M204.pdf

PDF 348 KB Posted

Attached to
Building 7 Boiler #2 Replacement
Solicitation number
12-223-SOL-00177
Issued by

About this file

J-1 Drawings M204

View the file

Other files

File Type Posted
amendment 3.pdf PDF
NCTR Air Permit.pdf PDF
attachment 2- list of attendees.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
attachment 1- list of attendees.pdf PDF
M202.pdf PDF
E202.pdf PDF
M103.pdf PDF
M201.pdf PDF
M101.pdf PDF
M601.pdf PDF
E201.pdf PDF
M203.pdf PDF
M404.pdf PDF
M102.pdf PDF
M200.pdf PDF
E106.pdf PDF
M403.pdf PDF
M104.pdf PDF
M305.pdf PDF
S102.pdf PDF
M304.pdf PDF
M402.pdf PDF
M501.pdf PDF
M306.pdf PDF
M401.pdf PDF
E103.pdf PDF
M303.pdf PDF
M702.pdf PDF
M302.pdf PDF
M703.pdf PDF
E104.pdf PDF
01120018 Add 01 Specs 080312.pdf PDF
12-223-SOL-00177.pdf PDF
M100.pdf PDF
E301.pdf PDF
S101.pdf PDF
M301.pdf PDF
E101.pdf PDF
G100.pdf PDF
E102.pdf PDF
E105.pdf PDF
M701.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING

FORCED

DRAFT

FAN

#1

EXISTING

BINDUCED

DRAFT

FAN

#1

8" VTR8" VTR8" VTR

24"ø

4 3.4 3 2.4 1.4 1

H

E

D

B

A

3" S15 DOWN FOR STEAM SUPPLY TO NEW STEAM

UNIT HEATERS.

CONTRACTOR SHALL MODIFY EXISTING OPENING

FOR NEW EXHAUST FAN. COORDINATE THE SIZE

OF THE OPENING WITH EXHAUST FAN ROOF CURB.

ADDITIVE OPTION #4: NEW STEAM UNIT HEATERS

AND ALL S15 STEAM PIPING FEEDING NEW STEAM

UNIT HEATERS.

NEW STACK FROM NEW FIRE TUBE BOILER #2.

4" S100

4" S100

4" S100

6" VTR

EXISTING

PRV-1

PRV-1

EXISTING

DA-1

EXISTING

WATER

TUBE

BOILER

"ø

"ø

1" SR

8" S15

3" S15 1" S15

3" S15

1" D

4" S15

6" BFW

4" SCW

2" SR

1" D

1" D

3" PCR

4" PCR

4" S15

8" S15

6" VTR

2" BFW

EF-1 EF-2 EF-3

KEYED NOTES:

BOILER INSTALLATION SYSTEM SCHEDULE

PROJECT PHASE SCOPE OF WORK - MAJOR EQUIPMENT

1). INSTALL NEW FIRE TUBE BOILER #2 AND 2-STAGE ECONOMIZER.

2). INSTALL THREE NEW EXHAUST FANS.

1). REMOVE EXISTING WATER TUBE BOILER #2, ALL ASSOCIATED PIPING BACK TO MAINS, AND ALL ASSOCIATED EQUIPMENT, INDUCED DRAFT

FAN, AND COMBUSTION AIR FAN.

OPTION 1: REMOVE ABANDONED DEAERATOR TANK AND ALL ASSOCIATED PIPING.

OPTION 2: REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED FEEDWATER PIPING ABOVE SLAB.

OPTION 3: REMOVE EXISTING FEEDWATER PIPING IN TRENCH.

OPTION 4: NEW STEAM UNIT HEATERS AND ALL S15 STEAM PIPING FEEDING NEW STEAM UNIT HEATERS.

OPTION 5: REMOTE MONITORING OF THE BOILERS, SURGE TANK, AND DEAERATOR TANK AT BUILDING 50.

OPTION 6: REMOTE MONITORING OF THE BOILER CONTROL SYSTEM AT BOILER MANUFACTURE'S TECHNICAL SERVICE FACILITY.

OPTION 7: RELOCATE EXISTING FLOW METER INSTALLED ON CAMPUS STEAM CONDENSATE STEAM RETURN PIPE.

OPTION 8: PROVIDE PVC JACKET FOR ALL NON-STEAM AND STEAM CONDENSATE PIPING (I.E. FEED WATER, DOMESTIC WATER, ECONOMIZER

PIPING FOR BOTH NEW AND EXISTING BOILER).

BOILER 2

INSTALLATION

DEMOLITION

BOILER 2

INSTALLATION

NEW WORK

ADDITIVE

OPTIONS

ISSUE DATE:

SHEET NUMBER:

PROJECT NUMBER:

5800 EVERGREEN DRIVE

LITTLE ROCK,

ARKANSAS

72205-1757

Phone: (501) 666-6776 Fax: (501) 663-8888 tme@tmecorp.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

MARK DATE DESCRIPTION

Je ffe rs on

L ab or at or ie s F oo d an d

D ru g A dm in is tr at io n

N

C T

R R d Je ffe rs on , A

R

M204

BOILER 2 INSTALLATION - FAN

PLATFORM - MECHANICAL

NEW

06-26-12

FDA-SOI-06-00268

B ui ld in g

B oi le r

R ep la ce m en t

1/4" = 1’−0"

BOILER 2 INSTALLATION − FAN PLATFORM PLAN − MECHANICAL NEW

1 08/03/12 ADDENDUM #1

BID SET

File details come from the government source that posted it. Updated .