M101.pdf

PDF 811 KB Posted

Attached to
Building 7 Boiler #2 Replacement
Solicitation number
12-223-SOL-00177
Issued by

About this file

J-1 Drawings M101

View the file

Other files

File Type Posted
amendment 3.pdf PDF
NCTR Air Permit.pdf PDF
attachment 2- list of attendees.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
attachment 1- list of attendees.pdf PDF
S102.pdf PDF
M304.pdf PDF
M402.pdf PDF
M501.pdf PDF
M306.pdf PDF
M401.pdf PDF
E103.pdf PDF
M303.pdf PDF
M702.pdf PDF
M302.pdf PDF
M203.pdf PDF
M404.pdf PDF
M102.pdf PDF
M200.pdf PDF
E106.pdf PDF
M403.pdf PDF
M104.pdf PDF
M305.pdf PDF
M202.pdf PDF
E202.pdf PDF
M103.pdf PDF
M201.pdf PDF
M601.pdf PDF
M204.pdf PDF
E201.pdf PDF
M703.pdf PDF
E104.pdf PDF
01120018 Add 01 Specs 080312.pdf PDF
12-223-SOL-00177.pdf PDF
M100.pdf PDF
E301.pdf PDF
S101.pdf PDF
M301.pdf PDF
E101.pdf PDF
G100.pdf PDF
E102.pdf PDF
E105.pdf PDF
M701.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING

BOILER

FEED

PUMP

EXISTING

BOILER

FEED

PUMP

EXISTING

BOILER

FEED

PUMP

EXISTING

BOILER

CONTROL

PANEL

EXISTING

AIR

STORAGE

TANK

EXISTING 2" FUEL OIL

PIPING FOS/FOR

6" S 15

6" S 15

6" S 15

10" S 15

3" SR

6" SR

6" BD DOWN TO

BLOWDOWN TANK

CPS-1

BDHX-1

EXISTING

CHEMICAL

TREATMENT

EXISTING

WATER TUBE

BOILER 2

TO BE

REMOVED

EXISTING

WATER TUBE

BOILER 1

3" S15

1" DCW

BS-1

EXISTING

FIRE TUBE

BOILER 1

CST-1

2" F

O S

4" DCW

8" S100

FOS-1

2" SR

2" BD

4" BFW

4 3.4 3 2.4 1.4 1

H

E

D

B

A

REMOVE EXISTING LOUVER AND GLASS FOR

INSTALLATION OF NEW BOILER #2. REMOVE

EXISTING X-BRACING. RELOCATE X-BRACING PER

STRUCTURAL DRAWINGS. AFTER NEW BOILER #2

IS IN AND PLACED. INSTALL NEW LOUVER TO

REPLACE EXISTING LOUVER, GLASS AND PORTION

OF REMOVED WALL.

EXISTING BOILER #2 AND ASSOCIATED

EQUIPMENT TO BE REMOVED UNDER BOILER 2

INSTALLATION.

EXISTING STRUCTURAL SUPPORT COLUMN TO

REMAIN. PROTECT DURING BOILER DEMOLITION.

EXISTING NATURAL GAS PIPES, FUEL OIL SUPPLY

AND RETURN PIPING IN TRENCH SHALL REMAIN TO

SERVE EXISTING WATER TUBE BOILER.

VENT PIPE TO BE CUT AND TEMPORARILY

REMOVED FROM BLOW-OFF TANK AND

REINSTALLED AFTER BOILER #2 HAS BEEN

MOVED INTO BUILDING. CUTLINE BELOW

SURFACE OF PIT COVERS. SEE DETAIL #2 ON THIS

SHEET.

REMOVE AND CAP HIGH PRESSURE NATURAL GAS

LINE IN TRENCH.

REMOVE PORTION OF WALL TO THE COLUMN AS

REQUIRED TO MOVE BOILER #2 INTO THE BLDG.

M101

4" NG

6" BD

3" S15

3" S15

6" BD

1" DCW

3" BD

6" BD

4" VTR

UNIT

HEATER

UNIT

HEATER

UNIT

HEATER

UNIT

HEATER

3/4" FOR

1" FOS

SEE GENERAL

NOTE #1

SEE GENERAL NOTE #1

SEE GENERAL NOTE #19

6" SR

3" BD

2" BD

3" NG

1" BD

8" S100

3" NG

3" BFW

2" V

4" NG

6" NG

FOP-1

EXISTING 6" BD TO BE REMOVED.

ALL EXISTING PIPING TO BE REMOVED.

EXISTING STEAM UNIT HEATER TO BE REMOVED.

REMOVE ALL ASSOCIATED CONTROLS AND

SUPPORTS. REMOVE ALL ASSOCIATED PIPING

AND CAP PIPING AT POINT OF DEMOLITION.

EXISTING BOILER TO REMAIN.

EXISTING 30 PSI NATURAL GAS PIPE TO EXISTING

WATER TUBE BOILER TO BE REMOVED AND

CAPPED INSIDE THE EXISTING TRENCH.

EXISTING FUEL OIL PIPE DOWN TO TRENCH TO

REMAIN.

EXISTING FUEL OIL PUMP SERVING EXISTING

WATER TUBE BOILER TO REMAIN.

EXISTING FUEL OIL PUMP SERVING EXISTING AND

NEW FIRE TUBE BOILER TO REMAIN.

ADDITIVE OPTION 1: REMOVE ABANDONED PIPING

ASSOCIATED WITH EXISTING FEED WATER

SYSTEM.

ADDITIVE OPTION 2: REMOVE EXISTING

FEEDWATER PUMPS AND ALL ASSOCIATED

FEEDWATER PIPING, CONCRETE, ETC., PATCH

FLOOR AND SMOOTH FINISHED SURFACE.

ADDITIVE OPTION 3: REMOVE EXISTING

FEEDWATER PIPING IN TRENCH.

EXISTING WATER SOFTENER TANKS TO REMAIN.

EXISTING AIR COMPRESSOR TO REMAIN.

4"SCW UP

TO DA TANK

ABOVE

3" NG

4" BFW

6" S15

4" BFW

GENERAL NOTES:

1. CONTRACTOR SHALL PROVIDE PRICING

FOR OPTIONS 1 THRU 8 AS LISTED ON

THIS DRAWING.

2. ALL EXISTING EQUIPMENT, PIPING,

VALVES TO REMAIN UNLESS

OTHERWISE NOTED.

DEMOLITION KEYES NOTES:

17EXISTING CONDENSATE

RETURN PUMPS

17EXISTING CHEMICAL

FEED PUMP PADS

FIRST FLOOR

0' - 0"

SECOND FLOOR

24' - 0"

FAN PLATORM

36' - 0"

ROOF

56' - 0"

32.4

FAN PLATFORM

36' - 0"

MEZZANINE

12' - 0"

4" V

6" VTR

6" VTR

BlOW-OFF

TANK

PIT COVERS

4" BD

PIPE SUPPORT

TO BE REMOVED

AND REUSED

2" VTR

6" VTR

1 1

BOILER INSTALLATION SYSTEM SCHEDULE

PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT

1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.

2). INSTALL THREE NEW EXHAUST FANS.

1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT

FAN, AND COMBUSTION AIR FAN.

OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.

OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.

OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.

OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.

OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER

PIPING FOR BOTH NEW AND EXISTING BOILER).

BOILER 2

INSTALLATION

DEMOLITION

BOILER 2

INSTALLATION

NEW WORK

ADDITIVE

OPTIONS

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

Je ffe rs on

L ab or at or ie s F oo d an d

D ru g A dm in is tr at io n

N

C T

R R d Je ffe rs on , A

R

M101

BOILER 2 INSTALLATION -

FIRST FLOOR PLAN -

MECHANICAL DEMOLITION

06-26-12

FDA-SOI-06-00268

B ui ld in g

B oi le r

R ep la ce m en t

1/4" = 1’−0"

BOILER 2 INSTALLATION − FIRST FLOOR PLAN − MECHANICAL DEMOLITION

1/4" = 1’−0"

SECTION − EXTERIOR BLOW−OFF TANK

AND VENT DEMOLITION

1 08/03/12 ADDENDUM #1

BID SET