The file is a Preliminary Bid Results spreadsheet for the Oregon Department of Transportation (ODOT) OR 140: Culvert Repair Project, covering a 21.94-mile stretch of highway from milepost 73.09 to 95.031 in Lake County. The project solicits bids for comprehensive culvert rehabilitation work, including temporary water management facilities, CCTV culvert inspections, and cured-in-place pipe (CIPP) liner installations. Four contractors submitted bids: JR Carlon Corp, Whitaker Construction Company, LaDuke Construction LLC, and HP Civil Inc. The project requires substantial completion by September 26, 2026, with a final completion date of October 3, 2026, and bid submissions were due by May 14, 2025, through the OregonBuys eProcurement system.
The bid results show detailed pricing for 21 line items, with total bid prices ranging from $542,442.55 to $926,386.33 across the four bidders. The project involves culvert work with pipes ranging from 12" to 48" in diameter, including pipe installation, video inspection, drainage marker placement, and streambed enhancement. Contractors must be registered with the Oregon Construction Contractors Board, comply with prevailing wage rates, and adhere to Buy America provisions. The project requires performance and payment bonds each equal to 100% of the contract price, and contractors must have a qualifying drug testing program. Funding appears to be from state resources, with a focus on infrastructure maintenance and environmental considerations in BOLI Region 11.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00013506 Att C Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00013506 Att A Revised Plans.pdf | ||
| 00013506 Att C Revised Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00013507 Prelim Bid Results.xlsx | XLSX spreadsheet | |
| 00013506 Att B Special Provisions and Specifications.docx | DOCX document | |
| 00013506 Att A Plans.pdf | ||
| 00013506 Invitation to Bid.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| S-73000-00013506 | |||||||
| PRELIMINARY BID RESULTS | JR Carlon Corp | Whitaker Construction Company | LaDuke Construction LLC | HP Civil Inc. | |||
| Bid Item # | Description | Est | |||||
| QTY | UNIT | UNIT | |||||
| PRICE | TOTAL | ||||||
| PRICE | UNIT | ||||||
| PRICE | TOTAL | ||||||
| PRICE | UNIT | ||||||
| PRICE | TOTAL | ||||||
| PRICE | UNIT | ||||||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $60,750.00 | $ 60,750.00 | $142,000.00 | $ 142,000.00 | $176,700.00 | $ 176,700.00 | $ 92,638.630 | $ 92,638.63 |
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 39,501.00 | $ 39,501.00 | $ 41,900.00 | $ 41,900.00 | $ 54,320.00 | $ 54,320.00 | $ 155,000.000 | $ 155,000.00 |
| 3 | Portable Changeable Message Signs | 2 | EACH | $ 1,890.00 | $ 3,780.00 | $ 5,580.00 | $ 11,160.00 | $ 5,960.00 | $ 11,920.00 | $ 3,000.000 | $ 6,000.00 |
| 4 | Automated Flagger Assistance Device | 2 | EACH | $ 2,025.00 | $ 4,050.00 | $ 3,070.00 | $ 6,140.00 | $ 5,600.00 | $ 11,200.00 | $ 1,250.000 | $ 2,500.00 |
| 5 | Pollution Control Plan | 1 | LS | $ 450.00 | $ 450.00 | $ 2980.00 | $ 2,980.00 | $ 980.00 | $ 980.00 | $ 500.000 | $ 500.00 |
| 6 | Erosion Control | 1 | LS | $ 450.00 | $ 450.00 | $ 7,910.00 | $ 7,910.00 | $ 4,600.00 | $ 4,600.00 | $ 4,000.000 | $ 4,000.00 |
| 7 | Temporary Water Management, MP 95.03 | 1 | LS | $ 18,071.99 | $ 18,071.99 | $ 44,100.00 | $ 44,100.00 | $ 46,430.00 | $ 46,430.00 | $ 35,000.000 | $ 35,000.00 |
| 8 | 12 inch culvert Pipe, 5 ft depth | 10 | FOOT | $ 126.04 | $ 1,260.40 | $ 245.00 | $ 2,450.00 | $ 298.00 | $ 2,980.00 | $ 500.000 | $ 5,000.00 |
| 9 | 18 inch culvert Pipe, 5 ft depth | 45 | FOOT | $ 150.26 | $ 6,761.86 | $ 250.00 | $ 11,250.00 | $ 332.00 | $ 14,940.00 | $ 445.000 | $ 20,025.00 |
| 10 | 18 inch culvert Pipe, 10 ft depth | 20 | FOOT | $ 140.28 | $ 2,805.51 | $ 705.00 | $ 14,100.00 | $ 388.00 | $ 7,760.00 | $ 550.000 | $ 11,000.00 |
| 11 | 24 inch culvert Pipe, 5 ft depth | 20 | FOOT | $ 137.07 | $ 2,741.37 | $ 360.00 | $ 7,200.00 | $ 406.00 | $ 8,120.00 | $ 525.000 | $ 10,500.00 |
| 12 | connect to extg. Pipe | 6 | EACH | $ 150.00 | $ 900.00 | $ 355.00 | $ 2,130.00 | $ 1,300.00 | $ 7,800.00 | $ 1,200.000 | $ 7,200.00 |
| 13 | Rehabilitate 18" culvert | 406 | FOOT | $ 265.95 | $ 107,975.70 | $ 250.00 | $ 101,500.00 | $ 227.00 | $ 92,162.00 | $ 235.000 | $ 95,410.00 |
| 14 | Rehabilitate 24" culvert | 471 | FOOT | $ 297.00 | $ 139,887.00 | $ 290.00 | $ 136,590.00 | $ 260.00 | $ 122,460.00 | $ 425.000 | $ 200,175.00 |
| 15 | Rehabilitate 48" culvert | 170 | FOOT | $ 615.00 | $ 104,550.00 | $ 700.00 | $ 119,000.00 | $ 470.00 | $ 79,900.00 | $ 1,100.000 | $ 187,000.00 |
| 16 | Mainline Video Inspection | 1954 | FOOT | $ 12.60 | $ 24,620.40 | $ 2.50 | $ 4,885.00 | $ 3.00 | $ 5,862.00 | $ 10.050 | $ 19,637.70 |
| 17 | Culvert Drainage Markers, Type 1 | 13 | EACH | $ 250.00 | $ 3,250.00 | $ 230.00 | $ 2,990.00 | $ 228.00 | $ 2,964.00 | $ 200.000 | $ 2,600.00 |
| 18 | Culvert Drainage Markers, Type 2 | 12 | EACH | $ 250.00 | $ 3,000.00 | $ 230.00 | $ 2,760.00 | $ 187.00 | $ 2,244.00 | $ 200.000 | $ 2,400.00 |
| 19 | Streambed Enhancment | 1 | LS | $ 10,447.50 | $ 10,447.50 | $ 18,700.00 | $ 18,700.00 | $ 46,800.00 | $ 46,800.00 | $ 51,500.000 | $ 51,500.00 |
| 20 | Grade control structure | 1 | EACH | $ 6,739.81 | $ 6,739.81 | $ 1,000.00 | $ 1,000.00 | $ 11,800.00 | $ 11,800.00 | $ 15,000.000 | $ 15,000.00 |
| 21 | Fish Rocks, Type 2 | 6 | EACH | $ 75.00 | $ 450.00 | $ 545.00 | $ 3,270.00 | $ 1,240.00 | $ 7,440.00 | $ 550.000 | $ 3,300.00 |
| TOTAL | $ 542,442.55 | $ 684,015.00 | $ 719,382.00 | $ 926,386.33 |