I405 MP 2. 88-2. 99 Kerby Entrance Ramp Pavement Repair

Closed State & local contract opportunity Posted

Solicitation number
S-73000-00017629
State
Oregon
Responses due

Opportunity facts

UNSPSC codes
Show all 25

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Department of Transportation is requesting competitive quotes for pavement repair on Interstate 405 at the Kerby Entrance Ramp (milepost 2.88–2.99) in Multnomah County under RFCQ S-73000-00017629, with quotes due August 13, 2026 through the OregonBuys eProcurement system. The contractor must hold a current State Construction Contractors Board license prior to submission; all subcontractors must be licensed before commencing work.

The scope encompasses a 2-inch grind-and-inlay operation across 739 linear feet on the southbound lane, including cold-plane pavement removal, tack coat application, Level 4 Dense Asphalt Concrete Pavement (PG 70-22ER 1/2 inch) with minimum 91% compaction of Maximum Aggregate Mixture Density, temporary and permanent pavement markings, and a comprehensive Traffic Control Plan. The contractor is responsible for all labor, materials, equipment, transportation, traffic control costs, erosion and sediment control, and environmental protection at no separate payment. Estimated bid items include mobilization (lump sum), temporary work-zone traffic control (lump sum), cold-plane removal (1,100 square yards), asphalt pavement (130 tons), and methyl methacrylate surface (700 linear feet); quantities are estimates and payment will be based on actual measured quantities.

Substantial completion is September 30, 2026; final completion is October 15, 2026. The work is subject to Oregon prevailing wage rates for Multnomah County (BOLI Region 2, effective July 5, 2026). Bid security of 10% of the total bid amount is required. The successful offeror must provide Performance and Payment Bonds each equal to the contract price and Commercial General Liability insurance of $1,000,000 per occurrence / $2,000,000 annual aggregate. Liquidated damages apply at $2,500 per calendar day for failure to achieve substantial completion and $500 per 15 minutes per lane for lane closures exceeding specified limits. Requests for clarification must be submitted no later than seven calendar days prior to the closing date. Award will be made to the responsible offeror with the lowest total price.

Opportunity text

The purpose of this RFCQ is to establish a Contract to complete pavement repair, including temporary and permanent pavement markings, traffic control for the benefit of ODOT. The work contemplated under the Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents.

Files

File Type Posted
Exhibit 5 - Specifications~22.pdf PDF
Attachment A Form A-2_Bid Pricing Form~2.xlsx XLSX spreadsheet
Attachment B - Sample Contract~13.docx DOCX document
00017629_RFCQ.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors