Lakeland Avenue Drainage Improvements

Closed State & local contract opportunity Posted

Solicitation number
PE-66249-NONST-2027-000000117
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 25
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Valdosta, Georgia is requesting sealed bids for the Lakeland Avenue Drainage Improvements project (Project No. 26-07-715), with bids due September 24, 2026 at 10:00 AM and a mandatory pre-bid conference on September 8, 2026 at 10:00 AM.

The scope includes stormwater drainage improvements along approximately 2,000 linear feet of Lakeland Avenue from Melrose Drive to Barack Obama Boulevard: curb and gutter installation, storm pipe construction, sidewalk improvements, dredging of the existing One Mile Branch channel, construction of a 1.25-acre regional stormwater pond west of One Mile Branch, and construction of a 0.5-acre stormwater pond behind the Senior Center. The bid package contains a unit price schedule with 99 line items spanning mobilization, traffic control, survey work, utility adjustments, erosion control, clearing and demolition, grading, asphalt and concrete work, pipe installation, drainage structures, water and sewer systems, signage, fencing, and mailbox relocation. All work must comply with GDOT Standard Specifications for Construction of Transportation Systems (2021 edition), City of Valdosta Standard Specifications for Water and Sewer Construction, and City Land Development Regulations.

The contract term is 300 consecutive calendar days from the Notice to Proceed, with construction hours limited to 8:00 AM to 6:00 PM Monday through Friday and 9:00 AM to 4:00 PM Saturday. Liquidated damages are assessed at $250 per day for failure to complete work within the contract timeframe.

Bidders must submit a non-collusive affidavit, Georgia Security and Immigration Compliance affidavit, and a bid bond or certified check equal to five percent of the bid amount. Performance and Payment Bonds equal to 100 percent of the contract price are required unless the bid price is $25,000 or less. The contract will be awarded on a unit price basis with monthly payments based on actual quantities, with five percent retainage applied to all payments. Contractors must maintain a City of Valdosta Occupational Tax Certificate/Business License and provide comprehensive liability insurance with the City named as an additional insured, along with workers' compensation coverage. The City reserves the right to reject any or all bids and to adjust line item quantities to bring project costs within available funding.

Opportunity text

The Lakeland Avenue Drainage Improvement work consists of the following: Stormwater drainage improvements along Lakeland Avenue including curb and gutter, storm pipes and sidewalks; Dredging of the existing channel of One Mile Branch; Construction of a 1.25-acre regional stormwater pond to the west of One Mile Branch; Construction of a 0.5-acre stormwater pond behind the Senior Center

Files

File Type Posted
LakelandAveDrainageImp_BidDocs08272026.pdf PDF

On GovTribe