About this opportunity

The Oregon Department of Transportation (ODOT) is soliciting bids for the OR 140: Culvert Repair Project, located in Lake County, covering a 21.94-mile stretch of highway from milepost 73.09 to 95.031. This Invitation to Bid (ITB/Bid Solicitation No. S-73000-00013506) seeks a contractor to perform comprehensive culvert rehabilitation work, including constructing temporary water management facilities, cleaning and conducting CCTV inspections of culverts, and installing cured-in-place pipe (CIPP) liners at multiple locations on OR 140 and US 395. The project involves working with culverts ranging from 12" to 48" in diameter, with specific tasks including pipe installation, mainline video inspection, drainage marker placement, and streambed enhancement. Bidders must submit proposals through the OregonBuys eProcurement system by May 14, 2025, with a required substantial completion date of September 26, 2026, and a final completion date of October 3, 2026. Qualification requirements include registration with the Oregon Construction Contractors Board, compliance with prevailing wage rates, and adherence to Buy America provisions mandating that steel, iron, and manufactured products be produced in the United States.

The contract appears to have no specific set-aside designations for disadvantaged enterprises, but bidders must meet several key requirements, including providing performance and payment bonds each equal to 100% of the awarded contract price. Contractors must have a qualifying drug testing program and comply with non-discrimination laws. While no specific incumbent vendor is mentioned, the project involves working with existing highway infrastructure, focusing on culvert rehabilitation and water management. The bidding process includes first-tier subcontractor disclosure and requires adherence to recycled materials usage and state procurement regulations. Though the exact contract value is not explicitly stated in the documents, the comprehensive bid pricing form suggests a detailed, itemized approach to project costing, with line items covering mobilization, traffic control, pollution control, erosion management, and various culvert pipe installation and rehabilitation tasks. The project is funded through state resources and will be executed in BOLI Region 11, with a focus on infrastructure maintenance and environmental considerations.

Opportunity text

The purpose of this ITB is to establish a Contract for constructing temporary water management facilities, as needed, clean and CCTV culverts, and install CIPP liners at multiple locations on OR 82 for the benefit of ODOT.

Files

File Type Posted
00013506 Att C Bid Pricing Form.xlsx XLSX spreadsheet
00013506 Att A Revised Plans.pdf PDF
00013506 Att A Plans.pdf PDF
00013506 Invitation to Bid.docx DOCX document
00013506 Prelim Bid Results.xlsx XLSX spreadsheet
00013506 Att C Revised Bid Pricing Form.xlsx XLSX spreadsheet
00013506 Att B Special Provisions and Specifications.docx DOCX document
00013507 Prelim Bid Results.xlsx XLSX spreadsheet

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity