This document is a February 2017 technical memorandum from Arcadis U.S., Inc. to the International Boundary and Water Commission (IBWC) presenting slope inclinometer readings for the Remediation Design of Levee Floodplain Failure within the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project. The memo details measurements from seven inclinometers (four new: ARC-1, ARC-2, ARC-3, ARC-4 and three existing: I-32, I-33, I-34) taken between June 2016 and February 2017.
Key observations include tension cracks near inclinometer ARC-1 on the levee's top edge, with six pin flags installed to monitor crack progression. The incremental and cumulative displacement plots show minimal movement, with only ARC-1 displaying a slight progressive movement starting at depths between 28-30 feet, corresponding to the interpreted Alluvium/Pleistocene interface. The inclinometers were measured monthly and will continue to be monitored until early July 2017 to track potential ground displacement. The measurements were taken using a Digitilt AT system with an inclinometer probe, control cable, Bluetooth reel, and an Android-based tablet computer.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Arcadis U.S., Inc.
10352 Plaza Americana Drive
Baton Rouge
Louisiana 70816
Tel 225 292 1004
Fax 225 218 9677
Page:
1/4
MEMO
To:
Edgar Iniguez Contracting Officer Representative
IBWC
Copies:
Padinare Unnikrishna (USIBWC) Armando Flores (Arcadis)
From:
Kirk Lowery, P.E.
Date: Arcadis Project No.:
February 15, 2017 LA003315.0000
Subject:
February 2017 Summary Report of Inclinometer Readings Remediation Design of Levee Floodplain Failure within the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project – IBM15D0001 – IBM15T0015
1. Introduction
Arcadis U.S., Inc. (Arcadis), is pleased to submit this summary technical memorandum including data charts of the slope inclinometer readings at the IBWC site. The baseline readings for the new inclinometers, ARC- 1, ARC-2, ARC-3 and ARC-4, were taken in June 2016 and the seventh set of readings were measured on February 8, 2017. These inclinometers will be measured every month until early July of 2017.
Exact readings for the existing inclinometers, I-32, I-33 and I-34, were not made when Arcadis visited the site February 8, 2017. However, the probe was placed in the inclinometer casings and the depth at which it would not pass was recorded. Arcadis measured the depth range in which the inclinometer probe could not pass through the constricted area of the pipe and are as follows:
I-32 (Top of the Levee): Depth Range: 32 feet
I-33 (Toe of the Levee): Depth Range: 38 feet to 39 feet
I-34 (Below Toe of Levee): Depth Range: 30 feet to 31 feet
In addition, tension cracks were observed on top of the levee near inclinometer ARC-1. The cracks begin at the northern edge of the 2-foot by 2-foot concrete pad and ends approximately 14 feet and four inches south from the center of the inclinometer casing along the top edge of the levee. Arcadis installed six pin
2/4
MEMO
flags along the crack as shown in Attachment B. These pin flags will be used as a reference to measure over the next five months to observe if the crack widens or extends either south or north. Table 1 summarized the pin flags location along the cracks.
Table 1. Pin Flag Locations
Pin Flag No. Location
14'-4" from center of inclinometer ARC-1 (southern edge of crack)
2 and 3 11' from center of inclinometer ARC-1.
10 and 1/16" between the two pin flags
4 and 5 6' from center of inclinometer ARC-1
7 and 15/32" between the two pin flags
6 and 1/16" from wood frame edge of the concrete pad
The readings for each inclinometer are reflected in the graphical displays provided in Attachment A.
Attachment A includes both incremental and cumulative displacement plots. Attachment B shows the inclinometer locations on a Google Map.
The incremental displacement plot compares the mean deviation data to the baseline survey file. This plot reveals the exact depth where displacements are actually occurring. The cumulative displacement is the sum of the displacements from the base of the borehole. This plot shows the change in the position of the casing from the first set of readings.
The A-axis charts in the displacement plots show displacements in the plane perpendicular to the levee while the B-axis charts show displacements in the plane parallel with the levee. A positive reading in the A-axis chart indicates displacement to the west heading toward the Rio Grande River, and a positive reading in the B-axis chart indicates displacement to the north heading toward the Gateway Bridge.
2. Digitilt AT Inclinometer Digitilt AT system was used to survey the inclinometers. The system components include an inclinometer probe, control cable, a Bluetooth reel and the Digitilt Reader app for certified Android-based tablet computer.
The equipment is shown in Figure 1.
3/4
MEMO
Figure 1: Digitilt AT System Components.
3. February 2017 Inclinometers Assessment
The depth of the casing restriction for the USACE installed inclinometers, I-32, I-33 and I-34 appears to be the same depth as the previous readings.
Data collected on February 8, 2017 followed the same trend as the baseline reading measured in June 2016. The monthly displacement plots recorded between July through February are presented in Attachment A. Data comparisons for each inclinometer are described below:
Inclinometer Arc-1: The base readings for inclinometer Arc-1 were collected on June 22, 2016. The Arc-1 cumulative plot in the A-Axis direction shows a slight progressive movement starting at depths between 28 and 30 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ December 2, 2016 Draft Geotechnical Assessment Report. This inclinometer will continue to be monitored on the normally scheduled frequency to determine if there is any increase in cumulative displacements.
Inclinometer Arc-2: The base readings for inclinometer Arc-2 were collected on June 17, 2016. The Arc-2 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee. Although the cumulative plot in the A-Axis direction shows a slight displacement at depths between 40 and 42 feet, this displacement is not progressive. This displacement could have been caused during the curing of the grout or some other environmental factor after the initial reading.
Inclinometer Arc-3: The base readings for inclinometer Arc-3 were collected on June 17, 2016. The Arc-3 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.
4/4
MEMO
Inclinometer Arc-4: The base readings for inclinometer Arc-4 were collected on June 22, 2016. The Arc-4 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.
ATTACHMENTS:
A – Inclinometer Plots B – Inclinometer Location Map
ATTACHMENT A
INCLINOMETER PLOTS
IBWC Arc-1 A - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-1 B - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-1 A - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-1 B - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-2 A - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-2 B - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM
D e pt h in F e et
IBWC Arc-2 A - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-2 B - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM
D e pt h in F e et
IBWC Arc-3 A - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-3 B - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM
D e pt h in F e et
IBWC Arc-3 A - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-3 B - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM
D e pt h in F e et
IBWC Arc-4 A - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-4 B - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM
D e pt h in F e et
IBWC Arc-4 A - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-4 B - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM
D e pt h in F e et
ATTACHMENT B
INCLINOMETER LOCATION MAP
Pin Flag #1
Concrete Pad
(2'x2'x4")
Pin Flag #6
Pin Flag #2
Pin Flag #3
Pin Flag #4
Pin Flag #5
Arc-1 (B-1)
I-32
I-33
I-34
Arc-2 (B-2)
Arc-3 (B-3)
Arc-4 (B-4)
REMEDIATION DESIGN OF LEVEE FLOODPLAIN FAILURE
WITHIN THE UPPER BROWNSVILLE LEVEE REACH
LOWER RIO GRANDE FLOOD CONTROL PROJECT
INCLINOMETER LOCATION
ATTACHMENT
B
IBWC
SUMMARY REPORT OF INCLINOMETER READINGS
| TM_Inclinometer Readings_IBWC Project_February 2017.pdf |
| IBWC_Attachment A_2-14-17.pdf |
| Arc-1_Inc |
| Arc-1_Cum |
| Arc-2_Inc |
| Arc-2_Cum |
| Arc-3_Inc |
| Arc-3_Cum |
| Arc-4_Inc |
| Arc-4_Cum |
File details come from the government source that posted it. Updated .