12-223-SOL-00177.pdf
PDF 662 KB Posted
- Attached to
- Building 7 Boiler #2 Replacement
- Solicitation number
- 12-223-SOL-00177
About this file
solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 3.pdf | ||
| NCTR Air Permit.pdf | ||
| attachment 2- list of attendees.pdf | ||
| amendment 2.pdf | ||
| amendment 1.pdf | ||
| attachment 1- list of attendees.pdf | ||
| M203.pdf | ||
| M404.pdf | ||
| M102.pdf | ||
| M200.pdf | ||
| E106.pdf | ||
| M403.pdf | ||
| M104.pdf | ||
| M305.pdf | ||
| M202.pdf | ||
| E202.pdf | ||
| M103.pdf | ||
| M201.pdf | ||
| M101.pdf | ||
| M601.pdf | ||
| M204.pdf | ||
| E201.pdf | ||
| M703.pdf | ||
| E104.pdf | ||
| 01120018 Add 01 Specs 080312.pdf | ||
| M100.pdf | ||
| E301.pdf | ||
| S101.pdf | ||
| M301.pdf | ||
| E101.pdf | ||
| G100.pdf | ||
| E102.pdf | ||
| E105.pdf | ||
| M701.pdf | ||
| S102.pdf | ||
| M304.pdf | ||
| M402.pdf | ||
| M501.pdf | ||
| M306.pdf | ||
| M401.pdf | ||
| E103.pdf | ||
| M303.pdf | ||
| M702.pdf | ||
| M302.pdf |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1105693
FDA/OO/OFBA/OAGS/DAP
OAGS - ACQUISITION SERVICES
Nick Sartain
3900 NCTR ROAD
HFA-323
JEFFERSON AR 72079
Same as Block 7
NICHOLAS SARTAIN 870-543-7370
1x 08/06/2012
12-223-SOL-00177
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The Contractor shall furnish the required labor, material, equipment and supervision to accomplish the work called for by this contract in accordance with the Scope of
Work in Part I, Section C and the Specifications and Drawings found in Part II, Section J-List of Attachments, Attachment J-1.
This solicitation is set-aside for Service-Disabled Veteran-Owned Small Business concerns under NAICS code 238220.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 365 calendar days and complete it within ________________ ________________ calendar days after receiving
F-2 FAR 52.211-10
09/06/2012
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
FDA/OO/OFBA/OAGS/DAP
OAGS - ACQUISITION SERVICES
Nick Sartain
3900 NCTR ROAD
HFT-323
JEFFERSON AR 72079
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 60
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12-223-SOL-00177
Delivery: 365 Days After Notice to Proceed
Delivery Location Code: NCTR
3900 NCTR ROAD
3900 NCTR ROAD
JEFFERSON AR 72079 US
FOB: Destination
1 See Section B for item details.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
PART I – THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B-1 Purpose B-2 Schedule of Items
SECTION C - DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
C-1 – Scope of Work
SECTION D-PACKAGING AND MARKING
D-1 Marking Instructions for Reports D-2 Payment of Postage and Fees
SECTION E - INSPECTION AND ACCEPTANCE
E-1 - Inspection and Acceptance E-2 - 52.252-2 Clauses Incorporated by Reference. (FEB 1998) E-3 Government Inspectors
SECTION F - DELIVERIES OR PERFORMANCE
F-1 - Reports/Deliverables F-2 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) F-3 - 52.252-2 Clauses Incorporated by Reference. (FEB 1998)
SECTION G - CONTRACT ADMINISTRATION DATA
G-1 Contracting Officer’s Representative (COR) G-2 Technical Guidance G-3 Contract Administration G-4 HHSAR 352.242-70 Key Personnel (January 2006) G-5 Bonding Requirement G-6 Reporting Matters Involving Fraud, Waste, and Abuse G-7 Contractor Performance Evaluation (s)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-1 FDA 1335 Personnel Security Clearance Requirements H-2 Payments to Contractors H-3 Invoice Submission H-4 FDA 1405 Contract Changes H-5 FDA 1409 Subcontracting and Subcontractors H-6 Required Insurance H-7 FDA 1418 General Conditions (Construction at NCTR) H-8 Specifications and Drawings for Construction H-9 Construction Schedule H-10 Pre-Construction/Installation Conference H-11 FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) H-12 Applicable Wage Rate Decision
PART II CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I-1 FAR 52.252-2 Clauses Incorporated by Reference. (FEB 1998) I-2 FAR 52.217-7 Option for Increased Quantity-Separately Priced Line Item (MAR 1989). 41 I-3 52.228-1 Bid Guarantee (SEPT 1996)
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
12-223-SOL-00177 4 of 60
SECTION J - LIST OF ATTACHMENTS
Attachment J-1 Specifications and Drawings Attachment J-2 U.S. Department of Labor General Decision Number: AR120125
07/20/2012 AR125
Attachment J-3 FDA Form 3391, “Security Card Access Request” Attachment J-4 FDA Form 3398 “Contractor commitment to protect non-public information”
PART IV RESPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
K-1 FAR 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) K-2 FAR 52.204-8 Annual Representations and Certifications (MAY 2012)
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
L-1 FAR 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) L-2 52.215-1 Instructions to Offerors—Competitive Acquisition (JAN 2004)-
DEVIATION
L-3 FAR 52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR
INFORMATION OTHER THAN COST OR PRICING DATA (OCT 1997) Alternate IV (Oct 1997) L-4 FAR 52.216-1 Type of Contract (APR 1984) L-5 FAR 52.233-2 Service of Protest (SEPT 2006) L-6 Bid Guarantee Requirements L-7 General Proposal Instructions L-8 Submission of Offers L-9 Cost of Proposal Preparation L-10 Reference Materials L-11 Magnitude of Construction L-12 FAR 52.236-27 Site Visit (Construction). (FEB 1995) Alt I (FEB 1995) L-13 FAR 52.252-5 Authorized Deviations in Provisions (APR 1984)
SECTION M - EVALUATION FACTORS FOR AWARD
M-1 General M-2 Evaluation Criteria M-3 52.217-5 Evaluation of Options (JULY 1990) M-4 Basis for Award
12-223-SOL-00177 5 of 60
PART I – THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B-1 Purpose
Boiler #2 replacement at the Food and Drug Administration (FDA), Jefferson Lab Campus in Jefferson, Arkansas, as detailed in section C.
B-2 Schedule of Items
Item No. Description Price/Cost
01- This project includes replacing of existing water tube boiler #2 with new fire tube boiler with master boiler control system. The scope of work also includes removal of the existing water tube boiler, asbestos abatement of the existing water tube boiler, structural steel, roofing repairs and electrical upgrades.
For the Firm Fixed Price Lump Sum of 1 Job $___________
Notice to Offerors: Line item 02 through 09 are optional items. Options may be exercised within 180 calendar days after contract award, see FAR Clause 52.217-7 in Section I-2.
02- Optional item 1: Remove abandoned de-aerator tank and all associated piping as specified on specifications and drawings.
03- Optional item 2: Remove existing feed water pumps above slab on grade and all associated feed water piping as specified on specifications and drawings.
04- Optional item 3: Remove existing feed water piping in trench as specified on specifications and drawings.
05- Optional item 4: Install six (6) new vertical downflow steam unit heaters with thermostat and control valve package and include all S15 steam piping feeding new steam unit heaters as specified on specifications and drawings.
12-223-SOL-00177 6 of 60
06- Optional item 5: Remote monitoring of the boilers and associated systems such as the surge tank, de-aerator and economizer at Building 50 as specified on specifications and drawings.
07- Optional item 6: Remote monitoring of the boiler control system at the boiler manufacturer’s technical service Headquarters as specified on specifications and drawings.
08- Optional item 7: Relocate existing flow meter installed on the condensate return from the campus as specified on specifications and drawings.
09- Optional item 8: Provide PVC jacket for all the non-steam condensate piping (i.e., feedwater, domestic, economizer piping (existing and new)) as specified on specifications and drawings.
Total Base and all options (CLINs 1-9): $_________________________
12-223-SOL-00177 7 of 60
SECTION C - DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
C-1 – Scope of Work
Independently and not as an agent of the Government, the Contractor shall furnish the necessary personnel, materials, services, facilities, and otherwise do all things necessary for or incident to the performance of the work set forth herein and in Part II, Section J, Attachment No. J-1, Contract Drawings and Specifications. The attachments listed in Section J are hereby made part of this solicitation and any resultant contract.
Scope of Work (See drawings and specifications Section J, attachment J-1, for Complete Scope of Work)
This project includes replacement of existing water tube boiler #2 with new fire tube boiler with master boiler control system. The scope of work also includes removal of the existing water tube boiler, asbestos abatement of the existing water tube boiler, structural steel, roofing repairs and electrical upgrades. Options include; removal of exiting Feed water pumps, removal of existing DA tank and Surge tanks, removal of Feed water pipe in existing trench. The demolition of the existing boiler will not start until the scheduled cold shut down of the Boiler Plant; Spring of 2013.
Government Furnished Property and Services
NOTE: The Jefferson Laboratories will not furnish any materials/property, except as noted below.
Utilities
Water and electricity may be used by the Contractor from existing outlets at no cost to the Contractor. The Contractor shall pay for all temporary connections. The Contractor must provide telephone services at the contractor’s cost.
12-223-SOL-00177 8 of 60
SECTION D-PACKAGING AND MARKING
D-1 Marking Instructions for Reports
The contractor shall mark each shipment with its organization name, contract number, item number, and quantity (indicate partial or final shipment). As appropriate, note on the face page of the report and when feasible on the binding (1) “one volume only” or (2) “volume 1 of 2, volume 2 of 2” etc.
D-2 Payment of Postage and Fees
All postage and fees related to distribution of deliverable including forms, reports, etc., shall be paid by the Contractor.
12-223-SOL-00177 9 of 60
SECTION E - INSPECTION AND ACCEPTANCE
E-1 - Inspection and Acceptance
Pursuant to the appropriate inspection clause as provided below and upon notice by the Contractor that the work is substantially complete, final inspection and acceptance of all items called for by this contract shall be made by the CO or his/her designated inspector (COR). The Contractor shall be responsible for any countermeasures or corrective action, within the scope of this contract, which may be required by the Contracting Officer as a result of such inspection.
E-2 - 52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
[Internet addresses: https://www.acquisition.gov/far/ ]
FAR
Clause No. Title and Date
52.246-12 Inspection of Construction (AUG 1996)
E-3 Government Inspectors
The work shall be conducted under the general direction of the Contracting Officer and is subject to inspection by his/her designated inspectors (COR) to insure compliance with the terms of the contract. No inspector is authorized to change any provision of the specifications without written authorization of the Contracting Officer, nor shall the presence or absence of an inspector relieve the Contractor from any requirements of the contract.
12-223-SOL-00177 10 of 60 https://www.acquisition.gov/far/
SECTION F - DELIVERIES OR PERFORMANCE
F-1 - Reports/Deliverables
Unless otherwise noted, all reports/deliverables shall be delivered to the attention of the contract specialist, OAGS, Building 50 Room 422, 3900 NCTR Road, Jefferson, AR 72079.
The Contractor shall submit the following reports/deliverables:
Scheduled Items Qty Due Dates
1. FDA Form 3391 1/person
Upon notice of clearance under Preliminary security checks. Submit to NCTR Safety Office, Building 50, Room 304.
2. Performance and Payment Bonds 1 Within 20 calendar days after contract award
3. Pre-construction conference 1 Within 20 calendar days after contract award
4. Listing of Contractor Employees 1
10 calendar days prior to commencement of work. Submit to NCTR Safety Office, Building 50, Room 304.
5. Certificate of insurance 1 Prior to commencement of work.
6. Preliminary Construction Performance Schedule
NLT 20 calendar days after receipt of notice to proceed submit preliminary schedule. Submit complete schedule as outlined in Section H-9. Submit to
COR.
7. Schedule of Values 3 Within 30 calendar days of date established for commencement of work
8. Invoice 3 Monthly.
9. Submittals 5
Far enough in advance of scheduled dates of installation to provide 30 calendar days for reviews, approvals, possible revisions and resubmittals and for placing orders and securing delivery.
10. Updates to construction schedule 2 Monthly to COR.
11. Certification Statement & Payrolls 1 Monthly with Invoice
12. Progress Meetings As needed – Date to be Determined
12-223-SOL-00177 11 of 60
13. Project Record Drawings 2 NLT 30 days Prior to submission of final invoice
14. O & M Manuals 4 NLT 30 days Prior to submission of final invoice
15. Warranties 2 NLR 30 days Prior to submission of final invoice
F-2 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
F-3 - 52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
[Internet addresses: https://www.acquisition.gov/far/ ]
FAR
Clause No. Title and Date 52.211-13 Time Extensions. (SEPT 2000) 52.242-14 Suspension of Work (APR 1984)
12-223-SOL-00177 12 of 60
SECTION G - CONTRACT ADMINISTRATION DATA
G-1 Contracting Officer’s Representative (COR)
The COR responsible for the acceptance of work provided hereunder will be designated by separate correspondence. The term ‘‘COR’’ means the person who monitors the technical aspects of contract performance. The COR is not authorized to issue any instructions or directions which cause any increase or decrease in the scope of work which would result in the increase or decrease in the price of this contract, or changes in the delivery schedule or period of performance of this contract. If applicable, the COR is not authorized to receive or act upon any notification or revised cost estimate provided by the Contractor in accordance with the Limitation of Cost or Limitation of Funds Clauses of this contract.
G-2 Technical Guidance
A. Performance of the work under this contract shall be subject to the technical Guidance of the Contracting Officer’s Technical Representative (COR). The term "technical guidance" is defined to include the following:
1. Providing information to the Contractor for assistance in the interpretation of drawings, specifications, or technical portions of the work description, other technical performance requirements; and
2. Review and, where required by the contract, approval of technical reports, drawings, specifications, and technical information to be delivered by the Contractor to the Government under the contract;
3. Perform technical evaluation as required;
4. Perform technical inspections and acceptances required by this contract; and
5. Assisting in the resolution of technical problems encountered during performance.
B. Technical guidance must be within the general scope of work stated in the contract. The COR does not have the authority to, and may not, issue any technical direction which (1) constitutes an assignment of additional work outside the general scope of the contract; (2) constitutes a change as defined in the contract Clause entitled "Changes," (3) in any manner causes an increase or decrease in the total contract price; or (4) changes any of the expressed terms, conditions, or specifications of the contract.
C. All technical guidance shall be issued in writing by the COR or shall be confirmed by him/her in writing within five (5) working days.
D. The Contractor shall proceed promptly with the performance of technical guidance duly issued by the COR in the manner prescribed by this clause and within his/her authority under the
12-223-SOL-00177 13 of 60 provisions of this clause.
E. If, in the opinion of the Contractor, any instruction or direction issued by the COR is within one of the categories as defined in B.(1) through B.(4) above, the Contractor shall not proceed but shall notify the Contracting Officer, in writing, within five (5) working days after the receipt of any such instruction or direction and shall request the Contracting Officer to modify the contract accordingly. Upon receiving such notification from the Contractor, the Contracting Officer shall issue an appropriate contract modification or advise the Contractor, in writing, that, in his/her opinion, the technical directions are within the scope of this clause and do not constitute a change under the "Changes" Clause of the contract. The Contractor shall thereupon proceed immediately with the direction given. Any failure of the parties to agree upon the nature of the instruction or direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the contract Clause entitled "Disputes."
The Contractor shall contact the FDA's COR prior to performance to arrange for the following:
Access to the Facility
G-3 Contract Administration
a. Administrative Contracting Officer Nick Sartain, Contract Specialist 3900 NCTR Road
HFT-320
Jefferson, AR 72079 Phone: 870-543-7370 Email: Nick.sartain@fda.hhs.gov
b. Contractor’s Point of Contact
To be completed at time of award Name:
Office:
Cell:
Email:
c. Technical Point of Contact-Contracting Officer’s Representative (COR)
Name: To be completed at time of award Office:
Email:
G-4 HHSAR 352.242-70 Key Personnel (January 2006)
The key personnel specified in this contract are considered to be essential to work performance.
At least 30 days prior to diverting any of the specified individuals to other programs or contracts (or as soon as possible, if an individual must be replaced, for example, as a result of leaving the
12-223-SOL-00177 14 of 60 mailto:Nick.sartain@fda.hhs.gov employ of the Contractor), the Contractor shall notify the Contracting Officer and shall submit comprehensive justification for the diversion or replacement request (including proposed substitutions for key personnel) to permit evaluation by the Government of the impact on performance under this contract. The Contractor shall not divert or otherwise replace any key personnel without the written consent of the Contracting Officer. The Government may modify the contract to add or delete key personnel at the request of the contractor or Government.
The individuals cited below are key personnel.
Name Title
____________________________ On-Site Superintendent
(End of clause)
G-5 Bonding Requirement
Acceptable Performance and Payment Bonds shall be furnished to the Contracting Officer by the Contractor within twenty (20) days after date of contract award. Notice to Proceed will not be given until all bond requirements are satisfactorily met. Bonds shall be delivered to:
Food and Drug Administration National Center for Toxicological Research Attention: Nick Sartain, Contract Specialist
OAGS, HFT-320
3900 NCTR Road Jefferson, AR 72079-9502
The penal amount of the performance bond shall be 100% of the original contract price.
The penal amount of the payment bond shall equal:
1. 100% of the original contract price; and
2. If the contract price increases, an additional amount equal to 100% of the increase; and
3. The amount of the Payment Bond must be no less than the amount of the
Performance Bond.
Any increase in the contract price shall require an increase in performance and payment bond.
The surety(ies) shall be acceptable to the Government and a “Power of Attorney” of the agent authorized to certify under the surety’s seal shall be furnished with the bond. Standard Form 25 “Performance Bond” and 25A “Payment Bond” can be obtained electronically at http://www.gsa.gov/portal/forms/type/SF. Contractors and sureties shall follow the instructions on the back of the form. See FAR Clause 52.228-15 included in Section I.
12-223-SOL-00177 15 of 60 http://www.gsa.gov/portal/forms/type/SF
G-6 Reporting Matters Involving Fraud, Waste, and Abuse
Anyone who becomes aware of the existence or apparent existence of fraud, waste and abuse in FDA funded programs is encouraged to report such matters to the HHS Inspector Generals Office in writing or on the Inspector General’s Hotline. The toll free number is 1-800-HHS-TIPS (1-800-447-8477). All telephone calls will be handled confidentially. The email address is HHStips@oig.hhs.gov and the mailing address is:
Office of Inspector General Department of Health and Human Services Attn: HOTLINE 330 Independence Avenue, S.W.
Washington, D.C. 20201
Information regarding procedural matters is contained on the HHS/OIG website at http://oig.hhs.gov/hotline.html
G-7 Contractor Performance Evaluation (s)
In accordance with Federal Acquisition Regulation (FAR) 42.15, FDA will complete annual and final contractor performance evaluations. Annual evaluations will be prepared to coincide with the anniversary date of the contract. Additional interim performance evaluations may be prepared at Contracting Officer discretion, as necessary. Final performance evaluations will be completed upon contract expiration.
FDA will utilize the Contractor Performance Assessment Reporting System (CPARS) in order to execute annual and final contractor performance evaluations. CPARS is a secure Internet website located at http://www.cpars.csd.disa.mil/cparsmain.htm. FDA will register the contractor in CPARS upon receipt of the name and email address of two (2) individuals who will be responsible for serving as the Contractor’s primary and alternate CPARS contacts. Once FDA registers the contractor in CPARS, the Contractor will receive an automated CPARS email message which contains User IDs and instructions for creating a password.
Once a performance evaluation is issued, the Contractor’s primary and alternate CPARS contact will receive an email instructing them to logon to CPARS in order to review the performance evaluation. The Contractor has 30 days from the date of performance evaluation issuance in which to review the evaluation. If the Contractor is in agreement with the performance evaluation outcome, the evaluation becomes final. Should the Contractor be in disagreement with the performance evaluation outcome, rebuttal comments must be submitted via the CPARS within 30 days from date the evaluation was issued by FDA. Any disagreement between the Contracting Officer and the Contractor will be referred to a contracting official one level above the Contracting Officer, whose decision will be final.
Copies of each performance evaluation and contractor responses, if any, will be retained as part of the official contract file and will be used to support future award decisions. Evaluations will also be stored for a 3 year period in the Past Performance Information Retrieval System (PPIRS) at www.ppirs.gov.
12-223-SOL-00177 16 of 60 mailto:HHStips@oig.hhs.gov http://oig.hhs.gov/hotline.html http://www.cpars.csd.disa.mil/cparsmain.htm http://www.ppirs.gov/
Contractors may obtain CPARS training material and register for on-line training at http://www.cpars.csd.disa.mil/allapps/cpcbtdlf.htm. There is no fee for registration or use of the
CPARS.
12-223-SOL-00177 17 of 60 http://www.cpars.csd.disa.mil/allapps/cpcbtdlf.htm
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-1 FDA 1335 Personnel Security Clearance Requirements
1. BACKGROUND
The Office of the Assistant Secretary for Management and Budget, Department of Health and Human Services (DHHS), requires that all DHHS employees and contractor employees (including subcontractors) who will be working in a DHHS-owned or leased space and/or who will have access to DHHS equipment, and non-public privileged, proprietary, or trade secret information, undergo a background investigation of some type.
Contractor employees who will be in DHHS-owned or leased space for less than thirty (30) days are exempted from the background investigation requirement. These contractor employees must be escorted at all time while in DHHS-owned or leased space.
2. GENERAL
The contractor shall submit the following items to the Contracting Officer, ten (10) calendar days prior to commencement of work under this contract:
a. Certification that all required security form packets and a list of contractor employees names for whom the requisite security information has been provided to Division of
Security Operations, Policy and Planning, Personnel Security Staff.
b. “Contractor’s Commitment to Protect Non-public Information Agreement” forms signed by each employee named in paragraph a. above.
With the exception of costs associated with fingerprinting Contractor employees outside of the FDA Personnel Security Office, the Government will conduct all required background investigations at no cost to the contractor. The cost of fingerprinting Contractor employees at any location other than the FDA Personnel Security Office shall be borne by the Contractor.
Contractor employees shall obtain security badges in order to access to DHHS-owned or leased property without an escort. (See Section 3 for details on the badging process). However, in the event that work must commence before security badges can be issued, contractor employees will be allowed onto DHHS-owned or leased property, but must be escorted at all times.
All Contractor employees who undergo a background investigation are required to log onto the Office of Personnel Management’s (OPM’s) Electronic Questionnaire for investigation Processing (e-QIP) system to complete the forms necessary to initiate their background investigations. The forms required vary with the position risk levels for the contract.
The position risk levels for this contract are Level 5.
12-223-SOL-00177 18 of 60
There are two (2) potential position risk levels, which are:
a. Non-Sensitive Positions (Level 1) (SEE CHART A) – Positions which involve the lowest degree of adverse impact on the efficiency of the Agency. The impact involving the duties are of limited effect. The forms set forth by CHART A are required for Non- Sensitive Positions (Level 1). Contractor employees assigned to Level 1 who receive a favorable preliminary check shall be required to provide additional security information for a background investigation as specified in Paragraph 5 below.
b. Public Trust Positions (Levels 5 or 6) (SEE CHARTS B) – Positions in which the incumbent’s actions or inaction could diminish public confidence in the integrity, efficiency, or effectiveness of assigned Government activities, whether or not actual damage occurs. The forms set forth by CHARTS B are required for Public Trust Positions (Levels 5 or 6). Contractor employees assigned Levels 5 or 6 must receive a preliminary check as well as a background investigation.
In order to access the e-QIP system, Contractor employees must provide the appropriate Personnel Security Specialist with the following information: (a) full name; (b) position title; (c) social security number; (d) date of birth; (e) place of birth; (f) email address; and (g) phone number. The Personnel Security Specialist will use this information to initiate each Contractor employee into the e-QIP system. Once this is done, each Contractor employee will receive an email that contains a web link to access the e-QIP system, as well as instructions and additional forms needed to initiate the suitability background investigation. The COR for the contract will provide the name of the appropriate Personnel Security Specialist to the Contractor.
A Contractor’s failure to comply with the e-QIP processing guidelines shall result in the Contractor’s employees being denied access to FDA property until all security processing has been completed.
3. BADGING PROCESS
The FDA COR will sponsor Contractor employees on the FDA Form 3391 for the purpose of obtaining an FDA Security Access Card. In order to obtain one, a contractor employee must receive a “favorable” fingerprint return. Fingerprints must be submitted to the Personnel Security Officer at least ten (10) days prior to the commencement of work. Fingerprints shall be submitted in one of two ways, depending on where the contract will be performed.
a. Contractor employees who will work in the Washington D.C. metro area shall, at the direction of the FDA COR or his/her designee, contact the Personnel Security Branch to schedule a fingerprinting appointment, or
b. Contractor employees who will work on the National Center for Toxicological Research facility shall contact the following to arrange for fingerprinting:
12-223-SOL-00177 19 of 60
Safety Office, Building 50, Room 304
Jefferson, AR 72079
Upon the receipt of a “favorable” fingerprint return, each Contractor employee must present two forms of identification in order to receive his or her badge. One form of identification must be a government-issued photo identification document. Acceptable forms of photo identification are referenced on the FDA Form 3391. Acceptable forms of secondary identification are listed on the back of the I-9 Form. This form can be obtained at http://uscis.gov/graphics/formsfee/forms/files/i-9.pdf
An individual who receives an unfavorable report may appeal that finding by submitting a written request to the Personnel Security Staff.
4. BACKGROUND INVESTIGATIONS
The Government shall conduct an additional background investigation for those individuals named to risk levels 1, 5, and 6 serving under this contract.
Required background investigations may include, but not be limited to:
Review of prior Government/military personnel records;
Review of FBI records and fingerprint files;
Searches of credit bureaus;
Personal interviews; and Written inquires covering the subject’s background.
Background investigations will be conducted by the Office of Personnel Management (OPM).
The Contractor is responsible for ensuring that the integrity of contract performance is maintained pending completion of all appropriate background investigations of contractor employees.
The Contractor shall submit the information required for eQIP access and other requisite forms for the risk level(s) specified. In addition, the contractor shall provide a cover letter which includes: the Contractor’s name, the contract number, the name of the Contracting Officer administering the Contract, the names of all Contractor employees’ for whom a background check is required and those employees’ social security numbers, dates of birth, and former names. This cover letter and all completed forms shall be transmitted, in a separate sealed envelope marked, “TO BE OPENED BY ADDRESSEE ONLY,” to:
Safety Office, Building 50, Room 304
12-223-SOL-00177 20 of 60 http://uscis.gov/graphics/formsfee/forms/files/i-9.pdf
The Contractor shall send a separate letter to the Contracting Officer that includes the contract number and employee names.
The Contractor shall advise its prospective employees that all standard forms submitted to the FDA shall be forwarded to the Office of Personnel Management (OPM) for scheduling background investigations.
Personnel Security Staff will resolve with the contract employee any issues arising out of inaccurate or incomplete forms.
Employees who have been previously granted a Government security clearance shall advise Personnel Security Staff of the details of such clearances to determine if a previous clearance level is suitable for the current FDA position.
At any time, if a contractor employee for whom security forms have been submitted is terminated or otherwise ceases work under the contract, the contractor shall immediately notify Personnel Security Staff, in writing, with copies to the respective FDA Project and Contracting Officers.
The OPM background investigation will take approximately 120 days. The Contracting Officer will notify the Contractor in writing if an employee is denied a clearance. Those individuals who have been cleared by Personnel Security Staff may continue to work under the contract.
Those who are not cleared must cease work on the contract immediately.
If a Contractor employee changes job responsibilities under this contract, the contractor shall notify the Contracting Officer, and the Government will make a determination whether an additional security clearance is required.
In the event that a cleared individual is replaced, the contractor shall notify the Contracting Officer and comply with all requirements of this clause, as specified herein, prior to the commencement of work by the replacement individual.
The Contractor shall be responsible for the return of any Government issued security badges to the COR.
5. NON-PUBLIC DATA PROTECTION
The Contractor shall protect the privacy of all information reported by or about contract employees and shall protect against unauthorized disclosure.
For clarification purposes and to facilitate the flow of all required security forms, the following Chart A and B matrix is provided:
12-223-SOL-00177 21 of 60
CHART A
Mandatory for all on-site contract employees
NON-SENSITIVE
POSITIONS - LEVEL
FORM NAME
OBTAIN
FROM
WHEN REQUIRED SUBMIT
TO
DATE
REQUIRED
FDA Form 3391 - FDA Security Card Access
Request
COR.
Sponsorship must be provided by
FDA COR.
All positions on DHHS property or leased space
Food and Drug Administration Office of Security Operations, Policy & Planning Attn: Food and Drug
Administration National Center for Toxicological
Research Safety Office, Building 50, Room
**Form must be submitted by Security Rep.
Form must be received prior to making fingerprint appointment.
Contractor’s Commitment to Protect Non-Public Information (NPI) Agreement form
Contracting Officer
All positions with access to non-public privileged, proprietary, or trade secret information
If requested by the government
Contracting Officer for retention in contract file
Ten (10) calendar days prior to commencement of work
Listing of all contractor employee names, social security #s, gender, dates of birth, former names, and a completed Fair Credit Reporting Act Release
Contractor generated
All positions, including intermittent, per diem or Temporary
When Requested by
* Food and Drug Administration Attn: Food and Drug
Administration National Center for Toxicological
Research Safety Office, Building 50, Room
3900 NCTR Road
Jefferson, AR 72079 870-543-7193, -7941
Ten (10) calendar days prior to commencement of work
SF 85 - Questionnaire for Non-Sensitive Positions
Online via OPM’s e-QIP system
For Non U.S. Citizens only
Non-Sensitive Positions - Level 1
Clearance
*Submit to OPM online via the e- QIP system
Ten (10) calendar days upon request of the Contracting
Officer
FD 258 - Fingerprint Chart (2 Charts Required)
Fingerprinting services available by appointment only.
Call (870) 543-7193
Contracting Officer
Non-Sensitive Positions - Level 1
Clearance When Requested by government
* Food and Drug Administration Attn: Food and Drug
Administration National Center for Toxicological
Research Safety Office, Building 50, Room
3900 NCTR Road
Jefferson, AR 72079 870-543-7193, -7941
Ten (10) calendar days prior to commencement of work
*In addition to the submission of these forms, the contractor shall provide a cover letter that includes: contractor’s name, contract number, contractor employees’ names, and name of
Contracting Officer.
*Upon favorable fingerprint return, contractor will be notified to respond to the badging office for their building pass.
12-223-SOL-00177 22 of 60
Attn: Food and Drug Administration
Safety Office, Building 50, Room 304 3900 NCTR Road
870-543-7193, -7941
CHART B
Public Trust
Positions - Levels 5 or 6
FORM NAME
OBTAIN
FROM
WHEN REQUIRED SUBMIT
TO
DATE
REQUIRED
SF 85P - Questionnaire for Public Trust Positions
Online via OPM’s e-QIP system
For non U.S. Citizens only
Public Trust Positions - Level 5 or 6 Clearance
*Submit to OPM online via the e-QIP system
Ten (10) calendar days prior to commencement of work
FD 258 - Fingerprint Chart (2 Charts Required)
Fingerprinting services available by appointment only.
Call (301) 827-9527
Contracting Officer
Public Trust Positions - Level 5 or 6 Clearance
When requested by the
* Food and Drug Administration Attn: Food and Drug Administration
National Center for Toxicological Research
Safety Office, Building 50, Room 304 3900 NCTR Road
Jefferson, AR 72079 870-543-7193, -7941
Ten (10) calendar days prior to commencement of work
FDA Form 3391 - FDA Security Card Access Request
COR.
Sponsorship must be provided by
FDA COR.
All positions on DHHS property or leased space
Food and Drug Administration Office of Security Operations, Policy & Planning Attn: Food and Drug Administration
National Center for Toxicological Research
Safety Office, Building 50, Room 304
**Form must be submitted by Security Rep.
Form must be received prior to making fingerprinting appointment.
Contractor’s Commitment to Protect Non-Public
Information (NPI) Agreement form
Contracting Officer
All positions with access to non-public privileged, proprietary, or trade secret information
Contracting Officer for retention in contract file
Ten (10) calendar days prior to commencement of work
Listing of all contractor employee names, social security #s, gender, dates of birth, former names, and a completed Fair Credit Reporting Act Release
Contractor generated
All positions, including intermittent, per diem or temporary
* Food and Drug Administration Attn: Food and Drug Administration
National Center for Toxicological Research
Safety Office, Building 50, Room 304 3900 NCTR Road
Jefferson, AR 72079 870-543-7193, -7941
Ten (10) calendar days prior to commencement of work
H-2 Payments to Contractors
Progress payments will be made in accordance with the Clause 52.232-5 entitled "Payments Under Fixed-Price Construction Contracts (SEP 2002)" in Part II, Section I, supplemented as
12-223-SOL-00177 23 of 60 follows:
A. Before the first progress payment under the contract becomes due, the Contractor shall prepare a schedule, acceptable to the Contracting Officer, of the estimated values of each principal category of the work which, when added together, will be used for determining progress payments and shall be in such detail as may be required by the Contracting Officer.
The cost of preparatory work, overhead, profit, bonds and insurance, taxes, warranties, as-built drawings, etc., shall be prorated into items of work throughout the contract.
B. Partial payments containing requests for materials on site shall be accompanied by itemized inventory lists with unit prices and supporting invoices showing unit costs of materials on site.
C. The Contractor, prior to receiving a progress or final payment under this contract, shall submit to the Contracting Officer a certification that the Contractor has made payment from the proceeds of prior payments, or that it will make timely payment then due, to its Subcontractor and suppliers in accordance with contractual arrangements with them.
D. After completion of the work, and prior to final payment, the Contractor shall furnish to the Contracting Officer a release of claims against the United States arising out of the Contractor, other than claims specifically excepted from the operation of the release.
H-3 Invoice Submission
The Contractor shall submit invoices in accordance with the following instructions:
A. An original and two (2) copies shall be submitted to the attention of the designated Contract Specialist at the following address:
Department of Health and Human Services Food and Drug Administration National Center for Toxicological Research Attention: Nick Sartain, Contract Specialist Office of Acquisitions & Grants Services, HFT-320 3900 NCTR Road Jefferson, AR 72079-9502
Or emailed to nick.sartain@fda.hhs.gov
B. One copy to the COR clearly marked “courtesy copy only”:
To be completed at time of award.
C. Invoices submitted under this contract must comply with the requirements set forth in FAR clauses 52.232-25 (Prompt Payment) and 52.232-33 (Payment by Electronic Funds Transfer – Central Contractor Registration) and/or other applicable far clauses specified herein. To constitute a proper invoice, the invoice must be submitted on company letterhead and include
12-223-SOL-00177 24 of 60 mailto:nick.sartain@fda.hhs.gov each of the following:
(i) Name and address of the contractor;
(ii) Invoice date and invoice number;
(iii) Contract number;
(iv) Description, quantity, unit of measure, unit price and extended price supplies delivered or services performed;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent (must be the same as that in the Contract or in a proper notice of assignment);
(viii) Name, title, and phone number of person to notify in event of defective invoice;
(ix) Taxpayer Identification Number (TIN).
(x) Electronic funds transfer (EFT) banking information.
(xi) Name and telephone number of the FDA Contracting Officer’s Technical Representative referenced on the contract; and
(xii) Any other information or documentation required by the Contract.
D. Questions regarding invoice payments should be directed to the FDA payment office at:
Attn: Division of Payment Services 3900 NCTR road, HFT-324 Building 50, 6th floor suite 616 Jefferson, AR 72079 Fax 870-543-7224 nctrinvoices@fda.hhs.gov
H-4 FDA 1405 Contract Changes
The provisions of Clauses 52.243-4, Changes, in Part II, Section I, is supplemented as follows:
A. All proposals for equitable adjustments due to changes in the work shall be submitted in a lump-sum amount.
B. With each lump-sum proposal for a change involving either an increase or decrease in the amount of the contract, or an extension or an acceleration of the period of performance, the Contractor shall promptly submit, by separate trades, an itemized breakdown that will include the following:
1. Material quantities and unit prices;
2. Labor costs (broken down by contractor and each subsequent subcontractor by trades, hours worked, and hourly rates;
3. Construction equipment costs;
4. Workmen's Compensation and Public Liability Insurance costs;
12-223-SOL-00177 25 of 60 mailto:nctrinvoices@fda.hhs.gov
5. Overhead costs;
6. Profit;
7. Employment Taxes, and those resulting from the Federal Insurance Contribution Act (FICA) and Federal Unemployment Tax Act (FUTA), and State Unemployment Act (SUTA);
8. Any effect of the change on the time required to complete the job, increase or decrease; and
9. Any increase or decrease in bond coverage.
C. When, either because of insufficient time to review and negotiate a proposed change or through failure of the parties to reach an agreement, the Government may order the Contractor to proceed, on the basis of a price to be determined later (at the earliest practicable date) which will not be more than the increase or less than the decrease stated in the proceed order.
D. Allowable overhead, profit, and commission percentages shall be considered to include, but not be limited to, insurance other than mentioned herein, field and office supervisors and assistants, use of small tools, incidental job burdens, and general office expense. No percentage for overhead, profit or commission will be allowed on employment taxes under FICA, FUTA and SUTA.
E. The percentages for overhead, profit, and commission to be allowed by the Government may vary according to the nature, extent, and complexity of the work involved, and will be negotiated under each individual change order.
F. Not more than three (3) percentages, none of which shall exceed ten percent (10%) will be allowed regardless of the number of Subcontractors, i.e., the mark-up on work subcontracted by a Subcontractor will be limited to one overhead percentage and one profit percentage in addition to the general Contractor's commission percentage.
G. On proposals involving a combination of increases and decreases in the amount of the contract, the overhead, profit, and commission will be allowed on the net difference between the direct costs of the increases and decreases only.
H-5 FDA 1409 Subcontracting and Subcontractors
A. Selection of Subcontractors. Unless otherwise specified, the Contractor and each subcontractor shall be free to select their subcontractors. Each Subcontractor must be capable of satisfactorily performing all work Subcontracted to it or of Subcontracting, in turn, those portion(s) of the work which it cannot perform to someone who is.
When there is Subcontracting, the Contractor must submit, or require the submission of, the following to the Contract Specialist:
1. The name and address of each subcontractor;
2. A detailed description of the work covered by each Subcontractor; and
3. A statement that the subcontractor has adequate resources and is
12-223-SOL-00177 26 of 60 capable of performing the work.
When required by the Contracting Officer, the Contractor shall submit for approval the names and addresses of any firms to be employed as subcontractors by the prime Contractor or any subcontractors.
B. Copies of subcontracts. No Subcontractor shall be allowed to perform any work on the project site until the following condition, in addition to those in Paragraph A. above, have been met by the Contractor:
1. A copy of the subcontract entered into on SF-1413 (Statement and Acknowledge), describing the work to be performed on the project site, has been furnished to the Contracting Officer; and
2. The subcontract contains Paragraphs (b)(i) through (b)(ii) of Clause 52.222-26, Equal Opportunity.
(These requirements pertain to all subcontracts, no matter what tier of relationship they have to the prime Contractor, except that the Equal Opportunity Clause is not required to be included in subcontracts of $10,000 or less.)
C. Contractor's responsibility for a Subcontractor. The Contractor shall be responsible for the acts of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .