Report of Subsurface Exploration Intl Bridge PSI (2).pdf

PDF 1 MB Posted

Attached to
Upper Brownsville Levee
Solicitation number
191BWC25R0010
Issued by

About this file

This document is a detailed geotechnical report of subsurface exploration and evaluation conducted by Professional Service Industries, Inc. (PSI) for the Cameron County International Bridge project located in Brownsville, Texas. The report focuses on Pier No. 5, which is the first bent south of the north abutment on the downstream span, and was designed to bear at elevation -26.24 feet. The investigation involved two soil test borings drilled to approximately 70 feet deep, with comprehensive testing including penetration tests, split-barrel sampling, soil classification, and laboratory analyses of soil samples.

Key findings reveal significant geotechnical challenges, including a large layer of very soft clay just above the estimated pier bearing level and groundwater encountered at depths of 46-48 feet. The evaluation indicates the pier has experienced base failure with periodic side shear failure, and its frictional capacity is nearly exceeded under transitory live loads. As a result, the report recommends installing a new foundation support using driven or augercast pile foundations, specifically targeting the very stiff to hard silty clays below elevation -33 feet. The recommended pile types include pre-cast concrete, concrete-filled steel shell, and concrete-filled steel pipe, with estimated design capacities of 40 to 60 tons when driven or augered to about elevation -35 feet.

View the file

Other files

File Type Posted
191BWC25R0010_Brownsville Specs_ 20250702_.pdf PDF
SF-30 Amendment 005_.pdf PDF
SF-30 Amendment 004.pdf PDF
Section L Source Selection Criteria _4.pdf PDF
Technical Specifications Brownsville 20250630.pdf PDF
SF-30 Amendment 003.pdf PDF
191BWC25R0010_Brownsville_Specs_20250620.pdf PDF
191BWC25R0010_Brownsville_Drawings_20250617.pdf PDF
Section L Source Selection Criteria _6_21_25.pdf PDF
SF-30 Amendment 002.pdf PDF
191BWC25R0010 Brownsville Rev Dwgs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250530.pdf PDF
SF-30 Amendment 001.pdf PDF
USIBWC Amendment 4 -D5_27_25.pdf PDF
USIBWC Amendment 3- D5-24-25.pdf PDF
USIBWC Amendment 2- D5-19-23.pdf PDF
Section L Source Selection Criteria _3.pdf PDF
Section L Source Selection Criteria (2).pdf PDF
REDUCED Geotech Donna Pump to Brownsville Raba Kistner.pdf PDF
R Upper Brownsville Levee and Floodplain Failure DDR Redacted_REDUCED.pdf PDF
USIBWC Amendment 1- D5-13-25.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI.pdf PDF
Reduced Size_ Geotech Donna Pump to Brownsville SandB.pdf PDF
Report of Subsurface Exploration Truck Lane Improvements Gateway Inl Bridge.pdf PDF
191BWC24R0010 Brownsville Drawings 20240419 FS.pdf PDF
SOLICITATION Upper Brownsville Levee_E_191BWC25R0010_.pdf PDF
Upper Brownsville Levee E-191BWC25R0010_.pdf PDF
Section L Source Selection Criteria.pdf PDF
191BWC25R0010 Brownsville Specs 20250115___.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts- REDUCED.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts.pdf PDF
00_31_32-1_3_A_1_m_20200716 Inclinometer Readings.pdf PDF
00_31_19-1_4_C_04783-000-00 RGBPP River Revetment at Fort Brown 1950-04-04.pdf PDF
WD_TX_20250003-01-03-2025.pdf PDF
00_31_32-1_3_A_1_c_20161031 Inclinometer Readings.pdf PDF
00_31_32-1_3_C_4_20070928 Geotech Donna Pump to Brownsville Boreholes SandB.pdf PDF
Attachment_Docs_List.pdf PDF
00_31_32-1_3_A_1_l_20200403 Inclinometer Readings.pdf PDF
191BWC25R0010 Brownsville Specs 20250115.pdf PDF
191BWC15R0010 Past Performance Questionnaire.pdf PDF
00_31_32-1_3_A_1_h_20170412 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_d_20161118 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_f_20170215 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_i_20170519 Inclinometer Readings.pdf PDF
IBWC_Form_245C_Performance_of_Work_Contractor.pdf PDF
Client_Authorization_Letter.docx DOCX document
00_31_32-1_3_A_1_g_20170320 Inclinometer Readings.pdf PDF
00_31_19-1_4_A_2_201205 Upper Brownsville Levee Design Report TT REDACTED.pdf PDF
00_31_32-1_3_A_1_k_20170718 Inclinometer Readings.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

Introduction
Evaluation
Recommendations
Construction Considerations
General Comments
Appendix I-Drawings
Boring Location Plan
Generalized Subsurface Profile
Appendix II-Field Testing Procedures
Appendix III-Subsurface Materials and Drilling Conditions
Appendix IV-Laboratory Testing Procedures
Appendix V-Laboratory Test Results

File details come from the government source that posted it. Updated .