J-1 Drawings M103
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
DA
TANK
EXISTING BOILER 1
TO REMAIN
1-1/2" BLOW DOWN ,
DOWN TO MEZZ.
2-1/2" S100
4" BFW
8" VTR
8" VTR
6" VTR
S
8" VTR
8" VTR
6" VTR
S
S
2" VTR
14" HIGH PRESSURE STEAM
SUPPLY TO CAMPUS
MAKE UP WATER PIPING
12" HEADER
6 6
EXISTING
10" S100
DOWN TO
14" HEADER
EXISTING 10" S100
DOWN TO
14" HEADER
4" V
EXISTING
WATER TUBE
BOILER 1
EXISTING
FIRE TUBE
BOILER 2
24"ø
2" SR
4 3.4 3 2.4 1.4 1
H
E
D
B
A
EXISTING BOILER #2 AND ASSOCIATED
EQUIPMENT TO BE REMOVED UNDER BOILER
2 INSTALLATION.
REMOVE EXISTING STEAM PIPING TO THIS
POINT. CAP EXISTING VALVE.
EXISTING FEED WATER PIPING TO BE
REMOVED.
EXISTING MANUAL/ AUXILIARY FEEDWATER
PIPING.
NOT USED.
EXISTING BOILER /PLATFORM SUPPORT
COLUMNS TO REMAIN. PROTECT DURING
BOILER DEMOLITION. REFER TO
STRUCTURAL DRAWINGS.
REMOVE EXISTING VENTS THRU ROOF. CAP
ROOF OPENINGS.
EXISTING VALVES ON EXISTING 14" S100 TO
REMAIN.
EXISTING S100 FROM EXISTING WATER TUBE
BOILER TO REMAIN.
ADDITIVE OPTION #1: REMOVE ABANDONED
PIPING ASSOCIATED WITH DEARATOR TANK
AND OPTION 1.
REMOVE ABANDONED DEARATOR TANK AS
PART OF OPTION #1.
4" SR
4" PCR
2" D
2" BFW
6" BFW 1" D1" D
1" D
4" SCW
6" VTR
2 1/2" S100
4" S100
4" S100
8" S100
DOWN TO EXISTING
BOILER
12" S100
4" SR
8" S100
10" S100
14" S100
10" S100
12" S100
1" D
BOILER
STACK
8" S100
8" S100
4" BFW
1 1/2"
1 1/2" BD
8 8
6" SR10
10" BFW10
10" S15
6" S100
4" SCW
6" VTR UP FROM SURGE TANK
2" S100
DOWN AND
OUT TO
EXTERIOR
WALL
DOWN TO
SURGE
TANK
BELOW
DOWN TO
SURGE
TANK
BELOW
DN FROM
DA TANK
ABOVE
UP TO
DA TANK
ABOVE
4" PCR
4" SR
DN TO
POLISHER
BELOW
DN TO
SURGE
TANK
BELOW
GENERAL NOTES:
DEMOLITION KEYED NOTES:
1. CONTRACTOR SHALL PROVIDE PRICING
FOR OPTIONS 1 THRU 8 AS LISTED ON
THIS DRAWING.
2. ALL EXISTING EQUIPMENT, PIPING,
VALVES TO REMAIN UNLESS
OTHERWISE NOTED.
BOILER INSTALLATION SYSTEM SCHEDULE
PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT
1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.
2). INSTALL THREE NEW EXHAUST FANS.
1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT
FAN, AND COMBUSTION AIR FAN.
OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.
OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.
OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.
OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.
OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER
PIPING FOR BOTH NEW AND EXISTING BOILER).
BOILER 2
INSTALLATION
DEMOLITION
BOILER 2
INSTALLATION
NEW WORK
ADDITIVE
OPTIONS
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
Je ffe rs on
L ab or at or ie s F oo d an d
D ru g A dm in is tr at io n
N
C T
R R d Je ffe rs on , A
R
M103
BOILER 2 ISNTALLATION -
SECOND FLOOR PLAN -
MECHANICAL DEMOLITION
06-26-12
FDA-SOI-06-00268
B ui ld in g
B oi le r
R ep la ce m en t
1/4" = 1’−0"
BOILER 2 INSTALLATION − SECOND FLOOR PLAN − MECHANICAL DEMOLITION
1 08/03/12 ADDENDUM #1