The document is an IBWC Form 245C (Minimum Qualifications for Award: Performance of Construction Work by Contractor), which provides instructions and a template for contractors to detail their self-performance of work on federal construction contracts. The form is specifically related to the Upper Brownsville Levee and Floodplain Failure project (Solicitation No. 191BWC25R), a Firm Fixed Price Contract with an estimated value exceeding $10,000,000.

The form requires contractors to break down their bid price, including design costs, preconstruction surveys, geotechnical analysis, utility surveys, and site inspections, and calculate the percentage of work to be self-performed. Key contract details include a mandatory site visit at the USIBWC Mercedes Field Office on May 28, 2025, at 8:00 AM CDT, with advance registration required. The contract falls under NAICS Code 237990 with a Small Business Size Standard of $45M, and is administered by the International Boundary and Water Commission U.S.-Mexico. Wage determinations 2015-5245 Rev 25 and TX20250003 are applicable to this procurement.

View the file

Other files

File Type Posted
SF-30 Amendment 004.pdf PDF
Technical Specifications Brownsville 20250630.pdf PDF
SF-30 Amendment 003.pdf PDF
191BWC25R0010_Brownsville_Drawings_20250617.pdf PDF
191BWC25R0010_Brownsville_Specs_20250620.pdf PDF
Section L Source Selection Criteria _6_21_25.pdf PDF
SF-30 Amendment 002.pdf PDF
191BWC25R0010 Brownsville Rev Dwgs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250605.pdf PDF
SF-30 Amendment 001.pdf PDF
191BWC25R0010 Brownsville Specs 20250530.pdf PDF
USIBWC Amendment 4 -D5_27_25.pdf PDF
USIBWC Amendment 3- D5-24-25.pdf PDF
USIBWC Amendment 2- D5-19-23.pdf PDF
Section L Source Selection Criteria (2).pdf PDF
R Upper Brownsville Levee and Floodplain Failure DDR Redacted_REDUCED.pdf PDF
USIBWC Amendment 1- D5-13-25.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI (2).pdf PDF
Reduced Size_ Geotech Donna Pump to Brownsville SandB.pdf PDF
191BWC24R0010 Brownsville Drawings 20240419 FS.pdf PDF
SOLICITATION Upper Brownsville Levee_E_191BWC25R0010_.pdf PDF
Upper Brownsville Levee E-191BWC25R0010_.pdf PDF
Section L Source Selection Criteria.pdf PDF
191BWC25R0010 Brownsville Specs 20250115___.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts- REDUCED.pdf PDF
191BWC15R0010 Past Performance Questionnaire.pdf PDF
00_31_32-1_3_A_1_m_20200716 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_l_20200403 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_i_20170519 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_d_20161118 Inclinometer Readings.pdf PDF
00_31_32-1_3_C_3_20070928 Geotech Donna Pump to Brownsville SandB.pdf PDF
00_31_43-1_5_A_20230906 USACE 404 SWG-2023-00309 NWP.pdf PDF
WD_TX_20250003-01-03-2025.pdf PDF
00_31_32-1_3_B_20150713 ERDC Report of Investigation.pdf PDF
00_31_32-1_3_A_1_j_20170621 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_e_20170105 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_c_20161031 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_a_20160829 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_b_20160926 Inclinometer Readings.pdf PDF
Upper Brownsville Levee and Floodplain F-191BWC25R0010_.pdf PDF
Attachment_Docs_List.pdf PDF
00_31_32-1_3_C_4_20070928 Geotech Donna Pump to Brownsville Boreholes SandB.pdf PDF
191BWC25R0010 Brownsville Specs 20250115.pdf PDF
Client_Authorization_Letter.docx DOCX document
00_31_32-1_3_A_1_f_20170215 Inclinometer Readings.pdf PDF
00_31_19-1_4_A_2_201205 Upper Brownsville Levee Design Report TT REDACTED.pdf PDF
00_31_19-1_4_C_04783-000-00 RGBPP River Revetment at Fort Brown 1950-04-04.pdf PDF
00_31_32-1_3_A_1_k_20170718 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_h_20170412 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_g_20170320 Inclinometer Readings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IBWC Form 245C (COND)

12/31/2024 Previous Editions are Obsolete Page 1 of 1

INTERNATIONAL BOUNDARY & WATER COMMISSION

MINIMUM QUALIFICATIONS FOR AWARD

PERFORMANCE OF CONSTRUCTION WORK BY CONTRACTOR

Contractor Name:

Solicitation Name: Solicitation No:

Complete form to determine percent of work performed by Contractor per FAR 52.236-1.

Describe the work to be self-performed:

A. Total Bid Price on Above Solicitation

B. Total Design Costs included in Bid ++

C. Total Preconstruction Survey Costs included in Bid ++

D. Total Preconstruction Geotechnical Borings/Analysis included in Bid ++

E. Total Preconstruction Utility Surveys included in Bid ++

F. Total Preconstruction Site Inspection included in Bid ++

G. Total G&A, Home Office Overhead, Profit, Bond, Insurance, etc.

H. Total Construction Work to be Performed (H = A - B - C - D - E - F - G)

I. Total Self-Performed Construction Work

J. Percent Self-Performed Construction Work (I / H x 100) % .

++ Include both self-performed and subcontractor costs for these items

I certify that the above information is current, accurate and complete to the best of my knowledge and that I have the authority to provide the information requested on this form.

Printed Name of Contractor's Representative Contractor's Representative's Title

Signature of Contractor's Representative Date Signed

IBWC Form 245C (COND)

12/31/2024 Previous Editions are Obsolete Instructions

INTERNATIONAL BOUNDARY & WATER COMMISSION

MINIMUM QUALIFICATIONS FOR AWARD

PERFORMANCE OF CONSTRUCTION WORK BY CONTRACTOR

INSTRUCTIONS

Contractor Name: Enter the name of the company biding on the solicitation (IFB/RFP), i.e. your name.

Solicitation Name: Enter the name of the project that is being solicited.

Solicitation Number: Enter the USIBWC solicitation number.

The following are definitions concerning self-performance of work by the Contractor in accordance with FAR Clause 52.236-1 Performance of Work by the Contractor (APR 1984).

“Self-Performance of Work” generally includes mobilization and utilization of owned or rented plant and equipment to be operated by the Contractor's own (not subcontract) employees. Include only those materials which will be both purchased and installed by the Contractor's own (not subcontract) forces, the labor associated with those aforementioned materials or equipment, only those supplies to directly support work performed by the Contractor's own employees, and the Contractor's own job overhead costs.

"Design Costs" includes all work defined in FAR 36.306-4(a)(1) and (2). Include all work that produces an engineer signed and stamped document required to proceed with construction except for work on as-built drawings.

"Preconstruction Survey Costs" includes all work defined in FAR 36.306-4(a)(4) that is performed before construction begins. This does not include surveying for as-builts, quantities, or other post construction work.

"Preconstruction Geotechnical Borings/Analysis" includes all work associated with collecting geotechnical bores or samples, performing analysis on collected materials, and performing additional or new geotechnical analysis on the site of work. This includes preconstruction establishment/identification of borrow areas but does not include any quality control testing detailed in the construction specifications.

"Preconstruction Utility Surveys" includes all work performed to identify type or location of utilities performed prior to construction in the area of the utilities.

"Preconstruction Site Inspection" includes all work associated with photographing the site, videotaping the site, trips to the site, and other similar work performed prior to construction.

"On the Site" includes the construction site(s), jobsite, and worksite as well as offsite fabrication plant, borrow sites, or other facilities necessary to manufacture assemblies or provide materials to be incorporated into the construction project. See Technical Specifications Section 01.42.00 for definition of jobsite and worksite.

“Total Self-Performed Construction Work" is comprised of all direct (variable, fixed, one-time and semi-variable) costs to the Contractor, including jobsite overhead costs, to construct the project. It generally includes all self-performed work, as defined above, and cost of all supplies and materials installed by Contractor.

The following are NOT self-performed work for purposes of the clause: markups for profit, general and administrative (G&A) overhead, bonds, insurance, or other indirect costs on self-performed or subcontracted work, "Owner-operated equipment," rental of plant or equipment for operation by subcontractors, and purchase of materials for installation by subcontractors. These items are entered into Line G.

RELATED FORMS

245 Minimum Qualifications for Award (Individual, Partnership, Company, or Corporation) 245A Minimum Qualifications for Award (Joint Venture) 245B Minimum Qualifications for Award: Backup Information 245D Minimum Qualifications for Award: Performance of Work by Design-Builder

Button3:
Project: Upper Brownsville Levee and Floodplain Failure
Print Title:
Click here1: Click below to add signature image to form
Contractor_Signature:
Date Signed:
Note2: Use signature image
Check: Off
Note1: Use digital signature
Button2:
Print:
Note: Form must be "printed" to pdf prior to submittal to USIBWC.
buttonClear:
Contractor Name:
Print_Name:
Contract Number: 191BWC25R
Describe the work to be selfperformed 1:
Total:
Design:
Survey:
Geotechnical:
Utility:
Site_Inspection:
G&A:
Construction: 0
Total_SelfPerformed:
Percent: