G100.pdf
PDF 629 KB Posted
- Attached to
- Building 7 Boiler #2 Replacement
- Solicitation number
- 12-223-SOL-00177
About this file
J-1 Drawings G100
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TS
A TE FO
REGISTERED
PROFESSIONAL
ENGINEER
ARKANSAS
NO. 7512H
A M
ID HABI B
I
OOOOOOOO TME, INC.
ER
ENNA
CCCC
RK
A
S -A S GE N I
No. 178
NNNN
TTTT
TTTTRRRRAAAAAAAA TTTT
RRRRPPPP
OOOORRRR
EEEEE IIIIRRRR SSSSGGGGEEE
IIII
TME, Inc. Engineers a division of TME, Inc.
DATE:
I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS HAVE BEEN PREPARED BY ME,
OR UNDER MY SUPERVISION. I FURTHER CERTIFY THAT TO THE BEST OF MY KNOWLEDGE
THESE PLANS AND SPECIFICATIONS ARE AS REQUIRED BY LAW AND IN COMPLIANCE WITH
PLUMBING AND MECHANICAL CODE FOR THE STATE OF ARKANSAS.
Little Rock, Arkansas 72205−1757 5800 Evergreen Drive
Phone: (501) 666−6776 Fax: (501) 663−8888 tme@tmecorp.com
H. HABIBI, P.E.
TME PROJECT NO: 01−12−0018
Jefferson Laboratories
Food and Drug Administration 3900 NCTR Rd
Jefferson, AR 72079
Building 7 - Boiler # 2 Replacement
06-26-12
FDA-SOI-06-00268
DRAWING INDEX
SHEET
NUMBER SHEET NAME
ELECTRICAL
E101 BOILER 2 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
E102 BOILER 2 INSTALLATION - FAN PLATFORM - ELECTRICAL DEMOLITION
E103 BOILER 2 INSTALLATION - FIRST FLOOR PLAN - ELECTRICAL NEW
E104 BOILER 2 INSTALLATION - MEZZANINE PLAN - ELECTRICAL NEW
E105 BOILER 2 INSTALLATION - SECOND FLOOR PLAN - ELECTRICAL NEW
E106 BOILER 2 INSTALLATION - FAN PLATFORM - ELECTRICAL NEW
E201 ONE-LINE DIAGRAMS
E202 ELECTRICAL PANEL SCHEDULES
E301 ELECTRICAL DETAILS
STRUCTURAL
S101 STRUCTURAL SECOND FLOOR PLAN
S102 STRUCTURAL ELEVATIONS & DETAILS
DRAWING INDEX
SHEET
NUMBER SHEET NAME
COVER
G100 COVER SHEET
MECHANICAL
M100 BOILER 2 INSTALLATION - TRENCH PLAN - MECHANICAL DEMOLITION
M101 BOILER 2 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL DEMOLITION
M102 BOILER 2 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL DEMOLITION
M103 BOILER 2 ISNTALLATION - SECOND FLOOR PLAN - MECHANICAL DEMOLITION
M104 BOILER 2 INSTALLATION - FAN PLATFORM - MECHANICAL DEMOLITION
M200 BOILER 2 INSTALLATION - TRENCH PLAN - MECHANICAL NEW
M201 BOILER 2 INSTALLATION - FIRST FLOOR PLAN - MECHANICAL NEW
M202 BOILER 2 INSTALLATION - MEZZANINE FLOOR PLAN - MECHANICAL NEW
M203 BOILER 2 INSTALLATION - SECOND FLOOR PLAN - MECHANICAL NEW
M204 BOILER 2 INSTALLATION - FAN FLATFORM - MECHANICAL NEW
M301 MAIN HEADER SECTIONS
M302 NEW LOUVER INSTALLATION SECTION
M303 SECTION PLAN VIEW EXISTING WATER TUBE BOILER - ASBESTOS ABATMENT
M304 SECTION SIDE ELEVATION EXISTING WATER TUBE BOILER - ASBESTOS ABATMENT
M305 BOILER 2 INSTALLATION - HVAC PIPING RISER DEMOLITION
M306 BOILER 2 INSTALLATION - HVAC PIPING RISER NEW
M401 DETAILS
M402 DETAILS
M403 DETAILS
M404 DETAILS
M501 PIPING DIAGRAMS/FLOWS
M601 SCHEDULES
M701 CONTROLS
M702 CONTROLS
M703 CONTROLS
BID SET
08/03/12 ADDENDUM #11
File details come from the government source that posted it. Updated .