J-1 Drawings M201

View the file

Other files

File Type Posted
amendment 3.pdf PDF
NCTR Air Permit.pdf PDF
attachment 2- list of attendees.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
attachment 1- list of attendees.pdf PDF
S102.pdf PDF
M304.pdf PDF
M402.pdf PDF
M501.pdf PDF
M306.pdf PDF
M401.pdf PDF
E103.pdf PDF
M303.pdf PDF
M702.pdf PDF
M302.pdf PDF
M202.pdf PDF
E202.pdf PDF
M103.pdf PDF
M101.pdf PDF
M601.pdf PDF
M204.pdf PDF
E201.pdf PDF
M203.pdf PDF
M404.pdf PDF
M102.pdf PDF
M200.pdf PDF
E106.pdf PDF
M403.pdf PDF
M104.pdf PDF
M305.pdf PDF
M703.pdf PDF
E104.pdf PDF
01120018 Add 01 Specs 080312.pdf PDF
12-223-SOL-00177.pdf PDF
M100.pdf PDF
E301.pdf PDF
S101.pdf PDF
M301.pdf PDF
E101.pdf PDF
G100.pdf PDF
E102.pdf PDF
E105.pdf PDF
M701.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING

AIR

STORAGE

TANK

EXISTING

AIR

COMPRESSOR

EXISTING

WATER

SOFTENER

TANK

EXISTING

WATER

SOFTENER

TANK

EXISTING 2" FUEL OIL PIPING DOWN IN TRENCH

TO EXISTING WATER TUBE BOILER

BDHX-1

EXISTING

CHEMICAL

TREATMENT

EXISTING

WATER TUBE

BOILER 1

TO REMIAN

3" BD

BS-1

2" BD

4" SR

2" SR

6" SR

4" BFW

CST-1

13 3

M302

UH-1

4 3.4 3 2.4 1.4 1

H

E

D

B

A

3" BD

TEMPORARY STRUCTURAL PLATFORM OVER

BLOW-OFF TANK AND PIT

FOR BOILER #2 INSTALLATION

NEW BOILER #2.

EXISTING BOILER STRUCTURAL SUPPORT COLUMN/

PLATFORM SUPPORT COLUMN TO REMAIN. PROTECT

DURING BOILER INSTALLATION. REFER TO STRUCTURAL

DRAWINGS.

NEW LOUVER, SEE DETAIL # 2.

INSTALL NEW BACKFLOW PREVENTER ON DOMESTIC COLD

WATER PIPE TO EXISTING CP-1 @ 36" ABOVE AFF ON UNI-

STRUTS.

EXISTING PULSA FEEDER CHEMICAL TREATMENT DELIVERY

SYSTEM.

4" STEAM VENTS UP THRU ROOF WITH DRIP PAN ELBOWS.

8" STEAM PIPING UP TO NEW STEAM HEADER ON SECOND

FLOOR. PROVIDE FACTORY TESTED ASME CERTIFIED NON-

RETURN VALVE ASSEMBLY.

24" BOILER FLUE UP TO NEW 2-STAGE ECONOMIZER.

PROVIDE ALL REQUIRED TRANSITIONS FROM FLUE TO

ECONOMIZER. REFER TO STRUCTURAL PLANS FOR

STRUCTURAL SUPPORT DETAILS FOR ECONOMIZER.

M201

EXISTING BOILER TO REMAIN.

FUEL OIL CIRCULATION TANK.

1" FUEL OIL SUPPLY AND RETURN PIPING FROM

CIRCULATION TANK TO BOILER FUEL OIL INJECTION PUMP

CONNECTIONS.

NOT USED.

NEW 12'-0" X 13'-0" X 0'-6" LOUVER LV-1 TO REPLACE

EXISTING LOUVER, WINDOW GLASS AND PART OF

EXISTING WALL. FIELD VERIFY THE EXACT LOCATION.

NEW VERTICAL DOWNFLOW STEAM HEATER.

ADDITIVE OPTION #4: NEW STEAM UNIT HEATERS AND ALL

S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

2" BOILER SHUT DOWN COOLING DRAIN PIPE WITH VALVE

ROUTED TO TRENCH.

EXISTING DOMESTIC COLD WATER TO EXISTING

CONDENSATE POLISHER.

FOP-2

1" DCW

1" DCW

4" DCW

4" DCW

4" SCW

4" SCW

4" NG

6" NG

6" NG

2" FOS

3" BFW

3" NG

2" FOS 2" FOR

NAT GAS

PRESSURE

REGULATOR

(7.5 PSI)

2" D

B-2

3/4" FOS

3/4" FOR

3" NG

2" BD

4" SCW

4" SCW

2 1/2" BD

3" NG

3/4" S15

4" SR

4" SR

2"S100

TO UP

12" STEAM

HEADER

2" FOS

M301

M301

M301

EXISTING

BOILER

CONTROL

PANEL

FOS-1

EXISTING CPS-1

EXISTING

FOP-1

EXISTING 4"

NATURAL

GAS TO

EXISTING

BOILER

4" BFW

EXISTING 4"

SCW UP TO

EXISTING

DA TANK

ABOVE

BELOW

EXISTING

4" SCW TO

EXISTING

BDHX-1

4" SR

4" PCR

4" SR

4" PCR

UP TO

DA-1

3" BD DOWN

IN TRENCH

4" V

1" DCW

3/4" S15

3/4" S15

EXISTING

FUEL OIL

EXISTING

FUEL OIL

1 1/4" V

3" BD

1" D

2" BD

B-1

2" BD2" V

2" BD

2" FOR

EXISTING

WATER

SOFTENER

TANK

6" VTR

2" V

4" V

3/4" SR

3" BFW

3" BFW

3" NG

3" BFW

2" FOS

UP FROM

TRENCH

(30 PSI)

3/4" FOS

3/4" FOR

6" SR

4" SCW

3/4" SR

2" D

2" D

2" D

2" D

4" SWC

CAPPED

EXISTING BLOWDOWN RECOVERY

(EXISTING)

KEYED NOTES:

LV-1

6" SR

1" BD 1

GENERAL NOTES:

1. CONTRACTOR SHALL PROVIDE PRICING

FOR OPTIONS 1 THRU 8 AS LISTED ON

THIS DRAWING.

2. ALL EXISTING EQUIPMENT, PIPING, VALVES

TO REMAIN UNLESS OTHERWISE NOTED.

3. REFER TO PIPING DIAGRAM M501 AND

CONTROL DIAGRAM FOR LOCATION OF

ALL FLOW METERS TO BE INSTALLED.

FIRST FLOOR

0' - 0"

SECOND FLOOR

24' - 0"

FAN PLATORM

36' - 0"

ROOF

56' - 0"

2.4

FAN PLATFORM

36' - 0"

MEZZANINE

12' - 0"

6" VTR

4" V

6" VTR

2" VTR

6" VTR

PIPE SUPPORT

TO BE

RE-INSTALLED

BlOW-OFF

TANK

4" BD

PIT COVERS

LV-1

BOILER INSTALLATION SYSTEM SCHEDULE

PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT

1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.

2). INSTALL THREE NEW EXHAUST FANS.

1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT

FAN, AND COMBUSTION AIR FAN.

OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.

OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.

OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.

OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.

OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER

PIPING FOR BOTH NEW AND EXISTING BOILER).

BOILER 2

INSTALLATION

DEMOLITION

BOILER 2

INSTALLATION

NEW WORK

ADDITIVE

OPTIONS

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

Je ffe rs on

L ab or at or ie s F oo d an d

D ru g A dm in is tr at io n

N

C T

R R d Je ffe rs on , A

R

M201

BOILER 2 INSTALLATION -

FIRST FLOOR PLAN -

MECHANICAL NEW

06-26-12

FDA-SOI-06-00268

B ui ld in g

B oi le r

R ep la ce m en t

1/4" = 1’−0"

BOILER 2 INSTALLATION − FIRST FLOOR PLAN − MECHANICAL NEW 1/4" = 1’−0"

SECTION − EXTERIOR BLOW−OFF TANK

AND VENT RENOVATION 1 08/03/12 ADDENDUM #1

BID SET