00_31_43-1_5_A_20230906 USACE 404 SWG-2023-00309 NWP.pdf

PDF 3 MB Posted

Attached to
Upper Brownsville Levee
Solicitation number
191BWC25R0010
Issued by

About this file

This document is a Nationwide Permit (NWP) Verification issued by the U.S. Army Corps of Engineers Galveston District for bank stabilization activities along the Rio Grande. The permit, issued to the International Boundary and Water Commission, authorizes a bank stabilization project near the Cameron County Gateway International Bridge in Brownsville, Texas. The project involves stabilizing approximately 1,285 linear feet of riverbank, including 1,078 linear feet with Articulated Concrete Block Mattress (ACBM) revetment and 207 linear feet with rock rip rap. The installation will result in discharging 70 cubic yards of ACBM material and 175 cubic yards of rip rap below the ordinary high water mark.

The permit is verified under Nationwide Permit 13 for Bank Stabilization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899. The Corps has determined that the proposed activity complies with all terms and conditions of NWP 13 and that the environmental effects will be minimal. Notably, the agency is waiving the standard requirement that bank stabilization activities must be no more than 500 feet in length. The NWP verification is valid until the permit is modified, reissued, or revoked, with the current NWPs scheduled to be modified prior to March 15, 2026.

View the file

Other files

File Type Posted
191BWC25R0010_Brownsville Specs_ 20250702_.pdf PDF
SF-30 Amendment 005_.pdf PDF
SF-30 Amendment 004.pdf PDF
Section L Source Selection Criteria _4.pdf PDF
Technical Specifications Brownsville 20250630.pdf PDF
SF-30 Amendment 003.pdf PDF
191BWC25R0010_Brownsville_Specs_20250620.pdf PDF
191BWC25R0010_Brownsville_Drawings_20250617.pdf PDF
Section L Source Selection Criteria _6_21_25.pdf PDF
SF-30 Amendment 002.pdf PDF
191BWC25R0010 Brownsville Rev Dwgs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250530.pdf PDF
SF-30 Amendment 001.pdf PDF
USIBWC Amendment 4 -D5_27_25.pdf PDF
USIBWC Amendment 3- D5-24-25.pdf PDF
USIBWC Amendment 2- D5-19-23.pdf PDF
Section L Source Selection Criteria _3.pdf PDF
Section L Source Selection Criteria (2).pdf PDF
REDUCED Geotech Donna Pump to Brownsville Raba Kistner.pdf PDF
R Upper Brownsville Levee and Floodplain Failure DDR Redacted_REDUCED.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI (2).pdf PDF
USIBWC Amendment 1- D5-13-25.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI.pdf PDF
Reduced Size_ Geotech Donna Pump to Brownsville SandB.pdf PDF
Report of Subsurface Exploration Truck Lane Improvements Gateway Inl Bridge.pdf PDF
191BWC24R0010 Brownsville Drawings 20240419 FS.pdf PDF
SOLICITATION Upper Brownsville Levee_E_191BWC25R0010_.pdf PDF
Upper Brownsville Levee E-191BWC25R0010_.pdf PDF
Section L Source Selection Criteria.pdf PDF
191BWC25R0010 Brownsville Specs 20250115___.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts- REDUCED.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts.pdf PDF
00_31_32-1_3_A_1_m_20200716 Inclinometer Readings.pdf PDF
00_31_19-1_4_C_04783-000-00 RGBPP River Revetment at Fort Brown 1950-04-04.pdf PDF
WD_TX_20250003-01-03-2025.pdf PDF
00_31_32-1_3_A_1_c_20161031 Inclinometer Readings.pdf PDF
00_31_32-1_3_C_4_20070928 Geotech Donna Pump to Brownsville Boreholes SandB.pdf PDF
Attachment_Docs_List.pdf PDF
00_31_32-1_3_A_1_l_20200403 Inclinometer Readings.pdf PDF
191BWC25R0010 Brownsville Specs 20250115.pdf PDF
191BWC15R0010 Past Performance Questionnaire.pdf PDF
00_31_32-1_3_A_1_h_20170412 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_d_20161118 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_f_20170215 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_i_20170519 Inclinometer Readings.pdf PDF
IBWC_Form_245C_Performance_of_Work_Contractor.pdf PDF
Client_Authorization_Letter.docx DOCX document
00_31_32-1_3_A_1_g_20170320 Inclinometer Readings.pdf PDF
00_31_19-1_4_A_2_201205 Upper Brownsville Levee Design Report TT REDACTED.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

5151 FLYNN PARKWAY, SUITE 306

CORPUS CHRISTI, TEXAS 78411

September 6, 2023

Corpus Christi Regulatory Field Office

SUBJECT: Permit No. SWG-2023-00309; Nationwide Permit Verification

International Boundary and Water Commission ATTN: Gilbert Anaya 4191 N Mesa St.

El Paso, TX 79902

Dear Mr. Anaya

This is in reference to your request, dated June 2, 2023, to conduct bank stabilization activities along the Rio Grande. Approximately 1,285 linear feet along the bank of the Rio Grande will be stabilized with 1,078 linear feet of Articulated Concrete Block Mattress (ACBM) revetment erosion protection system, and 207 linear feet of rock rip rap. Installation of the ACBM and rip rap will result in the discharge of 70 cubic yards and 175 cubic yards of material below the ordinary high water mark, respectively. The project site is located in the Rio Grande, near the Cameron County Gateway International Bridge in Brownsville, Cameron County, Texas.

This request is verified by Nationwide Permit (NWP) 13 pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899. This NWP verification is valid provided the activity is compliant with the enclosed plans, in 7 sheets. In addition, the activity must be in compliance with the NWP General/Regional Conditions, Section 401 Water Quality Certification, and the Coastal Management Program, which can be found at:

https://www.swg.usace.army.mil/Missions/Regulatory/Permits/Nationwide-General- Permits/. A hard copy can be provided to you upon request.

NWP 13. Bank Stabilization: Authorizes activities necessary for erosion control or prevention, such as vegetative stabilization, bioengineering, sills, rip rap, revetment, gabion baskets, stream barbs, and bulkheads, or combinations of other methods.

We have determined the proposed activity would comply with all the terms and conditions of NWP 13 and that the adverse environmental effects of the proposed project would be minimal both individually and cumulatively. Therefore, in this case, we are waiving the requirement that the activity must be no more than 500 feet in length along the bank.

-2-

The NWP verification is valid until the NWP is modified, reissued, or revoked. The subject NWPs authorized in 2021 are scheduled to be modified, reissued, or revoked prior to March 15, 2026. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP.

This verification does not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted as such. If you have any questions, please contact Amanda Barker by electronic mail (email) amanda.m.barker@USACE.Army.Mil or by telephone at 361-960-4894.

Please notify the Galveston District Regulatory Division Corpus Christi Field Office in writing by email at CESWGRegulatoryInbox@USACE.Army.Mil upon completion of the authorized project.

FOR THE DISTRICT COMMANDER:

Kristie A. Wood Supervisor Corpus Christi Regulatory Field Office cc w/Encl.

Elizabeth Verdecchia, Elizabeth.verdecchia@ibwc.gov Texas Commission on Environmental Quality

SWG-2023-00309

Vicinity Map

Legend

Project Site 25.898278 -97.497134

2 mi

N

N Sheet 1 of 7

Site Map

Legend

Project Site 25.898278 -97.497134

700 ft

N

N Sheet 2 of 7

Recd 29 June 2023

Sheet 3 of 7

Sheet 4 of 7

Sheet 5 of 7

Sheet 6 of 7

Sheet 7 of 7

File details come from the government source that posted it. Updated .