This document is a technical memorandum from Arcadis U.S., Inc. to the International Boundary and Water Commission (IBWC) detailing May 2017 inclinometer readings for the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project. The report covers measurements from six inclinometers (I-32, I-33, I-34, ARC-1, ARC-2, ARC-3, and ARC-4) installed to monitor ground movement and potential levee instability.
The memorandum highlights that tension cracks were observed on the levee near inclinometer ARC-1, with some cracks showing slight increases in length compared to previous measurements. Incremental displacement data shows minimal movement, with ARC-1 experiencing a 0.02-inch displacement towards the Rio Grande at a depth of 28 feet, and ARC-2 showing a 0.03-inch displacement at 38 feet depth. The report includes detailed incremental and cumulative displacement plots for each inclinometer, GPS coordinates of observed cracks, and photographic documentation of new surface tension cracks. The technical assessment suggests continued monitoring to track potential further ground movement.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Arcadis U.S., Inc.
10352 Plaza Americana Drive
Baton Rouge
Louisiana 70816
Tel 225 292 1004
Fax 225 218 9677
Page:
1/4
MEMO
To:
Edgar Iniguez Contracting Officer Representative
IBWC
Copies:
Padinare Unnikrishna (USIBWC) Armando Flores (Arcadis)
From:
Kirk Lowery, P.E.
Date: Arcadis Project No.:
May 19, 2017 LA003315.0000
Subject:
May 2017 Summary Report of Inclinometer Readings - Revised Remediation Design of Levee Floodplain Failure within the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project – IBM15D0001 – IBM15T0015
1. Introduction
Arcadis U.S., Inc. (Arcadis), is pleased to submit this summary technical memorandum including data charts of the slope inclinometer readings at the IBWC site. The baseline readings for the new inclinometers, ARC- 1, ARC-2, ARC-3 and ARC-4, were taken in June 2016 and the ninth set of readings were measured on May 9, 2017. These inclinometers will be measured every month until early July of 2017.
Exact readings for the existing inclinometers, I-32, I-33 and I-34, were not made when Arcadis visited the site May 9, 2017. However, the probe was placed in the inclinometer casings and the depth at which it would not pass was recorded. Arcadis measured the depth range in which the inclinometer probe could not pass through the constricted area of the pipe and are as follows:
I-32 (Top of the Levee): Depth Range: 32 feet
I-33 (Toe of the Levee): Depth Range: 38 feet
I-34 (Below Toe of Levee): Depth Range: 30 feet to 31 feet
In this month’s visit to the IBWC site, tension cracks were observed on top of the levee near inclinometer ARC-1, south of the existing retaining wall in two sections and new cracks were discovered east of the existing cracks as shown in Attachment B. Attachment C presents photos of the new surface tension cracks.
At the known surface cracks near ARC-1, there was no displacement with respect to the April 10, 2017 measurements for Pin 1 through Pin 5. The west outer edge of the wood frame to Pin 6 crack has increased
2/4
MEMO
in length by 1 inch as compared to April 10 and about ¾ inch since the March 17 measurement. It was noted that the form work for the concrete pad is expanding. The tension crack at the northwest edge of the wood frame extended north for a length of approximately 3 inches and discontinued and showed no change from previous measurements. The ten pins located south of the retaining wall Pin 7 to Pin 12 and Pin 13 to Pin 16 exhibited no displacement with respect to previous measurements. These pin flags mentioned above will be used as a reference to measure over the next two months to observe if the cracks widen or extend either south or north. Table 1 summarizes the pin flags location along the cracks.
Table 1. Pin Flag Locations
Pin Flag No. Pin Location
14'-4" from center of inclinometer ARC-1 (southern edge of crack).
2 and 3 11' from center of inclinometer ARC-1.
10 and 1/16" between the two pin flags.
4 and 5 6' from center of inclinometer ARC-1.
7 and 15/32" between the two pin flags.
6 6 and 3/4" from wood frame edge of the concrete pad.
GPS Coordinates N25.897884°, W97.496458° (northern edge of crack)
8 and 9 South 8’ from Pin 7.
11.5" between the two pin flags.
10 and 11 South 23’ from Pin 7.
14.0" between the two pin flags.
12 South 35’ from Pin 7.
GPS Coordinates N25.897672°, W97.496342° (northern edge of crack)
14 and 15 South 4’ from Pin 13.
15.38" between the two pin flags.
16 South 8’ from Pin 13.
The readings for each inclinometer are reflected in the graphical displays provided in Attachment A.
Attachment A includes both incremental and cumulative displacement plots. Attachment B shows the inclinometer locations on a Google Map.
The incremental displacement plot compares the mean deviation data to the baseline survey file. This plot reveals the exact depth where displacements are actually occurring. The cumulative displacement is the sum of the displacements from the base of the borehole. This plot shows the change in the position of the casing from the first set of readings.
3/4
MEMO
The A-axis charts in the displacement plots show displacements in the plane perpendicular to the levee while the B-axis charts show displacements in the plane parallel with the levee. A positive reading in the A-axis chart indicates displacement to the west heading toward the Rio Grande River, and a positive reading in the B-axis chart indicates displacement to the north heading toward the Gateway Bridge.
2. Digitilt AT Inclinometer
Digitilt AT system was used to survey the inclinometers. The system components include an inclinometer probe, control cable, a Bluetooth reel and the Digitilt Reader app for certified Android-based tablet computer.
The equipment is shown in Figure 1.
Figure 1: Digitilt AT System Components.
3. May 2017 Inclinometers Assessment
The depth of the casing restriction for the USACE installed inclinometers, I-32, I-33 and I-34 appears to be the same depth as the previous readings.
Data collected on May 9, 2017 followed the same trend as the baseline reading measured in June 2016.
The monthly displacement plots recorded between July through May are presented in Attachment A. Data comparisons for each inclinometer are described below:
Inclinometer ARC-1: The base readings for inclinometer ARC-1 were collected on June 22, 2016. The ARC- 1 cumulative plot in the A-Axis direction shows a slight progressive movement starting at depths between 28 and 30 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ December 2, 2016 Draft Geotechnical Assessment Report. Comparing the measurements taken in April 2017 to May 2017, the displacement increases 0.02 inches towards the Rio Grande (A-Axis) at a depth of 28 feet. This inclinometer will continue to be monitored on the normally scheduled frequency to determine if there is any increase in cumulative displacements. The displacement
4/4
MEMO
parallel to the levee are comparatively smaller and does not show any sign of movement in this month’s readings.
Inclinometer Arc-2: The base readings for inclinometer ARC-2 were collected on June 17, 2016. The ARC- 2 cumulative displacement plot in the A-Axis direction shows a slight displacement between the depths of 38 feet to 40 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ December 2, 2016 Draft Geotechnical Assessment Report. Comparing the measurements taken in April 2017 to May 2017, the displacement increases 0.03 inches towards the Rio Grande (A-Axis) at a depth of 38 feet. This inclinometer will continue to be monitored on the normally scheduled frequency to determine if there is any increase in cumulative displacements. The displacement parallel to the levee are comparatively smaller and does not show any sign of movement in this month’s readings.
Inclinometer ARC-3: The base readings for inclinometer ARC-3 were collected on June 17, 2016. The ARC- 3 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.
Inclinometer ARC-4: The base readings for inclinometer ARC-4 were collected on June 22, 2016. The ARC- 4 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.
ATTACHMENTS:
A – Inclinometer Plots B – Inclinometer Location Map C – Photos of New Surface Tension Cracks
ATTACHMENT A
INCLINOMETER PLOTS
IBWC Arc-1 A - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM
3/17/2017 12:20:09 PM 4/10/2017 3:12:10 PM
5/9/2017 2:13:46 PM
D ep th in
F ee t
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-1 B - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM
3/17/2017 12:20:09 PM 4/10/2017 3:12:10 PM
5/9/2017 2:13:46 PM
D ep th in
F ee t
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-1 A - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM
3/17/2017 12:20:09 PM 4/10/2017 3:12:10 PM
5/9/2017 2:13:46 PM
D ep th in
F ee t
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-1 B - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM
3/17/2017 12:20:09 PM 4/10/2017 3:12:10 PM
5/9/2017 2:13:46 PM
D ep th in
F ee t
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-2 A - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM
3/17/2017 11:58:39 AM 4/10/2017 2:47:48 PM
5/9/2017 1:53:54 PM
D ep th in
F ee t
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-2 B - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM
3/17/2017 11:58:39 AM 4/10/2017 2:47:48 PM
5/9/2017 1:53:54 PM
D ep th in
F ee t
IBWC Arc-2 A - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM
3/17/2017 11:58:39 AM 4/10/2017 2:47:48 PM
5/9/2017 1:53:54 PM
D ep th in
F ee t
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-2 B - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM
3/17/2017 11:58:39 AM 4/10/2017 2:47:48 PM
5/9/2017 1:53:54 PM
D ep th in
F ee t
IBWC Arc-3 A - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM
3/17/2017 11:40:50 AM 4/10/2017 2:26:29 PM
5/9/2017 1:36:04 PM
D ep th in
F ee t
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-3 B - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM
3/17/2017 11:40:50 AM 4/10/2017 2:26:29 PM
5/9/2017 1:36:04 PM
D ep th in
F ee t
IBWC Arc-3 A - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM
3/17/2017 11:40:50 AM 4/10/2017 2:26:29 PM
5/9/2017 1:36:04 PM
D ep th in
F ee t
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-3 B - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM
3/17/2017 11:40:50 AM 4/10/2017 2:26:29 PM
5/9/2017 1:36:04 PM
D ep th in
F ee t
IBWC Arc-4 A - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM
3/17/2017 11:22:03 AM 4/10/2017 2:04:56 PM
5/9/2017 1:18:23 PM
D ep th in
F ee t
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-4 B - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM
3/17/2017 11:22:03 AM 4/10/2017 2:04:56 PM
5/9/2017 1:18:23 PM
D ep th in
F ee t
IBWC Arc-4 A - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM
3/17/2017 11:22:03 AM 4/10/2017 2:04:56 PM
5/9/2017 1:18:23 PM
D ep th in
F ee t
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-4 B - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM
3/17/2017 11:22:03 AM 4/10/2017 2:04:56 PM
5/9/2017 1:18:23 PM
D ep th in
F ee t
ATTACHMENT B
INCLINOMETER AND LEVEE CRACKING LOCATION MAP
Pin #1
Concrete Pad
(2'x2'x4")
Pin #6
Pin #2
Pin #3
Pin #4
Pin #5Arc-1 (B-1)
I-32
I-33
I-34
Arc-2 (B-2)
Arc-3 (B-3)
Arc-4 (B-4)
Pin #7
Pin #9
Pin #8
Pin #10
Pin #11
Pin #12
Pin #16
Pin #13
Pin #14
Pin #15
Observed
Crack May 2017
REMEDIATION DESIGN OF LEVEE FLOODPLAIN FAILURE
WITHIN THE UPPER BROWNSVILLE LEVEE REACH
LOWER RIO GRANDE FLOOD CONTROL PROJECT
INCLINOMETER & LEVEE CRACKING LOCATION
ATTACHMENT
B
IBWC
SUMMARY REPORT OF INCLINOMETER READINGS
klowery Pencil klowery Oval klowery Oval klowery Oval klowery Oval klowery Pencil klowery Pencil klowery Pencil
ATTACHMENT C
PHOTOS OF NEW SURFACE TENSION CRACKS
C-1
Photo 1 - Looking South - New Surface Tension Crack 5.75 Feet East of ARC-1
Photo 2 - Looking North – New Surface Tension Crack East of Pins 8 through 11
C-2
Photo 3 - Looking South - New Surface Tension Crack East of Pins 8 and 9
Photo 4 - Looking North - New Surface Tension Crack East of Pins 14 and 15
| TM_Inclinometer Readings_IBWC Project_May 2017_revised.pdf |
| IBWC_Attacment A_5-10-17.pdf |
| Arc-1_inc |
| Arc-1_cum |
| Arc-2_inc |
| Arc-2cum |
| Arc-3_inc |
| Arc-3_cum |
| Arc-4_Inc |
| Arc-4_cum |
File details come from the government source that posted it. Updated .