This document is a technical memorandum from Arcadis U.S., Inc. reporting on slope inclinometer readings for the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project. The report presents data collected on March 31, 2020, for four inclinometers (ARC-1, ARC-2, ARC-3, and ARC-4) installed at different locations along the levee. The baseline readings were taken in June 2016, with this being the second-to-last measurement set.
The analysis reveals slight progressive movement towards the Rio Grande for inclinometers ARC-1, ARC-2, and ARC-3, with displacements ranging from 0.08 to 0.17 inches at depths between 28-40 feet. These movements correspond to the interpreted Alluvium/Pleistocene interface and are attributed to fluctuations in the Rio Grande water level. Inclinometer ARC-4 showed no significant movement. The report includes incremental and cumulative displacement plots, an inclinometer location map, and site photos documenting the levee conditions. Readings for USACE inclinometers (I-32, I-33, I-34) were not taken due to potential probe obstruction from previous soil movement.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Arcadis U.S., Inc.
10352 Plaza Americana Drive
Baton Rouge
Louisiana 70816
Tel 225 292 1004
Fax 225 218 9677
Page:
1/3
MEMO
To:
Jose Vela Contracting Officer Representative
IBWC
Copies:
Padinare Unnikrishna (USIBWC) Armando Flores (Arcadis)
From:
Kirk Lowery, P.E.
Date: Arcadis Project No.:
April 3, 2020 LA003315.0000
Subject:
March 2020 Summary Report of Inclinometer Readings Remediation Design of Levee Floodplain Failure within the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project – IBM15D0001 – IBM15T0015
1. Introduction
Arcadis U.S., Inc. (Arcadis), is pleased to submit this summary technical memorandum including data charts of the slope inclinometer readings at the IBWC site. The baseline readings for the new inclinometers, ARC- 1, ARC-2, ARC-3 and ARC-4, were taken in June 2016 and the twelfth set of readings were measured on March 31, 2020. Under the current scope of work, this set of readings will be the second to last measurement to be taken for these inclinometers.
Readings for the United States Corps of Engineers’ (USACE) inclinometers, I-32, I-33 and I-34, were not taken for fear of getting the inclinometer probe stuck in the already constricted areas of the pipe due to previous soil movement.
During the March 31, 2020 site visit, several pins that were installed June 14, 2017 have been removed.
The removed pins were predominantly on top of the levee near inclinometer ARC-1 and south of the existing retaining wall. It is assumed that pins were removed by active traffic on the levee roadway and by grass mowing activities. In addition, vegetation at the top of the levee as covered the caliche base road.
For these reasons, the longitudinal cracks noted in July 2017 could not be observed or measured during the March 2020 visit. Attachment C shows photos of the top of the levee where tension cracks were present in July 2017.
2/3
MEMO
The readings for each inclinometer are reflected in the graphical displays provided in Attachment A.
Attachment A includes both incremental and cumulative displacement plots. Attachment B shows the inclinometer locations on a Google Map.
The incremental displacement plot compares the mean deviation data to the baseline survey file. This plot reveals the exact depth where displacements are actually occurring. The cumulative displacement is the sum of the displacements from the base of the borehole. This plot shows the change in the position of the casing from the first set of readings.
The A-axis charts in the displacement plots show displacements in the plane perpendicular to the levee while the B-axis charts show displacements in the plane parallel with the levee. A positive reading in the A-axis chart indicates displacement to the west heading toward the Rio Grande, and a positive reading in the B-axis chart indicates displacement to the north heading toward the Gateway Bridge.
2. Digitilt AT Inclinometer
Digitilt AT system was used to survey the inclinometers. The system components include an inclinometer probe, control cable, a Bluetooth reel and the Digitilt Reader app for certified Android-based tablet computer.
The equipment is shown in Figure 1.
Figure 1: Digitilt AT System Components.
3. March 2020 Inclinometers Assessment
Data collected on March 31, 2020 followed the same trend as the readings measured in July 2017. The incremental and cumulative displacement plots recorded between September 2016 through March 2020 are presented in Attachment A. The location Data comparisons for each inclinometer are described below:
Inclinometer ARC-1: The base readings for inclinometer ARC-1 were collected on June 22, 2016. The ARC- 1 cumulative plot in the A-Axis direction shows a slight progressive movement starting at depths between
3/3
MEMO
28 and 30 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ July 31, 2017 Final Geotechnical Assessment Report. After reviewing the cumulative displacement plots, there was a slight increase in displacement between the dates of September 2016 and March 2017. After March 2017, the displacement towards the Rio Grande (A-Axis) started to increase at a slow rate. Comparing the measurements taken in July 2017 to March 2020, the displacement is 0.17 inch towards the Rio Grande (A-Axis) at a depth of 28 feet. The overall displacement at a depth of 28 feet is
0.33 inch.
The displacement parallel to the levee does not show any sign of movement in this month’s readings.
Inclinometer Arc-2: The base readings for inclinometer ARC-2 were collected on June 17, 2016. The ARC-2 cumulative displacement plot in the A-Axis direction shows displacement between the depths of 38 feet to 40 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ July 31, 2017 Final Geotechnical Assessment Report. The cumulative displacement plots show a slight increase in displacement in September 2016 and a decrease in movement in December 2016. After December 2016, the movement towards the Rio Grande (A-Axis) started to increase at a slow rate. Comparing the measurements taken in July 2017 to March 2020, the displacement is 0.08 inches towards the Rio Grande (A-Axis) at a depth of 40 feet. The overall displacement at a depth of 40 feet is 0.25 inch.
The displacement parallel to the levee does not show any sign of movement in this month’s readings.
Inclinometer ARC-3: The base readings for inclinometer ARC-3 were collected on June 17, 2016. The ARC- 3 cumulative displacement plot in the A-Axis direction shows displacement between the depths of 36 feet to 38 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ July 31, 2017 Final Geotechnical Assessment Report. Previous readings showed less than 0.1 inch movement at this depth that no shows an overall displacement of 0.15 inch.
Inclinometer ARC-4: The base readings for inclinometer ARC-4 were collected on June 22, 2016. The ARC- 4 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.
After reviewing the cumulative displacement plots, these figures in Attachment A show that each reading exhibits increasing displacement towards the Rio Grande (A-Axis direction) for inclinometers ARC-1 and ARC-2. The displacement for these inclinometers demonstrates a trend that will increase over time due to fluctuations of the water level in the Rio Grande. After critically reviewing the cumulative displacement plots, the graphical displays in Attachment A shows that there is an increase in movement towards the Rio Grande (A-Axis direction) for the inclinometers ARC-1, ARC-2, and ARC-3. The displacement for these inclinometers is progressive but moving at a very slow rate.
ATTACHMENTS:
A – Inclinometer Plots B – Inclinometer Location Map C – Site Photos
ATTACHMENT A
INCLINOMETER PLOTS
IBWC Arc-1 A - Axis
6/22/2016 11:22:30 AM 9/22/2016 1:35:22 PM
12/22/2016 3:53:53 PM 3/17/2017 12:20:09 PM
6/14/2017 12:51:51 PM 7/12/2017 9:22:17 AM
3/31/2020 1:00:00 PM
D e p th in F e e t
Incremental Displacement (in)
-2 -1 0 1 2
IBWC Arc-1 B - Axis
6/22/2016 11:22:30 AM 9/22/2016 1:35:22 PM
12/22/2016 3:53:53 PM 3/17/2017 12:20:09 PM
6/14/2017 12:51:51 PM 7/12/2017 9:22:17 AM
3/31/2020 1:00:00 PM
D e p th in F e e t
Incremental Displacement (in)
-2 -1 0 1 2
IBWC Arc-1 A - Axis
6/22/2016 11:22:30 AM 9/22/2016 1:35:22 PM
12/22/2016 3:53:53 PM 3/17/2017 12:20:09 PM
6/14/2017 12:51:51 PM 7/12/2017 9:22:17 AM
3/31/2020 1:00:00 PM
D e p th in F e e t
Cumulative Displacement (in)
-2 -1 0 1 2
IBWC Arc-1 B - Axis
6/22/2016 11:22:30 AM 9/22/2016 1:35:22 PM
12/22/2016 3:53:53 PM 3/17/2017 12:20:09 PM
6/14/2017 12:51:51 PM 7/12/2017 9:22:17 AM
3/31/2020 1:00:00 PM
D e p th in F e e t
Cumulative Displacement (in)
IBWC Arc-2 A - Axis
6/17/2016 6:27:13 PM 9/22/2016 2:05:40 PM
12/22/2016 4:18:54 PM 3/17/2017 11:58:39 AM
6/14/2017 1:13:37 PM 7/12/2017 8:38:59 AM
3/31/2020 12:15:00 PM
D e p th in F e e t
Incremental Displacement (in)
-2 -1 0 1 2
IBWC Arc-2 B - Axis
6/17/2016 6:27:13 PM 9/22/2016 2:05:40 PM
12/22/2016 4:18:54 PM 3/17/2017 11:58:39 AM
6/14/2017 1:13:37 PM 7/12/2017 8:38:59 AM
3/31/2020 12:15:00 PM
D e p th in F e e t
IBWC Arc-2 A - Axis
6/17/2016 6:27:13 PM 9/22/2016 2:05:40 PM
12/22/2016 4:18:54 PM 3/17/2017 11:58:39 AM
6/14/2017 1:13:37 PM 7/12/2017 8:38:59 AM
3/31/2020 12:15:00 PM
D e p th in F e e t
Cumulative Displacement (in)
-2 -1 0 1 2
IBWC Arc-2 B - Axis
6/17/2016 6:27:13 PM 9/22/2016 2:05:40 PM
12/22/2016 4:18:54 PM 3/17/2017 11:58:39 AM
6/14/2017 1:13:37 PM 7/12/2017 8:38:59 AM
3/31/2020 12:15:00 PM
D e p th in F e e t
IBWC Arc-3 A - Axis
6/17/2016 7:05:22 PM 9/22/2016 2:36:13 PM
12/22/2016 4:38:15 PM 3/17/2017 11:40:50 AM
6/14/2017 1:30:10 PM 7/12/2017 8:22:33 AM
3/31/2020 11:00:00 AM
D e p th in F e e t
Incremental Displacement (in)
-2 -1 0 1 2
IBWC Arc-3 B - Axis
6/17/2016 7:05:22 PM 9/22/2016 2:36:13 PM
12/22/2016 4:38:15 PM 3/17/2017 11:40:50 AM
6/14/2017 1:30:10 PM 7/12/2017 8:22:33 AM
3/31/2020 11:00:00 AM
D e p th in F e e t
IBWC Arc-3 A - Axis
6/17/2016 7:05:22 PM 9/22/2016 2:36:13 PM
12/22/2016 4:38:15 PM 3/17/2017 11:40:50 AM
6/14/2017 1:30:10 PM 7/12/2017 8:22:33 AM
3/31/2020 11:00:00 AM
D e p th in F e e t
Cumulative Displacement (in)
-2 -1 0 1 2
IBWC Arc-3 B - Axis
6/17/2016 7:05:22 PM 9/22/2016 2:36:13 PM
12/22/2016 4:38:15 PM 3/17/2017 11:40:50 AM
6/14/2017 1:30:10 PM 7/12/2017 8:22:33 AM
3/31/2020 11:00:00 AM
D e p th in F e e t
IBWC Arc-4 A - Axis
6/22/2016 10:48:04 AM 9/22/2016 3:09:20 PM
12/22/2016 5:00:01 PM 3/17/2017 11:22:03 AM
6/14/2017 1:48:14 PM 7/12/2017 8:06:31 AM
3/31/2020 9:30:00 AM
D e p th in F e e t
Incremental Displacement (in)
-2 -1 0 1 2
IBWC Arc-4 B - Axis
6/22/2016 10:48:04 AM 9/22/2016 3:09:20 PM
12/22/2016 5:00:01 PM 3/17/2017 11:22:03 AM
6/14/2017 1:48:14 PM 7/12/2017 8:06:31 AM
3/31/2020 9:30:00 AM
D e p th in F e e t
IBWC Arc-4 A - Axis
6/22/2016 10:48:04 AM 9/22/2016 3:09:20 PM
12/22/2016 5:00:01 PM 3/17/2017 11:22:03 AM
6/14/2017 1:48:14 PM 7/12/2017 8:06:31 AM
3/31/2020 9:30:00 AM
D e p th in F e e t
Cumulative Displacement (in)
-2 -1 0 1 2
IBWC Arc-4 B - Axis
6/22/2016 10:48:04 AM 9/22/2016 3:09:20 PM
12/22/2016 5:00:01 PM 3/17/2017 11:22:03 AM
6/14/2017 1:48:14 PM 7/12/2017 8:06:31 AM
3/31/2020 9:30:00 AM
D e p th in F e e t
ATTACHMENT B
INCLINOMETER LOCATION MAP
N
O
R
T
H
REMEDIATION DESIGN OF LEVEE FLOODPLAIN FAILURE
WITHIN THE UPPER BROWNSVILLE LEVEE REACH
LOWER RIO GRANDE FLOOD CONTROL PROJECT
INCLINOMETER LOCATION MAP
D B
R
P
E T
R I E
S
B
E L
D
S
O T
H O
N
M
N
P
I C
O p t
M R e q d
T
O p t
Y R
O p t O
N
O
F F
R
E F
C U s e r s a f l o r e s D e s k t o p I n c l i n o m e t e r C
A D
F i l e I B
W C
I n c l i n o m e t e r
L o c a t i o n
M a p d w g
Y
O U
T
L
O C
A T
I O
N
M
V
E D
C A
D V
E R
T
C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
O
T T
E D
B
Y
F
L O
R E
S
A
R M
A N
D O
ATTACHMENT
B
IBWC
SUMMARY REPORT OF INCLINOMETER READINGS
RIO GRANDE
GATEWAY BRIDGE
ARC-1 (B-1)
ARC-2 (B-2)
ARC-3 (B-3)
ARC-4 (B-4)
00 50' 100'
SCALE: 1/2" = 1'
LEGEND:
B-1: 100 FEET BOREHOLE DRILLED AT THE TOP OF THE LEVEE B-3: 80 FEET BOREHOLE DRILLED AT THE EDGE OF THE RIVERBANK
ARC-1: 98 FEET INCLINOMETER CASING INSTALLED WITHIN BORING B-1 ARC-3: 78 FEET INCLINOMETER CASING INSTALLED WITHIN BORING B-3
B-2: 80 FEET BOREHOLE DRILLED AT THE TOE OF THE LEVEE B-4: 80 FEET BOREHOLE DRILLED NEAR THE NORTH ABUTMENT OF THE GATEWAY BRIDGE
ARC-2: 78 FEET INCLINOMETER CASING INSTALLED WITHIN BORING B-2 ARC-4: 78 FEET INCLINOMETER CASING INSTALLED WITHIN BORING B-4
ATTACHMENT C
SITE PHOTOS
C-1
Photo 1 – Looking North – Top of the Levee.
Photo 2 – Looking South – Top of the Levee.
C-2
Photo 3 – Looking South – Top of the Levee.
Photo 4 – Looking South – Top of the Levee.
C-3
Photo 5 – Looking South – Top of the Levee.
| Sheets and Views |
| Location Map |
File details come from the government source that posted it. Updated .