This document is a Response to Vendor Questions for the Upper Brownsville Levee and Floodplain Failure project, issued by the U.S. Section of the International Boundary and Water Commission (USIBWC) for Solicitation No. 191BWC25R0010. The document provides technical clarification about soil mix column design specifications, specifically focusing on the area replacement ratio (ar). The document details two design scenarios - the original and a revised version - for 3' diameter soil mix columns, maintaining the same overlap replacement ratio of 0.26% while adjusting column dimensions such as diameter, center-to-center spacing, and column overlap.

The solicitation is for a full and open Firm Fixed Price Contract with an estimated project value exceeding $10,000,000, classified under NAICS Code 237990 with a small business size standard of $45M. A mandatory site visit is scheduled for May 28, 2025, at 8:00 AM CDT at the USIBWC Mercedes Field Office in Texas. Prospective bidders must submit attendee names by 10:00 AM MDT on May 27, 2025, and can submit written questions via email before 10:00 AM MDT on May 23, 2025. The project will utilize Wage Determinations 2015-5245 Rev 25 and TX20250003, with contractors required to submit proposals according to the specified general proposal instructions.

View the file

Other files

File Type Posted
Technical Specifications Brownsville 20250630.pdf PDF
SF-30 Amendment 004.pdf PDF
191BWC25R0010_Brownsville_Specs_20250620.pdf PDF
SF-30 Amendment 003.pdf PDF
191BWC25R0010_Brownsville_Drawings_20250617.pdf PDF
Section L Source Selection Criteria _6_21_25.pdf PDF
191BWC25R0010 Brownsville Rev Dwgs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250605.pdf PDF
SF-30 Amendment 002.pdf PDF
191BWC25R0010 Brownsville Specs 20250530.pdf PDF
SF-30 Amendment 001.pdf PDF
USIBWC Amendment 4 -D5_27_25.pdf PDF
USIBWC Amendment 2- D5-19-23.pdf PDF
Section L Source Selection Criteria (2).pdf PDF
R Upper Brownsville Levee and Floodplain Failure DDR Redacted_REDUCED.pdf PDF
USIBWC Amendment 1- D5-13-25.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI (2).pdf PDF
Reduced Size_ Geotech Donna Pump to Brownsville SandB.pdf PDF
191BWC24R0010 Brownsville Drawings 20240419 FS.pdf PDF
SOLICITATION Upper Brownsville Levee_E_191BWC25R0010_.pdf PDF
Section L Source Selection Criteria.pdf PDF
Upper Brownsville Levee E-191BWC25R0010_.pdf PDF
191BWC25R0010 Brownsville Specs 20250115___.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts- REDUCED.pdf PDF
00_31_32-1_3_C_4_20070928 Geotech Donna Pump to Brownsville Boreholes SandB.pdf PDF
191BWC25R0010 Brownsville Specs 20250115.pdf PDF
IBWC_Form_245C_Performance_of_Work_Contractor.pdf PDF
Client_Authorization_Letter.docx DOCX document
00_31_32-1_3_A_1_f_20170215 Inclinometer Readings.pdf PDF
00_31_19-1_4_A_2_201205 Upper Brownsville Levee Design Report TT REDACTED.pdf PDF
00_31_19-1_4_C_04783-000-00 RGBPP River Revetment at Fort Brown 1950-04-04.pdf PDF
00_31_32-1_3_C_3_20070928 Geotech Donna Pump to Brownsville SandB.pdf PDF
00_31_43-1_5_A_20230906 USACE 404 SWG-2023-00309 NWP.pdf PDF
WD_TX_20250003-01-03-2025.pdf PDF
00_31_32-1_3_B_20150713 ERDC Report of Investigation.pdf PDF
00_31_32-1_3_A_1_j_20170621 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_e_20170105 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_c_20161031 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_a_20160829 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_b_20160926 Inclinometer Readings.pdf PDF
Upper Brownsville Levee and Floodplain F-191BWC25R0010_.pdf PDF
Attachment_Docs_List.pdf PDF
191BWC15R0010 Past Performance Questionnaire.pdf PDF
00_31_32-1_3_A_1_m_20200716 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_l_20200403 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_i_20170519 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_d_20161118 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_k_20170718 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_h_20170412 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_g_20170320 Inclinometer Readings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERNATIONAL BOUNDARY AND WATER COMMISSION

UNITED STATES AND MEXICO

ACQUISITIONS DIVISION

U.S. Section, International Boundary and Water Commission (USIBWC) Response to Vendor Questions Solicitation No.: 191BWC25R0010 Project Title: Upper Brownsville Levee and Floodplain Failure Date: 5/24/2025

To all interested offerors:

With soil mix columns and stone columns too, the critical “factor” in the design is the area replacement ratio (ar). They can use any size soil mix columns as long as they maintain that ratio based on the current design. The contractor is allowed to modify the design or change the ar if they can prove it will meet the design requirements. The below table is what could be used with 3’ diameter soil mix columns. You will notice everything is halved to allow the ar to not change.

Dimensions Design Revised Thickness of Deep Soil Mix Zone (ft) H 44.8 44.8 Width of Deep Soil Mix Zone or Length of Panel (ft) B 45 45 Deep Soil Mix Column Diameter (ft) d 6 3 Center-to-Center Spacing of Columns (ft) s 20 10 Overlap of Columns (ft) e 1 0.5 Overlap Replacement Ratio (%) ar 0.26 0.26

For questions regarding this process, please contact the Contracting Officer before the deadline.

Sincerely, Suzette Smith Contracting Officer International Boundary and Water Commission (USIBWC) Email: suzette.smith @ibwc.gov Phone: 915-832-4110 mailto:philip.johnson@ibwc.gov

U.S. Section, International Boundary and Water Commission (USIBWC) Response to Vendor Questions Solicitation No.: 191BWC25R0010 Project Title: Upper Brownsville Levee and Floodplain Failure Date: 5/24/2025
To all interested offerors:
With soil mix columns and stone columns too, the critical “factor” in the design is the area replacement ratio (ar). They can use any size soil mix columns as long as they maintain that ratio based on the current design. The contractor is allowed t...
For questions regarding this process, please contact the Contracting Officer before the deadline.
Sincerely, Suzette Smith Contracting Officer International Boundary and Water Commission (USIBWC) Email: suzette.smith @ibwc.gov Phone: 915-832-4110

File details come from the government source that posted it. Updated .