IBWC_Form_245C_Performance_of_Work_Contractor.pdf
PDF 117 KB Posted
- Attached to
- Upper Brownsville Levee
- Solicitation number
- 191BWC25R0010
About this file
The document is an IBWC Form 245C (Minimum Qualifications for Award: Performance of Construction Work by Contractor), which provides instructions and a template for contractors to detail their self-performance of work on federal construction contracts. The form is specifically related to the Upper Brownsville Levee and Floodplain Failure project (Solicitation No. 191BWC25R), a Firm Fixed Price Contract with an estimated value exceeding $10,000,000.
The form requires contractors to break down their bid price, including design costs, preconstruction surveys, geotechnical analysis, utility surveys, and site inspections, and calculate the percentage of work to be self-performed. Key contract details include a mandatory site visit at the USIBWC Mercedes Field Office on May 28, 2025, at 8:00 AM CDT, with advance registration required. The contract falls under NAICS Code 237990 with a Small Business Size Standard of $45M, and is administered by the International Boundary and Water Commission U.S.-Mexico. Wage determinations 2015-5245 Rev 25 and TX20250003 are applicable to this procurement.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IBWC Form 245C (COND)
12/31/2024 Previous Editions are Obsolete Page 1 of 1
INTERNATIONAL BOUNDARY & WATER COMMISSION
MINIMUM QUALIFICATIONS FOR AWARD
PERFORMANCE OF CONSTRUCTION WORK BY CONTRACTOR
Contractor Name:
Solicitation Name: Solicitation No:
Complete form to determine percent of work performed by Contractor per FAR 52.236-1.
Describe the work to be self-performed:
A. Total Bid Price on Above Solicitation
B. Total Design Costs included in Bid ++
C. Total Preconstruction Survey Costs included in Bid ++
D. Total Preconstruction Geotechnical Borings/Analysis included in Bid ++
E. Total Preconstruction Utility Surveys included in Bid ++
F. Total Preconstruction Site Inspection included in Bid ++
G. Total G&A, Home Office Overhead, Profit, Bond, Insurance, etc.
H. Total Construction Work to be Performed (H = A - B - C - D - E - F - G)
I. Total Self-Performed Construction Work
J. Percent Self-Performed Construction Work (I / H x 100) % .
++ Include both self-performed and subcontractor costs for these items
I certify that the above information is current, accurate and complete to the best of my knowledge and that I have the authority to provide the information requested on this form.
Printed Name of Contractor's Representative Contractor's Representative's Title
Signature of Contractor's Representative Date Signed
IBWC Form 245C (COND)
12/31/2024 Previous Editions are Obsolete Instructions
INTERNATIONAL BOUNDARY & WATER COMMISSION
MINIMUM QUALIFICATIONS FOR AWARD
PERFORMANCE OF CONSTRUCTION WORK BY CONTRACTOR
INSTRUCTIONS
Contractor Name: Enter the name of the company biding on the solicitation (IFB/RFP), i.e. your name.
Solicitation Name: Enter the name of the project that is being solicited.
Solicitation Number: Enter the USIBWC solicitation number.
The following are definitions concerning self-performance of work by the Contractor in accordance with FAR Clause 52.236-1 Performance of Work by the Contractor (APR 1984).
“Self-Performance of Work” generally includes mobilization and utilization of owned or rented plant and equipment to be operated by the Contractor's own (not subcontract) employees. Include only those materials which will be both purchased and installed by the Contractor's own (not subcontract) forces, the labor associated with those aforementioned materials or equipment, only those supplies to directly support work performed by the Contractor's own employees, and the Contractor's own job overhead costs.
"Design Costs" includes all work defined in FAR 36.306-4(a)(1) and (2). Include all work that produces an engineer signed and stamped document required to proceed with construction except for work on as-built drawings.
"Preconstruction Survey Costs" includes all work defined in FAR 36.306-4(a)(4) that is performed before construction begins. This does not include surveying for as-builts, quantities, or other post construction work.
"Preconstruction Geotechnical Borings/Analysis" includes all work associated with collecting geotechnical bores or samples, performing analysis on collected materials, and performing additional or new geotechnical analysis on the site of work. This includes preconstruction establishment/identification of borrow areas but does not include any quality control testing detailed in the construction specifications.
"Preconstruction Utility Surveys" includes all work performed to identify type or location of utilities performed prior to construction in the area of the utilities.
"Preconstruction Site Inspection" includes all work associated with photographing the site, videotaping the site, trips to the site, and other similar work performed prior to construction.
"On the Site" includes the construction site(s), jobsite, and worksite as well as offsite fabrication plant, borrow sites, or other facilities necessary to manufacture assemblies or provide materials to be incorporated into the construction project. See Technical Specifications Section 01.42.00 for definition of jobsite and worksite.
“Total Self-Performed Construction Work" is comprised of all direct (variable, fixed, one-time and semi-variable) costs to the Contractor, including jobsite overhead costs, to construct the project. It generally includes all self-performed work, as defined above, and cost of all supplies and materials installed by Contractor.
The following are NOT self-performed work for purposes of the clause: markups for profit, general and administrative (G&A) overhead, bonds, insurance, or other indirect costs on self-performed or subcontracted work, "Owner-operated equipment," rental of plant or equipment for operation by subcontractors, and purchase of materials for installation by subcontractors. These items are entered into Line G.
RELATED FORMS
245 Minimum Qualifications for Award (Individual, Partnership, Company, or Corporation) 245A Minimum Qualifications for Award (Joint Venture) 245B Minimum Qualifications for Award: Backup Information 245D Minimum Qualifications for Award: Performance of Work by Design-Builder
| Button3: |
| Project: Upper Brownsville Levee and Floodplain Failure |
| Print Title: |
| Click here1: Click below to add signature image to form |
| Contractor_Signature: |
| Date Signed: |
| Note2: Use signature image |
| Check: Off |
| Note1: Use digital signature |
| Button2: |
| Print: |
| Note: Form must be "printed" to pdf prior to submittal to USIBWC. |
| buttonClear: |
| Contractor Name: |
| Print_Name: |
| Contract Number: 191BWC25R |
| Describe the work to be selfperformed 1: |
| Total: |
| Design: |
| Survey: |
| Geotechnical: |
| Utility: |
| Site_Inspection: |
| G&A: |
| Construction: 0 |
| Total_SelfPerformed: |
| Percent: |