G100.pdf

PDF 629 KB Posted

Attached to
Building 7 Boiler #2 Replacement
Solicitation number
12-223-SOL-00177
Issued by

About this file

J-1 Drawings G100

View the file

Other files

File Type Posted
amendment 3.pdf PDF
NCTR Air Permit.pdf PDF
attachment 2- list of attendees.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
attachment 1- list of attendees.pdf PDF
M203.pdf PDF
M404.pdf PDF
M102.pdf PDF
M200.pdf PDF
E106.pdf PDF
M403.pdf PDF
M104.pdf PDF
M305.pdf PDF
S102.pdf PDF
M304.pdf PDF
M402.pdf PDF
M501.pdf PDF
M306.pdf PDF
M401.pdf PDF
E103.pdf PDF
M303.pdf PDF
M702.pdf PDF
M302.pdf PDF
M202.pdf PDF
E202.pdf PDF
M103.pdf PDF
M201.pdf PDF
M101.pdf PDF
M601.pdf PDF
M204.pdf PDF
E201.pdf PDF
M703.pdf PDF
E104.pdf PDF
01120018 Add 01 Specs 080312.pdf PDF
12-223-SOL-00177.pdf PDF
M100.pdf PDF
E301.pdf PDF
S101.pdf PDF
M301.pdf PDF
E101.pdf PDF
E102.pdf PDF
E105.pdf PDF
M701.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TS

A TE FO

REGISTERED

PROFESSIONAL

ENGINEER

ARKANSAS

NO. 7512H

A M

ID HABI B

I

OOOOOOOO TME, INC.

ER

ENNA

CCCC

RK

A

S -A S GE N I

No. 178

NNNN

TTTT

TTTTRRRRAAAAAAAA TTTT

RRRRPPPP

OOOORRRR

EEEEE IIIIRRRR SSSSGGGGEEE

IIII

TME, Inc. Engineers a division of TME, Inc.

DATE:

I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS HAVE BEEN PREPARED BY ME,

OR UNDER MY SUPERVISION. I FURTHER CERTIFY THAT TO THE BEST OF MY KNOWLEDGE

THESE PLANS AND SPECIFICATIONS ARE AS REQUIRED BY LAW AND IN COMPLIANCE WITH

PLUMBING AND MECHANICAL CODE FOR THE STATE OF ARKANSAS.

Little Rock, Arkansas 72205−1757 5800 Evergreen Drive

Phone: (501) 666−6776 Fax: (501) 663−8888 tme@tmecorp.com

H. HABIBI, P.E.

TME PROJECT NO: 01−12−0018

Jefferson Laboratories

Food and Drug Administration 3900 NCTR Rd

Jefferson, AR 72079

Building 7 - Boiler # 2 Replacement

06-26-12

FDA-SOI-06-00268

DRAWING INDEX

SHEET

NUMBER SHEET NAME

ELECTRICAL

E101 BOILER 2 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION

E102 BOILER 2 INSTALLATION - FAN PLATFORM - ELECTRICAL DEMOLITION

E103 BOILER 2 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL NEW

E104 BOILER 2 INSTALLATION - MEZZANINE PLAN - ELECTRICAL NEW

E105 BOILER 2 INSTALLATION - SECOND FLOOR PLAN - ELECTRICAL NEW

E106 BOILER 2 INSTALLATION - FAN PLATFORM - ELECTRICAL NEW

E201 ONE-LINE DIAGRAMS

E202 ELECTRICAL PANEL SCHEDULES

E301 ELECTRICAL DETAILS

STRUCTURAL

S101 STRUCTURAL SECOND FLOOR PLAN

S102 STRUCTURAL ELEVATIONS & DETAILS

DRAWING INDEX

SHEET

NUMBER SHEET NAME

COVER

G100 COVER SHEET

MECHANICAL

M100 BOILER 2 INSTALLATION - TRENCH PLAN - MECHANICAL DEMOLITION

M101 BOILER 2 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL DEMOLITION

M102 BOILER 2 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL DEMOLITION

M103 BOILER 2 ISNTALLATION - SECOND FLOOR PLAN - MECHANICAL DEMOLITION

M104 BOILER 2 INSTALLATION - FAN PLATFORM - MECHANICAL DEMOLITION

M200 BOILER 2 INSTALLATION - TRENCH PLAN - MECHANICAL NEW

M201 BOILER 2 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL NEW

M202 BOILER 2 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL NEW

M203 BOILER 2 INSTALLATION - SECOND FLOOR PLAN - MECHANICAL NEW

M204 BOILER 2 INSTALLATION - FAN FLATFORM - MECHANICAL NEW

M301 MAIN HEADER SECTIONS

M302 NEW LOUVER INSTALLATION SECTION

M303 SECTION PLAN VIEW EXISTING WATER TUBE BOILER - ASBESTOS ABATMENT

M304 SECTION SIDE ELEVATION EXISTING WATER TUBE BOILER - ASBESTOS ABATMENT

M305 BOILER 2 INSTALLATION - HVAC PIPING RISER DEMOLITION

M306 BOILER 2 INSTALLATION - HVAC PIPING RISER NEW

M401 DETAILS

M402 DETAILS

M403 DETAILS

M404 DETAILS

M501 PIPING DIAGRAMS/FLOWS

M601 SCHEDULES

M701 CONTROLS

M702 CONTROLS

M703 CONTROLS

BID SET

08/03/12 ADDENDUM #11

File details come from the government source that posted it. Updated .