M202.pdf

PDF 704 KB Posted

Attached to
Building 7 Boiler #2 Replacement
Solicitation number
12-223-SOL-00177
Issued by

About this file

J-1 Drawings M202

View the file

Other files

File Type Posted
amendment 3.pdf PDF
NCTR Air Permit.pdf PDF
attachment 2- list of attendees.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
attachment 1- list of attendees.pdf PDF
M203.pdf PDF
M404.pdf PDF
M102.pdf PDF
M200.pdf PDF
E106.pdf PDF
M403.pdf PDF
M104.pdf PDF
M305.pdf PDF
S102.pdf PDF
M304.pdf PDF
M402.pdf PDF
M501.pdf PDF
M306.pdf PDF
M401.pdf PDF
E103.pdf PDF
M303.pdf PDF
M702.pdf PDF
M302.pdf PDF
E202.pdf PDF
M103.pdf PDF
M201.pdf PDF
M101.pdf PDF
M601.pdf PDF
M204.pdf PDF
E201.pdf PDF
M703.pdf PDF
E104.pdf PDF
01120018 Add 01 Specs 080312.pdf PDF
12-223-SOL-00177.pdf PDF
M100.pdf PDF
E301.pdf PDF
S101.pdf PDF
M301.pdf PDF
E101.pdf PDF
G100.pdf PDF
E102.pdf PDF
E105.pdf PDF
M701.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tectonic Copyright 2007

R E

F

T ectonic Cop yright 2007

EXISTING 14"

MAIN STEAM

HEADER

EXISTING14" S100 MAIN

STEAM HEADER

SAMPLING

STATION

EXISTING

WATER TUBE

BOILER 1

BSE-2 BSE-1

12 12

8" S100

1" DCW

4 3.4 3 2.4 1.4 1

H

E

D

B

A

2 1/2" SCW

6" SR

NEW 24" ROUND DUCT FLUE UP THROUGH ROOF.

NEW 2-STAGE BOILER STACK ECONOMIZER HEATEXCHANGER

BSE-2. REFER TO STRUCTURAL DRAWINGS FOR SUPPORT

INFORMATION.

FLOW METER

FIRST STAGE ECONOMIZER CONNECTIONS - 3".

SECOND STAGE ECONOMIZER CONNECTIONS - 2-1/2".

NOT USED

NOT USED

2 1/2" MAKE-UP SOFTENED WATER

2 1/2" MAKE-UP WATER UP TO MAKE-UP WATER HEADER

CONNECTION.

NEW 8" STEAM PIPING TO NEW 14" STEAM HEADER ON

SECOND FLOOR.

STEAM SUPPLY PIPING UP.

NEW VERTICAL DOWNFLOW STEAM UNIT HEATER. TOTAL OF

SEVEN REQUIRED FOR THIS PROJECT.

2" STEAM RETURN LOOP FOR STEAM UNIT HEATER. ROUTE

TO SURGE TANK CONNECTION.

STEAM VENTS THRU EXTERIOR WALL.

1" FUEL OIL SUPPLY AND RETURN DOWN TO FUEL OIL

CIRCULATION TANK.

3" NATURAL GAS 7.5 PSI DOWN AND CONNECT TO BOILER

GAS PIPING.

ADDITIVE OPTION #4: NEW STEAM UNIT HEATERS AND ALL S15

STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

INSTALL DRIP LEG WITH TRAP ASSEMBLY AND ROUTE THE

STEAM CONDENSATE TO EXISTING 6" SR TO SURGE TANK.

FOP-2

2" D

1" FOS

3/4" FOR

6" NG

2" FOR

4" SCW

3" NG

2"V DOWN

TO GAS

TRAIN

3" NATURAL

GAS DOWN

TO

EXISTING

BOILER

1" FOR

1" FOS

2 1/2" SCW

4" SCW

FUEL OIL

DOWN TO

RECIR PUMP

4"PCR UP

FROM

POLISHER

4"PCR

UP TO

DA TANK

2 1/2" SCW

2 1/2" SCW

3" S15

UP TO

PRV-1

2" S15

2" S15

3/4" S15

2" V

4" V

4" V

4" V

2" V 2" S100

1" SR

4" FOS

4" FOS

4" SCW

2" S15

1" BFW

4" BFW

4" BFW

4" SCW

4" SCW

4" V

2" S15

14" S100

4" SR

4" SR

4" SCW

4" SCW

4" SCW

4" SCW

DOWN TO

BDHX-1

4" SCW

UP FROM

BDHX-1

4" SCW

TO DA

TANK

ABOVE

2" BFW BYPASS

UP TO

DA TANK

6" BFW DOWN

FROM DA

TANK

6" VTR

4" BFW

DOWN TO

EXISTING

BOILER

4" SCW

EXISTING

14" S100

HEADER

2 1/2" SCW

4" SCW

4" BFW

3" NG

2 1/2" SCW

1" SR

1"SR UP TO

DRIP LEG

ON STEAM

HEADER

ABOVE

3" NG

6" NG

4" SCW

FOP-1

1" BD

1 1/4" VTR

1 1/2" DCW

UH-1

3" NG

1" BD

UH-1

UH-1

UH-1

UH-1

UH-1

1" FOS

1 1/2" DCW

1" BFW

4" BFW

2" FOR

1" FOS1" FOR

6" VTR

4" V

2" S15

2" SR

4" SCW

14" S100

4" SCW

1" BFW

2" SR BELOW

2" SR

BELOW

3/4" S15

3/4" SRBELOW

14" S100 BELOW3/4" S153/4" SR BELOW

3/4" S15

3/4" SR

BELOW

B-2

B-1

8" S100

CAPPED

6" BFW

6" BFW6" BFW

6" BFW

2" SR

KEYED NOTES:

DOWN TO

EXISTING

CP-1

1 1/2" DCW

GERNERAL NOTE

1. REFER TO PIPING DIAGRAM ON M501 AND CONTROL

DIAGRAM FOR LOCATION OF ALL FLOW METERS,

TEMP. WELLS, ETC.TO BE INSTALLED

BOILER INSTALLATION SYSTEM SCHEDULE

PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT

1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.

2). INSTALL THREE NEW EXHAUST FANS.

1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT

FAN, AND COMBUSTION AIR FAN.

OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.

OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.

OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.

OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.

OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER

PIPING FOR BOTH NEW AND EXISTING BOILER).

BOILER 2

INSTALLATION

DEMOLITION

BOILER 2

INSTALLATION

NEW WORK

ADDITIVE

OPTIONS

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

Je ffe rs on

L ab or at or ie s F oo d an d

D ru g A dm in is tr at io n

N

C T

R R d Je ffe rs on , A

R

M202

BOILER 2 INSTALLATION -

MEZZANINE FLOOR PLAN -

MECHANICAL NEW

06-26-12

FDA-SOI-06-00268

B ui ld in g

B oi le r

R ep la ce m en t

1/4" = 1’−0"

BOILER 2 INSTALLATION − MEZZANINE FLOOR PLAN − MECHANICAL NEW

1 08/03/12 ADDENDUM #1

BID SET

File details come from the government source that posted it. Updated .