00_31_32-1_3_A_1_g_20170320 Inclinometer Readings.pdf

PDF 910 KB Posted

Attached to
Upper Brownsville Levee
Solicitation number
191BWC25R0010
Issued by

About this file

This document is a technical memorandum from Arcadis U.S., Inc. reporting March 2017 slope inclinometer readings for the Upper Brownsville Levee Reach of the Lower Rio Grande Flood Control Project. The memo details measurements from four new inclinometers (ARC-1, ARC-2, ARC-3, and ARC-4) and three existing inclinometers (I-32, I-33, and I-34), which were installed to monitor potential ground movement and levee stability.

During the March 17, 2017 site visit, Arcadis observed tension cracks on the levee top near inclinometer ARC-1 and discovered new cracks south of an existing retaining wall. The inclinometer readings were compared against baseline measurements taken in June 2016, with the analysis showing minimal displacement. Specifically, ARC-1 exhibited a slight progressive movement between 28-30 feet depth, which corresponds with the interpreted Alluvium/Pleistocene interface. The other inclinometers (ARC-2, ARC-3, and ARC-4) showed no significant movement. The report includes detailed incremental and cumulative displacement plots for each inclinometer, with measurements taken using a Digitilt AT system.

View the file

Other files

File Type Posted
191BWC25R0010_Brownsville Specs_ 20250702_.pdf PDF
SF-30 Amendment 005_.pdf PDF
SF-30 Amendment 004.pdf PDF
Section L Source Selection Criteria _4.pdf PDF
Technical Specifications Brownsville 20250630.pdf PDF
SF-30 Amendment 003.pdf PDF
191BWC25R0010_Brownsville_Specs_20250620.pdf PDF
191BWC25R0010_Brownsville_Drawings_20250617.pdf PDF
Section L Source Selection Criteria _6_21_25.pdf PDF
SF-30 Amendment 002.pdf PDF
191BWC25R0010 Brownsville Rev Dwgs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250605.pdf PDF
191BWC25R0010 Brownsville Specs 20250530.pdf PDF
SF-30 Amendment 001.pdf PDF
USIBWC Amendment 4 -D5_27_25.pdf PDF
USIBWC Amendment 3- D5-24-25.pdf PDF
USIBWC Amendment 2- D5-19-23.pdf PDF
Section L Source Selection Criteria _3.pdf PDF
Section L Source Selection Criteria (2).pdf PDF
REDUCED Geotech Donna Pump to Brownsville Raba Kistner.pdf PDF
R Upper Brownsville Levee and Floodplain Failure DDR Redacted_REDUCED.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI (2).pdf PDF
USIBWC Amendment 1- D5-13-25.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI.pdf PDF
Reduced Size_ Geotech Donna Pump to Brownsville SandB.pdf PDF
Report of Subsurface Exploration Truck Lane Improvements Gateway Inl Bridge.pdf PDF
191BWC24R0010 Brownsville Drawings 20240419 FS.pdf PDF
SOLICITATION Upper Brownsville Levee_E_191BWC25R0010_.pdf PDF
Upper Brownsville Levee E-191BWC25R0010_.pdf PDF
Section L Source Selection Criteria.pdf PDF
191BWC25R0010 Brownsville Specs 20250115___.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts- REDUCED.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts.pdf PDF
00_31_32-1_3_A_1_m_20200716 Inclinometer Readings.pdf PDF
00_31_19-1_4_C_04783-000-00 RGBPP River Revetment at Fort Brown 1950-04-04.pdf PDF
WD_TX_20250003-01-03-2025.pdf PDF
00_31_32-1_3_A_1_c_20161031 Inclinometer Readings.pdf PDF
00_31_32-1_3_C_4_20070928 Geotech Donna Pump to Brownsville Boreholes SandB.pdf PDF
Attachment_Docs_List.pdf PDF
00_31_32-1_3_A_1_l_20200403 Inclinometer Readings.pdf PDF
191BWC25R0010 Brownsville Specs 20250115.pdf PDF
191BWC15R0010 Past Performance Questionnaire.pdf PDF
00_31_32-1_3_A_1_h_20170412 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_d_20161118 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_f_20170215 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_i_20170519 Inclinometer Readings.pdf PDF
IBWC_Form_245C_Performance_of_Work_Contractor.pdf PDF
Client_Authorization_Letter.docx DOCX document
00_31_19-1_4_A_2_201205 Upper Brownsville Levee Design Report TT REDACTED.pdf PDF
00_31_32-1_3_A_1_k_20170718 Inclinometer Readings.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Arcadis U.S., Inc.

10352 Plaza Americana Drive

Baton Rouge

Louisiana 70816

Tel 225 292 1004

Fax 225 218 9677

Page:

1/4

MEMO

To:

Edgar Iniguez Contracting Officer Representative

IBWC

Copies:

Padinare Unnikrishna (USIBWC) Armando Flores (Arcadis)

From:

Kirk Lowery, P.E.

Date: Arcadis Project No.:

March 20, 2017 LA003315.0000

Subject:

March 2017 Summary Report of Inclinometer Readings Remediation Design of Levee Floodplain Failure within the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project – IBM15D0001 – IBM15T0015

1. Introduction

Arcadis U.S., Inc. (Arcadis), is pleased to submit this summary technical memorandum including data charts of the slope inclinometer readings at the IBWC site. The baseline readings for the new inclinometers, ARC- 1, ARC-2, ARC-3 and ARC-4, were taken in June 2016 and the eighth set of readings were measured on March 17, 2017. These inclinometers will be measured every month until early July of 2017.

Exact readings for the existing inclinometers, I-32, I-33 and I-34, were not made when Arcadis visited the site March 17, 2017. However, the probe was placed in the inclinometer casings and the depth at which it would not pass was recorded. Arcadis measured the depth range in which the inclinometer probe could not pass through the constricted area of the pipe and are as follows:

I-32 (Top of the Levee): Depth Range: 32 feet

I-33 (Toe of the Levee): Depth Range: 38 feet to 39 feet

I-34 (Below Toe of Levee): Depth Range: 30 feet to 31 feet

In this month’s visit to the IBWC site, tension cracks were observed on top of the levee near inclinometer ARC-1 and new cracks were discovered south of the existing retaining wall in two sections as shown in Attachment B. At the known surface cracks near ARC-1, there was no displacement with respect to the

2/4

MEMO

February 8, 2017 measurements for Pin 1 through Pin 6. For the two new cracks that were observed during this month’s visit, Arcadis installed ten additional pin flags along the two cracks to obtain initial measurements. These pin flags mentioned above will be used as a reference to measure over the next four months to observe if the cracks widen or extend either south or north. Table 1 summarized the pin flags location along the cracks.

Table 1. Pin Flag Locations

Pin Flag No. Pin Location

14'-4" from center of inclinometer ARC-1 (southern edge of crack).

2 and 3 11' from center of inclinometer ARC-1.

10 and 1/16" between the two pin flags.

4 and 5 6' from center of inclinometer ARC-1.

7 and 15/32" between the two pin flags.

6 6 and 1/16" from wood frame edge of the concrete pad.

GPS Coordinates N25.897884°, W97.496458° (northern edge of crack)

8 and 9 South 8’ from Pin 7.

11.5" between the two pin flags.

10 and 11 South 23’ from Pin 7.

14.0" between the two pin flags.

12 South 35’ from Pin 7.

GPS Coordinates N25.897672°, W97.496342° (northern edge of crack)

14 and 15 South 4’ from Pin 13.

15.38" between the two pin flags.

16 South 8’ from Pin 13.

The readings for each inclinometer are reflected in the graphical displays provided in Attachment A.

Attachment A includes both incremental and cumulative displacement plots. Attachment B shows the inclinometer locations on a Google Map.

The incremental displacement plot compares the mean deviation data to the baseline survey file. This plot reveals the exact depth where displacements are actually occurring. The cumulative displacement is the sum of the displacements from the base of the borehole. This plot shows the change in the position of the casing from the first set of readings.

The A-axis charts in the displacement plots show displacements in the plane perpendicular to the levee while the B-axis charts show displacements in the plane parallel with the levee. A positive reading in the A-

3/4

MEMO

axis chart indicates displacement to the west heading toward the Rio Grande River, and a positive reading in the B-axis chart indicates displacement to the north heading toward the Gateway Bridge.

2. Digitilt AT Inclinometer Digitilt AT system was used to survey the inclinometers. The system components include an inclinometer probe, control cable, a Bluetooth reel and the Digitilt Reader app for certified Android-based tablet computer.

The equipment is shown in Figure 1.

Figure 1: Digitilt AT System Components.

3. March 2017 Inclinometers Assessment

The depth of the casing restriction for the USACE installed inclinometers, I-32, I-33 and I-34 appears to be the same depth as the previous readings.

Data collected on March 17, 2017 followed the same trend as the baseline reading measured in June 2016.

The monthly displacement plots recorded between July through March are presented in Attachment A. Data comparisons for each inclinometer are described below:

Inclinometer Arc-1: The base readings for inclinometer Arc-1 were collected on June 22, 2016. The Arc-1 cumulative plot in the A-Axis direction shows a slight progressive movement starting at depths between 28 and 30 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ December 2, 2016 Draft Geotechnical Assessment Report. This inclinometer will continue to be monitored on the normally scheduled frequency to determine if there is any increase in cumulative displacements. The displacement parallel to the levee are comparatively smaller and does not show any sign of movement in this month readings.

Inclinometer Arc-2: The base readings for inclinometer Arc-2 were collected on June 17, 2016. The Arc-2 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular

4/4

MEMO

to the levee nor on the plane parallel to the levee. Although the cumulative plot in the A-Axis direction shows a slight displacement at depths between 40 and 42 feet, this displacement is not progressive. This displacement could have been caused during the curing of the grout or some other environmental factor after the initial reading.

Inclinometer Arc-3: The base readings for inclinometer Arc-3 were collected on June 17, 2016. The Arc-3 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.

Inclinometer Arc-4: The base readings for inclinometer Arc-4 were collected on June 22, 2016. The Arc-4 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.

ATTACHMENTS:

A – Inclinometer Plots B – Inclinometer Location Map

ATTACHMENT A

INCLINOMETER PLOTS

IBWC Arc-1 A - Axis

6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM

8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM

10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM

12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM

3/17/2017 12:20:09 PM

D ep th in

F ee t

Incremental Displacement (in) -2 -1 0 1 2

IBWC Arc-1 B - Axis

6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM

8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM

10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM

12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM

3/17/2017 12:20:09 PM

D ep th in

F ee t

Incremental Displacement (in) -2 -1 0 1 2

IBWC Arc-1 A - Axis

6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM

8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM

10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM

12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM

3/17/2017 12:20:09 PM

D ep th in

F ee t

Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2

IBWC Arc-1 B - Axis

6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM

8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM

10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM

12/22/2016 3:53:53 PM 2/8/2017 9:25:00 AM

3/17/2017 12:20:09 PM

D ep th in

F ee t

Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2

IBWC Arc-2 A - Axis

6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM

8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM

10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM

12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM

3/17/2017 11:58:39 AM

D ep th in

F ee t

Incremental Displacement (in) -2 -1 0 1 2

IBWC Arc-2 B - Axis

6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM

8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM

10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM

12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM

3/17/2017 11:58:39 AM

D ep th in

F ee t

IBWC Arc-2 A - Axis

6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM

8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM

10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM

12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM

3/17/2017 11:58:39 AM

D ep th in

F ee t

Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2

IBWC Arc-2 B - Axis

6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM

8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM

10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM

12/22/2016 4:18:54 PM 2/8/2017 9:52:21 AM

3/17/2017 11:58:39 AM

D ep th in

F ee t

IBWC Arc-3 A - Axis

6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM

8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM

10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM

12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM

3/17/2017 11:40:50 AM

D ep th in

F ee t

Incremental Displacement (in) -2 -1 0 1 2

IBWC Arc-3 B - Axis

6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM

8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM

10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM

12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM

3/17/2017 11:40:50 AM

D ep th in

F ee t

IBWC Arc-3 A - Axis

6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM

8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM

10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM

12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM

3/17/2017 11:40:50 AM

D ep th in

F ee t

Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2

IBWC Arc-3 B - Axis

6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM

8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM

10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM

12/22/2016 4:38:15 PM 2/8/2017 10:12:24 AM

3/17/2017 11:40:50 AM

D ep th in

F ee t

IBWC Arc-4 A - Axis

6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM

8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM

10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM

12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM

3/17/2017 11:22:03 AM

D ep th in

F ee t

Incremental Displacement (in) -2 -1 0 1 2

IBWC Arc-4 B - Axis

6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM

8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM

10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM

12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM

3/17/2017 11:22:03 AM

D ep th in

F ee t

IBWC Arc-4 A - Axis

6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM

8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM

10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM

12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM

3/17/2017 11:22:03 AM

D ep th in

F ee t

Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2

IBWC Arc-4 B - Axis

6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM

8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM

10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM

12/22/2016 5:00:01 PM 2/8/2017 10:34:24 AM

3/17/2017 11:22:03 AM

D ep th in

F ee t

ATTACHMENT B

INCLINOMETER LOCATION MAP

Pin #1

Concrete Pad

(2'x2'x4")

Pin #6

Pin #2

Pin #3

Pin #4

Pin #5Arc-1 (B-1)

I-32

I-33

I-34

Arc-2 (B-2)

Arc-3 (B-3)

Arc-4 (B-4)

Pin #7

Pin #9

Pin #8

Pin #10

Pin #11

Pin #12

Pin #16

Pin #13

Pin #14

Pin #15

REMEDIATION DESIGN OF LEVEE FLOODPLAIN FAILURE

WITHIN THE UPPER BROWNSVILLE LEVEE REACH

LOWER RIO GRANDE FLOOD CONTROL PROJECT

INCLINOMETER & LEVEE CRACKING LOCATION

ATTACHMENT

B

IBWC

SUMMARY REPORT OF INCLINOMETER READINGS

TM_Inclinometer Readings_IBWC Project_March 2017.pdf
IBWC_Attachment A_3-20-17.pdf
Arc-1_Inc
Arc-1_Cum
Arc-2_Inc
Arc-2_Cum
Arc-3_Inc
Arc-3_Cum
Arc-4_Inc
Arc-4_Cum

File details come from the government source that posted it. Updated .