M202.pdf
PDF 704 KB Posted
- Attached to
- Building 7 Boiler #2 Replacement
- Solicitation number
- 12-223-SOL-00177
About this file
J-1 Drawings M202
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tectonic Copyright 2007
R E
F
T ectonic Cop yright 2007
EXISTING 14"
MAIN STEAM
HEADER
EXISTING14" S100 MAIN
STEAM HEADER
SAMPLING
STATION
EXISTING
WATER TUBE
BOILER 1
BSE-2 BSE-1
12 12
8" S100
1" DCW
4 3.4 3 2.4 1.4 1
H
E
D
B
A
2 1/2" SCW
6" SR
NEW 24" ROUND DUCT FLUE UP THROUGH ROOF.
NEW 2-STAGE BOILER STACK ECONOMIZER HEATEXCHANGER
BSE-2. REFER TO STRUCTURAL DRAWINGS FOR SUPPORT
INFORMATION.
FLOW METER
FIRST STAGE ECONOMIZER CONNECTIONS - 3".
SECOND STAGE ECONOMIZER CONNECTIONS - 2-1/2".
NOT USED
NOT USED
2 1/2" MAKE-UP SOFTENED WATER
2 1/2" MAKE-UP WATER UP TO MAKE-UP WATER HEADER
CONNECTION.
NEW 8" STEAM PIPING TO NEW 14" STEAM HEADER ON
SECOND FLOOR.
STEAM SUPPLY PIPING UP.
NEW VERTICAL DOWNFLOW STEAM UNIT HEATER. TOTAL OF
SEVEN REQUIRED FOR THIS PROJECT.
2" STEAM RETURN LOOP FOR STEAM UNIT HEATER. ROUTE
TO SURGE TANK CONNECTION.
STEAM VENTS THRU EXTERIOR WALL.
1" FUEL OIL SUPPLY AND RETURN DOWN TO FUEL OIL
CIRCULATION TANK.
3" NATURAL GAS 7.5 PSI DOWN AND CONNECT TO BOILER
GAS PIPING.
ADDITIVE OPTION #4: NEW STEAM UNIT HEATERS AND ALL S15
STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
INSTALL DRIP LEG WITH TRAP ASSEMBLY AND ROUTE THE
STEAM CONDENSATE TO EXISTING 6" SR TO SURGE TANK.
FOP-2
2" D
1" FOS
3/4" FOR
6" NG
2" FOR
4" SCW
3" NG
2"V DOWN
TO GAS
TRAIN
3" NATURAL
GAS DOWN
TO
EXISTING
BOILER
1" FOR
1" FOS
2 1/2" SCW
4" SCW
FUEL OIL
DOWN TO
RECIR PUMP
4"PCR UP
FROM
POLISHER
4"PCR
UP TO
DA TANK
2 1/2" SCW
2 1/2" SCW
3" S15
UP TO
PRV-1
2" S15
2" S15
3/4" S15
2" V
4" V
4" V
4" V
2" V 2" S100
1" SR
4" FOS
4" FOS
4" SCW
2" S15
1" BFW
4" BFW
4" BFW
4" SCW
4" SCW
4" V
2" S15
14" S100
4" SR
4" SR
4" SCW
4" SCW
4" SCW
4" SCW
DOWN TO
BDHX-1
4" SCW
UP FROM
BDHX-1
4" SCW
TO DA
TANK
ABOVE
2" BFW BYPASS
UP TO
DA TANK
6" BFW DOWN
FROM DA
TANK
6" VTR
4" BFW
DOWN TO
EXISTING
BOILER
4" SCW
EXISTING
14" S100
HEADER
2 1/2" SCW
4" SCW
4" BFW
3" NG
2 1/2" SCW
1" SR
1"SR UP TO
DRIP LEG
ON STEAM
HEADER
ABOVE
3" NG
6" NG
4" SCW
FOP-1
1" BD
1 1/4" VTR
1 1/2" DCW
UH-1
3" NG
1" BD
UH-1
UH-1
UH-1
UH-1
UH-1
1" FOS
1 1/2" DCW
1" BFW
4" BFW
2" FOR
1" FOS1" FOR
6" VTR
4" V
2" S15
2" SR
4" SCW
14" S100
4" SCW
1" BFW
2" SR BELOW
2" SR
BELOW
3/4" S15
3/4" SRBELOW
14" S100 BELOW3/4" S153/4" SR BELOW
3/4" S15
3/4" SR
BELOW
B-2
B-1
8" S100
CAPPED
6" BFW
6" BFW6" BFW
6" BFW
2" SR
KEYED NOTES:
DOWN TO
EXISTING
CP-1
1 1/2" DCW
GERNERAL NOTE
1. REFER TO PIPING DIAGRAM ON M501 AND CONTROL
DIAGRAM FOR LOCATION OF ALL FLOW METERS,
TEMP. WELLS, ETC.TO BE INSTALLED
BOILER INSTALLATION SYSTEM SCHEDULE
PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT
1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.
2). INSTALL THREE NEW EXHAUST FANS.
1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT
FAN, AND COMBUSTION AIR FAN.
OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.
OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.
OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.
OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.
OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER
PIPING FOR BOTH NEW AND EXISTING BOILER).
BOILER 2
INSTALLATION
DEMOLITION
BOILER 2
INSTALLATION
NEW WORK
ADDITIVE
OPTIONS
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
Je ffe rs on
L ab or at or ie s F oo d an d
D ru g A dm in is tr at io n
N
C T
R R d Je ffe rs on , A
R
M202
BOILER 2 INSTALLATION -
MEZZANINE FLOOR PLAN -
MECHANICAL NEW
06-26-12
FDA-SOI-06-00268
B ui ld in g
B oi le r
R ep la ce m en t
1/4" = 1’−0"
BOILER 2 INSTALLATION − MEZZANINE FLOOR PLAN − MECHANICAL NEW
1 08/03/12 ADDENDUM #1
BID SET
File details come from the government source that posted it. Updated .