M201.pdf
PDF 782 KB Posted
- Attached to
- Building 7 Boiler #2 Replacement
- Solicitation number
- 12-223-SOL-00177
About this file
J-1 Drawings M201
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| 12-223-SOL-00177.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
AIR
STORAGE
TANK
EXISTING
AIR
COMPRESSOR
EXISTING
WATER
SOFTENER
TANK
EXISTING
WATER
SOFTENER
TANK
EXISTING 2" FUEL OIL PIPING DOWN IN TRENCH
TO EXISTING WATER TUBE BOILER
BDHX-1
EXISTING
CHEMICAL
TREATMENT
EXISTING
WATER TUBE
BOILER 1
TO REMIAN
3" BD
BS-1
2" BD
4" SR
2" SR
6" SR
4" BFW
CST-1
13 3
M302
UH-1
4 3.4 3 2.4 1.4 1
H
E
D
B
A
3" BD
TEMPORARY STRUCTURAL PLATFORM OVER
BLOW-OFF TANK AND PIT
FOR BOILER #2 INSTALLATION
NEW BOILER #2.
EXISTING BOILER STRUCTURAL SUPPORT COLUMN/
PLATFORM SUPPORT COLUMN TO REMAIN. PROTECT
DURING BOILER INSTALLATION. REFER TO STRUCTURAL
DRAWINGS.
NEW LOUVER, SEE DETAIL # 2.
INSTALL NEW BACKFLOW PREVENTER ON DOMESTIC COLD
WATER PIPE TO EXISTING CP-1 @ 36" ABOVE AFF ON UNI-
STRUTS.
EXISTING PULSA FEEDER CHEMICAL TREATMENT DELIVERY
SYSTEM.
4" STEAM VENTS UP THRU ROOF WITH DRIP PAN ELBOWS.
8" STEAM PIPING UP TO NEW STEAM HEADER ON SECOND
FLOOR. PROVIDE FACTORY TESTED ASME CERTIFIED NON-
RETURN VALVE ASSEMBLY.
24" BOILER FLUE UP TO NEW 2-STAGE ECONOMIZER.
PROVIDE ALL REQUIRED TRANSITIONS FROM FLUE TO
ECONOMIZER. REFER TO STRUCTURAL PLANS FOR
STRUCTURAL SUPPORT DETAILS FOR ECONOMIZER.
M201
EXISTING BOILER TO REMAIN.
FUEL OIL CIRCULATION TANK.
1" FUEL OIL SUPPLY AND RETURN PIPING FROM
CIRCULATION TANK TO BOILER FUEL OIL INJECTION PUMP
CONNECTIONS.
NOT USED.
NEW 12'-0" X 13'-0" X 0'-6" LOUVER LV-1 TO REPLACE
EXISTING LOUVER, WINDOW GLASS AND PART OF
EXISTING WALL. FIELD VERIFY THE EXACT LOCATION.
NEW VERTICAL DOWNFLOW STEAM HEATER.
ADDITIVE OPTION #4: NEW STEAM UNIT HEATERS AND ALL
S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
2" BOILER SHUT DOWN COOLING DRAIN PIPE WITH VALVE
ROUTED TO TRENCH.
EXISTING DOMESTIC COLD WATER TO EXISTING
CONDENSATE POLISHER.
FOP-2
1" DCW
1" DCW
4" DCW
4" DCW
4" SCW
4" SCW
4" NG
6" NG
6" NG
2" FOS
3" BFW
3" NG
2" FOS 2" FOR
NAT GAS
PRESSURE
REGULATOR
(7.5 PSI)
2" D
B-2
3/4" FOS
3/4" FOR
3" NG
2" BD
4" SCW
4" SCW
2 1/2" BD
3" NG
3/4" S15
4" SR
4" SR
2"S100
TO UP
12" STEAM
HEADER
2" FOS
M301
M301
M301
EXISTING
BOILER
CONTROL
PANEL
FOS-1
EXISTING CPS-1
EXISTING
FOP-1
EXISTING 4"
NATURAL
GAS TO
EXISTING
BOILER
4" BFW
EXISTING 4"
SCW UP TO
EXISTING
DA TANK
ABOVE
BELOW
EXISTING
4" SCW TO
EXISTING
BDHX-1
4" SR
4" PCR
4" SR
4" PCR
UP TO
DA-1
3" BD DOWN
IN TRENCH
4" V
1" DCW
3/4" S15
3/4" S15
EXISTING
FUEL OIL
EXISTING
FUEL OIL
1 1/4" V
3" BD
1" D
2" BD
B-1
2" BD2" V
2" BD
2" FOR
EXISTING
WATER
SOFTENER
TANK
6" VTR
2" V
4" V
3/4" SR
3" BFW
3" BFW
3" NG
3" BFW
2" FOS
UP FROM
TRENCH
(30 PSI)
3/4" FOS
3/4" FOR
6" SR
4" SCW
3/4" SR
2" D
2" D
2" D
2" D
4" SWC
CAPPED
EXISTING BLOWDOWN RECOVERY
(EXISTING)
KEYED NOTES:
LV-1
6" SR
1" BD 1
GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE PRICING
FOR OPTIONS 1 THRU 8 AS LISTED ON
THIS DRAWING.
2. ALL EXISTING EQUIPMENT, PIPING, VALVES
TO REMAIN UNLESS OTHERWISE NOTED.
3. REFER TO PIPING DIAGRAM M501 AND
CONTROL DIAGRAM FOR LOCATION OF
ALL FLOW METERS TO BE INSTALLED.
FIRST FLOOR
0' - 0"
SECOND FLOOR
24' - 0"
FAN PLATORM
36' - 0"
ROOF
56' - 0"
2.4
FAN PLATFORM
36' - 0"
MEZZANINE
12' - 0"
6" VTR
4" V
6" VTR
2" VTR
6" VTR
PIPE SUPPORT
TO BE
RE-INSTALLED
BlOW-OFF
TANK
4" BD
PIT COVERS
LV-1
BOILER INSTALLATION SYSTEM SCHEDULE
PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT
1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.
2). INSTALL THREE NEW EXHAUST FANS.
1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT
FAN, AND COMBUSTION AIR FAN.
OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.
OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.
OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.
OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.
OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.
OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.
OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.
OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER
PIPING FOR BOTH NEW AND EXISTING BOILER).
BOILER 2
INSTALLATION
DEMOLITION
BOILER 2
INSTALLATION
NEW WORK
ADDITIVE
OPTIONS
ISSUE DATE:
SHEET NUMBER:
PROJECT NUMBER:
5800 EVERGREEN DRIVE
LITTLE ROCK,
ARKANSAS
72205-1757
Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
MARK DATE DESCRIPTION
Je ffe rs on
L ab or at or ie s F oo d an d
D ru g A dm in is tr at io n
N
C T
R R d Je ffe rs on , A
R
M201
BOILER 2 INSTALLATION -
FIRST FLOOR PLAN -
MECHANICAL NEW
06-26-12
FDA-SOI-06-00268
B ui ld in g
B oi le r
R ep la ce m en t
1/4" = 1’−0"
BOILER 2 INSTALLATION − FIRST FLOOR PLAN − MECHANICAL NEW 1/4" = 1’−0"
SECTION − EXTERIOR BLOW−OFF TANK
AND VENT RENOVATION 1 08/03/12 ADDENDUM #1
BID SET