J-1 Drawings M203

View the file

Other files

File Type Posted
amendment 3.pdf PDF
NCTR Air Permit.pdf PDF
attachment 2- list of attendees.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
attachment 1- list of attendees.pdf PDF
M404.pdf PDF
M102.pdf PDF
M200.pdf PDF
E106.pdf PDF
M403.pdf PDF
M104.pdf PDF
M305.pdf PDF
S102.pdf PDF
M304.pdf PDF
M402.pdf PDF
M501.pdf PDF
M306.pdf PDF
M401.pdf PDF
E103.pdf PDF
M303.pdf PDF
M702.pdf PDF
M302.pdf PDF
M202.pdf PDF
E202.pdf PDF
M103.pdf PDF
M201.pdf PDF
M101.pdf PDF
M601.pdf PDF
M204.pdf PDF
E201.pdf PDF
M703.pdf PDF
E104.pdf PDF
01120018 Add 01 Specs 080312.pdf PDF
12-223-SOL-00177.pdf PDF
M100.pdf PDF
E301.pdf PDF
S101.pdf PDF
M301.pdf PDF
E101.pdf PDF
G100.pdf PDF
E102.pdf PDF
E105.pdf PDF
M701.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW

HANDRAIL

SYSTEM

EXISTING

GRATING

FLOORING

EXISTING

GRATING

FLOORING

1-1/2" BLOW DOWN

DOWN TO MEZZANINE

8" VTR

8" VTR

6" VTR

10" S100

14" HIGH PRESSURE STEAM

SUPPLY TO CAMPUS

EXISTING

GRATING

FLOORING

12" HEADER

FM

"ø

"ø

4 3.4 3 2.4 1.4 1

H

E

D

B

A

14" S1008" S100

4" PCR

2" D

4" SR

2" BFW

6" BFW

4" SCW

6" VTR

2 1/2" S100

PROVIDE NEW HANDRAIL SYSTEM AROUND

FLOOR OPENING WHERE BOILER 2 WAS

LOCATED. ADD HANDRAIL TO BACK SIDE

OF OLD BOILER CONNECT TO THE

EXISTING HANDRAIL SYSTEM.

NEW 8" S100 DOWN TO CONNECTION AT

NEW BOILER #2. REFER TO STRUCTURAL

DRAWINGS.

CONNECT NEW 8" S100 TO EXISTING 12"

STEAM HEADER.

EXISTING 10" STEAM FROM EXISTING

WATER TUBE BOILER.

NOT USED.

NEW 24" BOILER FLUE UP THRU ROOF.

3" S15 DOWN. STEAM SUPPLY FOR UNIT

HEATERS.

EXISTING BOILER PLANT TOTAL STEAM

PRODUCTION FLOW METER.

ADDITIVE OPTION #4: NEW STEAM UNIT

HEATERS AND ALL S15 STEAM PIPING

FEEDING NEW STEAM UNIT HEATERS.

2"S100 DOWN

AND OUT

OF EXTERIOR

WALL

12" S100

1" SR

2" S100

8" S100

1" DCW

1 1/2"

1 1/2" BD

10" S10010" S100

14" S100

EXISTING

WATER

TUBE

BOILER

8" S100

4" S100

4" S100

8" S100

4" S100

4" SR

4" PCR

6" VTR

8" S100

4" S100 UP

TO DA TANK

8" S100 DOWN

TO FIRE TUBE

BOILER #1

BYPASS

UP AND

DOWN

KEYED NOTES:

GERNERAL NOTE

1. REFER TO PIPING DIAGRAM ON M501 AND CONTROL

DIAGRAM FOR LOCATION OF ALL FLOW METERS,

TEMP. WELLS, ETC.TO BE INSTALLED

BOILER INSTALLATION SYSTEM SCHEDULE

PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT

1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.

2). INSTALL THREE NEW EXHAUST FANS.

1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT

FAN, AND COMBUSTION AIR FAN.

OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.

OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.

OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.

OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.

OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER

PIPING FOR BOTH NEW AND EXISTING BOILER).

BOILER 2

INSTALLATION

DEMOLITION

BOILER 2

INSTALLATION

NEW WORK

ADDITIVE

OPTIONS

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

Je ffe rs on

L ab or at or ie s F oo d an d

D ru g A dm in is tr at io n

N

C T

R R d Je ffe rs on , A

R

M203

BOILER 2 INSTALLATION -

SECOND FLOOR PLAN -

MECHANICAL NEW

06-26-12

FDA-SOI-06-00268

B ui ld in g

B oi le r

R ep la ce m en t

1/4" = 1’−0"

BOILER 2 INSTALLATION − SECOND FLOOR PLAN − MECHANICAL NEW