- Building 7 Boiler #2 Replacement
- Solicitation number
- 12-223-SOL-00177
About this file
J-1 Drawings E104
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M703.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
BOILER 1
1. UH-1. STEAM UNIT HEATERS. 277V, 1Ø.
2. MODULATOR VALVES. 120V. VERIFY EXACT LOCATION WITH MECHANICAL.
3. FLOW METER ON FIRST STAGE OF ECONOMIZER. 120V. VERIFY EXACT LOCATION
WITH MECH.
1. ELECTRICAL CONTRACTOR TO PROVIDE POWER FOR ALL METERS
REQUIRING 120V POWER. SEE MECHANICAL FLOOR PLANS AND
CONTROL DRAWINGS.
2. REFER TO MECHANICAL DRAWINGS FOR OPTIONS.
TO BELOW
1 1 1
TO BELOW
"NH-7-2" - 2
4 3.4 3 2.4 1.4 1
H
E
D
B
A
"NH-7-2" - 4
ELECTRICAL KEYED NOTES: ELECTRCIAL GENERAL NOTES:
BOILER INSTALLATION SYSTEM SCHEDULE
PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT
1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.
2). INSTALL THREE NEW EXHAUST FANS.
1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT
FAN, AND COMBUSTION AIR FAN.
OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.
OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.
OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.
OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.
OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER
PIPING FOR BOTH NEW AND EXISTING BOILER).
BOILER 2
INSTALLATION
DEMOLITION
BOILER 2
INSTALLATION
NEW WORK
ADDITIVE
OPTIONS
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
Je ffe rs on
L ab or at or ie s F oo d an d
D ru g A dm in is tr at io n
N
C T
R R d Je ffe rs on , A
R
E104
BOILER 2 INSTALLATION -
MEZZANINE PLAN -
ELECTRICAL NEW
06-26-12
FDA-SOI-06-00268
B ui ld in g
B oi le r
R ep la ce m en t
1/4" = 1’−0"
BOILER 2 INSTALLATION − MEZZANINE FLOOR PLAN − ELECTRICAL NEW
1 08/03/12 ADDENDUM #1
BID SET
File details come from the government source that posted it. Updated .