J-1 Drawings M203
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW
HANDRAIL
SYSTEM
EXISTING
GRATING
FLOORING
EXISTING
GRATING
FLOORING
1-1/2" BLOW DOWN
DOWN TO MEZZANINE
8" VTR
8" VTR
6" VTR
10" S100
14" HIGH PRESSURE STEAM
SUPPLY TO CAMPUS
EXISTING
GRATING
FLOORING
12" HEADER
FM
"ø
"ø
4 3.4 3 2.4 1.4 1
H
E
D
B
A
14" S1008" S100
4" PCR
2" D
4" SR
2" BFW
6" BFW
4" SCW
6" VTR
2 1/2" S100
PROVIDE NEW HANDRAIL SYSTEM AROUND
FLOOR OPENING WHERE BOILER 2 WAS
LOCATED. ADD HANDRAIL TO BACK SIDE
OF OLD BOILER CONNECT TO THE
EXISTING HANDRAIL SYSTEM.
NEW 8" S100 DOWN TO CONNECTION AT
NEW BOILER #2. REFER TO STRUCTURAL
DRAWINGS.
CONNECT NEW 8" S100 TO EXISTING 12"
STEAM HEADER.
EXISTING 10" STEAM FROM EXISTING
WATER TUBE BOILER.
NOT USED.
NEW 24" BOILER FLUE UP THRU ROOF.
3" S15 DOWN. STEAM SUPPLY FOR UNIT
HEATERS.
EXISTING BOILER PLANT TOTAL STEAM
PRODUCTION FLOW METER.
ADDITIVE OPTION #4: NEW STEAM UNIT
HEATERS AND ALL S15 STEAM PIPING
FEEDING NEW STEAM UNIT HEATERS.
2"S100 DOWN
AND OUT
OF EXTERIOR
WALL
12" S100
1" SR
2" S100
8" S100
1" DCW
1 1/2"
1 1/2" BD
10" S10010" S100
14" S100
EXISTING
WATER
TUBE
BOILER
8" S100
4" S100
4" S100
8" S100
4" S100
4" SR
4" PCR
6" VTR
8" S100
4" S100 UP
TO DA TANK
8" S100 DOWN
TO FIRE TUBE
BOILER #1
BYPASS
UP AND
DOWN
KEYED NOTES:
GERNERAL NOTE
1. REFER TO PIPING DIAGRAM ON M501 AND CONTROL
DIAGRAM FOR LOCATION OF ALL FLOW METERS,
TEMP. WELLS, ETC.TO BE INSTALLED
BOILER INSTALLATION SYSTEM SCHEDULE
PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT
1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.
2). INSTALL THREE NEW EXHAUST FANS.
1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT
FAN, AND COMBUSTION AIR FAN.
OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.
OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.
OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.
OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.
OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER
PIPING FOR BOTH NEW AND EXISTING BOILER).
BOILER 2
INSTALLATION
DEMOLITION
BOILER 2
INSTALLATION
NEW WORK
ADDITIVE
OPTIONS
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
Je ffe rs on
L ab or at or ie s F oo d an d
D ru g A dm in is tr at io n
N
C T
R R d Je ffe rs on , A
R
M203
BOILER 2 INSTALLATION -
SECOND FLOOR PLAN -
MECHANICAL NEW
06-26-12
FDA-SOI-06-00268
B ui ld in g
B oi le r
R ep la ce m en t
1/4" = 1’−0"
BOILER 2 INSTALLATION − SECOND FLOOR PLAN − MECHANICAL NEW
1 08/03/12 ADDENDUM #1
BID SET