This document is a technical memorandum from Arcadis U.S., Inc. dated January 5, 2017, presenting a summary report of inclinometer readings for the Remediation Design of Levee Floodplain Failure within the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project. The report covers measurements taken from six inclinometers (four new: Arc-1 through Arc-4, and three existing: I-32, I-33, and I-34) between June and December 2016, using a Digitilt AT system to monitor ground displacement and potential levee movement.
The inclinometer readings were collected monthly, with baseline measurements taken in June 2016 and the sixth set of readings on December 22, 2016. While most new inclinometers showed minimal displacement, the Arc-1 inclinometer exhibited a slight progressive movement starting at depths between 28 and 30 feet, corresponding to the interpreted Alluvium/Pleistocene interface. The existing inclinometers (I-32, I-33, and I-34) could not be fully measured due to probe passage difficulties, with restricted depth ranges noted for each. The report recommends continued monitoring of the Arc-1 inclinometer to track any potential increase in cumulative displacements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Arcadis U.S., Inc.
10352 Plaza Americana Drive
Baton Rouge
Louisiana 70816
Tel 225 292 1004
Fax 225 218 9677
Page:
1/3
MEMO
Copies:
Padinare Unnikrishna (USIBWC) Armando Flores (Arcadis)
Arcadis Project No.:
LA003315.0000
To:
Edgar Iniguez Contracting Officer Representative
IBWC
From:
Kirk Lowery, P.E.
Date:
January 5, 2017
Subject:
December 2016 Summary Report of Inclinometer Readings Remediation Design of Levee Floodplain Failure within the Upper Brownsville Levee Reach Lower Rio Grande Flood Control Project – IBM15D0001 – IBM15T0015
1. Introduction
Arcadis U.S., Inc. (Arcadis), is pleased to submit this summary technical memorandum including data charts of the slope inclinometer readings at the IBWC site. The baseline readings for the new inclinometers, Arc- 1, Arc-2, Arc-3 and Arc-4, were taken in June 2016 and the sixth set of readings were measured on December 22, 2016. These inclinometers will be measured every month until June of 2017.
Readings for the existing inclinometers, I-32, I-33 and I-34, were not made when Arcadis visited the site December 22, 2016. During the June readings, the inclinometer probe had difficulty passing certain depths and when Arcadis passed those depths retrieving the inclinometer probe was problematic. Arcadis plans to periodically read these inclinometers, but not to attempt to pass the probe through the constricted area of the pipe and possibly lose/abandon the probe. Since the readings could not be measured for the existing inclinometers, in December 2016, Arcadis measured the depth range in which the inclinometer probe could not pass through the constricted area of the pipe and are as follows:
I-32 (Top of the Levee): Depth Range: 32 feet
I-33 (Toe of the Levee): Depth Range: 38 feet to 39 feet
I-34 (Below Toe of Levee): Depth Range: 30 feet to 31 feet
Page:
2/3
MEMO
The readings for each inclinometer are reflected in the graphical displays provided in Attachment A.
Attachment A includes both incremental and cumulative displacement plots. Attachment B shows the inclinometer locations on a Google Map.
The incremental displacement plot compares the mean deviation data to the baseline survey file. This plot reveals the exact depth where displacements are actually occurring. The cumulative displacement is the sum of the displacements from the base of the borehole. This plot shows the change in the position of the casing from the first set of readings.
The A-axis charts in the displacement plots show displacements in the plane perpendicular to the levee while the B-axis charts show displacements in the plane parallel with the levee. A positive reading in the A-axis chart indicates displacement to the west heading toward the Rio Grande River, and a positive reading in the B-axis chart indicates displacement to the north heading toward the Gateway Bridge.
2. Digitilt AT Inclinometer Digitilt AT system was used to survey the inclinometers. The system components include an inclinometer probe, control cable, a Bluetooth reel and the Digitilt Reader app for certified Android-based tablet computer.
The equipment is shown in Figure 1.
Figure 1: Digitilt AT System Components.
3. December 2016 Inclinometers Assessment
The depth of the casing restriction for the USACE installed inclinometers, I-32, I-33 and I-34 appears to be the same depth as the previous readings.
Data collected on December 22, 2016 followed the same trend as the baseline reading measured in June 2016. The monthly displacement plots recorded between July through December are presented in Attachment A. Data comparisons for each inclinometer are described below:
Page:
3/3
MEMO
Inclinometer Arc-1: The base readings for inclinometer Arc-1 were collected on June 22, 2016. The Arc-1 cumulative plot in the A-Axis direction shows a slight progressive movement starting at depths between 28 and 30 feet. This depth corresponds with the interpreted Alluvium/Pleistocene interface presented in Figure 2 of Arcadis’ December 2, 2016 Draft Geotechnical Assessment Report. This inclinometer will continue to be monitored on the normally scheduled frequency to determine if there is any increase in cumulative displacements.
Inclinometer Arc-2: The base readings for inclinometer Arc-2 were collected on June 17, 2016. The Arc-2 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee. Although the cumulative plot in the A-Axis direction shows a slight displacement at depths between 40 and 42 feet, this displacement is not progressive. This displacement could have been caused during the curing of the grout or some other environmental factor after the initial reading.
Inclinometer Arc-3: The base readings for inclinometer Arc-3 were collected on June 17, 2016. The Arc-3 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.
Inclinometer Arc-4: The base readings for inclinometer Arc-4 were collected on June 22, 2016. The Arc-4 cumulative and incremental displacement does not show any sign of movement on the plane perpendicular to the levee nor on the plane parallel to the levee.
ATTACHMENTS:
A – Inclinometer Plots B – Inclinometer Location Map
ATTACHMENT A
INCLINOMETER PLOTS
IBWC Arc-1 A - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-1 B - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-1 A - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-1 B - Axis
6/22/2016 11:22:30 AM 7/25/2016 3:17:20 PM
8/25/2016 1:34:40 PM 9/22/2016 1:35:22 PM
10/27/2016 2:18:50 PM 11/14/2016 1:34:00 PM
12/22/2016 3:53:53 PM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-2 A - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-2 B - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM
D e pt h in F e et
IBWC Arc-2 A - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-2 B - Axis
6/17/2016 6:27:13 PM 7/25/2016 3:57:11 PM
8/25/2016 2:02:22 PM 9/22/2016 2:05:40 PM
10/27/2016 2:44:45 PM 11/14/2016 1:57:25 PM
12/22/2016 4:18:54 PM
D e pt h in F e et
IBWC Arc-3 A - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-3 B - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM
D e pt h in F e et
IBWC Arc-3 A - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-3 B - Axis
6/17/2016 7:05:22 PM 7/25/2016 4:28:56 PM
8/25/2016 2:41:46 PM 9/22/2016 2:36:13 PM
10/27/2016 3:17:17 PM 11/14/2016 2:27:09 PM
12/22/2016 4:38:15 PM
D e pt h in F e et
IBWC Arc-4 A - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM
D e pt h in F e et
Incremental Displacement (in) -2 -1 0 1 2
IBWC Arc-4 B - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM
D e pt h in F e et
IBWC Arc-4 A - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM
D e pt h in F e et
Cumulative Displacement (in) -2 -1.5 -1 -0.5 0 0.5 1 1.5 2
IBWC Arc-4 B - Axis
6/22/2016 10:48:04 AM 7/25/2016 5:08:42 PM
8/25/2016 3:15:23 PM 9/22/2016 3:09:20 PM
10/27/2016 3:58:37 PM 11/14/2016 3:00:46 PM
12/22/2016 5:00:01 PM
D e pt h in F e et
ATTACHMENT B
INCLINOMETER LOCATION MAP
REMEDIATION DESIGN OF LEVEE FLOODPLAIN FAILURE
WITHIN THE UPPER BROWNSVILLE LEVEE REACH
LOWER RIO GRANDE FLOOD CONTROL PROJECT
INCLINOMETER LOCATION
ATTACHMENT
B
IBWC
DECEMBER 2016 SUMMARY REPORT OF INCLINOMETER READINGS
| TM_Inclinometer Readings_IBWC Project_December 2016.pdf |
| Attachment A_1-5-17.pdf |
| Arc-1_Inc |
| Arc-1_Cum |
| Arc-2_Inc |
| Arc-2_Cum |
| Arc-3_Inc |
| Arc-3_Cum |
| Arc-4_Inc |
| Arc-4_Cum |
File details come from the government source that posted it. Updated .