This document is a Past Performance Questionnaire for the International Boundary and Water Commission's Upper Brownsville Levee and Floodplain Failure project (Solicitation No. 191BWC25R0010). The questionnaire is designed to collect detailed feedback from previous project stakeholders about a contractor's performance across multiple evaluation categories, including quality, timeliness, cost control, business relationships, safety, management, technical capabilities, and coordination.

The solicitation is for a full and open Firm Fixed Price Contract valued at over $10 million, with a NAICS code of 237990 and a small business size standard of $45M. A mandatory site visit is scheduled for May 28, 2025, at 8:00 AM CDT at the USIBWC Mercedes Field Office. Prospective bidders must submit attendee names by 10:00 AM MDT on May 27, 2025, and can submit written questions in advance. The project involves furnishing all labor, materials, and equipment necessary to complete the levee and floodplain failure work, with applicable wage determinations dated December 23, 2024.

View the file

Other files

File Type Posted
SF-30 Amendment 004.pdf PDF
Technical Specifications Brownsville 20250630.pdf PDF
191BWC25R0010_Brownsville_Specs_20250620.pdf PDF
SF-30 Amendment 003.pdf PDF
191BWC25R0010_Brownsville_Drawings_20250617.pdf PDF
Section L Source Selection Criteria _6_21_25.pdf PDF
SF-30 Amendment 002.pdf PDF
191BWC25R0010 Brownsville Rev Dwgs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250530.pdf PDF
SF-30 Amendment 001.pdf PDF
USIBWC Amendment 4 -D5_27_25.pdf PDF
USIBWC Amendment 3- D5-24-25.pdf PDF
USIBWC Amendment 2- D5-19-23.pdf PDF
Section L Source Selection Criteria (2).pdf PDF
R Upper Brownsville Levee and Floodplain Failure DDR Redacted_REDUCED.pdf PDF
USIBWC Amendment 1- D5-13-25.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI (2).pdf PDF
Reduced Size_ Geotech Donna Pump to Brownsville SandB.pdf PDF
191BWC24R0010 Brownsville Drawings 20240419 FS.pdf PDF
SOLICITATION Upper Brownsville Levee_E_191BWC25R0010_.pdf PDF
Upper Brownsville Levee E-191BWC25R0010_.pdf PDF
Section L Source Selection Criteria.pdf PDF
191BWC25R0010 Brownsville Specs 20250115___.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts- REDUCED.pdf PDF
00_31_32-1_3_C_4_20070928 Geotech Donna Pump to Brownsville Boreholes SandB.pdf PDF
191BWC25R0010 Brownsville Specs 20250115.pdf PDF
IBWC_Form_245C_Performance_of_Work_Contractor.pdf PDF
Client_Authorization_Letter.docx DOCX document
00_31_32-1_3_A_1_f_20170215 Inclinometer Readings.pdf PDF
00_31_19-1_4_A_2_201205 Upper Brownsville Levee Design Report TT REDACTED.pdf PDF
00_31_19-1_4_C_04783-000-00 RGBPP River Revetment at Fort Brown 1950-04-04.pdf PDF
00_31_32-1_3_A_1_m_20200716 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_l_20200403 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_i_20170519 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_d_20161118 Inclinometer Readings.pdf PDF
00_31_32-1_3_C_3_20070928 Geotech Donna Pump to Brownsville SandB.pdf PDF
00_31_43-1_5_A_20230906 USACE 404 SWG-2023-00309 NWP.pdf PDF
WD_TX_20250003-01-03-2025.pdf PDF
00_31_32-1_3_B_20150713 ERDC Report of Investigation.pdf PDF
00_31_32-1_3_A_1_j_20170621 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_e_20170105 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_c_20161031 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_a_20160829 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_b_20160926 Inclinometer Readings.pdf PDF
Upper Brownsville Levee and Floodplain F-191BWC25R0010_.pdf PDF
Attachment_Docs_List.pdf PDF
00_31_32-1_3_A_1_k_20170718 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_h_20170412 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_g_20170320 Inclinometer Readings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

International Boundary and Water Commission United States and Mexico United States Section

Past Performance Questionnaire Upper Brownsville Levee and Floodplain Failure Solicitation No. 191BWC25R0010

RETURN ALL QUESTIONNAIRES TO:

Suzette Smith

(915) 832-4110 suzette.smith@ibwc.gov

Solicitation 191BWC25R0010 Upper Brownsville Levee and Floodplain Failure

Note: Past performance information is required for each team member and each major subcontractor. The Offeror shall ensure that a Past Performance Questionnaire is completed for each project used to demonstrate experience and past performance ratings in Volume II. Relevant past performance information is defined as work of a similar nature to that shown in the

Solicitation and accomplished during the past 10 years.

Questionnaires are to be completed by the contracting activity (e.g., owners, clients, and prime

Contractors) responsible for the particular projects and furnished by the completing party directly to:

Suzette Smith

Contract Specialist

(915) 832-4110 suzette.smith@ibwc.gov

Questionnaires provided by the Offeror will not be considered.

Notes for emailing:

• If using the form fields contained in this pdf, either sign the form electronically or scan

Respondent Information (Page 15 of 16) page at a minimum resolution of 300 dpi in color.

• If filling out the form by hand, please scan the whole document at a minimum resolution of 300 dpi in color.

• Only pages 4 through 15/16 need be returned.

Instructions for Completing Past Performance Questionnaire

A. Questions 1 through 11 on page 4 shall be completed by the Offeror. All other parts of the questionnaire shall be completed by companies or agencies who hired the Offeror. Offerors shall not fill out a questionnaire for themselves.

B. Indicate, based on the adjectives listed (using letter designation below), the Contractor’s performance on the identified program. Assessments should reflect only Contractor-liable performance. The following is a definition of the rating levels:

RATING DEFINITION NOTE

E

(Exceptional)

Performance meets contractual requirements and exceeds many requirements to the benefit of the Government.

The contractual performance of the element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

An exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an exceptional rating. Also, there should have been no significant weaknesses identified.

V

(Very Good)

Performance meets contractual requirements and exceeds some requirements. The contractual performance of the element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

A very good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government. There should have been no significant weaknesses identified.

S

(Satisfactory)

Performance meets minimum contractual requirements.

The contractual performance of the element being assessed contains some minor problems for which corrective actions taken by the Contractor were, or appear to be, satisfactory.

A satisfactory rating is appropriate when there were only minor problems, or major problems that the Contractor recovered from without impact to the contract. There should have been no significant weaknesses identified.

M

(Marginal)

Performance does not meet some contractual requirements. The contractual performance of the element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions or the Contractor’s proposed actions appear only marginally effective or were not fully implemented.

A marginal is appropriate when a significant event occurred that the Contractor had trouble overcoming which impacted the Government.

U

(Unsatisfactory)

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element being assessed contains serious problem(s) for which the Contractor’s corrective actions were, or appear to be, ineffective.

An unsatisfactory rating is appropriate when multiple significant events occurred that the Contractor had trouble overcoming and which impacted the Government. A singular problem, however could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

N/A (Not

Applicable)

Self-explanatory. Use if you are unable to provide a rating for an area.

Rating will be neither positive nor negative.

C. Please provide narrative explanations for your answers. Space for your narrative remarks is provided after each area. If more space is required, attach additional sheets.

D. In addition to completing the attached questionnaire for the identified program, please provide your comments on other programs for which your activity has contracts with this firm.

You are urged to supplement your own knowledge of the Contractor’s performance with the judgment of others in your organization.

OFFEROR COMPLETE THIS PAGE

OFFEROR

COMPLETE PAGES 4 AND 5

Past Performance Questionnaire Details:

Name of Respondent's Agency/Company: ___________________________________________

Title of Project to be Evaluated: ___________________________________________________

Offeror Teaming Details for Solicitation 191BWC23R0004

(must match Client Authorization Letter)

Name of Offeror Requesting Questionnaire: __________________________________________

Name of Prime Contractor for 191BWC23R0004 Team: ________________________________

In the above referenced project, Offeror Being Reviewed was:

Prime Contractor (company submitting bid proposal to USIBWC)

Subcontractor

Other: ___________________________________________________

OFFEROR COMPLETE THIS PAGE

Business and Project Identification (This page to be completed by Offeror for project related to past performance)

1. Offeror's company name: ___________________________________________________

2. Project title: ___________________________________________________________

3. Contract number: _________________________________________________________

4. Description of the project:

5. Period of performance (Original and Current/Actual): ____________________________

a. Original scheduled completion date: ____________________________________

b. Current or actual completion date: ______________________________________

c. Number of times it changed: __________________________________________

d. Primary causes of changes: ___________________________________________

e. If not complete, percentage of completion: _______________________________

6. Was Offeror prime Contractor, subcontractor, or vendor: _________________________*

* Prime Contractor indicates that the Offeror held the contract. Subcontractor indicates that the Offeror provided services (designs, construction, surveying, testing, etc.) for the prime. Vendor indicates that the Offeror provided supplies, materials, equipment, etc. for the prime or a subcontractor.

7. Percentage of work physically performed by Offeror: ____________________________

8. Total project dollar value (prime contract value): ________________________________

9. Offeror's original contract dollar value: ________________________________________

a. Current or actual value at time of completion: ____________________________

b. Number of times it changed: __________________________________________

c. Primary causes of changes: ___________________________________________

10. Location of project: _______________________________________________________

11. Specific role of Offeror on the project (please provide work task(s) performed):

12. Specific role persons/organization identified as participants in the project (please provide name, project role, and telephone number for each participant):

REVIEWER COMPLETE THIS PAGE

REVIEWER/RESPONDENT

COMPLETE PAGES 7 THROUGH 16

REVIEWER COMPLETE THIS PAGE

Description of Contract (This and all additional pages to be completed by Reviewer/Respondent)

What function did the Contractor fill on this project? (Check all that apply)

Construction Architect-Engineer

Construction Management (CM) Vendor

Design-Build Other:

How was the Contract awarded? (Check all that apply)

Sealed Bid 8(a) Direct Award

Competitive Sole Source

Negotiated Small Business Set Aside

Task Order/Delivery Order Other:

How was the Contract paid? (Check all that apply)

Unit Price Line Items Time and Materials

Lump Sum Line Items Cost Plus

Lump Sum Contract Other:

Yes No N/A

1. Do you agree with the Contractor's response to 5.d. on page 5?

2. Do you agree with the Contractor's response to 9.c. on page 5?

Please provide additional information to any “no” answers.

Complexity of Project

What was the complexity of project being reviewed: ___________________________________

For example: highly complex - multiple construction disciplines with a short time frame moderately complex - simpler construction with one or two difficult areas average - one or two construction disciplines with no problems simple - straight forward construction with nothing out of the average

Please indicate items that the Contractor performed as part of this project.

'Performed' indicates that items were constructed by Contractor, designed by Contractor, inspected by Contractor, or supplied by Contractor, depending upon role indicated on Page 5.

Type of Work Performed Type of Work Performed

Excavation/earthwork (this excludes mass excavation)

Reinforced Concrete Pipe installation

Clearing and grubbing Riprap installation

Compacted backfill Articulated concrete block installation

Earthen embankment/levee construction

Stone columns

Construction with restrictive soil types

Soil mix columns

Borrow site utilization Placing geotextile

Borrow site establishment Flowable backfill

Hauling Reseeding/revegetation

Gravel roadways Stormwater control

If construction with restrictive soil types was selected, explain what type(s) you used:

Evaluation of Contractor's Performance

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable See page 3 for complete rating descriptions.

Quality

Quality E V S M U N/A

1. Overall quality of the project.

2. Key management/design/construction personnel qualifications to perform the requirements of project.

3. Quality of the subcontractor’s work.

4. Accuracy of the record keeping procedure and the ability to prepare accurate reports.

5. Procedures that ensured that the level of quality remains constant throughout the project.

6. Contractor's quality program in identifying, correcting, and preventing initial and recurring discrepancies.

7. Contractor's quality control manager was onsite during project work.

Comments: ____________________________________________________________________

Timeliness

Timeliness E V S M U N/A

1. Timeliness in completing the project.

2. Meeting program schedule and monitoring critical milestones.

3. Timeliness in completing reports.

4. Provided a process for timely responses to requests for modifications.

5. Timeliness in providing all project documents.

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Cost Controls

Cost Control E V S M U N/A

1. Provided good products/materials, considering the price paid for the items.

2. Demonstrated financial stability during the project performance period.

3. Demonstrated reasonableness of proposed modification costs.

Business Relationships

Business Relationships E V S M U N/A

1. Cooperation in solving problems.

2. A good relationship with technical personnel.

3. A good relationship with contracting office personnel.

4. A good relationship with subcontractors.

5. Compliance with the terms of the contract.

Customer Satisfaction

Customer Satisfaction Yes No N/A

1. You, as the end user, were satisfied with the services performed.

2. You would be their advocate for future work.**

** Government reviewers should take this to mean the same as the CPARS recommendation that states "Given what I know today about the contractor's ability to perform in accordance with this contract or order's most significant requirements, I would/would not recommend them for similar requirements in the future."

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Management

Management E V S M U N/A

1. Adequate, qualified overall project management.

2. Site supervisor understood project scope and work.

3. Management kept crews busy, materials on site, and equipment in working order.

4. Contractor's ability to manage subcontractors.

5. Site supervisor was onsite during project work.

Technical

Technical E V S M U N/A

1. Met the general and detailed design specifications requirements.

2. Ensured the technical data and details submitted were acceptable.

3. Submittals were well researched and clearly identified the proposed item.

Environmental

Environmental E V S M U N/A

1. Met the general environmental requirements.

2. Adequacy of Contractor's environmental program, oversight, compliance, and management.

3. Contractor promoted environmental awareness.

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Design and Construction

Construction E V S M U N/A

1. Your satisfaction with the methods of construction.

2. The promptness and quality of completion of punch list items.

3. Your satisfaction with the response to warranty calls.

4. General housekeeping and site upkeep.

Safety

Safety E V S M U N/A

1. Offeror maintained the site in a safe manner.

2. There was a comprehensive safety plan in place that was enforced.

3. Any unsafe work methods, materials, or employees were removed or changed immediately.

4. Employees viewed safety equipment as a necessity.

5. Contractor promoted safety awareness.

Safety Yes No N/A

6. Were there any injuries on this project?

7. Were there any accidents on this project?

Please provide additional information to any “yes” answers.

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Financial Management

Financial Management Yes No N/A

1. Were there any instances where subcontractors were not paid?

2. Were any liens placed against the project?

3. To your knowledge, have any key personnel associated with this Offeror been indicted on any criminal charges within the past 10 years?

4. Did any submitted payrolls fail to meet minimum wage rates?

5. Did employees complain about not being paid?

Please provide additional information to any “yes” answers.

General Information

General Information Yes No N/A

1. Has this Offeror demonstrated capability to work independently and without significant customer oversight?

2. Given a choice, would you use this Offeror again?

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Project Specific Questions

Coordination Required Yes No N/A

1. Did project involve work along border or near areas with significant policing/CBP presence?

2. Did project involve coordination with multiple stakeholders? (For example, property owners and different government entities)

Coordination E V S M U N/A

1. Coordination with stakeholders and adjacent property owners.

2. Coordination with policing agencies and/or CBP.

Respondent Information

The following information will assist with the analysis of the data.

This information will be kept CONFIDENTIAL and will not be released to Contractor.

We recognize that your responses and comments are only your personal opinion and that they do not represent the opinion of your company or organization.

Name (please print): _____________________________________________________________

Signature: _____________________________________________________________________

Agency/company: ______________________________________________________________

Address: ______________________________________________________________________

Address: ______________________________________________________________________

Work phone number: ____________________________________________________________

Email address: __________________________________________________________________

Your role relative to the project/contract: ____________________________________________

(e.g., Contracting Officer, Inspector, Contract Administration, Buyer, Quality Assurance Evaluator, Other - explain)

Agency/Company's role relative to the Owner (Do not answer if you are Owner): _________________

(e.g., Prime Contractor, Subcontractor, Joint Venture Sponsor, Other - explain)

Length of involvement in project/contract: ___________________________________________

Date the questionnaire was completed: ______________________________________________

Do you know anyone else who can provide information regarding this Offeror’s performance?

Name: Phone:

Name: Phone:

Project Owner Information (Provide information if the Respondent is not the project owner)

Agency/company: ______________________________________________________________

Address: ______________________________________________________________________

Address: ______________________________________________________________________

Work phone number: ____________________________________________________________

THANK YOU FOR COMPLETING THIS QUESTIONNAIRE.

REVIEWER COMPLETE THIS PAGE

Additional Remarks Use additional pages if necessary.

Instructions for Completing Past Performance Questionnaire
Offer Information
Business and Project Identification
Description of Contract
Complexity of Project
Evaluation of Contractor's Performance
Quality
Timeliness
Cost Control
Business Relationships
Customer Satisfaction
Management
Technical
Environmental
Design and Construction
Safety
Financial Management
General Information
Project Specific Questions
Respondent Information
Additional Remarks
Period of performance:
Original schedule:
Current or actual schedule:
Number of times it changed:
Primary causes of changes:
Current or actual completion date and if not complete percentage of completion:
Offeror_Type: [Prime Contractor]
Original project dollar value:
Current or actual value at time of completion:
Number of times it changed_2:
Primary causes of changes_2:
Location of Project:
Complexity: [Simple]
BoxCC1: Off
BoxCC2: Off
BoxCC3: Off
COST CONTROL:
BoxB1: Off
BoxB2: Off
BoxB3: Off
BoxB4: Off
BoxB5: Off
Comments_4:
BoxCS1: Off
BoxCS2: Off
CUSTOMER SATISFACTION:
BoxM1: Off
BoxM2: Off
BoxM3: Off
BoxM4: Off
BoxM5: Off
MANAGEMENT:
BoxTT1: Off
BoxTT2: Off
BoxTT3: Off
TECHNICAL:
BoxE1: Off
BoxE2: Off
BoxE3: Off
ENVIRONMENTAL:
BoxD1: Off
BoxD2: Off
BoxD3: Off
BoxD4: Off
BoxS1: Off
BoxS2: Off
BoxS3: Off
BoxS4: Off
BoxS5: Off
BoxS6: Off
BoxS7: Off
SAFETY:
BoxF1: Off
BoxF2: Off
BoxF3: Off
BoxF4: Off
BoxF5: Off
BoxG1: Off
BoxG2: Off
Project-Contract Number:
Percent of Work:
Contract dollar value at time of selection:
BoxCR1: Off
BoxCR2: Off
OtherDC1:
OtherDC2:
OtherDC3:
Paid1: Off
Paid4: Off
Paid2: Off
Paid5: Off
Paid3: Off
Paid6: Off
Award1: Off
Award2: Off
Award3: Off
Award4: Off
Award5: Off
Award6: Off
Award7: Off
Award8: Off
Fill1: Off
FINANCIAL MANAGEMENT:
DESIGN AND CONSTRUCTION:
Prime Contractor Company Name:
Offeror1: 1
Offeror Other:
BoxQ1: Off
BoxQ2: Off
BoxQ3: Off
BoxQ4: Off
BoxQ5: Off
BoxQ6: Off
BoxQ7: Off
BoxQ8: Off
QUALITY:
BoxT1: Off
BoxT2: Off
BoxT3: Off
BoxT4: Off
BoxT5: Off
TIMELINESS:
Project title:
each team member 2:
each team member 3:
Description of Project:
Check1:
1:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
0:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
Companyagency name:
Responses:
Soil:
Additional:
Name:
Work Address 1:
Work Address 2:
Work phone number:
email:
Your role relative to the projectcontract:
Length of involvement in projectcontract:
Date the questionnaire was completed:
Name1:
Phone1:
Name2:
Phone2:
POCompany:
POWork Address 1:
POWork Address 2:
POWork phone number:
GENERAL INFORMATION:
BoxY1: Off
BoxY2: Off
COMMENT-EXTRA:
BoxZ1: Off
BoxZ2: Off
BoxY3: Off
Company2:
Company22:

File details come from the government source that posted it. Updated .