY SERVICE UTILITIES FOR THIS
BUILDING, ANY OTHER BUILDING OR ANY OTHER POINT OF USE.
K. OCCUPIED AREAS SHALL BE KEPT CLEAN OF DEBRIS ON A CONTINUAL BASIS. ALL RUBBISH SHALL BE REMOVED FROM
THE SITE AND TAKEN TO APPROPRIATE DISPOSAL FACILITIES.
GENERAL ELECTRICAL DEMOLITION NOTES GENERAL NOTES
15. COORDINATE ROUTING OF CONDUIT WITH OTHER DISCIPLINES FOR A NEAT
AND PROFESSIONAL INSTALLATION.
16. ALL HORIZONTAL RUNS OF CONDUIT INTERIOR TO BUILDING SHALL BE
INSTALLED AS HIGH AS POSSIBLE TO BOTTOM OF STRUCTURE.
17. MINIMUM CONDUIT SIZE SHALL BE 3/4" FOR POWER CIRCUITS AND 1" FOR LOW
VOLTAGE SYSTEMS UNLESS OTHERWISE NOTED.
18. PRIOR TO CORING, CORING LOCATIONS SHALL BE COORDINATED AS
NECESSARY SO AS TO NOT COMPROMISE STRUCTURAL INTEGRITY.
19. ALL PENETRATIONS OF SMOKE/FIRE RATED FLOORS OR PARTITIONS DUE TO
THE INSTALLATION OF ELECTRICAL SYSTEMS SHALL BE SEALED WITH A U.L.
LISTED AND FACTORY MUTUAL (FM) APPROVED ASSEMBLY AND SHALL
MAINTAIN THE FIRE RATING OF THE PARTITION.
20. PROVIDE SIMILAR LOOKING ENGRAVED NAMEPLATES FOR ALL FOLLOWING
ELECTRICAL DISTRIBUTION EQUIPMENT WHETHER OR NOT PROVIDED
DIRECTLY BY THE E.C.; E.G. SWITCHBOARDS, DISTRIBUTION BOARDS,
PANELBOARDS, TRANSFER SWITCHES, DISCONNECT SWITCHES, MANUAL &
AUTOMATIC STARTERS, COMBINATION STARTER/DISCONNECTS, AND TRANSFORMERS.
21. PANEL SCHDULE DIRECTORIES SHALL BE TYPEWRITTEN AND KEPT CURRENT
TO AS-BUILT CONDITIONS.
22. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MARKING ALL
SWITCHES, RECEPTACLES, AND FIXED EQUIPMENT WITH THE BRANCH CIRCUIT
PANEL NAME AND NUMBER SERVING EACH DEVICE.
23. PROVIDE DEDICATED NEUTRALS FOR ALL BRANCH CIRCUITS, NEUTRAL SHALL
NOT BE SHARED.
24.
25.
COORDINATE WITH THE GENERAL CONTRACTOR FOR THE SEQUENCE OF
WORK AT EACH AREA.
26.
EXISTING BRANCH CIRCUITS NO LONGER USED SHALL BE REMOVED BACK TO
THE SERVING PANEL. CONDUIT SHALL REMAIN TO ACCESSIBLE CEILING SPACE
ABOVE PANEL. PANEL SCHEDULE DIRECTORIES SHALL BE UPDATED AND TYPEWRITTEN.
27.
ALL EQUIPMENT, FIXTURES AND DEVICES REMOVED SHALL BE STORED AS
DIRECTED BY THE OWNER OR RELOCATED AS INDICATED. PROVIDE FOR
CONTINUITY OF EXISTING CIRCUITS TO REMAIN.
OUTAGES SHALL BE COORDINATED WITH THE OWNER AND GENERAL
CONTRACTOR A MINIMUM OF 72 HOURS PRIOR TO COMMENCEMENT OF WORK.
1. WHERE PLANS AND SPECIFICATIONS MAY BE CONSTRUED TO BE IN CONFLICT,
THE MORE STRINGENT REQUIREMENT SHALL BE COMPLIED WITH.
2. ALL WORK SHALL COMPLY WITH THE EDITION OF THE 2011 NATIONAL ELECTRIC
CODE (N.E.C.).
3. THE SPECIFICATIONS ARE AS BINDING ON THE CONTRACTOR AS THE
DRAWINGS. THE CONTRACTOR SHALL READ THE SPECIFICATIONS AND SHALL
INCLUDE ALL ITEMS REQUIRED BY THE SPECIFICATIONS BEFORE SUBMITTING A
BID.
4. MINIMUM WIRE SIZE SHALL BE #12 AWG UNLESS OTHERWISE NOTED.
5. EACH CIRCUIT SHALL HAVE AN EQUIPMENT GROUNDING CONDUCTOR, AND
MULTI-WIRE CIRCUITS OF DIFFERENT PHASES MAY SHARE THE EQUIPMENT
GROUND. EQUIPMENT GROUND CONDUCTOR SIZE SHALL NOT BE LESS THAN
#12 AWG OR AS INDICATED ON THE DRAWINGS.
6. ALL CONDUCTORS #10 AND SMALLER SHALL BE SOLID COPPER, EXCEPT
WHERE FLEXIBILITY IS REQUIRED, AND ALL CONDUCTORS #8 AND LARGER
SHALL BE STRANDED COPPER USING BOLTED LUGS AT TERMINALS.
7. CONDUCTORS OF GFI CIRCUITS (FED FROM GFI CIRCUIT BREAKER) SHALL BE
TYPE XHHW (COMPATIBLE WITH GFI DEVICE).
8. ALL EQUIPMENT AND DEVICES SHALL BE INSTALL PLUMB, SQUARE AND TRUE.
ALIGN EQUIPMENT HORIZONTALLY OR VERTICALLY FOR A NEAT AND
PROFESSIONAL INSTALLATION.
9. ALL ELECTRICAL EQUIPMENT AND DEVICES SHALL BE LABELED WITH THE
PANEL NAME AND CIRCUIT NUMBER(S).
10. JUNCTION BOXES SHALL BE LABELED WITH THE LIST OF CIRCUITS BY PANEL
NAME AND CIRCUIT NUMBER.
11. VERIFY EXACT LOCATION, ELEVATION AND REQUIREMENTS OF ALL
MECHANICAL EQUIPMENT WITH MECHANICAL CONTRACTOR.
12. VERIFY EXACT LOCATION, ELEVATION AND REQUIREMENTS OF ALL PLUMBING
EQUIPMENT WITH PLUMBING CONTRACTOR.
13. SIZING OF ALL MOTOR OVERLOAD DEVICES (HEATERS) IN STARTERS BASED ON
ACTUAL NAMEPLATE RATINGS ON THE MOTORS BEING INSTALLED PER N.E.C.
430.6(A)(2).
14. ALL LOW VOLTAGE INTERLOCKING OF HVAC EQUIPMENT SHALL BE BY THE
CONTROLS CONTRACTOR. ALL "LINE VOLTAGE" CONTROLS SHALL BE BY THE
ELECTRICAL CONTRACTOR AND SHALL BE IN CONDUIT.
MDP 7-1
600A, 480V, 3Ø, 4W
SE RATED, 22KAIC, 600A MCB
ALL BREAKERS SHALL BE LSI ADJUSTABLE TRIP
200A225A 225A200A 200A
B O
IL
E
R
N E
W B
O
IL
E R
F U
T U
R E
B O
IL
E
R
D E
A E
R A
T O
R
200A 125A 125A 125A
S P
A R
E
IN
D
U C
E D
D R
A F
T F
A N
S P
A R
E
F O
R C
E D
R A
F T
F A
N
125A
S U
R G
E T
A N
K
70A
ATS 7-1
SE RATED
600A, 480V, 3P
35KAIC
OPEN TRANSITION
EXISTING
GENERATOR
250KW
G
600A
NH-7-1
225A, 480V, 3Ø, 4W
225A MCB, FEED THRU LUGS
TN-7-1
75KVA, 480VY/120-208V
NL-7-1
225A, 208V, 3Ø, 4W
225A MCB, FEED THRU LUGS
NH-7-2
225A, 480V, 3Ø, 4W
225A MCB, FEED THRU LUGS
TN-7-2
75KVA, 480VY/120-208V
NL-7-2
225A, 208V, 3Ø, 4W
225A MCB, FEED THRU LUGS
225A
225A
NL-7-1B
225A, 208V, 3Ø, 4W
225A MCB, FEED THRU LUGS
225A
225A
125A
125A
R V
T R
A N
S F
O R
M E
R
400A
NH-7-E1
EXISTING
100A42
41 41 41 41 35 38 38 18 42
EXISTING FEEDER FROM
SUB 1A (480V) REWORKED
TO SERVE NEW SYSTEM. 600A, 480V, 3P FUSED
DISCONNECT. FUSED AT
600A
300KVA ISOLATION
TRANSFORMER.
480V-DELTA/480V-Y
NEMA 3R
600A, 480V, 3P, 3R FUSED
DISCONNECT. FUSED AT
600A
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
Je ffe rs on
L ab or at or ie s F oo d an d
D ru g A dm in is tr at io n
N
C T
R R d Je ffe rs on , A
R
E201
ONE-LINE DIAGRAMS
06-26-12
FDA-SOI-06-00268
B ui ld in g
B oi le r
R ep la ce m en t
1/4" = 1’−0"
ONE−LINE DIAGRAM − BOILER 2 INSTALLATION
1 08/03/12 ADDENDUM #1
BID SET
File details come from the government source that posted it. Updated .