This document is a technical memorandum from Arcadis U.S., Inc. detailing the July 2020 summary report of inclinometer readings for the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project. The report covers measurements taken from four inclinometers (ARC-1, ARC-2, ARC-3, and ARC-4) installed at different locations along the levee, with baseline readings originally taken in June 2016 and the final set of readings measured on July 10, 2020.

The analysis reveals progressive but slow ground displacement, particularly for inclinometers ARC-1, ARC-2, and ARC-3, with movements primarily toward the Rio Grande. Specifically, inclinometer ARC-1 showed a 0.19-inch displacement towards the Rio Grande at a depth of 28 feet, while ARC-2 demonstrated 0.08 inches of displacement at a depth of 40 feet. The displacements are attributed to fluctuations in the Rio Grande water level and are tracked using incremental and cumulative displacement plots. The report notes that USACE inclinometers (I-32, I-33, and I-34) were not measured due to potential probe obstruction from previous soil movement.

View the file

Other files

File Type Posted
SF-30 Amendment 005_.pdf PDF
191BWC25R0010_Brownsville Specs_ 20250702_.pdf PDF
SF-30 Amendment 004.pdf PDF
Section L Source Selection Criteria _4.pdf PDF
191BWC25R0010_Brownsville_Specs_20250620.pdf PDF
SF-30 Amendment 003.pdf PDF
191BWC25R0010_Brownsville_Drawings_20250617.pdf PDF
Section L Source Selection Criteria _6_21_25.pdf PDF
SF-30 Amendment 002.pdf PDF
191BWC25R0010 Brownsville Specs 20250530.pdf PDF
SF-30 Amendment 001.pdf PDF
Section L Source Selection Criteria _3.pdf PDF
R Upper Brownsville Levee and Floodplain Failure DDR Redacted_REDUCED.pdf PDF
REDUCED Geotech Donna Pump to Brownsville Raba Kistner.pdf PDF
USIBWC Amendment 1- D5-13-25.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI (2).pdf PDF
Reduced Size_ Geotech Donna Pump to Brownsville SandB.pdf PDF
Report of Subsurface Exploration Truck Lane Improvements Gateway Inl Bridge.pdf PDF
Report of Subsurface Exploration Intl Bridge PSI.pdf PDF
191BWC24R0010 Brownsville Drawings 20240419 FS.pdf PDF
SOLICITATION Upper Brownsville Levee_E_191BWC25R0010_.pdf PDF
Upper Brownsville Levee E-191BWC25R0010_.pdf PDF
Section L Source Selection Criteria.pdf PDF
191BWC25R0010 Brownsville Specs 20250115___.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts.pdf PDF
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts- REDUCED.pdf PDF
00_31_32-1_3_C_4_20070928 Geotech Donna Pump to Brownsville Boreholes SandB.pdf PDF
191BWC25R0010 Brownsville Specs 20250115.pdf PDF
IBWC_Form_245C_Performance_of_Work_Contractor.pdf PDF
Client_Authorization_Letter.docx DOCX document
00_31_32-1_3_A_1_f_20170215 Inclinometer Readings.pdf PDF
00_31_19-1_4_A_2_201205 Upper Brownsville Levee Design Report TT REDACTED.pdf PDF
00_31_19-1_4_C_04783-000-00 RGBPP River Revetment at Fort Brown 1950-04-04.pdf PDF
191BWC15R0010 Past Performance Questionnaire.pdf PDF
00_31_32-1_3_A_1_l_20200403 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_i_20170519 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_d_20161118 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_k_20170718 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_h_20170412 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_g_20170320 Inclinometer Readings.pdf PDF
00_31_32-1_3_C_3_20070928 Geotech Donna Pump to Brownsville SandB.pdf PDF
00_31_43-1_5_A_20230906 USACE 404 SWG-2023-00309 NWP.pdf PDF
WD_TX_20250003-01-03-2025.pdf PDF
00_31_32-1_3_B_20150713 ERDC Report of Investigation.pdf PDF
00_31_32-1_3_A_1_j_20170621 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_e_20170105 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_c_20161031 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_a_20160829 Inclinometer Readings.pdf PDF
00_31_32-1_3_A_1_b_20160926 Inclinometer Readings.pdf PDF
Upper Brownsville Levee and Floodplain F-191BWC25R0010_.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Arcadis U.S., Inc.

10352 Plaza Americana Drive

Baton Rouge

Louisiana 70816

Tel 225 292 1004

Fax 225 218 9677

Page:

1/4

MEMO

To:

Jose Vela

Contracting Officer Representative

IBWC

Copies:

Padinare Unnikrishna (USIBWC) Armando Flores (Arcadis)

From:

Kirk Lowery, P.E.

Date: Arcadis Project No.:

July 16, 2020 LA003315.0000

Subject:

July 2020 Summary Report of Inclinometer Readings

Remediation Design of Levee Floodplain Failure within the

Upper Brownsville Levee Reach Lower Rio Grande Flood

Control Project – IBM15D0001 – IBM15T0015

1. Introduction

Arcadis U.S., Inc. (Arcadis), is pleased to submit this summary technical memorandum including data charts of the slope inclinometer readings at the IBWC site. The baseline readings for the new inclinometers, ARC- 1, ARC-2, ARC-3 and ARC-4, were taken in June 2016 and the twelfth set of readings were measured on July 10, 2020 and ARC-1 was re-read on July 13, 2020. Under the current scope of work, this set of readings will be the last measurement to be taken for these inclinometers.

Readings for the United States Corps of Engineers’ (USACE) inclinometers, I-32, I-33 and I-34, were not taken for fear of getting the inclinometer probe stuck in the already constricted areas of the pipe due to previous soil movement.

As noted in the March report, several pins that were installed June 14, 2017 have been removed. The removed pins were predominantly on top of the levee near inclinometer ARC-1 and south of the existing retaining wall. It is assumed that pins were removed by active traffic on the levee roadway and by grass mowing activities. Attachment C shows photos of the top of the levee where tension cracks were present in July 2017.

2/4

MEMO

The readings for each inclinometer are reflected in the graphical displays provided in Attachment A.

Attachment A includes both incremental and cumulative displacement plots. Attachment B shows the inclinometer locations on a Google Map.

The incremental displacement plot compares the mean deviation data to the baseline survey file. This plot reveals the exact depth where displacements are actually occurring. The cumulative displacement is the sum of the displacements from the base of the borehole. This plot shows the change in the position of the casing from the first set of readings.

The A-axis charts in the displacement plots show displacements in the plane perpendicular to the levee while the B-axis charts show displacements in the plane parallel with the levee. A positive reading in the A-axis chart indicates displacement to the west heading toward the Rio Grande, and a positive reading in the B-axis chart indicates displacement to the north heading toward the Gateway Bridge.

2. Digitilt AT Inclinometer

Digitilt AT system was used to survey the inclinometers. The system components include an inclinometer probe, control cable, a Bluetooth reel and the Digitilt Reader app for certified Android-based tablet computer.

The equipment is shown in Figure 1.

Figure 1: Digitilt AT System Components.

3. July 2020 Inclinometers Assessment

Previous readings of the inclinometers were repeated with specific Digitilt equipment that since the March reading was damaged. The readings made this month were made with different equipment then previously used. As such the readings are slightly different and correcting the new readings using the equipment’s calibration data did not provide meaningful corrections. What is provided in Attachment A is the data collected on July 10th with the new equipment without calibration. For the most part as shown in Attachment

3/4

MEMO

A, the incremental readings appear similar to previous readings and the cumulative readings are different especially beneath depths of 40 feet. After reviewing the cumulative readings, a second reading at ARC-1 was taken on July 13th to compare with the July 10th reading to help ensure the July 10th readings from the new equipment was accurate. Attachment D presents the cumulative print out of ARC-1 which shows the two readings were virtually identical.

The data collected on July 10, 2020 appears to follow the same trend as the readings measured in March 2020. The incremental and cumulative displacement plots recorded between September 2016 through July 2020 are presented in Attachment A. Data comparisons for each inclinometer are described below:

Inclinometer ARC-1: The base readings for inclinometer ARC-1 were collected on June 22, 2016. The ARC- 1 cumulative plot in the A-Axis direction shows a slight progressive movement starting at depths between 28 and 30 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ July 31, 2017 Final Geotechnical Assessment Report. After reviewing the cumulative displacement plots, there was a slight increase in displacement between the dates of September 2016 and March 2017. After March 2017, the displacement towards the Rio Grande (A-Axis) started to increase at a slow rate. Comparing the measurements taken in July 2017 to July 2020, the displacement is 0.19 inch towards the Rio Grande (A-Axis) at a depth of 28 feet. The overall displacement at a depth of 28 feet is

0.35 inch.

The displacement parallel to the levee does not show any sign of movement in this month’s readings.

Inclinometer Arc-2: The base readings for inclinometer ARC-2 were collected on June 17, 2016. The ARC-2 cumulative displacement plot in the A-Axis direction shows displacement between the depths of 38 feet to 40 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ July 31, 2017 Final Geotechnical Assessment Report. The cumulative displacement plots show a slight increase in displacement in September 2016 and a decrease in movement in December 2016. After December 2016, the movement towards the Rio Grande (A-Axis) started to increase at a slow rate. Comparing the measurements taken in July 2017 to July 2020, the displacement is 0.08 inches towards the Rio Grande (A-Axis) at a depth of 40 feet. The overall displacement at a depth of 40 feet is 0.25 inch.

The displacement parallel to the levee does not show any sign of movement in this month’s readings.

Inclinometer ARC-3: The base readings for inclinometer ARC-3 were collected on June 17, 2016. The ARC- 3 cumulative displacement plot in the A-Axis direction shows displacement between the depths of 36 feet to 38 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ July 31, 2017 Final Geotechnical Assessment Report. Previous readings showed less than 0.1 inch movement at this depth that now shows an overall displacement of 0.15 inch.

The displacement parallel to the levee does not show any sign of movement in this month’s readings.

Inclinometer ARC-4: The base readings for inclinometer ARC-4 were collected on June 22, 2016. The ARC- 4 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.

After reviewing the cumulative displacement plots in Attachment A, the readings exhibit increasing displacement towards the Rio Grande (A-Axis direction) for inclinometer ARC-1. The displacement for these inclinometers demonstrates a trend that will increase over time due to fluctuations of the water level in the Rio Grande. After critically reviewing the cumulative displacement plots, the graphical displays in Attachment A shows that there is an increase in movement towards the Rio Grande (A-Axis direction) for the

4/4

MEMO

inclinometers ARC-1, ARC-2, and ARC-3. The displacement for these inclinometers is progressive but moving at a very slow rate.

ATTACHMENTS:

A – Inclinometer Plots B – Inclinometer Location Map C – Site Photos D – Cumulative Plots of Inclinometer ARC-1

ATTACHMENT A

INCLINOMETER PLOTS

IBWC Arc-1 A - Axis

6/22/2016 11:22:30 AM 6/14/2017 12:51:51 PM

7/12/2017 9:22:17 AM 3/31/2020 1:00:00 PM

7/10/2020 2:48:20 PM

D e p th in F e e t

Incremental Displacement (in)

-2 -1 0 1 2

IBWC Arc-1 B - Axis

6/22/2016 11:22:30 AM 6/14/2017 12:51:51 PM

7/12/2017 9:22:17 AM 3/31/2020 1:00:00 PM

7/10/2020 2:48:20 PM

D e p th in F e e t

Incremental Displacement (in)

-2 -1 0 1 2

IBWC Arc-1 A - Axis

6/22/2016 11:22:30 AM 6/14/2017 12:51:51 PM

7/12/2017 9:22:17 AM 3/31/2020 1:00:00 PM

7/10/2020 2:48:20 PM

D e p th in F e e t

Cumulative Displacement (in)

-2 -1 0 1 2

IBWC Arc-1 B - Axis

6/22/2016 11:22:30 AM 6/14/2017 12:51:51 PM

7/12/2017 9:22:17 AM 3/31/2020 1:00:00 PM

7/10/2020 2:48:20 PM

D e p th in F e e t

Cumulative Displacement (in)

IBWC Arc-2 A - Axis

6/17/2016 6:27:13 PM 6/14/2017 1:13:37 PM

7/12/2017 8:38:59 AM 3/31/2020 12:15:00 PM

7/10/2020 2:25:19 PM

D e p th in F e e t

Incremental Displacement (in)

-2 -1 0 1 2

IBWC Arc-2 B - Axis

6/17/2016 6:27:13 PM 6/14/2017 1:13:37 PM

7/12/2017 8:38:59 AM 3/31/2020 12:15:00 PM

7/10/2020 2:25:19 PM

D e p th in F e e t

IBWC Arc-2 A - Axis

6/17/2016 6:27:13 PM 6/14/2017 1:13:37 PM

7/12/2017 8:38:59 AM 3/31/2020 12:15:00 PM

7/10/2020 2:25:19 PM

D e p th in F e e t

Cumulative Displacement (in)

-2 -1 0 1 2

IBWC Arc-2 B - Axis

6/17/2016 6:27:13 PM 6/14/2017 1:13:37 PM

7/12/2017 8:38:59 AM 3/31/2020 12:15:00 PM

7/10/2020 2:25:19 PM

D e p th in F e e t

IBWC Arc-3 A - Axis

6/17/2016 7:05:22 PM 6/15/2017 3:53:45 PM

7/12/2017 8:22:33 AM 3/31/2020 11:00:00 AM

7/10/2020 2:01:14 PM

D e p th in F e e t

Incremental Displacement (in)

-2 -1 0 1 2

IBWC Arc-3 B - Axis

6/17/2016 7:05:22 PM 6/15/2017 3:53:45 PM

7/12/2017 8:22:33 AM 3/31/2020 11:00:00 AM

7/10/2020 2:01:14 PM

D e p th in F e e t

IBWC Arc-3 A - Axis

6/17/2016 7:05:22 PM 6/15/2017 3:53:45 PM

7/12/2017 8:22:33 AM 3/31/2020 11:00:00 AM

7/10/2020 2:01:14 PM

D e p th in F e e t

Cumulative Displacement (in)

-2 -1 0 1 2

IBWC Arc-3 B - Axis

6/17/2016 7:05:22 PM 6/15/2017 3:53:45 PM

7/12/2017 8:22:33 AM 3/31/2020 11:00:00 AM

7/10/2020 2:01:14 PM

D e p th in F e e t

IBWC Arc-4 A - Axis

6/22/2016 10:48:04 AM 6/14/2017 1:48:14 PM

7/12/2017 8:06:31 AM 3/31/2020 9:30:00 AM

7/10/2020 1:39:33 PM

D e p th in F e e t

Incremental Displacement (in)

-2 -1 0 1 2

IBWC Arc-4 B - Axis

6/22/2016 10:48:04 AM 6/14/2017 1:48:14 PM

7/12/2017 8:06:31 AM 3/31/2020 9:30:00 AM

7/10/2020 1:39:33 PM

D e p th in F e e t

IBWC Arc-4 A - Axis

6/22/2016 10:48:04 AM 6/14/2017 1:48:14 PM

7/12/2017 8:06:31 AM 3/31/2020 9:30:00 AM

7/10/2020 1:39:33 PM

D e p th in F e e t

Cumulative Displacement (in)

-2 -1 0 1 2

IBWC Arc-4 B - Axis

6/22/2016 10:48:04 AM 6/14/2017 1:48:14 PM

7/12/2017 8:06:31 AM 3/31/2020 9:30:00 AM

7/10/2020 1:39:33 PM

D e p th in F e e t

ATTACHMENT B

INCLINOMETER LOCATION MAP

N

O

R

T

H

REMEDIATION DESIGN OF LEVEE FLOODPLAIN FAILURE

WITHIN THE UPPER BROWNSVILLE LEVEE REACH

LOWER RIO GRANDE FLOOD CONTROL PROJECT

INCLINOMETER LOCATION MAP

D B

R

P

E T

R I E

S

B

E L

D

S

O T

H O

N

M

N

P

I C

O p t

M R e q d

T

O p t

Y R

O p t O

N

O

F F

R

E F

C U s e r s a f l o r e s D e s k t o p I n c l i n o m e t e r C

A D

F i l e I B

W C

I n c l i n o m e t e r

L o c a t i o n

M a p d w g

Y

O U

T

L

O C

A T

I O

N

M

V

E D

C A

D V

E R

T

C

H

G

E S

E T

U P

O

T S

T Y

L E

T A

B L

E

O

T T

E D

B

Y

F

L O

R E

S

A

R M

A N

D O

ATTACHMENT

B

IBWC

SUMMARY REPORT OF INCLINOMETER READINGS

RIO GRANDE

GATEWAY BRIDGE

ARC-1 (B-1)

ARC-2 (B-2)

ARC-3 (B-3)

ARC-4 (B-4)

00 50' 100'

SCALE: 1/2" = 1'

LEGEND:

B-1: 100 FEET BOREHOLE DRILLED AT THE TOP OF THE LEVEE B-3: 80 FEET BOREHOLE DRILLED AT THE EDGE OF THE RIVERBANK

ARC-1: 98 FEET INCLINOMETER CASING INSTALLED WITHIN BORING B-1 ARC-3: 78 FEET INCLINOMETER CASING INSTALLED WITHIN BORING B-3

B-2: 80 FEET BOREHOLE DRILLED AT THE TOE OF THE LEVEE B-4: 80 FEET BOREHOLE DRILLED NEAR THE NORTH ABUTMENT OF THE GATEWAY BRIDGE

ARC-2: 78 FEET INCLINOMETER CASING INSTALLED WITHIN BORING B-2 ARC-4: 78 FEET INCLINOMETER CASING INSTALLED WITHIN BORING B-4

ATTACHMENT C

SITE PHOTOS

C-1

Photo 1 – Looking North – Top of the Levee.

Photo 2 – Looking North – Top of the Levee.

C-2

Photo 3 – Looking South – Top of the Levee.

Photo 4 – Looking South – Top of the Levee.

C-3

Photo 5 – Looking South – Top of the Levee.

ATTACHMENT D

CUMULATIVE PLOTS OF INCLINOMETER ARC-1

IBWC Arc-1 A

12/31/1969 7/12/2017 3/31/2020

7/10/2020 7/13/2020

D e p th in F e e t

Profile Change in Inches

0 0.5 1 1.5

IBWC Arc-1 B

12/31/1969 7/12/2017 3/31/2020

7/10/2020 7/13/2020

D e p th in F e e t

Profile Change in Inches

-1 -0.5 0 0.5 1 klowery Text Box Cumulative Displacement

Sheets and Views
Location Map

File details come from the government source that posted it. Updated .